Exhibit_C_Form_H_Resumes_of_Key_Personnel_-_05.01.19.doc

DOC document 51 KB Posted

Attached to
TA-21 DP West Slabs D&D and Remediation Project
Solicitation number
RFP-0000300
Issued by

About this file

Exhibit C Form H Resumes of Key Personnel

View the file

Other files

File Type Posted
Exhibit_A_General_Conditions_Rev_0.doc DOC document
IMG_0015_TA21_150_basement.jpg JPG image
Exhibit_B_Special_Conditions_Rev_0_Draft.docx DOCX document
RFP-0000300_questions_log_-_6.12.19_-_Amendment_4.docx DOCX document
IMG_0018_TA21_150_basement.jpg JPG image
IMG_0016_TA21_150_basement.jpg JPG image
IMG_0014_TA21_150_basement.jpg JPG image
DB_NM190022_04-05-2019_NM22.pdf PDF
IMG_0008_TA21_150_basement.jpg JPG image
IMG_0017_TA21_150_basement.jpg JPG image
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_Amendment_4_-_6.13.19.docx DOCX document
IMG_0019_TA21_150_basement.jpg JPG image
Exhibit_H_TA_21_DP_West_Slabs_Final_with_signatures_-_Amendment_4_-_6.12.19.pdf PDF
EXHIBIT_L_Prime_Contract_Flow_Downs.docx DOCX document
IMG_0013_TA21_150_basement.jpg JPG image
RFP-0000300_questions_log_-_5.28.19_-_Amendment_3_FINAL.docx DOCX document
Exhibit_C_Form_D_Subcontract_Schedule_-_5.30.19__-_Amendment_3_FINAL.doc DOC document
Exhibit_F_Attachments,_F7.0_revised_5.30.19.pdf PDF
N3B_Waste_Acceptance_Criteria,_N3B-P409-1,_Rev._0.pdf PDF
Appendix_D-7_Training_matrix_TA-21_DP_West_Slabs_-_Exhibit_F_-_Amendment_3_-_5.30.19.pdf PDF
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_Amendment_3_-_5.30.19_FINAL.docx DOCX document
Exhibit_D_TA-21_DP_West_Slabs_(FINAL_5-30-19)_for_amendment_3.docx DOCX document
RFP-0000300_questions_log_-_5.20.19.docx DOCX document
18-0031_TA21_DPWest_Contour_Map.pdf PDF
Attachment_D-18_map_point_202_pipe_stub_photo_5.8.19.pdf PDF
Form_9072_-_RFP-0000300_TA-21_DP_West_Slabs_-_revised_for_amendment_2_-_5.20.19.docx DOCX document
RFP-0000300_Amendment__1_Reissue_5_01_19.docx DOCX document
Exhibit_C_Form_F_Project_Organization_and_Workplan_-_4.30.19.doc DOC document
Exhibit_D_TA-21_DP_West_Slabs_(FINAL_4-30-19).docx DOCX document
Exhibit_C_Form_C-1_Lower_Tier_Experience_Statement_-_4.30.19.doc DOC document
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_FINAL_-_4.30.19.docx DOCX document
Exhibit_C_Form_N_Experience_Statement_-_FINAL_4.30.19.doc DOC document
Exhibit_C_Form_D_Subcontract_Schedule_-_5.01.19.doc DOC document
D-_10_(17_of_18)_N3B-SOP-ER-2005,_r.0_-_Background_Comparisons_for_Radionuclides.pdf PDF
Exhibit_G_TA-21_Delta_Prime_West_Slabs_Project.pdf PDF
N3B_Form_9060_Insurance_Requirements.pdf PDF
Appendix_D-7_Training_matrix_TA-21_DP_West_Slabs.pdf PDF
Attachment_D-13_N3B_Request_for_Information_Form.pdf PDF
D-_10_(4_of_18)_N3B_P101-17_R3_Excavation_Fill_Soil_Disturbance.pdf PDF
D-_10_(12_of_18)_N3B_LA-UR-11-10371_R0_N3B_Storm_Water_BMP_Manual.pdf PDF
D-12_Threemile_SIR_R1_July18.pdf PDF
D-16_(2_of_3)_NMED_SSG_VOL-I_-March_2017_revised.pdf PDF
D-14_N3B_CoE_SDDR.pdf PDF
D-_10_(14_of_18)_N3B-AP-ER-0001,_r.0_Document_Development_for_Environmental_Deliverables.pdf PDF
D-_10_(5_of_18)_N3B_P151-1_R5_Packaging_and_Transportation_Program_Procedure.pdf PDF
Attachment_D-18_TA-21_Site_Cleanup_Items.pdf PDF
D-_10_(9_of_18)_N3B_ER-SOP-10093_R1_Sample_Control_and_Field_Documentation.pdf PDF
Form_9072_-_RFP-0000300_TA-21_DP_West_Slabs_-Final.pdf PDF
Exhibit_C_Form_B_Construction_Plant_Equipment_List_(new)_-_FINAL.doc DOC document
D-_10_(7_of_18)_N3B_ER-SOP-20145_R0_REQUESTING_AND_MANAGING_DATA_SETS.pdf PDF
Show 40 more

