N6264924R0029 PreSol Questions and Responses.pdf

PDF 45 KB Posted

Attached to
C-130 Maintenance & Repair Services
Solicitation number
N6264924R0029
Issued by

About this file

This document contains questions and responses related to a pre-solicitation notice for a federal contract opportunity to provide Scheduled and Unscheduled Maintenance, Repair and Overhaul (MRO) services for U.S. Marine Corps KC-130J aircraft forward deployed to the Western Pacific region. The existing multiple-award indefinite-delivery, indefinite-quantity (IDIQ) contract holders are MARSHALL OF CAMBRIDGE AEROSPACE LIMITED and CASCADE AEROSPACE INC. via subcontract with CANADIAN COMMERCIAL CORPORATION. The contract period of performance will be from January 2025 to July 2030. The solicitation will be issued as a Request for Proposal (RFP) under full and open competition. Key details addressed in the questions and responses include: correcting a description in the draft solicitation, application of a revised DCMA instruction, contractor warranty duration, whether a proprietary information agreement (PIA) is still required, and the expected inclusion of the cost to procure Performance and Environment Management Articles (PEMAs) in the proposal. The responses provide clarification on these matters.

View the file

Other files

File Type Posted
Attachment 40 Request for Data.docx DOCX document
RFP KC-130J_IDIQ_Attachment_01_PWS_(2024-07-26).docx DOCX document
Draft RFP KC130J N6264924R0029.pdf PDF
RFP KC-130J_IDIQ_Attachment_02_Contract_Admin_Plan_(2023-06-23).docx DOCX document
RFP KC-130J_IDIQ_Attachment_06_Drafting and Processing TEI (2023-06-23).docx DOCX document
RFP CDRL_C002_PRESENTATION_DOCUMENTATION_C-130 DistroE.pdf PDF
RFP CDRL_A013_NON-DESTRUCTIVE_INSPECTION_(NDI)_REPORT_C-130.pdf PDF
RFP CDRL_D001_PHASE-IN_TRANSITION_PLAN_C-130 DistroE.pdf PDF
RFP KC-130J_IDIQ_Attachment_08_Airfield_Requirements_(2023-06-23).docx DOCX document
RFP KC-130J_IDIQ_Attachment_03_QASP_(2023-06-23).docx DOCX document
RFP CDRL_D004_TRAINING_PLAN_C-130 DistroE.pdf PDF
RFP KC-130J_IDIQ_Attachment_04_OSHE_Provisions_(2023-06-23).docx DOCX document
RFP CDRL_G001_MATERIAL_EXPENSE_REPORT_C-130 DistroE.pdf PDF
RFP CDRL_A009_AIRCRAFT_CONDITION_EVALUATION_REPORT_C-130.pdf PDF
RFP KC-130J_IDIQ_Attachment_09_Facility_Requirements_(2023-06-23).docx DOCX document
RFP KC-130J_IDIQ_Attachment_12_GFP_(2023-06-23).xlsx XLSX spreadsheet
RFP CDRL_A003_TDC_KIT_RECEIPT_AND_REPORT_OF_KIT_DISCREPANCY_C-130.pdf PDF
RFP CDRL_A008_SITUATION_SUMMARY_REPORT_C-130.pdf PDF
RFP CDRL_A001_TECHNICAL_DIRECTIVES_REQUIREMENTS_10_DAY_REPORT_C-130.pdf PDF
RFP CDRL_A012_Maintenance_History_Summary_(MHS)_Report_C-130.pdf PDF
RFP CDRL_A014_CORROSION_INSPECTION_(CI)_REPORT_C-130 (2023-07) P000XX.pdf PDF
RFP CDRL_A006_NOTIFICATION_OF_AIRCRAFT_DELAY.pdf PDF
RFP CDRL_B001_AVDLR_TRACKER_C-130.pdf PDF
RFP CDRL_D002_TRANSITION_STATUS_REPORT_C-130 DistroE.pdf PDF
RFP CDRL_A005_PRODUCTION_PLAN_C-130.pdf PDF
Draft N6264924R0029 KC130J.pdf PDF
RFP KC-130J_IDIQ_Attachment_05_Drafting and Processing LMR (2023-06-23).docx DOCX document
RFP KC-130J_IDIQ_Attachment_10_Repairable_Items_(2023-06-23).docx DOCX document
RFP KC-130J_IDIQ_Attachment_07_PEMA_Specifications_(2023-06-23).docx DOCX document
RFP CDRL_F001_INTEGRATED_MASTER_SCHEDULE_C-130 DistroE.pdf PDF
RFP KC-130J_IDIQ_Attachment_01_PWS_(2023-06-23).docx DOCX document
RFP CDRL_A011_WEIGHT_AND_BALANCE_REPORTS_C-130 (2023-07) P000XX.pdf PDF
RFP CDRL_B003_FINAL_MATERIAL_CONSUMPTION_REPORT_C-130.pdf PDF
RFP CDRL_B002_AIRCRAFT_AWAITING_PARTS_REPORT_(AWP)_C-130 DistroE.pdf PDF
RFP CDRL_B004_MATERIAL_RECEIPT_TRACKER_REPORT_C-130.pdf PDF
RFP CDRL_A007_SCHEDULED_REMOVAL_CARDS_C-130.pdf PDF
RFP CDRL_A010_NOTED_BUT_NOT_CORRECTED_(NBNC)_REPORT_C-130.pdf PDF
RFP CDRL_A002_TECHNICAL_DIRECTIVES_REPORT_C-130.pdf PDF
RFP CDRL_L001_TECHNICAL_DATA_INVENTORY_LIST_C-130.pdf PDF
RFP KC-130J_IDIQ_Attachment_11_Support_Equipment_(2023-06-23).docx DOCX document
RFP CDRL_D003_TRANSITION_INVENTORY_PLAN_(SHUT-DOWN)_C-130 DistroE.pdf PDF
RFP CDRL_A004_DISCREPANT_PART_ON_INDUCTION_REPORT_C-130.pdf PDF
RFP CDRL_C001_MEETING_MINUTES_C-130 DistroE.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. Category Para. Or Page Question Answer

