DP_West_Slabs_Project_Appendix_D-4_sm_with_21-328_II.pdf

PDF 4 MB Posted

Attached to
TA-21 DP West Slabs D&D and Remediation Project
Solicitation number
RFP-0000300
Issued by

About this file

Appendix D-4 DP_West_Slabs_Project

View the file

Other files

File Type Posted
Exhibit_A_General_Conditions_Rev_0.doc DOC document
IMG_0015_TA21_150_basement.jpg JPG image
Exhibit_B_Special_Conditions_Rev_0_Draft.docx DOCX document
RFP-0000300_questions_log_-_6.12.19_-_Amendment_4.docx DOCX document
IMG_0018_TA21_150_basement.jpg JPG image
IMG_0016_TA21_150_basement.jpg JPG image
IMG_0014_TA21_150_basement.jpg JPG image
DB_NM190022_04-05-2019_NM22.pdf PDF
IMG_0008_TA21_150_basement.jpg JPG image
IMG_0017_TA21_150_basement.jpg JPG image
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_Amendment_4_-_6.13.19.docx DOCX document
IMG_0019_TA21_150_basement.jpg JPG image
Exhibit_H_TA_21_DP_West_Slabs_Final_with_signatures_-_Amendment_4_-_6.12.19.pdf PDF
EXHIBIT_L_Prime_Contract_Flow_Downs.docx DOCX document
IMG_0013_TA21_150_basement.jpg JPG image
RFP-0000300_questions_log_-_5.28.19_-_Amendment_3_FINAL.docx DOCX document
Exhibit_C_Form_D_Subcontract_Schedule_-_5.30.19__-_Amendment_3_FINAL.doc DOC document
Exhibit_F_Attachments,_F7.0_revised_5.30.19.pdf PDF
N3B_Waste_Acceptance_Criteria,_N3B-P409-1,_Rev._0.pdf PDF
Appendix_D-7_Training_matrix_TA-21_DP_West_Slabs_-_Exhibit_F_-_Amendment_3_-_5.30.19.pdf PDF
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_Amendment_3_-_5.30.19_FINAL.docx DOCX document
Exhibit_D_TA-21_DP_West_Slabs_(FINAL_5-30-19)_for_amendment_3.docx DOCX document
RFP-0000300_questions_log_-_5.20.19.docx DOCX document
18-0031_TA21_DPWest_Contour_Map.pdf PDF
Attachment_D-18_map_point_202_pipe_stub_photo_5.8.19.pdf PDF
Form_9072_-_RFP-0000300_TA-21_DP_West_Slabs_-_revised_for_amendment_2_-_5.20.19.docx DOCX document
RFP-0000300_Amendment__1_Reissue_5_01_19.docx DOCX document
Exhibit_C_Form_F_Project_Organization_and_Workplan_-_4.30.19.doc DOC document
Exhibit_C_Form_H_Resumes_of_Key_Personnel_-_05.01.19.doc DOC document
Exhibit_D_TA-21_DP_West_Slabs_(FINAL_4-30-19).docx DOCX document
Exhibit_C_Form_C-1_Lower_Tier_Experience_Statement_-_4.30.19.doc DOC document
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_FINAL_-_4.30.19.docx DOCX document
Exhibit_C_Form_N_Experience_Statement_-_FINAL_4.30.19.doc DOC document
Exhibit_C_Form_D_Subcontract_Schedule_-_5.01.19.doc DOC document
D-_10_(17_of_18)_N3B-SOP-ER-2005,_r.0_-_Background_Comparisons_for_Radionuclides.pdf PDF
Exhibit_G_TA-21_Delta_Prime_West_Slabs_Project.pdf PDF
N3B_Form_9060_Insurance_Requirements.pdf PDF
Appendix_D-7_Training_matrix_TA-21_DP_West_Slabs.pdf PDF
Attachment_D-13_N3B_Request_for_Information_Form.pdf PDF
D-_10_(4_of_18)_N3B_P101-17_R3_Excavation_Fill_Soil_Disturbance.pdf PDF
D-_10_(12_of_18)_N3B_LA-UR-11-10371_R0_N3B_Storm_Water_BMP_Manual.pdf PDF
D-12_Threemile_SIR_R1_July18.pdf PDF
D-16_(2_of_3)_NMED_SSG_VOL-I_-March_2017_revised.pdf PDF
D-14_N3B_CoE_SDDR.pdf PDF
D-_10_(14_of_18)_N3B-AP-ER-0001,_r.0_Document_Development_for_Environmental_Deliverables.pdf PDF
D-_10_(5_of_18)_N3B_P151-1_R5_Packaging_and_Transportation_Program_Procedure.pdf PDF
Attachment_D-18_TA-21_Site_Cleanup_Items.pdf PDF
D-_10_(9_of_18)_N3B_ER-SOP-10093_R1_Sample_Control_and_Field_Documentation.pdf PDF
Form_9072_-_RFP-0000300_TA-21_DP_West_Slabs_-Final.pdf PDF
Exhibit_C_Form_B_Construction_Plant_Equipment_List_(new)_-_FINAL.doc DOC document
Show 40 more

Latest 50 of 98 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

29 28 27

52 22

47 17

42 14

11 10 12 13

01 78

73 72

61 48

66 6070

79 80 81

107 109

108106 696867

66 125 70

65 124 71

64 123 72

73122

74121

1157512063105101

100 104 62 119 78 114

112111771186110399

98 102

78 110

126 80

9712981127

83 131

84 132

88 89

13890

91135

93133

20 21

15 16

24 25

31 32

33 34 35 36

45 46 47 38 39 40

48 49 41 42 43 44

108 109

110 111

106 107

51 52

53 54

18 19 11109875421

29 37

13 14

116 117

1,6 31, 1,631,900

1,632,000

1,632,000

1,632,100

1,632,100

1,632,200

1,632,200

1,632,300

1,632,300

1,632,400

1,632,400

1,632,500

1,632,500

1,632,600

1,632,600

1,632,700

1,6 32, 1,632,800

1,6 32, 1,774,000

1,7 74, 1,7

74, 1,7 74, 1,7 74, 1,7 74, 1,7 74, 1,7 74, 1,7

74, Q:\18-Projects\18-0019\mxd\map_18-0019-04_DPWestSlabs.mxd

Legend Additional DP West Sample Locations Delayed Sites IWP Sample Locations Building 21-002 FLWP Sample Locations Pipe Tunnels and Troughes Buildings and Rooms

New Mexico State Plane Coordinate System Central Zone (3002) North American Datum, 1983 (NAD 83) US Survey Ft GIS: Dave Frank, david.frank@em-la.doe.gov, 551-2945 Created: 22-August-2018 Edited by: Grayson Vogel Last Edited: Thursday, February 28, 2019 File: map_18-0019-04_DPWestSlabs DISCLAIMER: This map was created for work processes associated with the LLCC. All other uses for this map should be confirmed with N3B staff.

0 50 10025 Feet

TA-21 DP West Slabs D&D and Remediation Appendix D-4 Map 1: DP West Slab Sampling Locations

O

Bldg 21-002 Bldg 21-003 Bldg 21-004 Bldg 21-005

Bldg 21-150Bldg 21-328

RFP-0000300

B1 B2

B4 B5

B12

B18

B24

B3 B16

B22

B14

B20

B26

B28

B9 B10 B11

B13

B15 B17

B19

B21 B23

B25

B27

B6 B7 B8

1,632,500

1,632,500

1,632,600

1,632,600

1,632,700

1,632,700

1,632,800

1,632,800

1,774,100

1,7 74, 1,774,200

1,774,300

1,7 74, Q:\18-Projects\18-0019\mxd\map_18-0019-05_DPWestBasements.mxd

Legend Building Basements Additional DP West Basement Sample Locations

Bldg 21-005 Room 5-A

Bldg 21-150 Room B-2

Bldg 21-150 Room B-1

New Mexico State Plane Coordinate System Central Zone (3002) North American Datum, 1983 (NAD 83) US Survey Ft GIS: Dave Frank, david.frank@em-la.doe.gov, 551-2945 Created: 22-August-2018 Edited by: Grayson Vogel Last Edited: Thursday, January 10, 2019 File: map_18-0019-05_DPWestBasements DISCLAIMER: This map was created for work processes associated with the LLCC. All other uses for this map should be confirmed with N3B staff.

0 20 4010

Feet

O

TA-21 DP West Slabs D&D and Remediation Appendix D-4 Map 2: DP West Basement Sampling Locations x x x x x x x x xxxxxxx xxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxx xxxxxxxx x xxxxxxxxxxxx x x x x xxxx

- - - - - - - - - - - - - -x x x x x x x x x x xxxxxxxxxxxxx x x x x x x x x

- - - - - - - - - - - - - - - - - --- -- - - - - - - - -x x x x x x x x xx x x x x x x x x x x x x x x x x

W

W

W W

WW

W

W W

W W W

W

W

W W

W

W W

W

W W

W

W

W

W

W

W

W

W W

W

W

W

W W

WW

W

W

W

W

W

WW

W

W

W

W

W

W W W W W

W W

W

W W

W

WW WW

W

W

W

W W

WW

W

W

W W

W

W

W W

W

W

W W W W W W

W W WW W W

T

T

T

T T

T T

T T

T

T T

T T

T T

T

T T

T

T

T

T

T

T

T

T T

T T

T

T

T T

T

T T

T

T

T

T

T

T

T T

T

T

T T

T

T

T

T

T

S

S

S

S S

S S

S S

S

S S

S S

S S

S

S S

S

S

S

S

S

S

S

SS

S S

S

S

S S

S

S S

S

S

S

S

S

S

S S

S

S

S S

S

S

S

S

S

WS

WS

WS

WS WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS WS

WS

WS

WS

WS

WS

WS

WS

WS WS WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WSWS

WS

WS

WS

WS

WS WS WS

WS

WS WS

WS

WS

WS

GG

G

G G

G

G

G

HO

HO

HO

HO

HO

HO

HO

HO

HO HO HO HOHO HO HO HO HO

HO

HO

HO

HO

HO

HO

HO

HO

HO

HO

HO HOHO HO HOHO HO HO

HO

HO

C

C

C

C

C

C

C

C C

C

C

C

CC

C

C

C

C C C

C

C C

C

C

C

C

C

C

C C

C

C

CC

C

C

C

C C

C

CC C

CC

C

C

C

C

C

C C

C

CC

C

C

C C

C

C

C

C C

C

C

C C

C

C CC

C

C

C

C C

C

CC

C

CC

C

C C

C

C

C

C

W

W W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W W

W

W

W

W

W

W

WWWWWWWWW

W

WW

DSDSDS

DS

DSDS

DS

DS

DS

DS

DS

DS

DS

DS

D SDS

DS

DS

DS

DS

DS

DS

DS

DS

DS

DS

DS

GU

GU

GU GU

GU

GU GU

GU

GU

GU

GU

GU

GU

GU

GU

GU

GU

GU

GU

GUGU

GU

GU

GU

HO

HO HO HO HO HO HO

HO

HO

HO

HO

HO

HO

HO

HO

HO

HO

HO

HO

WI

WI

WI

WI WI

WI

WI

WI

WI

WI

WI

WI

WI WI WI WI

WI

WI

WI

WI

WI

WI

WI

WI

WI

WI

WI

WI

WI

WI

WI WI WI WI WI

WI

WI

WI

WI

WI

WI

WI WI

WI

WI

WI

WI

WI

WI

WI

WI

WI WI WI WI WI

WI

WI

WI WI WI

WI WI

WI

WI

WI

WI

WI

21-0286

21-0313 21-0312

21-0458

21-0210

21-0089

21-015021-0003

21-0116

21-0314 21-0315

21-0002 21-0004 21-0005

21-0080

21-0149

Legend C Communication Line HO Overhead Electric Line G Gas Line WI Industrial Waste Line WS Sewer Line TS Steam Line

DS Storm Drain W Water Line GU Underground Electric Line

- -- - -x x x Security fence Existing Structures and Slabs Former Structures

New Mexico State Plane Coordinate System Central Zone (3002) North American Datum, 1983 (NAD 83) US Survey Ft GIS Template: Dave Frank Edited by: Grayson Vogel Last Edited: 17-September-2018 File Name: 18-0016-10_DPWest_Utilities DISCLAIMER: This map was created for work processes associated with TA-21 Closure Project. All other uses for this map should be confirmed with N3B TA-21 Project Manager.

All utilities shown on this map are based on most current GIS data, historical knowledge, and field observations. Utility locations, particularly underground utilities, may not be accurately depicted. It is the SUBCONTRACTORS responsibility to obtain and maintain knowledge of actual utility locations.

0 60 12030 Feet

O

TA-21 DP West Slabs D&D and Remediation Project Appendix D-4 Map 3: DP West Slab Utilities

21-0328

Document Path: Q:\18-Projects\18-0012\MXD\TA_21_Site_Plan_11x17.mxd

Legend Container Storage Area DP West D&D Subcontractor Area IWL & 21-257 Subcontractor Area Personnel Parking Truck Scale N3B Field Trailers Future Subcontractor Field Trailers Truck Traffic Flow

MDA A

MDA T NES

IWL & 21-257

SUBCONTRACTOR AREA

DP WEST D&D

SUBCONTRACTOR AREA MDA U

CONTAINER STORAGE

AREA 1

CONTAINER STORAGE

AREA 2

CONTAINER STORAGE

AREA 4

CONTAINER STORAGE

AREA 3

CONTAINER STORAGE

AREA 5

New Mexico State Plane Coordinate System Central Zone (3002) North American Datum, 1983 (NAD 83) US Survey Ft GIS: Dave Frank, david.frank@em-la.doe.gov, 551-2945 Created: 22-August-2018 Edited by: Grayson Vogel Last Edited: Thursday, January 10, 2019 File: TA_21_Site_Plan_11x17 DISCLAIMER: This map was created for work processes associated with the LLCC. All other uses for this map should be confirmed with N3B staff.

O

TA-21 DP West Slabs D&D and Remediation Appendix D-4 Map 4: Site Utilization and Trafiic Plan

0 200 400100 Feet

File details come from the government source that posted it.