Exhibit_A_Prime_Contract_Flow_Downs_Final_RFP-0000300.pdf
PDF 783 KB Posted
- Attached to
- TA-21 DP West Slabs D&D and Remediation Project
- Solicitation number
- RFP-0000300
About this file
Exhibit A Prime Contract Flow Downs Final RFP-0000300
View the file
Other files
Show 40 more
Latest 50 of 98 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A
PO-0000300
Section H Prime Contract Flow downs
Revision Number: 0
9/21/18
Approved By Approved By Approved By
Signature Signature Signature
Print Name Print Name Print Name
Title/Department Title/Department Title/Department
Date Date Date
N3B 600 6th Street
Los Alamos, NM 87544
RFP-0000300
PO-0000300
Revision History
Revision No. Effective Date Sections Affected Description
0 XX/XX/XX All Initial Issue
Revisions This document is reviewed annually and revised as required to ensure it reflects current requirements for the projects under Newport News Nuclear BWXT-Los Alamos, LLC (N3B). Revisions to standards referenced within N3B project contracts are reviewed and evaluated and needed changes are incorporated.
Revisions, other than minor changes, require approval at the same responsibility level as the original document.
Distribution This document is corporately controlled and distributed electronically and/or in hard copy as appropriate for corporate and/or project-specific use. Only the electronic copy is assured to be the most recent official copy. The document becomes uncontrolled copy once printed. Where hard copy distribution is required for specific projects, the responsible project manager determines the distribution/document holders and assures appropriate document control via Document Control.
PO-0000300 H-1
SECTION H
PRIME CONTRACT FLOWDOWNS
SPECIAL CONTRACT REQUIREMENTS
FOR PURPOSES OF THIS SECTION THE TERM GOVERNMENT OR DOE SHALL MEAN NEWPORT
NEWS NUCLEAR BWXT-LOS ALAMOS, LLC (N3B), AND THE TERM “CONTRACTOR” SHALL MEAN
SUBCONTRACTOR.
Table of Contents
H.1 DOE-H-2013 CONSECUTIVE NUMBERING (OCT 2014)
H.2 RESERVED
H.3 RESERVED
H.4 RESERVED:
H.5 RESERVED
H.6 RESERVED
H.7 RESERVED
H.8 RESERVED
H.9 RESERVED
H.10 RESERVED
H.11 LABOR STANDARDS
H.12 RESERVED
H.13 DOE-H-2057 DEPARTMENT OF LABOR WAGE DETERMINATIONS (OCT 2014)
(REVISED)
BUSINESS SYSTEMS CLAUSES
H.14 RESERVED
H.15 RESERVED
H.16 RESERVED
H.17 RESERVED
H.18 RESERVED
H.19 RESERVED
DOE CORPORATE CLAUSES OTHER THAN CHRM OR BUSINESS SYSTEMS
H.20 DOE-H-2006 DEFENSE NUCLEAR FACILITY SAFETY BOARD (OCT 2014)
PO-0000300 H-2
H.21 DOE-H-2012 SUSTAINABLE ACQUISITIONS UNDER DOE CONSTRUCTION
CONTRACTS (OCT 2014)
H.23 RESERVED
H.25 RESERVED
H.26 DOE-H-2019 DISPOSITION OF INTELLECTUAL PROPERTY – FAILURE TO
COMPLETE CONTRACT PERFORMANCE (OCT 2014)
H.27 DOE-H-2020 PRICE-ANDERSON AMENDMENTS ACT NONCOMPLIANCE (OCT
2014)
H.28 DOE-H-2021 WORK STOPPAGE AND SHUTDOWN AUTHORIZATION (OCT 2014) 8
H.29 RESERVED
H.30 DOE-H-2034 CONTRACTOR INTERFACE WITH OTHER CONTRACTORS AND/OR
GOVERNMENT EMPLOYEES (OCT 2014)
H.31 RESERVED
H.32 DOE-H-2037 NATIONAL ENVIRONMENTAL POLICY ACT (OCT 2014)
H.33 DOE-H-2041 SUSTAINABLE ACQUISITION UNDER DOE SERVICE CONTRACTS
(OCT 2014)
H.34 RESERVED
H.35 RESERVED
H.36 DOE-H-2044 MATERIAL SAFETY DATA SHEET AVAILABILITY (OCT 2014)
H.37 RESERVED
H.38 RESERVED
H.39 DOE-H-2047 Federal Holidays and Other Closures (OCT 2014) (REVISED)
H.40 DOE-H-2048 PUBLIC AFFAIRS – CONTRACTOR RELEASES OF INFORMATION
(OCT 2014)
H.41 RESERVED
H.42 RESERVED
H.43 RESERVED
H.44 DOE-H-2053 WORKER SAFETY AND HEALTH PROGRAM IN ACCORDANCE WITH
10 CFR 851 (OCT 2014)
H.45 RESERVED
H.46 RESERVED
H.48 DOE-H-2059 PRESERVATION OF ANTIQUITIES, WILDLIFE AND LAND AREAS
(OCT 2014)
H.49 RESERVED
H.50 DOE-H-2062 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR
PERSONNEL - ALTERNATE I (OCT 2014)
H.51 DOE-H-2063 CONFIDENTIALITY OF INFORMATION (OCT 2014)
PO-0000300 H-3
H.52 DOE-H-2064 USE OF INFORMATION TECHNOLOGY EQUIPMENT, SOFTWARE,
AND THIRD PARTY SERVICES - ALTERNATE II (OCT 2014) (REVISED)
H.53 DOE-H-2065 REPORTING OF FRAUD, WASTE, ABUSE, CORRUPTION, OR
MISMANAGEMENT (OCT 2014)
H.54 DOE-H-2066 SAFEGUARDS AND SECURITY PROGRAM – ALTERNATE I (OCT
2014)
H.55 RESERVED
H.56 DOE-H-2069 PAYMENTS FOR DOMESTIC EXTENDED PERSONNEL
ASSIGNMENTS (OCT 2014) (Revised)
H.57 RESERVED
H.58 RESERVED
H.59 RESERVED
H.60 RESERVED
H.61 DOE-H-2075 PROHIBITION ON FUNDING FOR CERTAIN NONDISCLOSURE
AGREEMENTS (OCT 2014)
H.62 DOE-H-2076 LOBBYING RESTRICTIONS (OCT 2014)
H.63 RESERVED
H.64 RESERVED
H.65 EMERGENCY CLAUSE
H.66 SECURITY QUALIFICATIONS
H.67 RESERVED
H.68 ENVIRONMENTAL RESPONSIBILITY
H.69 RESERVED
H.70 INFORMATION
H.71 RESERVED
H.72 RESERVED
H.73 RESERVED
H.74 ENVIRONMENTAL OBJECTIVES AND REQUIREMENTS
H.75 RESERVED
PO-0000300 H-4
H.1 DOE-H-2013 CONSECUTIVE NUMBERING (OCT 2014)
Due to automated procedures employed in formulating this document, clauses and provisions contained within may not always be consecutively numbered
H.2 RESERVED
H.3 RESERVED
H.4 RESERVED:
H.5 RESERVED
H.6 RESERVED
H.7 RESERVED
H.8 RESERVED
H.9 RESERVED
H.10 RESERVED
