Draft N6264924R0029 KC130J.pdf
PDF 3 MB Posted
- Attached to
- C-130 Maintenance & Repair Services
- Solicitation number
- N6264924R0029
About this file
This document is a draft solicitation for KC-130J aircraft maintenance and repair services for the U.S. Navy and Marine Corps. The Navy intends to issue a Request for Proposal (RFP) under full and open competition to obtain Scheduled and Unscheduled Maintenance, Repair and Overhaul (MRO) services. The work will be performed at contractor-proposed facilities that meet the contract requirements. The Period of Performance will align with the existing Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple-Award Contract (MAC), which runs from January 2025 to July 2030. The applicable NAICS code is 488190 with a $40 million size standard. The contract will include Scheduled Maintenance, Repetitive Maintenance, Unscheduled Maintenance, Full Supply Support, Contract Data Requirements List deliverables, Accelerated Delivery, and Government Furnished Material handling. Pricing will be firm-fixed-price. The current MAC awardees are MARSHALL OF CAMBRIDGE AEROSPACE LIMITED and CASCADE AEROSPACE INC. subcontractor to CANADIAN COMMERCIAL CORPORATION.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local t ime
X
A X B X C X D
EX
X
G F 321 - 343
344 - 356 X H 357 - 365
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 365
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N62649 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 188
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
189 - 191 192 - 193
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
194 - 209
210 - 232 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 233 - 236 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 237 - 254 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
255 - 318
PART II - CO NTRACT CLAUSES
NAVSUP FLC YOKOSUKA
(CODE 200)
CONTRACTING DEPARTMENT
PSC 473 BOX 11
FPO AP 96349-0011
315-243-7733
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
319 - 320
6. REQUISITION/PURCHASE NO.5. DATE ISSUED4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N6264924R0029
Section B - Supplies or Services and Prices
The changes incorporated by this modification do not apply to task orders awarded prior to the modification of the basic IDIQ until incorporated via a separate modification into those task orders.
Consistent with FAR Clause 52.216-22 Indefinite Quantity, the Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in each individual task order. The unit prices identified in Section B are Firm-Fixed-Price (FFP) and shall not be adjusted as a result of the actual cost of performance. The quantities identified in Section B are estimates only. The exact quantities of deliveries are not known at the time of award:
The cumulative amount of all task orders to be issued under this contract shall not exceed the maximum specified below, and the Government shall order at least the minimum specified below:
Minimum: $5,000.00 per awardee at contract award for Post-Award Conference (CLIN X009) Maximum: $374,293,250.00
Note: The Government intends to induct one aircraft per awardee subsequent to the Post Award Conference. This initial induction will not fall under the H-1.0 ordering procedures, and pricing for the first induction will be based on the awarded amounts for Base Year 1. The sequence of induction will be addressed during the Post Award Conference and is intended to be based upon the readiness of the Contractor and what is the most advantageous sequence for the Government - See Section F 3.0.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Scheduled Maintenance - Base
FFP
The contractor shall perform KC-130J Scheduled Maintenance in accordance with the attached Performance Work Statement (PWS).
NET AMT
0001AA 5 Each KC-130J PMI - Base
FFP
The contractor shall perform KC-130J Scheduled Maintenance in accordance with the attached PWS.
FOB: Origin (Shipping Point)
PSC CD: J015
Repetitive Maintenance - Base
FFP
The contractor shall perform KC-130J As Required Maintenance, in accordance with the attached PWS.
0002AA 5 Each Restoration - Aircraft Exterior - Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Complete Restoration of Aircraft Exterior, in accordance with the attached PWS.
0002AB 5 Each Scuff, Sand, Overspray - Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Scuff, Sand, and Overspray - Aircraft Exterior, in accordance with the attached PWS.
0002AC 5 Each Weight & Balance - Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Aircraft Weight and Balance, in accordance with the attached PWS.
0002AD 5 Each Corrosion Control Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Aircraft Corrosion Control, in accordance with the attached PWS.
