This document is an attachment to a federal contract opportunity, specifically the Occupational Safety, Health and Environmental (OSHE) Provisions for the KC-130J Integrated Maintenance Plan (IMP) Planned Maintenance Interval (PMI) contract.

The key details are:

  • The contractor must comply with OSHE requirements, including developing and maintaining an Industrial Safety, Health, and Environmental program covering policy, responsibilities, training, fire protection/prevention, and emergency response.
  • The contractor must report and investigate any incidents, including hazardous material spills, personnel injuries, and damage to government property.
  • The contractor must document specific plans for hazard control in various aircraft maintenance and operations areas, such as lifting devices, aircraft jacking, compressed gas storage, aircraft towing, fuel/defuel operations, and more.
  • The contractor must comply with a list of referenced technical manuals and standards related to aircraft maintenance and safety.

This OSHE provisions attachment is associated with the overall federal contract opportunity for C-130 Maintenance & Repair Services, which is a pre-solicitation for a multiple-award IDIQ contract to provide scheduled and unscheduled maintenance, repair, and overhaul services for U.S. Marine Corps KC-130J aircraft in the Western Pacific region.

View the file

Other files

File Type Posted
Attachment 40 Request for Data.docx DOCX document
N6264924R0029 PreSol Questions and Responses.pdf PDF
RFP KC-130J_IDIQ_Attachment_01_PWS_(2024-07-26).docx DOCX document
Draft RFP KC130J N6264924R0029.pdf PDF
RFP KC-130J_IDIQ_Attachment_02_Contract_Admin_Plan_(2023-06-23).docx DOCX document
RFP KC-130J_IDIQ_Attachment_06_Drafting and Processing TEI (2023-06-23).docx DOCX document
RFP CDRL_C002_PRESENTATION_DOCUMENTATION_C-130 DistroE.pdf PDF
RFP CDRL_A013_NON-DESTRUCTIVE_INSPECTION_(NDI)_REPORT_C-130.pdf PDF
RFP CDRL_D001_PHASE-IN_TRANSITION_PLAN_C-130 DistroE.pdf PDF
RFP KC-130J_IDIQ_Attachment_08_Airfield_Requirements_(2023-06-23).docx DOCX document
RFP KC-130J_IDIQ_Attachment_03_QASP_(2023-06-23).docx DOCX document
RFP CDRL_D004_TRAINING_PLAN_C-130 DistroE.pdf PDF
RFP CDRL_G001_MATERIAL_EXPENSE_REPORT_C-130 DistroE.pdf PDF
RFP CDRL_A009_AIRCRAFT_CONDITION_EVALUATION_REPORT_C-130.pdf PDF
RFP KC-130J_IDIQ_Attachment_09_Facility_Requirements_(2023-06-23).docx DOCX document
RFP KC-130J_IDIQ_Attachment_12_GFP_(2023-06-23).xlsx XLSX spreadsheet
RFP CDRL_A003_TDC_KIT_RECEIPT_AND_REPORT_OF_KIT_DISCREPANCY_C-130.pdf PDF
RFP CDRL_A008_SITUATION_SUMMARY_REPORT_C-130.pdf PDF
RFP CDRL_A001_TECHNICAL_DIRECTIVES_REQUIREMENTS_10_DAY_REPORT_C-130.pdf PDF
RFP CDRL_A012_Maintenance_History_Summary_(MHS)_Report_C-130.pdf PDF
RFP CDRL_A014_CORROSION_INSPECTION_(CI)_REPORT_C-130 (2023-07) P000XX.pdf PDF
RFP CDRL_A006_NOTIFICATION_OF_AIRCRAFT_DELAY.pdf PDF
RFP CDRL_B001_AVDLR_TRACKER_C-130.pdf PDF
RFP CDRL_D002_TRANSITION_STATUS_REPORT_C-130 DistroE.pdf PDF
RFP CDRL_A005_PRODUCTION_PLAN_C-130.pdf PDF
Draft N6264924R0029 KC130J.pdf PDF
RFP KC-130J_IDIQ_Attachment_05_Drafting and Processing LMR (2023-06-23).docx DOCX document
RFP KC-130J_IDIQ_Attachment_10_Repairable_Items_(2023-06-23).docx DOCX document
RFP KC-130J_IDIQ_Attachment_07_PEMA_Specifications_(2023-06-23).docx DOCX document
RFP CDRL_F001_INTEGRATED_MASTER_SCHEDULE_C-130 DistroE.pdf PDF
RFP KC-130J_IDIQ_Attachment_01_PWS_(2023-06-23).docx DOCX document
RFP CDRL_A011_WEIGHT_AND_BALANCE_REPORTS_C-130 (2023-07) P000XX.pdf PDF
RFP CDRL_B003_FINAL_MATERIAL_CONSUMPTION_REPORT_C-130.pdf PDF
RFP CDRL_B002_AIRCRAFT_AWAITING_PARTS_REPORT_(AWP)_C-130 DistroE.pdf PDF
RFP CDRL_B004_MATERIAL_RECEIPT_TRACKER_REPORT_C-130.pdf PDF
RFP CDRL_A007_SCHEDULED_REMOVAL_CARDS_C-130.pdf PDF
RFP CDRL_A010_NOTED_BUT_NOT_CORRECTED_(NBNC)_REPORT_C-130.pdf PDF
RFP CDRL_A002_TECHNICAL_DIRECTIVES_REPORT_C-130.pdf PDF
RFP CDRL_L001_TECHNICAL_DATA_INVENTORY_LIST_C-130.pdf PDF
RFP KC-130J_IDIQ_Attachment_11_Support_Equipment_(2023-06-23).docx DOCX document
RFP CDRL_D003_TRANSITION_INVENTORY_PLAN_(SHUT-DOWN)_C-130 DistroE.pdf PDF
RFP CDRL_A004_DISCREPANT_PART_ON_INDUCTION_REPORT_C-130.pdf PDF
RFP CDRL_C001_MEETING_MINUTES_C-130 DistroE.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N62649XXXXXXX