H.11 LABOR STANDARDS
(a) The Contracting Officer will determine the appropriate labor standards that apply to specific work activities in accordance with the Wage Rate Requirements (Construction) statute (formerly known as the Davis-Bacon Act (DBA)), the Service Contract Labor Standards (SCLS) statute (formerly known as the Service Contract Act of 1965 (SCA)), or other applicable Federal labor standards law. Prior to the start of any proposed work activities, the Contractor shall request a labor standards determination from the Contracting Officer for specific work activities by submitting proposed work packages that describe the specific activities to be performed for particular work and other information as necessary for DOE to make a determination regarding the appropriate labor standard(s) for the work or aspects of the work.
Once a determination is made and provided to the Contractor, the Contractor shall comply with the determination and shall ensure that appropriate labor standards clauses and requirements are flowed down to and incorporated into any applicable subcontracts.
(b) The Contractor shall comply, and shall be responsible for compliance by any subcontractor, with the Wage Rate Requirements (Construction), the Service Contract Labor Standards, or other applicable labor standards law. The Contractor shall conduct such payroll and job-site reviews for construction work, including interviews with employees, with such frequency as may be necessary to assure compliance by its subcontractors and as requested or directed by the DOE. When performing work subject to the Wage Rate Requirements (Construction), Contractor shall maintain payroll records for a period of three years from completion of the Contract, for laborers and mechanics performing the work. In accordance with FAR 52.222-41(g) and FAR 52.222-6(b)(4), the Contractor and its subcontractors shall post in a prominent job-site location, the wage determination and, as applicable, PO-0000300 H-5
Department of Labor Publication: WH-1231, Notice to Employees Working on Federal or Federally Assisted Construction Projects and/or WH-1313, Notice to Employees Working on Government Contracts.
(c) For subcontracts determined to be subject to the Service Contract Labor Standards, the Contractor will prepare Standard Form 98 (e98), Notice of Intention to Make a Service Contract and Response Notice. This form is available on the Department of Labor website at: http://www.dol.gov/whd/govcontracts/sca/sf98/index.asp. The form shall be submitted to the Contracting Officer.
(d) In addition to any other requirements in the Contract, Contractor shall as soon as possible notify the Contracting Officer of all labor standards issues, including all complaints regarding incorrect payment of prevailing wages and/or fringe benefits, received from contractor or subcontractor employees; significant labor standards violations, as defined in 29 CFR 5.7; disputes concerning labor standards pursuant to 29 CFR parts 4,6, and 8 and as defined in FAR 52.222-41(t); disputed labor standards determinations; Department of Labor investigations; or legal or judicial proceedings related to the labor standards under this Contract or a subcontract. The Contractor shall furnish such additional information as may be required from time to time by the Contracting Officer.
(e) The Contractor shall prepare and submit, to the Contracting Officer, the DBA Semi-
Annual Enforcement Report, Form OMB 1910-5165, by April 21 and October 21 of each year. Form submittal will be administered through the iBenefits system (https://ibenefits.energy.gov) or its successor system.
H.12 RESERVED
H.13 DOE-H-2057 DEPARTMENT OF LABOR WAGE DETERMINATIONS (OCT
2014) (REVISED)
The Contractor’s performance under this contract shall comply with the requirements of U.S. Department of Labor Wage Determination(s) as provided.
BUSINESS SYSTEMS CLAUSES
H.14 RESERVED
H.15 RESERVED
H.16 RESERVED
H.17 RESERVED
H.18 RESERVED
H.19 RESERVED
http://www.dol.gov/whd/govcontracts/sca/sf98/index.asp https://ibenefits.energy.gov/
PO-0000300 H-6
DOE CORPORATE CLAUSES OTHER THAN CHRM OR BUSINESS
SYSTEMS
H.20 DOE-H-2006 DEFENSE NUCLEAR FACILITY SAFETY BOARD (OCT 2014)
The Contractor shall conduct activities in accordance with those DOE commitments to the Defense Nuclear Facilities Safety Board (DNFSB) which are contained in implementation plans and other DOE correspondence to the DNFSB. The Contractor shall support preparation of DOE responses to DNFSB issues and recommendations which affect or can affect contract work. Based on the Contracting Officer's Representative direction, the Contractor shall fully cooperate with the DNFSB and provide access to such work areas, personnel, and information as necessary. The Contractor shall maintain a document process consistent with the DOE manual on interface with the DNFSB. The Contractor shall be accountable for ensuring that subcontractors adhere to these requirements.