0002AE
Reserved
FFP
0002AF 5 Each FHD-NDI NX.1.7.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002AG 5 Each FHD-NDI NX.2.3.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002AH 5 Each FHD-NDI NX.2.4.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002AJ 5 Each FHD-NDI NX.3.1.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002AK 5 Each FHD-NDI NX.3.1.3 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002AL 5 Each FHD-NDI NX.3.1.4.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002AM 5 Each FHD-NDI NX.3.1.4.2 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002AN 5 Each FHD-NDI NX.3.3.3 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002AP 5 Each FHD-NDI NX.3.3.4 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002AQ 5 Each FHD-NDI NX.3.3.5 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002AR 5 Each FHD-NDI NX.3.3.8 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002AS 5 Each FHD-NDI NX.3.3.9 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002AT 5 Each FHD-NDI NX.3.3.11 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002AU 5 Each FHD-NDI NX.3.3.12 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002AV 5 Each FHD-NDI NX.3.3.13 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002AW
Reserved
FFP
0002AX 5 Each FHD-NDI NX.3.5.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002AY 5 Each FHD-NDI NX.3.6.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002AZ 5 Each FHD-NDI NX.3.7.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BA 5 Each FHD-NDI NX.4.1.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BB 5 Each FHD-NDI NX.4.1.2 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BC 5 Each FHD-NDI NX.4.1.3 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BD 5 Each FHD-NDI NX.4.1.5 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BE 5 Each FHD-NDI NX.4.1.10 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BF 5 Each FHD-NDI NX.4.1.11 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BG 5 Each FHD-NDI NX.4.1.11.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BH 5 Each FHD-NDI NX.4.2.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BJ 5 Each FHD-NDI NX.4.2.2 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BK 5 Each FHD-NDI NX.4.3.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BL 5 Each FHD-NDI NX.4.3.2 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BM 5 Each FHD-NDI NX.4.3.4 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BN 5 Each FHD-NDI NX.4.6.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BP 5 Each FHD-NDI NX.4.7.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BQ 5 Each FHD-NDI NX.5.1.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BR 5 Each FHD-NDI NX.5.2.2 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BS 5 Each FHD-NDI NX.5.4.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BT 5 Each FHD-NDI NX.6.2.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BU 5 Each FHD-NDI NX.6.2.2 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BV 5 Each FHD-NDI NX.6.2.3 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BW 5 Each FHD-NDI NX.6.2.4 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BX 5 Each FHD-NDI NX.6.2.5 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
0002BY 5 Each FHD-NDI NX.1.1.1 Base
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
Unscheduled Maintenance Base
FFP
The contractor shall perform KC-130J Unscheduled Maintenance in accordance
0003AA 55,000 Hours Over and Above (O&A) Base
FFP
The contractor shall perform KC-130J Unscheduled Maintenance, O&A, in accordance with the attached PWS.
0003AB 16,500 Hours TD and Aircraft Mods Base
FFP
The contractor shall perform KC-130J Technical Directives (TD) and Aircraft Modifications in accordance with the attached PWS.
0003AC 500 Hours Customer Service Requests (CSR) Base
FFP
The contractor shall perform KC-130J Unscheduled Maintenance, CSR, in accordance with the attached PWS
0003AD 500 Hours In-Service Repairs Base
FFP
The contractor shall perform KC-130J Unscheduled Maintenance, In-Service Repairs (ISR) in accordance with the attached PWS.
0003AE Hours Reserved
FFP
0004 5 Each Full Supply Support Base
FFP
The contractor shall provide Full Supply Support, in accordance with the attached
PWS.
CDRL Deliverables Base
FFP
Data Call (Reporting) identified with Contractor Data Requirement List (CDRL).
See Exhibits A001 - L001.
0006 500 Hours Accelerated Delivery Base
FFP
The contractor shall perform accelerated work in accordance with the PWS.
GFM Handling Base
FFP
The contractor shall perform accelerated work in accordance with the PWS.
0007AA 1 Lot Preserve & Pack Base
FFP
The contractor shall perform Preservation and Packing of Government Furnished Material (GFM) in accordance with the PWS.
0007AB 1 Lot Ship & Transport - Base
FFP
The contractor shall perform Ship and Transport in accordance with the PWS.
Travel Base
FFP
Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS.
MFR PART NR: j
0008AA 1 Lot Travel Base
FFP
Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.
0008AB 1 Lot Ferry Flight Base
FFP
The contractor shall perform KC-130J Unscheduled Maintenance, Ferry Flights, in accordance with the attached PWS.