1 Draft Solicitation CLIN 0007, 1007, 2007, 3007, 4007, and 5007 are described as "The contractor shall perform accelearted work in accordance with the PWS". It needs to be corrected accordingly

Solicitation updated and to be posted in SAM.

2 PWS 2.2 The DCMA INST was revised to version D in 2023, should version C apply?

Revision D should have been noted. The revised PWS dated 26 July 2024 is uploaded to the SAM.gov posting.

3 PWS 4.1.4.1 How long is the contractor warrants?

FAR clause 52.246-20 applies "within one (1) year from the date of acceptance signature on the DD250 or designated acceptance document by the Government." for each task order.

4 PWS 5.5.1

Is PIA / PIEA (between the OEM and the Contractor) still required?

Acc. to Q&A (C130+Industry+Day+Q+and+A+2023.pdf), HSC (Hercules Service Center) certificate from OEMis not required.

The PIA/PIEA requirement has been deleted in the revised PWS dated 26 July 2024, and is uploaded to the SAM.gov posting. The HSC certificate from the OEM is not a requiement of this contract.

5 PWS 5.5.4 Should a bidder include the cost of purchasing PEMAs in the Cost Proposal?

As stated in PWS requirement 5.5.4, the contractor may be requied to procure PEMAs, meeting the specifications listed in Attachment (7), Therefore, the cost of purchasing PEMAs is expected to be included in the proposal.

When a bidder is awared as MAC awardee, price per each CLIN / SLIN should be bounded IAW valid contract.

In this case of SCHEDULED MAINTENANCE REQUIREMENTS, "Total Task Order Proposal Prcie" in response to a solicitation for Task Orders seems to be the same.

Is it allowed for MAC awardee to propose "Total Task Order Proposal Price" which is different (lower or higher) from Price written in the valid contract?

Prices that are submitted in response to a solicitation for Task Order (competition) may be equal to or lower than the prices that are included in the base contract for the same supplies or services but may not be higher.

If awarded, the price proposed by the MAC holder will be the price reflected in the specific task order.

File details come from the government source that posted it. Updated .