H.21 DOE-H-2012 SUSTAINABLE ACQUISITIONS UNDER DOE CONSTRUCTION
CONTRACTS (OCT 2014)
Pursuant to Executive Order 13423, Strengthening Federal Environmental, Energy and Transportation Management, and 13514, Federal Leadership in Environmental, Energy, and Economic Performance, the Department of Energy is committed to managing its facilities in an environmentally preferable manner that will promote the natural environment and protect the health and well-being of its Federal employees and contractor service providers. In the performance of work under this contract, the Contractor shall exert its best efforts to provide its services in a manner that will promote the natural environment and protect the health and well-being of Federal and contract employees at the facility. Sustainable acquisition or environmentally preferable contracting has several interacting initiatives. Among the initiatives are the following:
• Recycled Content Products are described at http://epa.gov/cpg
• Biobased Products are described at http://www.biopreferred.gov/
• Energy efficient products are at http://energystar.gov/products for Energy Star products
• Energy efficient products are at http://www.eere.energy.gov/femp/procurement for FEMP designated products
• Environmentally Preferable Computers are at http://www.epeat.net
• Non-Ozone Depleting Alternative Products are at http://www.epa.gov/ozone/strathome.html
• Water efficient plumbing products are at http://epa.gov/watersense
To the extent that the services provided by the Contractor require provision of any of the above types of products, the Contractor is expected to provide the sustainable, environmentally preferable type of product unless that type of product is not available competitively within a reasonable time, at a reasonable price, is not life cycle cost efficient in the case of energy consuming products, or does not meet reasonable performance standards. The clauses at FAR 52.223-2, Affirmative Procurement of Biobased Products under Service and Construction Contracts, 52.223-15, Energy Efficiency in Energy Consuming Products, and 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts, in Section I of this contract require the use of products that have biobased content, are energy efficient, or have recycled content.
PO-0000300 H-7
In case of an apparent inconsistency between this provision and any specification elsewhere in the contract, consult the contracting officer for resolution.
H.22 RESERVED
H.23 RESERVED
H.24 RESERVED
H.25 RESERVED
H.26 DOE-H-2019 DISPOSITION OF INTELLECTUAL PROPERTY – FAILURE TO
COMPLETE CONTRACT PERFORMANCE (OCT 2014)
The following provisions shall apply in the event the Contractor does not complete Contract performance for any reason:
(a) The Government may take possession of and use all technical data, including limited rights data, restricted computer software, and data and software obtained from subcontractors, licensors, and licensees, necessary to complete the work in conformance with this contract, including the right to use the data in any Government solicitations for the completion of the work contemplated under this contract.
Technical data includes, but is not limited to, specifications, designs, drawings, operations manuals, flowcharts, software, databases and any other information necessary for of the completion of the work under this contract. Limited rights data and restricted computer software will be protected in accordance with the provisions of the Section I Clause entitled DEAR 970.5227-1 Rights in Data-Facilities. The Contractor shall ensure that its subcontractors and licensors make similar rights available to the Government and its contractors.
(b) The Contractor agrees to and does hereby grant to the Government an irrevocable, non-exclusive, paid-up license in and to any inventions or discoveries regardless of when conceived or actually reduced to practice by the Contractor, and any other intellectual property, including technical data, which are owned or controlled by the Contractor, at any time through completion of this contract and which are incorporated or embodied in the construction of the facilities or which are utilized in the operation or remediation of the facilities or which cover articles, materials or products manufactured at a facility: (1) to practice or to have practiced by or for the Government at the facility; and (2) to transfer such license with the transfer of that facility. The acceptance or exercise by the Government of the aforesaid rights and license shall not prevent the Government at any time from contesting the enforceability, validity or scope of, or title to, any rights or patents or other intellectual property herein licensed.
(c) In addition, the Contractor will take all necessary steps to assign permits, authorizations, leases, and licenses in any third party intellectual property to the Government, or such other third party as the Government may designate, that are necessary for the completion of the work contemplated under this Contract.
PO-0000300 H-8
H.27 DOE-H-2020 PRICE-ANDERSON AMENDMENTS ACT NONCOMPLIANCE (OCT
2014)
The Contractor shall establish an internal Price-Anderson Amendments Act (PAAA) noncompliance identification, tracking, and corrective action system and shall provide access to and fully support DOE reviews of the system. The Contractor shall also implement a Price- Anderson Amendments Act reporting process which meets applicable DOE standards. The Contractor shall be accountable for ensuring that subcontractors adhere to these requirements.
H.28 DOE-H-2021 WORK STOPPAGE AND SHUTDOWN AUTHORIZATION (OCT 2014)
(a) Imminent Health and Safety Hazard is a given condition or situation which, if not immediately corrected, could result in a serious injury or death, including exposure to radiation and toxic/hazardous chemicals. Imminent Danger in relation to the facility safety envelope is a condition, situation, or proposed activity which, if not terminated, could cause, prevent mitigation of, or seriously increase the risk of (1) nuclear criticality, (2) radiation exposure, (3) fire/explosion, and/or (4) toxic hazardous chemical exposure.