0009 1 Each Post-Award Conference Base
FFP
Post-Award Conference will be conducted in accordance with the attached PWS.
FOB: Origin (Shipping Point)
Scheduled Maintenance Opt 1
FFP
1001AA 5 Each KC-130J PMI Opt 1
FFP
The contractor shall perform KC-130J Scheduled Maintenance in accordance with the attached PWS.
Repetitive Maintenance Opt 1
FFP
1002AA 5 Each Restoration - Aircraft Exterior - Opt 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Complete Restoration of Aircraft Exterior, in accordance with the attached PWS.
1002AB 5 Each Scuff, Sand, Overspray - Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Scuff, Sand, and Overspray - Aircraft Exterior, in accordance with the attached PWS.
1002AC 5 Each Weight & Balance - Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Aircraft Weight and Balance, in accordance with the attached PWS.
1002AD 5 Each Corrosion Control - Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Aircraft Corrosion Control, in accordance with the attached PWS.
1002AE
Reserved Option Year 1
FFP
1002AF 5 Each FHD-NDI NX.1.7.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002AG 5 Each FHD-NDI NX.2.3.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002AH 5 Each FHD-NDI NX.2.4.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002AJ 5 Each FHD-NDI NX.3.1.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002AK 5 Each FHD-NDI NX.3.1.3 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002AL 5 Each FHD-NDI NX.3.1.4.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002AM 5 Each FHD-NDI NX.3.1.4.2 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002AN 5 Each FHD-NDI NX.3.3.3 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002AP 5 Each FHD-NDI NX.3.3.4 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002AQ 5 Each FHD-NDI NX.3.3.5 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002AR 5 Each FHD-NDI NX.3.3.8 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002AS 5 Each FHD-NDI NX.3.3.9 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002AT 5 Each FHD-NDI NX.3.3.11 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002AU 5 Each FHD-NDI NX.3.3.12 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002AV 5 Each FHD-NDI NX.3.3.13 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002AW
Reserved
FFP
1002AX 5 Each FHD-NDI NX.3.5.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002AY 5 Each FHD-NDI NX.3.6.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002AZ 5 Each FHD-NDI NX.3.7.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BA 5 Each FHD-NDI NX.4.1.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BB 5 Each FHD-NDI NX.4.1.2 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BC 5 Each FHD-NDI NX.4.1.3 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BD 5 Each FHD-NDI NX.4.1.5 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BE 5 Each FHD-NDI NX.4.1.10 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BF 5 Each FHD-NDI NX.4.1.11 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BG 5 Each FHD-NDI NX.4.1.11.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BH 5 Each FHD-NDI NX.4.2.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BJ 5 Each FHD-NDI NX.4.2.2 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BK 5 Each FHD-NDI NX.4.3.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BL 5 Each FHD-NDI NX.4.3.2 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BM 5 Each FHD-NDI NX.4.3.4 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BN 5 Each FHD-NDI NX.4.6.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BP 5 Each FHD-NDI NX.4.7.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BQ 5 Each FHD-NDI NX.5.1.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BR 5 Each FHD-NDI NX.5.2.2 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BS 5 Each FHD-NDI NX.5.4.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BT 5 Each FHD-NDI NX.6.2.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BU 5 Each FHD-NDI NX.6.2.2 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BV 5 Each FHD-NDI NX.6.2.3 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BW 5 Each FHD-NDI NX.6.2.4 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BX 5 Each FHD-NDI NX.6.2.5 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
1002BY 5 Each FHD-NDI NX.1.1.1 Option Year 1
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
Unscheduled Maintenance Opt 1
FFP
1003AA 55,000 Hours Over and Above (O&A) - Option Year 1
FFP
The contractor shall perform KC-130J Unscheduled Maintenance, O&A, in accordance with the attached PWS.
1003AB 16,500 Hours TD and Aircraft Mods - Option Year 1
FFP
The contractor shall perform KC-130J Technical Directives (TD) and Aircraft Modifications in accordance with the attached PWS.