Latest 50 of 98 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ex C Form H (Rev. 1, 9/22/08) Exhibit C Form H – Resumes of Key Personnel April 30, 2019

EXHIBIT “C”

FORM H

RESUMES OF KEY PERSONNEL

Bidder shall provide a resume (no more than 2 pages per person) for each key person to be assigned to the Subcontract, containing at least the following information for each person. Attach and properly designate additional pages, if necessary.

a.

Name:

b.

Title c.

Position d.

Education/Qualifications:

e.

Present Position in Bidder’s Company:

f.

Relevant Experience:

g.

Employment History:

h.

Citizenship:

Resumes are required for the following positions: PN: List positions for which resumes are required. Resumes are generally required for the Project Manager, Site/Construction Manager, Lead Site Engineers, Scheduling Engineers, Safety personnel (See Form G) and Lead Site Supervisors, all of whom would be assigned full time to the Subcontract.

· Project Manager

KEY PERSONNEL

· Field Team Leader(s)/Project Superintendent

· ES&H Specialist(s)

PN: When appropriate, include the optional Special Condition titled “KEY PERSONNEL” in Exhibit “B” and add the following sentence.

KEY PERSONNEL MINIMUM QUALIFICATIONS

Key personnel must meet minimum requirements listed here and in RFP-0000300 Section 9.1.5, Personnel Qualifications and Certifications. The key personnel listed below are an essential and material consideration for this subcontract. Any change to key personnel will be required to meet minimum qualifications listed herein and is subject to CONTRACTOR approval. Nominated personnel shall be made available for interview during any negotiations.

KEY PERSONNEL
MINIMUM QUALIFICATIONS
Project Manager
Shall have a bachelor’s degree in an environmental engineering or science discipline from a recognized institution of higher learning with at least ten (10) years of relevant practical management experience on projects involving radiological and hazardous materials. Shall have experience in managing government related contracts of the magnitude, nature and complexity of the scope of work under this subcontract and shall possess a working knowledge of FAR and DEAR regulations. Shall possess excellent verbal and written communication skills. Shall have the ability to anticipate change and to adjust promptly and effectively, and to establish and maintain strong and effective customer relations and communications.
Field Team Lead/ Project Superintendent
Shall have a minimum of four (4) years of practical management experience supervising field sampling and remediation projects of similar magnitude and complexity involving radiological and hazardous materials. Demonstrated successful completion of major field projects with elements of drilling, extensive sampling, site configuration and laydown, heavy equipment management and maintenance, application of remediation techniques to contaminated land areas and facilities, management of characterization sampling and remediation programs. Shall possess excellent verbal and written communication skills.
ES&H Specialist
Refer to Exhibit F, Section 4.0, for ES&H Specialist qualification requirements.

PR# RFP-0000300

File details come from the government source that posted it.