(b) Work Stoppage. In the event of an Imminent Health and Safety Hazard, identified by facility line management or operators or facility health and safety personnel overseeing facility operations, or other individuals, the individual or group identifying the imminent hazard situation shall immediately take actions to eliminate or mitigate the hazard (i.e., by directing the operator/implementer of the activity or process causing the imminent hazard to stop work, or by initiating emergency response actions or other actions) to protect the health and safety of the workers and the public, and to protect U.S. Department of Energy (DOE) facilities and the environment. In the event an imminent health and safety hazard is identified, the individual or group identifying the hazard should coordinate with an appropriate Contractor official, who will direct the shutdown or other actions, as required. Such mitigating action should subsequently be coordinated with the DOE and Contractor management. The suspension or stop-work order should be promptly confirmed in writing by the Contracting Officer.
(c) Shutdown. In the event of an imminent danger in relation to the facility safety envelope or a non-Imminent Health and Safety Hazard identified by facility line managers, facility operators, health and safety personnel overseeing facility operations, or other individuals, the individual or group identifying the potential health and safety hazard may recommend facility shutdown in addition to any immediate actions needed to mitigate the situation. However, the recommendation must be coordinated with Contractor management, and the DOE Site Manager. Any written direction to suspend operations shall be issued by the Contracting Officer, pursuant to the Clause entitled, "FAR 52.242-15, Stop-Work Order."
(d) Facility Representatives. DOE personnel designated as Facility Representatives provide the technical/safety oversight of operations. The Facility Representative has the authority to "stop work," which applies to the shutdown of an entire plant, activity, or job. This stop-work authority will be used for an operation of a facility which is performing work the Facility Representative believes:
PO-0000300 H-9
(1) Poses an imminent danger to health and safety of workers or the public if allowed to continue;
(2) Could adversely affect the safe operation of, or could cause serious damage to the facility if allowed to continue; or
(3) Could result in the release of radiological or chemical hazards to the environment in excess of regulatory limits.
(e) This clause flows down to all subcontractors at all tiers. Therefore, the Contractor shall insert a clause, modified appropriately to substitute "Contractor Representatives" for "the Contracting Officer" in all subcontracts.
H.29 RESERVED
H.30 DOE-H-2034 CONTRACTOR INTERFACE WITH OTHER CONTRACTORS AND/OR
GOVERNMENT EMPLOYEES (OCT 2014)
The Government may award contracts to other contractors for work to be performed at a DOE-owned or –controlled site or facility. The Contractor shall cooperate fully with all other on-site DOE contractors and Government employees. The Contractor shall coordinate its own work with such other work as may be directed by the Contracting Officer or a duly authorized representative. The Contractor shall not commit or permit any act which will interfere with the performance of work by any other contractor or by a Government employee.
The Contractor shall cooperate in a timely manner with DOE and any DOE contractor performing work at the site, especially DOE prime contractors. Cooperation includes, but is not limited to, working together to resolve interface and work performance issues;
establishing schedules to support accommodation of the work being performed under the other contract(s); establishing work groups; participating in meetings (including quarterly DOE/Contractor interface meetings); providing access to applicable technical and contract information and data, such as schedule and milestone data; discussing technical matters related to EM-LA; and, providing access to Contractor facilities or areas. The Contractor shall ensure that its activities in support of the other prime contractors are fully coordinated with DOE and the other prime contractors.
The Contractor is not authorized to direct and/or to provide oversight to any other EM-LA contractor, except as specified elsewhere in this contract or as directed by the CO. The CO has the authority to direct the Contractor to cease interference in the activities of other DOE contractors, and DOE retains oversight and approval authority for all EM-LA contracts.
The Contractor shall immediately notify the CO in writing if the Contractor’s activities will interfere with any DOE contractor or if there is an interference or conflict with any DOE contractor in performance of the Contractor’s activities in support of DOE or another DOE contractor.
H.31 RESERVED
H.32 DOE-H-2037 NATIONAL ENVIRONMENTAL POLICY ACT (OCT 2014)
PO-0000300 H-10
The work under this contract requires activities to be subject to the National Environmental Policy Act of 1969 (NEPA). The Contractor shall supply to DOE certain environmental information, as requested, in order for DOE to comply with NEPA and its implementing policies and regulations. Funds obligated under this contract shall only be expended by the Contractor on the activities set out below, unless the Contracting Officer modifies the listed activities or notifies the Contractor that NEPA requirements have been satisfied and the Contractor is authorized to perform the complete work required under the contract.
All contract activities including groundwater monitoring and investigations, aggregate area investigations and cleanups, material disposal area investigations and evaluations, contact-handled transuranic waste processing, and programmatic type support can be performed without specific NEPA impacts. However, during this period should sufficient progress be made in the areas of specific capital project development and potential groundwater remedy projects or activities, some activities may require support for NEPA activities before additional progress can be made.
H.33 DOE-H-2041 SUSTAINABLE ACQUISITION UNDER DOE SERVICE CONTRACTS
(OCT 2014)
(a) Pursuant to Executive Orders 13423, Strengthening Federal Environmental, Energy and Transportation Management, and 13514, Federal Leadership in Environmental, Energy, and Economic Performance, the Department of Energy (DOE) is committed to managing its facilities in a manner that will promote the natural environment and protect the health and well-being of its Federal employees and contractor service providers. The Contractor shall use its best efforts to support DOE in meeting those commitments, including sustainable acquisition or environmentally preferable contracting which may involve several interacting initiatives, such as -
(1) Alternative Fueled Vehicles and Alternative Fuels;
(2) Biobased Content Products (USDA Designated Products);
(3) Energy Efficient Products;
(4) Non-Ozone Depleting Alternative Products;
(5) Recycled Content Products (EPA Designated Products); and
(6) Water Efficient Products (EPA WaterSense Labeled Products).
(b) The Contractor should become familiar with these information resources:
(1) Recycled Products are described at http://epa.gov/cpg.
(2) Biobased Products are described at http://www.biopreferred.gov/.
(3) Energy efficient products are described at http://energystar.gov/products for
Energy Star products.
(4) FEMP designated products are described at http://www.eere.energy.gov/femp/procurement
(5) Environmentally Preferable Computers are described at http://www.epeat.net.
(6) Non-Ozone Depleting Alternative Products are described at http://www.epa.gov/ozone/strathome.html.
(7) Water efficient plumbing fixtures are described at http://epa.gov/watersense.
(c) If, in the course of providing services at the DOE site, the Contractor’s services necessitate the acquisition of any of the above types of products, it is expected that the Contractor will acquire the sustainable, environmentally preferable models unless the product is not available competitively within a reasonable time, at a reasonable
PO-0000300 H-11
price, is not life cycle cost efficient in the case of energy consuming products, or does not meet reasonable performance standards. While there is no formal reporting, DOE prepares a sustainable acquisition annual report and the Contractor may be asked by the Contracting Officer to provide information in support of DOE’s report.
H.34 RESERVED
H.35 RESERVED
H.36 DOE-H-2044 MATERIAL SAFETY DATA SHEET AVAILABILITY (OCT 2014)
In implementation of the clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data, the Contractor shall obtain, review and maintain a Material Safety Data Sheet (MSDS) in a readily accessible manner for each hazardous material (or mixture containing a hazardous material) ordered, delivered, stored or used; and maintain an accurate inventory and history of use of hazardous materials at each use and storage location. The MSDS shall conform to the requirements of 29 CFR 1910.1200(g).
H.37 RESERVED
H.38 RESERVED
H.39 DOE-H-2047 Federal Holidays and Other Closures (OCT 2014) (REVISED)
(a) Designated Federal holidays. Federal employees observe the following Federal holidays:
(1) New Year’s Day
(2) Birthday of Martin Luther King, Jr.
(3) Washington’s Birthday
(4) Memorial Day
(5) Independence Day
(6) Labor Day
(7) Columbus Day
(8) Veterans Day
(9) Thanksgiving Day
(10) Christmas Day
Generally, Federal holidays that fall on Saturday are observed on the preceding
Friday; and holidays that fall on Sunday are observed on the following Monday.
The exact calendar day and/or date on which any of the listed holidays are observed may change year to year.
(b) Other Federal Holidays. In addition to the holidays specified above in paragraph
(a), Federal employees may observe other holidays designated by Federal Statute, Executive Order, or Presidential Proclamation as a one-time, day-off such as Inauguration Day for the President of the United States.
(c) Unscheduled closures. Occasionally, an individual Federally-owned or -controlled
PO-0000300 H-12
site or facility will be closed or have an early closure on a normal work day for other reasons such as inclement weather or facility conditions. If an unplanned closure occurs, the Contractor will be notified as soon as possible after the determination that the Federally-owned or -controlled site or facility will be closed. If the Contractor determines it is necessary to work on a LANL non-work day, the Contractor shall obtain written EM-LA approval and be responsible for the safety of its personnel including storm warning, occupational medicine, HazMat, etc., and listing work on the LANL plan of the day with Emergency Operations Center (EOC).
(d) The Contractor shall provide the services required by the contract at Federally-owned or –controlled sites or facilities on all regularly scheduled Federal work days and other days as may be required by the contract. The Contractor shall not provide the services required by the contract on those days, or portions thereof, specified in paragraphs (a), (b) and (c), except as required under paragraph (e).
Accordingly, the Contractor’s employees, whose regular duty station in performance of this contract is a Federally-owned or controlled site or facility, shall not be granted access to the facility during those times specified in paragraphs (a), (b) and (c), unless required by paragraph (e) below.
(e) There may be times that the Contractor is required to perform the services required by the contract on a Federal holiday or other closure times. In the event that such performance is required, the Contracting Officer will notify the Contractor, in writing, and specify the extent to which performance of the contract will be required. The Contractor shall provide sufficient personnel to perform the contractually-required work on those days, as directed by the Contracting Officer.
(f) In accordance with the payment and other applicable clauses of the contract, the
Government will not pay the Contractor for its employees’ regularly scheduled work hours not actually provided directly in performance of the contract due to an unscheduled closure as contemplated in paragraphs (b) and (c) above.
H.40 DOE-H-2048 PUBLIC AFFAIRS – CONTRACTOR RELEASES OF INFORMATION
In implementation of the clause at DEAR 952.204-75, Public Affairs, all communications or releases of information to the public, the media, or Members of Congress prepared by the Contractor related to work performed under the contract shall be reviewed and approved by DOE prior to issuance. Therefore, the Contractor shall, at least 7 calendar days prior to the planned issue date, submit a draft copy to the Contracting Officer of any planned communications or releases of information to the public, the media, or Members of Congress related to work performed under this contract. The Contracting Officer will obtain necessary reviews and clearances and provide the Contractor with the results of such reviews prior to the planned issue date.
H.41 RESERVED
H.42 RESERVED
H.43 RESERVED
PO-0000300 H-13
H.44 DOE-H-2053 WORKER SAFETY AND HEALTH PROGRAM IN ACCORDANCE WITH
10 CFR 851 (OCT 2014)
(a) The Contractor shall comply with all applicable safety and health requirements set forth in 10 CFR 851, Worker Safety and Health Program, and any applicable DOE Directives incorporate into the contract. The Contractor shall develop, implement, and maintain a written Worker Safety and Health Plan (WSHP) which shall describe the Contractor's method for complying with and implementing the applicable requirements of 10 CFR 851. The WSHP shall be submitted to and approved by DOE. The approved WSHP must be implemented prior to the start of work. In performance of the work, the Contractor shall provide a safe and healthful workplace, and must comply with its approved WSHP and all applicable Federal and state environment, health, and safety regulations.
(b) The Contractor shall take all reasonable precautions to protect the environment, health, and safety of its employees, DOE personnel, and members of the public.
When more than one contractor works in a shared workplace, the Contractor shall coordinate with the other contractors to ensure roles, responsibilities, and worker safety and health provisions are clearly delineated. The Contractor shall participate in all emergency response drills and exercises related to the Contractor’s work and interface with other DOE contractors.
(c) The Contractor shall take all necessary and reasonable steps to minimize the impact of its work on DOE functions and employees, and immediately report all job-related injuries and/or illnesses which occur in any DOE facility to the Contracting Officer Representative (COR). Upon request, the Contractor shall provide to the COR a copy of occupational safety and health self-assessments and/or inspections of work sites for job hazards for work performed at DOE facilities.
(d) The Contracting Officer may notify the Contractor, in writing, of any noncompliance with the terms of this clause, and the corrective action(s) to be taken. After receipt of such notice, the Contractor shall immediately take such corrective action(s).
(e) In the event that the Contractor fails to comply with the terms and conditions of this clause, the Contracting Officer may, without prejudice to any other legal or contractual rights, issue a stop-work order halting all or any part of the work.
Thereafter, the Contracting Officer may, at his or her discretion, cancel the stop-work order so that the performance of work may be resumed. The Contractor shall not be entitled to an equitable adjustment of the Contract amount or extension of the performance schedule due to any stop-work order issued under this clause.
(f) The Contractor shall flow down the requirements of this clause to all subcontracts at any tier.
(g) In the event of a conflict between the requirements of this clause and 10 CFR 851, the requirements of 10 CFR 851 shall take precedence.
H.45 RESERVED
PO-0000300 H-14
H.46 RESERVED
H.47 RESERVED
H.48 DOE-H-2059 PRESERVATION OF ANTIQUITIES, WILDLIFE AND LAND AREAS
(a) Federal Law provides for the protection of antiquities located on land owned or controlled by the Government. Antiquities include Indian graves or campsites, relics and artifacts. The Contractor shall control the movements of its personnel and its subcontractor's personnel at the job site to ensure that any existing antiquities discovered thereon will not be disturbed or destroyed by such personnel. It shall be the duty of the Contractor to report to the Contracting Officer the existence of any antiquities so discovered.
(b) The Contractor shall also preserve all vegetation (including wetlands) except where such vegetation must be removed for survey or construction purposes. Any removal of vegetation shall be in accordance with the terms of applicable habitat mitigation plans and permits. Furthermore, all wildlife must be protected consistent with programs approved by the Contracting Officer.
(c) Except as required by or specifically provided for in other provisions of this contract, the Contractor shall not perform any excavations, earth borrow, preparation of borrow areas, or otherwise disturb the surface soils within the job site without the prior approval of DOE or its designee.
H.49 RESERVED.
H.50 DOE-H-2062 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR
PERSONNEL - ALTERNATE I (OCT 2014)
(a) Pursuant to the clause at FAR 52.204-9, Personal Identity Verification of Contractor
Personnel, the Contractor shall comply with applicable DOE regulations, policies and directives regarding identification, credential and access management for its personnel who have routine physical access to DOE-owned or -controlled sites or facilities or routine access to DOE information systems.
(b) The Contractor shall comply with the requirements of those DOE directives, or parts thereof, identified elsewhere in the contract pursuant to the clause at DEAR 970.5204-2, Laws, Regulations and DOE Directives.
H.51 DOE-H-2063 CONFIDENTIALITY OF INFORMATION (OCT 2014)
(a) Performance of work under this contract may result in the Contractor having access to confidential information via written or electronic documents, or by virtue of having access to DOE’s electronic or other systems. Such confidential information includes personally identifiable information (such as social security account numbers) or proprietary business, technical, or financial information belonging to the Government or other companies or organizations. The Contractor shall treat this information as confidential and agrees not to use this information for its own purposes, or to
PO-0000300 H-15
disclose the information to third parties, unless specifically authorized to do so in writing by the Contracting Officer.
(b) The restrictions set out in paragraph (a) above, however, do not apply to –
(1) Information which, at the time of receipt by the Contractor, is in the public domain;
(2) Information which, subsequent to receipt by the Contractor, becomes part of the public domain through no fault or action of the Contractor;
(3) Information which the Contractor can demonstrate was previously in its possession and was not acquired directly or indirectly as a result of access obtained by performing work under this contract;
(4) Information which the Contractor can demonstrate was received from a third party who did not require the Contractor to hold it in confidence; or
(5) Information which is subject to release under applicable law.
(c) The Contractor shall obtain a written agreement from each of its employees who are granted access to, or furnished with, confidential information, whereby the employee agrees that he or she will not discuss, divulge, or disclose any such information to any person or entity except those persons within the Contractor's organization directly concerned with the performance of the contract. The agreement shall be in a form satisfactory to the Contracting Officer.
(d) Upon request of the Contracting Officer, the Contractor agrees to execute an agreement with any party which provides confidential information to the Contractor pursuant to this contract, or whose facilities the Contractor is given access to that restrict use and disclosure of confidential information obtained by the Contractor. A copy of the agreement, which shall include all material aspects of this clause, shall be provided to the Contracting Officer for approval.
(e) Upon request of the Contracting Officer, the Contractor shall supply the Government with reports itemizing the confidential or proprietary information it receives under this contract and identify the source (company, companies or other organizations) of the information.
(f) The Contractor agrees to flow down this clause to all subcontracts issued under this contract.
H.52 DOE-H-2064 USE OF INFORMATION TECHNOLOGY EQUIPMENT, SOFTWARE,
AND THIRD PARTY SERVICES - ALTERNATE II (OCT 2014) (REVISED)
(a) Acquisition of Information Technology. The Government may provide information technology equipment, existing computer software (as described in 48 CFR 27.405), and third party services for the Contractor’s use in the performance of the contract;
and the Contracting Officer may provide guidance to the Contractor regarding usage of such equipment, software, and third party services. The Contractor is not authorized to acquire (lease or purchase) information technology equipment, existing computer software, or third party services at the Government’s direct expense without prior written approval of the Contracting Officer. Should the Contractor
PO-0000300 H-16
propose to acquire information technology equipment, existing computer software, or third party services, the Contractor shall provide to the Contracting Officer justification for the need, including a complete description of the equipment, software or third party service to be acquired, and a lease versus purchase analysis if appropriate.
(b) The Contractor shall immediately provide written notice to the Contracting Officer’s Representative when an employee of the Contractor no longer requires access to the Government information technology systems.
(c) The Contractor shall not violate any software licensing agreement, or cause the Government to violate any licensing agreement.
(d) The Contractor agrees that its employees will not use, copy, disclose, modify, or reverse engineer existing computer software provided to it by the Government except as permitted by the license agreement or any other terms and conditions under which the software is made available to the Contractor.
(e) If at any time during the performance of this contract the Contractor has reason to believe that its utilization of Government furnished existing computer software may involve or result in a violation of the software licensing agreement, the Contractor shall promptly notify the Contracting Officer, in writing, of the pertinent facts and circumstances. Pending direction from the Contracting Officer, the Contractor shall continue performance of the work required under this contract without utilizing the software.
(f) The Contractor agrees to include the requirements of this clause in all subcontracts at any tier.
(g) The Contractor shall comply with the requirements of those DOE directives, or parts thereof, identified elsewhere in the contract Section J, Attachment J-1, Requirements Sources and Implementing Documents (List A) and List of Applicable DOE Directives (List B).
H.53 DOE-H-2065 REPORTING OF FRAUD, WASTE, ABUSE, CORRUPTION, OR
MISMANAGEMENT (OCT 2014)
The Contractor shall comply with the following:
(a) Notify employees annually of their duty to report allegations of fraud, waste, abuse, misuse, corruption, criminal acts, or mismanagement relating to DOE programs, operations, facilities, contracts, or information technology systems to an appropriate authority (e.g., OIG, other law enforcement, supervisor, employee concerns office, security officials). Examples of violations to be reported include, but are not limited to, allegations of false statements; false claims; bribery; kickbacks; fraud; DOE environment, safety, and health violations; theft; computer crimes; contractor mischarging; conflicts of interest; and conspiracy to commit any of these acts.
Contractors must also ensure that their employees are aware that they may always report incidents or information directly to the Office of Inspector General (OIG).
PO-0000300 H-17
(b) Display the OIG hotline telephone number in buildings and common areas such as cafeterias, public telephone areas, official bulletin boards, reception rooms, and building lobbies.
(c) Publish the OIG hotline telephone number in telephone books and newsletters under the Contractor’s cognizance.
(d) Ensure that its employees report to the OIG within a reasonable period of time, but not later than 24 hours after discovery, all alleged violations of law, regulations, or policy, including incidents of fraud, waste, abuse, misuse, corruption, criminal acts, or mismanagement, that have been referred to Federal, State, or local law enforcement entities.
(e) Ensure that its employees report to the OIG any allegations of reprisals taken against employees who have reported to the OIG fraud, waste, abuse, misuse, corruption, criminal acts, or mismanagement.
(f) Ensure that its managers do not retaliate against DOE contractor employees who report fraud, waste, abuse, misuse, corruption, criminal acts, or mismanagement.
(g) Ensure that all their employees understand that they must –
(1) Comply with requests for interviews and briefings and must provide affidavits or sworn statements, if so requested by an employee of the OIG so designated to take affidavits or sworn statements;
(2) Not impede or hinder another employee's cooperation with the OIG; and
(3) Not take reprisals against DOE contractor employees who cooperate with or disclose information to the OIG or other lawful appropriate authority.
(h) Seek more specific guidance concerning reporting of fraud, waste, abuse, corruption, or mismanagement, and cooperation with the Inspector General, in DOE directives.
H.54 DOE-H-2066 SAFEGUARDS AND SECURITY PROGRAM – ALTERNATE I (OCT
2014)
(a) Pursuant to the clause at DEAR 952.204-2, Security, the Contractor agrees to comply with all security regulations and contract requirements as incorporated into the contract.
(b) The Contractor shall comply with the requirements of those DOE directives, or parts thereof, identified elsewhere in the contract pursuant to the clause at DEAR 970.5204-2, Laws, Regulations and DOE Directives.
H.55 RESERVED
H.56 DOE-H-2069 PAYMENTS FOR DOMESTIC EXTENDED PERSONNEL
ASSIGNMENTS (OCT 2014) (Revised)
(a) Definition.
For purposes of this clause, “domestic extended personnel assignments” are defined as any assignment of contractor personnel to a domestic location different than their
PO-0000300 H-18
permanent duty station for a period expected to exceed 30 consecutive calendar days.
(b) The Contractor’s personnel shall be physically located at or near the Los Alamos
National Laboratory to perform the requirements of the Contract in accordance with Section F.2, DOE-F-2002, PLACE OF PERFORMANCE – SERVICES (OCT 2014).
(c) For domestic extended personnel assignments, the Contractor shall be reimbursed the lesser of temporary relocation costs (Temporary Change of Station allowances as described in the Federal Travel Regulation at §302-3.400 - §302-3.429) or a reduced per diem (Extended Travel Duty) in accordance with the allowable cost provisions of the contract and the following:
(1) When a reduced per diem method (Extended Travel Duty) is utilized, the allowances are as follows:
(i) Lodging. For the first 60 days and last 30 days of the assignment, the
Government will reimburse costs associated with lodging at the lesser of actual cost or 100% of the Federal per diem rate at the assignment location.
The intervening days lodging will be reimbursed at the lesser of actual cost or 55% of Federal per diem.
(ii) Meals and Incidental Expenses. For the first 30 days and last 30 days of the assignment, the Government will reimburse costs associated with meals and incidental expenses (M&IE) at the lesser of actual cost or 100% of the Federal per diem rate at the assignment location. The intervening days M&IE will be reimbursed at the lesser of actual cost or 55% of Federal per diem.
(2) The Government will not reimburse any costs associated with per diem (except for en-route travel) unless the contractor employee maintains a residence at the permanent duty station.
(3) The Government will not reimburse costs associated with salary premiums, per diem, lodging, or other subsidies for contractor employees on domestic extended personnel assignments after 3 years (except for the reimbursements described above during the last 30 days of the assignment).
(4) If an assignment has breaks within a three year period, the calculation of the total length of the assignment will be as follows: If the break between assignments is less than 12 months, the Government will consider the assignment continuous for purposes of the three year clock. For instance, if a contractor employee completes a 2 year assignment at location A and returns to his/her permanent duty station for 12 months, a subsequent new 2 year assignment back to location A will restart the 3 year clock. The assignments will be considered two separate 2 year assignments. On the other hand, if in the previous example the employee's return to his/her permanent duty station was 6 months, the Government would consider the second assignment to be a continuation of the first for purposes of the 3 year rule.
(5) The Government will not reimburse costs associated with salary premiums that exceed 10%.
(6) The Contractor shall include the substance of this clause in all subcontracts in which travel will be reimbursed at cost.
PO-0000300 H-19
H.57 RESERVED
H.58 RESERVED
H.59 RESERVED
H.60 RESERVED
H.61 DOE-H-2075 PROHIBITION ON FUNDING FOR CERTAIN NONDISCLOSURE
AGREEMENTS (OCT 2014)
The Contractor agrees that:
(a) No cost associated with implementation or enforcement of nondisclosure policies, forms or agreements shall be allowable under this contract if such policies, forms or agreements do not contain the following provisions: ‘‘These provisions are consistent with and do not supersede, conflict with, or otherwise alter the employee obligations, rights, or liabilities created by existing statute or Executive order relating to (1) classified information, (2) communications to Congress, (3) the reporting to an Inspector General of a violation of any law, rule, or regulation, or mismanagement, a gross waste of funds, an abuse of authority, or a substantial and specific danger to public health or safety, or (4) any other whistleblower protection. The definitions, requirements, obligations, rights, sanctions, and liabilities created by controlling Executive orders and statutory provisions are incorporated into this agreement and are controlling.’’
(b) The limitation above shall not contravene requirements applicable to Standard
Form 312, Form 4414, or any other form issued by a Federal department or agency governing the nondisclosure of classified information.
(c) Notwithstanding the provisions of paragraph (a), a nondisclosure or confidentiality policy form or agreement that is to be executed by a person connected with the conduct of an intelligence or intelligence-related activity, other than an employee or officer of the United States Government, may contain provisions appropriate to the particular activity for which such document is to be used. Such form or agreement shall, at a minimum, require that the person will not disclose any classified information received in the course of such activity unless specifically authorized to do so by the United States Government. Such nondisclosure or confidentiality forms shall also make it clear that they do not bar disclosures to Congress, or to an authorized official of an executive agency or the Department of Justice, that are essential to reporting a substantial violation of law.
H.62 DOE-H-2076 LOBBYING RESTRICTIONS (OCT 2014)
The Contractor agrees that none of the funds obligated on this award shall be expended, directly or indirectly, to influence congressional action on any legislation or appropriation matters pending before Congress, other than to communicate to Members of Congress as described in 18 U.S.C. § 1913. This restriction is in addition to those prescribed elsewhere in statute and regulation.
PO-0000300 H-20
H.63 RESERVED
H.64 RESERVED
H.65 EMERGENCY CLAUSE
(a) The U.S. Department of Energy (DOE) Office of Environmental Management Site
Manager or designee shall have sole discretion to determine when an emergency situation exists at the Los Alamos EM site. In the event that either the DOE EM-LA Manager or designee determines such an emergency exists, the applicable DOE Manager or designee will have the authority to direct any and all activities of the Contractor and subcontractors necessary to resolve the emergency situation. The applicable DOE Manager or designee may direct the activities of the Contractor and subcontractors throughout the duration of the emergency.
(b) The Contractor shall include this Clause in all subcontracts at any tier for work performed in support of the EM-LA work.
H.66 SECURITY QUALIFICATIONS
(a) The Contractor may be required to perform work in designated security areas or work with documents or information which may require an access authorization (clearance). Additionally, the scope of their work may require enrollment into the Human Reliability Program (HRP). The Contractor shall ensure that all personnel assigned under this Contract and working with classified information, matter, and/or materials possess a DOE “Q” or “L” access authorization (clearance) matching the classification level of the data and information the employee will be required to work on in the performance of their assigned tasks.
(b) Individuals that do not require a “Q” or “L” clearance will possess either a Local Site
Specific Only (LSSO) badge or/and HSPD-12…