1003AC 500 Hours Customer Service Requests (CSR) - Opt 1
FFP
The contractor shall perform KC-130J Unscheduled Maintenance, CSR, in accordance with the attached PWS
1003AD 500 Hours In-Service Repairs - Option Year 1
FFP
The contractor shall perform KC-130J Unscheduled Maintenance, In-Service Repairs (ISR) in accordance with the attached PWS.
1003AE Hours Reserved
FFP
1004 5 Each Full Supply Support Opt 1
FFP
The contractor shall provide Full Supply Support, in accordance with the attached
PWS.
CDRL Deliverables Opt 1
FFP
Data Call (Reporting) identified with Contractor Data Requirement List (CDRL).
See Exhibits A001 - L001.
1006 500 Hours Accelerated Delivery Opt 1
FFP
The contractor shall perform accelerated work in accordance with the PWS.
GFM Handling Opt 1
1007AA 1 Lot Preserve & Pack - Opt 1
FFP
The contractor shall perform Preservation and Packing of Government Furnished Material (GFM) in accordance with the PWS.
1007AB 1 Lot Ship & Transport - Opt 1
FFP
The contractor shall perform Ship and Transport in accordance with the PWS.
Travel Opt 1
FFP
Additional costs incurred when the Contractor is required to travel for the required
1008AA 1 Lot Travel - Opt 1
FFP
Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.
1008AB 1 Lot Ferry Flight - Opt 1
FFP
The contractor shall perform KC-130J Unscheduled Maintenance, Ferry Flights, in accordance with the attached PWS.
1009 1 Each Reserved Opt 1
FFP
FOB: Origin (Shipping Point)
Scheduled Maintenance Opt 2
FFP
2001AA 5 Each KC-130J PMI - Opt 2
FFP
The contractor shall perform KC-130J Scheduled Maintenance in accordance with the attached PWS.
Repetitive Maintenance Opt 2
FFP
2002AA 5 Each Restoration Aircraft Exterior - Opt 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Complete Restoration of Aircraft Exterior, in accordance with the attached PWS.
2002AB 5 Each Scuff, Sand, Overspray - Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Scuff, Sand, and Overspray - Aircraft Exterior, in accordance with the attached PWS.
2002AC 5 Each Weight & Balance - Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Aircraft Weight and Balance, in accordance with the attached PWS.
2002AD 5 Each Corrosion Control - Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Aircraft Corrosion Control, in accordance with the attached PWS.
2002AE
Reserved Option Year 2
FFP
2002AF 5 Each FHD-NDI NX.1.7.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002AG 5 Each FHD-NDI NX.2.3.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002AH 5 Each FHD-NDI NX.2.4.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002AJ 5 Each FHD-NDI NX.3.1.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002AK 5 Each FHD-NDI NX.3.1.3 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002AL 5 Each FHD-NDI NX.3.1.4.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002AM 5 Each FHD-NDI NX.3.1.4.2 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002AN 5 Each FHD-NDI NX.3.3.3 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002AP 5 Each FHD-NDI NX.3.3.4 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002AQ 5 Each FHD-NDI NX.3.3.5 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002AR 5 Each FHD-NDI NX.3.3.8 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002AS 5 Each FHD-NDI NX.3.3.9 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002AT 5 Each FHD-NDI NX.3.3.11 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002AU 5 Each FHD-NDI NX.3.3.12 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002AV 5 Each FHD-NDI NX.3.3.13 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002AW
Reserved
FFP
2002AX 5 Each FHD-NDI NX.3.5.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002AY 5 Each FHD-NDI NX.3.6.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002AZ 5 Each FHD-NDI NX.3.7.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BA 5 Each FHD-NDI NX.4.1.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BB 5 Each FHD-NDI NX.4.1.2 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BC 5 Each FHD-NDI NX.4.1.3 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BD 5 Each FHD-NDI NX.4.1.5 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BE 5 Each FHD-NDI NX.4.1.10 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BF 5 Each FHD-NDI NX.4.1.11 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BG 5 Each FHD-NDI NX.4.1.11.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BH 5 Each FHD-NDI NX.4.2.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BJ 5 Each FHD-NDI NX.4.2.2 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BK 5 Each FHD-NDI NX.4.3.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BL 5 Each FHD-NDI NX.4.3.2 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BM 5 Each FHD-NDI NX.4.3.4 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BN 5 Each FHD-NDI NX.4.6.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BP 5 Each FHD-NDI NX.4.7.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BQ 5 Each FHD-NDI NX.5.1.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BR 5 Each FHD-NDI NX.5.2.2 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BS 5 Each FHD-NDI NX.5.4.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BT 5 Each FHD-NDI NX.6.2.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BU 5 Each FHD-NDI NX.6.2.2 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BV 5 Each FHD-NDI NX.6.2.3 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BW 5 Each FHD-NDI NX.6.2.4 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BX 5 Each FHD-NDI NX.6.2.5 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
2002BY 5 Each FHD-NDI NX.1.1.1 Option Year 2
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
Unscheduled Maintenance Opt 2
FFP
2003AA 55,000 Hours Over and Above (O&A) - Option Year 2
FFP
The contractor shall perform KC-130J Unscheduled Maintenance, O&A, in accordance with the attached PWS.
