N6264924R0029 PreSol Questions and Responses.pdf
PDF 45 KB Posted
- Attached to
- C-130 Maintenance & Repair Services
- Solicitation number
- N6264924R0029
About this file
This document contains questions and responses related to a pre-solicitation notice for a federal contract opportunity to provide Scheduled and Unscheduled Maintenance, Repair and Overhaul (MRO) services for U.S. Marine Corps KC-130J aircraft forward deployed to the Western Pacific region. The existing multiple-award indefinite-delivery, indefinite-quantity (IDIQ) contract holders are MARSHALL OF CAMBRIDGE AEROSPACE LIMITED and CASCADE AEROSPACE INC. via subcontract with CANADIAN COMMERCIAL CORPORATION. The contract period of performance will be from January 2025 to July 2030. The solicitation will be issued as a Request for Proposal (RFP) under full and open competition. Key details addressed in the questions and responses include: correcting a description in the draft solicitation, application of a revised DCMA instruction, contractor warranty duration, whether a proprietary information agreement (PIA) is still required, and the expected inclusion of the cost to procure Performance and Environment Management Articles (PEMAs) in the proposal. The responses provide clarification on these matters.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. Category Para. Or Page Question Answer
1 Draft Solicitation CLIN 0007, 1007, 2007, 3007, 4007, and 5007 are described as "The contractor shall perform accelearted work in accordance with the PWS". It needs to be corrected accordingly
Solicitation updated and to be posted in SAM.
2 PWS 2.2 The DCMA INST was revised to version D in 2023, should version C apply?
Revision D should have been noted. The revised PWS dated 26 July 2024 is uploaded to the SAM.gov posting.
3 PWS 4.1.4.1 How long is the contractor warrants?
FAR clause 52.246-20 applies "within one (1) year from the date of acceptance signature on the DD250 or designated acceptance document by the Government." for each task order.
4 PWS 5.5.1
Is PIA / PIEA (between the OEM and the Contractor) still required?
Acc. to Q&A (C130+Industry+Day+Q+and+A+2023.pdf), HSC (Hercules Service Center) certificate from OEMis not required.
The PIA/PIEA requirement has been deleted in the revised PWS dated 26 July 2024, and is uploaded to the SAM.gov posting. The HSC certificate from the OEM is not a requiement of this contract.
5 PWS 5.5.4 Should a bidder include the cost of purchasing PEMAs in the Cost Proposal?
As stated in PWS requirement 5.5.4, the contractor may be requied to procure PEMAs, meeting the specifications listed in Attachment (7), Therefore, the cost of purchasing PEMAs is expected to be included in the proposal.
When a bidder is awared as MAC awardee, price per each CLIN / SLIN should be bounded IAW valid contract.
In this case of SCHEDULED MAINTENANCE REQUIREMENTS, "Total Task Order Proposal Prcie" in response to a solicitation for Task Orders seems to be the same.
Is it allowed for MAC awardee to propose "Total Task Order Proposal Price" which is different (lower or higher) from Price written in the valid contract?
Prices that are submitted in response to a solicitation for Task Order (competition) may be equal to or lower than the prices that are included in the base contract for the same supplies or services but may not be higher.
If awarded, the price proposed by the MAC holder will be the price reflected in the specific task order.