Attachment (4) 23 June 2023

Attachment (4): Occupational Safety, Health and Environmental Provisions For

KC-130J

Integrated Maintenance Plan (IMP) Planned Maintenance Interval (PMI)

SECTION I - GENERAL SAFETY, HEALTH, AND ENVIRONMENTAL REQUIREMENTS

1. The Contractor, and its sub-contractors, shall comply with the provisions as set forth in the instructions of the U.S. Government in the performance of this contract as specified within its body, attachments, and references. Equivalent host nation standards may be used upon approval of DCMA Contract Safety.

1.1. The Contractor shall be responsible for developing and maintaining a detailed Industrial Safety, Health, and Environmental Program that includes:

1.1.1. Policy, organization, responsibilities, surveillance, enforcement, and training.

1.1.2. Fire protection/prevention and emergency response. The contractor shall identify specific plans for fire protection/prevention along with coordination of external activities that support these requirements for response to emergencies to include fire, chemical spill, accident, terrorist threat, adverse weather, natural disaster, etc. This item includes joint participation with external agencies in emergency response drills and training exercises.

1.1.3. Specific methods of compliance with the requirements of this section.

1.1.4. Compliance with applicable technical manual for each type, model, series aircraft.

2. The Contractor shall submit to the Administrative Contracting Officer (ACO), Government Flight Representative (GFR), and Contracting Officer’s Representative (COR) a copy of his Industrial Safety, Health and Environmental (ISHE) plan for review prior to execution, when changed and annually thereafter as part of this contract. The plan submitted shall be in English and provide a detailed description of the Contractor’s ISHE program.

3. In addition to the Mishap/Incident Reporting and Investigation requirements of DCMA INST 8210.1C Change 1, Contractor's Flight and Ground Procedures, the Contractor shall comply with the following:

3.1. The Contractor shall report, within the prescribed timeline, identification/occurrence of any incident that meets the mishap criteria, to the GFR and Integrated Product Team Lead (IPTL) Government representative by telephone. This includes hazardous material spill, occupational injury and/or illness(es) to contractor personnel, and/or damage to Government property as well as aircraft and/or explosive-related incidents.

3.2. The contractor shall submit a written investigation report detailing all available facts relating to each mishap case of material spill, personnel injury or damage to Government property to the GFR and IPTL within the prescribed timeline.

4. The contractor’s Aviation Safety Council shall promote a program of accident prevention, accept action items, provide safety expertise, implement changes as required, and address company mishaps for trend analysis and recommendations and operate as a focal point for ISHE within the company. These meetings shall be held on a regular basis (minimum quarterly per contract year).

SECTION II - INDUSTRIAL SAFETY REQUIREMENTS

1. The contractor shall document program specific plans for hazard control that ensures for compliance identified by specific standards within the following operations:

a) Lifting Devices

b) Aircraft Jacking Operations

c) Handling, Storing, and Transporting Compressed Gas Cylinders

d) Parked Aircraft

e) Moving or Tie-Down of Aircraft

f) Emergency Procedures to Safeguard Parked Aircraft During Severe Weather Conditions

g) Storage of Work Stands, Loose Aircraft Parts and Materials not Required for In-Progress Work

h) Aircraft Towing, Parking, Mooring

i) Fuel/Defuel, Fuel Tank/Cell Repair Operations

j) Removal of Hangered Fueled Aircraft

k) Aircraft Cleaning/Paint Removal/Painting

l) Handling, Storage and Use of Flammable Liquids

m) Housekeeping

n) Foreign Object Damage (FOD) Prevention

o) Welding

p) Fire Protection/Prevention

q) Personal Protective Equipment

r) Respiratory Protection

s) Lockout/Tagout (Energy Control)

t) Storage and Disposal of Hazardous Waste

u) Material Spills and Spill Response Procedures

v) Fall Protection

SECTION III - ADDITIONAL REQUIREMENTS

None

BIBLIOGRAPHY

The Contractor shall be responsible for compliance with all applicable portions of the documents listed below:

NUMBER
TITLE

DCMA 8210.1C Change 1 /NAVAIRINST 3710.1 (Series) Contractor’s Flight and Ground Operations

NAS 3306 (current version)
National Aeronautical Standard (NAS) Facility Requirements for Aircraft Operations
NAVAIR 01-75GAJ-00JG-00-1
General Maintenance Manual
NAVAIR 01-1A-35
Aircraft Fuel Cells and Tanks
NAVAIR 17-1-114
Inspection and Proofload Testing of Lifting Slings for Aircraft and Related Components
NAVAIR 19-70-521
Operation and Intermediate Maintenance with Illustrated Parts Breakdown, Aircraft Jacks

NAVAIR 19-600-135-6-1

Jacks, All Types GLCA Preoperational Checklist Aircraft Hydraulic

NAVAIR 19-600-135-6-2

Hydraulic Aircraft Jacks Periodic Maintenance Requirements Manuals

NAVSUPINST 4440.128 (Series)
Storage and Handling of Liquefied and Gaseous Compressed Gasses and Their Full and Empty Cylinders
DOD 4145.19 (Series)
Storage and Material Handling
NFPA 407 (Series)
National Fire Protection Association (NFPA) Standard for Aircraft Fuel Servicing