2003AB 16,500 Hours TD and Aircraft Mods - Option Year 2
FFP
The contractor shall perform KC-130J Technical Directives (TD) and Aircraft Modifications in accordance with the attached PWS.
2003AC 500 Hours Customer Service Requests (CSR) - Opt 2
FFP
The contractor shall perform KC-130J Unscheduled Maintenance, CSR, in accordance with the attached PWS
2003AD 500 Hours In-Service Repairs - Option Year 2
FFP
The contractor shall perform KC-130J Unscheduled Maintenance, In-Service Repairs (ISR) in accordance with the attached PWS.
2003AE Hours Reserved
FFP
2004 5 Each Full Supply Support Opt 2
FFP
The contractor shall provide Full Supply Support, in accordance with the attached
PWS.
CDRL Deliverables Opt 2
FFP
Data Call (Reporting) identified with Contractor Data Requirement List (CDRL).
See Exhibits A001 - L001.
2006 500 Hours Accelerated Delivery Opt 2
FFP
The contractor shall perform accelerated work in accordance with the PWS.
GFM Handling Opt 2
2007AA 1 Lot Preserve & Pack - Opt 2
FFP
The contractor shall perform Preservation and Packing of Government Furnished Material (GFM) in accordance with the PWS.
2007AB 1 Lot Ship & Transport - Opt 2
FFP
The contractor shall perform Ship and Transport in accordance with the PWS.
Travel Opt 2
FFP
Additional costs incurred when the Contractor is required to travel for the required
2008AA 1 Lot Travel - Opt 2
FFP
Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.
2008AB 1 Lot Ferry Flight - Opt 2
FFP
The contractor shall perform KC-130J Unscheduled Maintenance, Ferry Flights, in accordance with the attached PWS.
2009 1 Each Reserved Opt 2
FFP
FOB: Origin (Shipping Point)
Scheduled Maintenance Opt 3
FFP
3001AA 5 Each KC-130J PMI Opt 3
FFP
The contractor shall perform KC-130J Scheduled Maintenance in accordance with the attached PWS.
Repetitive Maintenance Opt 3
FFP
3002AA 5 Each Restoration Aircraft Exterior - Opt 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Complete Restoration of Aircraft Exterior, in accordance with the attached PWS.
3002AB 5 Each Scuff, Sand, Overspray - Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Scuff, Sand, and Overspray - Aircraft Exterior, in accordance with the attached PWS.
3002AC 5 Each Weight & Balance - Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Aircraft Weight and Balance, in accordance with the attached PWS.
3002AD 5 Each Corrosion Control - Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Aircraft Corrosion Control, in accordance with the attached PWS.
3002AE
Reserved Option Year 3
FFP
3002AF 5 Each FHD-NDI NX.1.7.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002AG 5 Each FHD-NDI NX.2.3.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002AH 5 Each FHD-NDI NX.2.4.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002AJ 5 Each FHD-NDI NX.3.1.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002AK 5 Each FHD-NDI NX.3.1.3 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002AL 5 Each FHD-NDI NX.3.1.4.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002AM 5 Each FHD-NDI NX.3.1.4.2 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002AN 5 Each FHD-NDI NX.3.3.3 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002AP 5 Each FHD-NDI NX.3.3.4 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002AQ 5 Each FHD-NDI NX.3.3.5 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002AR 5 Each FHD-NDI NX.3.3.8 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002AS 5 Each FHD-NDI NX.3.3.9 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002AT 5 Each FHD-NDI NX.3.3.11 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002AU 5 Each FHD-NDI NX.3.3.12 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002AV 5 Each FHD-NDI NX.3.3.13 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002AW
Reserved
FFP
3002AX 5 Each FHD-NDI NX.3.5.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002AY 5 Each FHD-NDI NX.3.6.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002AZ 5 Each FHD-NDI NX.3.7.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BA 5 Each FHD-NDI NX.4.1.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BB 5 Each FHD-NDI NX.4.1.2 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BC 5 Each FHD-NDI NX.4.1.3 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BD 5 Each FHD-NDI NX.4.1.5 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BE 5 Each FHD-NDI NX.4.1.10 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BF 5 Each FHD-NDI NX.4.1.11 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BG 5 Each FHD-NDI NX.4.1.11.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BH 5 Each FHD-NDI NX.4.2.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BJ 5 Each FHD-NDI NX.4.2.2 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BK 5 Each FHD-NDI NX.4.3.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BL 5 Each FHD-NDI NX.4.3.2 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BM 5 Each FHD-NDI NX.4.3.4 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BN 5 Each FHD-NDI NX.4.6.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BP 5 Each FHD-NDI NX.4.7.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BQ 5 Each FHD-NDI NX.5.1.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BR 5 Each FHD-NDI NX.5.2.2 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BS 5 Each FHD-NDI NX.5.4.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BT 5 Each FHD-NDI NX.6.2.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BU 5 Each FHD-NDI NX.6.2.2 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BV 5 Each FHD-NDI NX.6.2.3 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BW 5 Each FHD-NDI NX.6.2.4 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BX 5 Each FHD-NDI NX.6.2.5 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
3002BY 5 Each FHD-NDI NX.1.1.1 Option Year 3
FFP
The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.
Unscheduled Maintenance Opt 3
FFP
3003AA 55,000 Hours Over and Above (O&A) - Option Year 3
FFP
The contractor shall perform KC-130J Unscheduled Maintenance, O&A, in accordance with the attached PWS.
3003AB 16,500 Hours TD and Aircraft Mods - Option Year 3
FFP
The contractor shall perform KC-130J Technical Directives (TD) and Aircraft Modifications in accordance with the attached PWS.
3003AC 500 Hours Customer Service Requests (CSR) - Opt 3
FFP
The contractor shall perform KC-130J Unscheduled Maintenance, CSR, in accordance with the attached PWS
3003AD 500 Hours In-Service Repairs - Option Year 3
FFP
The contractor shall perform KC-130J Unscheduled Maintenance, In-Service Repairs (ISR) in accordance with the attached PWS.
3003AE Hours Reserved
FFP
3004 5 Each Full Supply Support Opt 3
FFP
The contractor shall provide Full Supply Support, in accordance with the attached
PWS.
CDRL Deliverables Opt 3
FFP
Data Call (Reporting) identified with Contractor Data Requirement List (CDRL).
See Exhibits A001 - L001.
3006 500 Hours Accelerated Delivery Opt 3
FFP
The contractor shall perform accelerated work in accordance with the PWS.
GFM Handling Opt 3
3007AA 1 Lot Preserve & Pack - Opt 3
FFP
The contractor shall perform Preservation and Packing of Government Furnished Material (GFM) in accordance with the PWS.
3007AB 1 Lot Ship & Transport - Opt 3
FFP
The contractor shall perform Ship and Transport in accordance with the PWS.
Travel Opt 3
FFP
Additional costs incurred when the Contractor is required to travel for the required
3008AA 1 Lot Travel - Opt 3
FFP
Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.
3008AB 1 Lot Ferry Flight - Opt 3
FFP
The contractor shall perform KC-130J Unscheduled Maintenance, Ferry Flights, in accordance with the attached PWS.
3009 1 Each Reserved Opt 3
FFP
FOB: Origin (Shipping Point)
Scheduled Maintenance Opt 4
FFP
4001AA 5 Each KC-130J PMI Opt 4
FFP
The contractor shall perform KC-130J Scheduled Maintenance in accordance with the attached PWS.
Repetitive Maintenance Opt 4
FFP
with the
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .