This document is a draft solicitation for KC-130J aircraft maintenance and repair services for the U.S. Navy and Marine Corps. The Navy intends to issue a Request for Proposal (RFP) under full and open competition to obtain Scheduled and Unscheduled Maintenance, Repair and Overhaul (MRO) services. The work will be performed at contractor-proposed facilities that meet the contract requirements. The Period of Performance will align with the existing Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple-Award Contract (MAC), which runs from January 2025 to July 2030. The applicable NAICS code is 488190 with a $40 million size standard. The contract will include Scheduled Maintenance, Repetitive Maintenance, Unscheduled Maintenance, Full Supply Support, Contract Data Requirements List deliverables, Accelerated Delivery, and Government Furnished Material handling. Pricing will be firm-fixed-price. The current MAC awardees are MARSHALL OF CAMBRIDGE AEROSPACE LIMITED and CASCADE AEROSPACE INC. subcontractor to CANADIAN COMMERCIAL CORPORATION.

View the file

Other files

File Type Posted
Attachment 40 Request for Data.docx DOCX document
N6264924R0029 PreSol Questions and Responses.pdf PDF
RFP KC-130J_IDIQ_Attachment_01_PWS_(2024-07-26).docx DOCX document
Draft RFP KC130J N6264924R0029.pdf PDF
RFP KC-130J_IDIQ_Attachment_02_Contract_Admin_Plan_(2023-06-23).docx DOCX document
RFP KC-130J_IDIQ_Attachment_06_Drafting and Processing TEI (2023-06-23).docx DOCX document
RFP CDRL_C002_PRESENTATION_DOCUMENTATION_C-130 DistroE.pdf PDF
RFP CDRL_A013_NON-DESTRUCTIVE_INSPECTION_(NDI)_REPORT_C-130.pdf PDF
RFP CDRL_D001_PHASE-IN_TRANSITION_PLAN_C-130 DistroE.pdf PDF
RFP KC-130J_IDIQ_Attachment_08_Airfield_Requirements_(2023-06-23).docx DOCX document
RFP KC-130J_IDIQ_Attachment_03_QASP_(2023-06-23).docx DOCX document
RFP CDRL_D004_TRAINING_PLAN_C-130 DistroE.pdf PDF
RFP KC-130J_IDIQ_Attachment_04_OSHE_Provisions_(2023-06-23).docx DOCX document
RFP CDRL_G001_MATERIAL_EXPENSE_REPORT_C-130 DistroE.pdf PDF
RFP CDRL_A009_AIRCRAFT_CONDITION_EVALUATION_REPORT_C-130.pdf PDF
RFP KC-130J_IDIQ_Attachment_09_Facility_Requirements_(2023-06-23).docx DOCX document
RFP KC-130J_IDIQ_Attachment_12_GFP_(2023-06-23).xlsx XLSX spreadsheet
RFP CDRL_A003_TDC_KIT_RECEIPT_AND_REPORT_OF_KIT_DISCREPANCY_C-130.pdf PDF
RFP CDRL_A008_SITUATION_SUMMARY_REPORT_C-130.pdf PDF
RFP CDRL_A001_TECHNICAL_DIRECTIVES_REQUIREMENTS_10_DAY_REPORT_C-130.pdf PDF
RFP CDRL_A012_Maintenance_History_Summary_(MHS)_Report_C-130.pdf PDF
RFP CDRL_A014_CORROSION_INSPECTION_(CI)_REPORT_C-130 (2023-07) P000XX.pdf PDF
RFP CDRL_A006_NOTIFICATION_OF_AIRCRAFT_DELAY.pdf PDF
RFP CDRL_B001_AVDLR_TRACKER_C-130.pdf PDF
RFP CDRL_D002_TRANSITION_STATUS_REPORT_C-130 DistroE.pdf PDF
RFP CDRL_A005_PRODUCTION_PLAN_C-130.pdf PDF
RFP KC-130J_IDIQ_Attachment_05_Drafting and Processing LMR (2023-06-23).docx DOCX document
RFP KC-130J_IDIQ_Attachment_10_Repairable_Items_(2023-06-23).docx DOCX document
RFP KC-130J_IDIQ_Attachment_07_PEMA_Specifications_(2023-06-23).docx DOCX document
RFP CDRL_F001_INTEGRATED_MASTER_SCHEDULE_C-130 DistroE.pdf PDF
RFP KC-130J_IDIQ_Attachment_01_PWS_(2023-06-23).docx DOCX document
RFP CDRL_A011_WEIGHT_AND_BALANCE_REPORTS_C-130 (2023-07) P000XX.pdf PDF
RFP CDRL_B003_FINAL_MATERIAL_CONSUMPTION_REPORT_C-130.pdf PDF
RFP CDRL_B002_AIRCRAFT_AWAITING_PARTS_REPORT_(AWP)_C-130 DistroE.pdf PDF
RFP CDRL_B004_MATERIAL_RECEIPT_TRACKER_REPORT_C-130.pdf PDF
RFP CDRL_A007_SCHEDULED_REMOVAL_CARDS_C-130.pdf PDF
RFP CDRL_A010_NOTED_BUT_NOT_CORRECTED_(NBNC)_REPORT_C-130.pdf PDF
RFP CDRL_A002_TECHNICAL_DIRECTIVES_REPORT_C-130.pdf PDF
RFP CDRL_L001_TECHNICAL_DATA_INVENTORY_LIST_C-130.pdf PDF
RFP KC-130J_IDIQ_Attachment_11_Support_Equipment_(2023-06-23).docx DOCX document
RFP CDRL_D003_TRANSITION_INVENTORY_PLAN_(SHUT-DOWN)_C-130 DistroE.pdf PDF
RFP CDRL_A004_DISCREPANT_PART_ON_INDUCTION_REPORT_C-130.pdf PDF
RFP CDRL_C001_MEETING_MINUTES_C-130 DistroE.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local t ime

X

A X B X C X D

EX

X

G F 321 - 343

344 - 356 X H 357 - 365

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 365

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N62649 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 188

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

189 - 191 192 - 193

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

194 - 209

210 - 232 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 233 - 236 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 237 - 254 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

255 - 318

PART II - CO NTRACT CLAUSES

NAVSUP FLC YOKOSUKA

(CODE 200)

CONTRACTING DEPARTMENT

PSC 473 BOX 11

FPO AP 96349-0011

315-243-7733

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

319 - 320

6. REQUISITION/PURCHASE NO.5. DATE ISSUED4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N6264924R0029

Section B - Supplies or Services and Prices

The changes incorporated by this modification do not apply to task orders awarded prior to the modification of the basic IDIQ until incorporated via a separate modification into those task orders.

Consistent with FAR Clause 52.216-22 Indefinite Quantity, the Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in each individual task order. The unit prices identified in Section B are Firm-Fixed-Price (FFP) and shall not be adjusted as a result of the actual cost of performance. The quantities identified in Section B are estimates only. The exact quantities of deliveries are not known at the time of award:

The cumulative amount of all task orders to be issued under this contract shall not exceed the maximum specified below, and the Government shall order at least the minimum specified below:

Minimum: $5,000.00 per awardee at contract award for Post-Award Conference (CLIN X009) Maximum: $374,293,250.00

Note: The Government intends to induct one aircraft per awardee subsequent to the Post Award Conference. This initial induction will not fall under the H-1.0 ordering procedures, and pricing for the first induction will be based on the awarded amounts for Base Year 1. The sequence of induction will be addressed during the Post Award Conference and is intended to be based upon the readiness of the Contractor and what is the most advantageous sequence for the Government - See Section F 3.0.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Scheduled Maintenance - Base

FFP

The contractor shall perform KC-130J Scheduled Maintenance in accordance with the attached Performance Work Statement (PWS).

NET AMT

0001AA 5 Each KC-130J PMI - Base

FFP

The contractor shall perform KC-130J Scheduled Maintenance in accordance with the attached PWS.

FOB: Origin (Shipping Point)

PSC CD: J015

Repetitive Maintenance - Base

FFP

The contractor shall perform KC-130J As Required Maintenance, in accordance with the attached PWS.

0002AA 5 Each Restoration - Aircraft Exterior - Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Complete Restoration of Aircraft Exterior, in accordance with the attached PWS.

0002AB 5 Each Scuff, Sand, Overspray - Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Scuff, Sand, and Overspray - Aircraft Exterior, in accordance with the attached PWS.

0002AC 5 Each Weight & Balance - Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Aircraft Weight and Balance, in accordance with the attached PWS.

0002AD 5 Each Corrosion Control Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Aircraft Corrosion Control, in accordance with the attached PWS.

0002AE

Reserved

FFP

0002AF 5 Each FHD-NDI NX.1.7.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002AG 5 Each FHD-NDI NX.2.3.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002AH 5 Each FHD-NDI NX.2.4.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002AJ 5 Each FHD-NDI NX.3.1.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002AK 5 Each FHD-NDI NX.3.1.3 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002AL 5 Each FHD-NDI NX.3.1.4.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002AM 5 Each FHD-NDI NX.3.1.4.2 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002AN 5 Each FHD-NDI NX.3.3.3 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002AP 5 Each FHD-NDI NX.3.3.4 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002AQ 5 Each FHD-NDI NX.3.3.5 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002AR 5 Each FHD-NDI NX.3.3.8 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002AS 5 Each FHD-NDI NX.3.3.9 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002AT 5 Each FHD-NDI NX.3.3.11 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002AU 5 Each FHD-NDI NX.3.3.12 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002AV 5 Each FHD-NDI NX.3.3.13 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002AW

Reserved

FFP

0002AX 5 Each FHD-NDI NX.3.5.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002AY 5 Each FHD-NDI NX.3.6.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002AZ 5 Each FHD-NDI NX.3.7.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BA 5 Each FHD-NDI NX.4.1.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BB 5 Each FHD-NDI NX.4.1.2 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BC 5 Each FHD-NDI NX.4.1.3 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BD 5 Each FHD-NDI NX.4.1.5 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BE 5 Each FHD-NDI NX.4.1.10 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BF 5 Each FHD-NDI NX.4.1.11 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BG 5 Each FHD-NDI NX.4.1.11.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BH 5 Each FHD-NDI NX.4.2.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BJ 5 Each FHD-NDI NX.4.2.2 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BK 5 Each FHD-NDI NX.4.3.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BL 5 Each FHD-NDI NX.4.3.2 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BM 5 Each FHD-NDI NX.4.3.4 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BN 5 Each FHD-NDI NX.4.6.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BP 5 Each FHD-NDI NX.4.7.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BQ 5 Each FHD-NDI NX.5.1.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BR 5 Each FHD-NDI NX.5.2.2 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BS 5 Each FHD-NDI NX.5.4.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BT 5 Each FHD-NDI NX.6.2.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BU 5 Each FHD-NDI NX.6.2.2 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BV 5 Each FHD-NDI NX.6.2.3 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BW 5 Each FHD-NDI NX.6.2.4 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BX 5 Each FHD-NDI NX.6.2.5 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

0002BY 5 Each FHD-NDI NX.1.1.1 Base

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

Unscheduled Maintenance Base

FFP

The contractor shall perform KC-130J Unscheduled Maintenance in accordance

0003AA 55,000 Hours Over and Above (O&A) Base

FFP

The contractor shall perform KC-130J Unscheduled Maintenance, O&A, in accordance with the attached PWS.

0003AB 16,500 Hours TD and Aircraft Mods Base

FFP

The contractor shall perform KC-130J Technical Directives (TD) and Aircraft Modifications in accordance with the attached PWS.

0003AC 500 Hours Customer Service Requests (CSR) Base

FFP

The contractor shall perform KC-130J Unscheduled Maintenance, CSR, in accordance with the attached PWS

0003AD 500 Hours In-Service Repairs Base

FFP

The contractor shall perform KC-130J Unscheduled Maintenance, In-Service Repairs (ISR) in accordance with the attached PWS.

0003AE Hours Reserved

FFP

0004 5 Each Full Supply Support Base

FFP

The contractor shall provide Full Supply Support, in accordance with the attached

PWS.

CDRL Deliverables Base

FFP

Data Call (Reporting) identified with Contractor Data Requirement List (CDRL).

See Exhibits A001 - L001.

0006 500 Hours Accelerated Delivery Base

FFP

The contractor shall perform accelerated work in accordance with the PWS.

GFM Handling Base

FFP

The contractor shall perform accelerated work in accordance with the PWS.

0007AA 1 Lot Preserve & Pack Base

FFP

The contractor shall perform Preservation and Packing of Government Furnished Material (GFM) in accordance with the PWS.

0007AB 1 Lot Ship & Transport - Base

FFP

The contractor shall perform Ship and Transport in accordance with the PWS.

Travel Base

FFP

Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS.

MFR PART NR: j

0008AA 1 Lot Travel Base

FFP

Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.

0008AB 1 Lot Ferry Flight Base

FFP

The contractor shall perform KC-130J Unscheduled Maintenance, Ferry Flights, in accordance with the attached PWS.

0009 1 Each Post-Award Conference Base

FFP

Post-Award Conference will be conducted in accordance with the attached PWS.

FOB: Origin (Shipping Point)

Scheduled Maintenance Opt 1

FFP

1001AA 5 Each KC-130J PMI Opt 1

FFP

The contractor shall perform KC-130J Scheduled Maintenance in accordance with the attached PWS.

Repetitive Maintenance Opt 1

FFP

1002AA 5 Each Restoration - Aircraft Exterior - Opt 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Complete Restoration of Aircraft Exterior, in accordance with the attached PWS.

1002AB 5 Each Scuff, Sand, Overspray - Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Scuff, Sand, and Overspray - Aircraft Exterior, in accordance with the attached PWS.

1002AC 5 Each Weight & Balance - Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Aircraft Weight and Balance, in accordance with the attached PWS.

1002AD 5 Each Corrosion Control - Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Aircraft Corrosion Control, in accordance with the attached PWS.

1002AE

Reserved Option Year 1

FFP

1002AF 5 Each FHD-NDI NX.1.7.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002AG 5 Each FHD-NDI NX.2.3.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002AH 5 Each FHD-NDI NX.2.4.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002AJ 5 Each FHD-NDI NX.3.1.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002AK 5 Each FHD-NDI NX.3.1.3 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002AL 5 Each FHD-NDI NX.3.1.4.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002AM 5 Each FHD-NDI NX.3.1.4.2 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002AN 5 Each FHD-NDI NX.3.3.3 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002AP 5 Each FHD-NDI NX.3.3.4 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002AQ 5 Each FHD-NDI NX.3.3.5 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002AR 5 Each FHD-NDI NX.3.3.8 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002AS 5 Each FHD-NDI NX.3.3.9 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002AT 5 Each FHD-NDI NX.3.3.11 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002AU 5 Each FHD-NDI NX.3.3.12 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002AV 5 Each FHD-NDI NX.3.3.13 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002AW

Reserved

FFP

1002AX 5 Each FHD-NDI NX.3.5.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002AY 5 Each FHD-NDI NX.3.6.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002AZ 5 Each FHD-NDI NX.3.7.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BA 5 Each FHD-NDI NX.4.1.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BB 5 Each FHD-NDI NX.4.1.2 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BC 5 Each FHD-NDI NX.4.1.3 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BD 5 Each FHD-NDI NX.4.1.5 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BE 5 Each FHD-NDI NX.4.1.10 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BF 5 Each FHD-NDI NX.4.1.11 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BG 5 Each FHD-NDI NX.4.1.11.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BH 5 Each FHD-NDI NX.4.2.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BJ 5 Each FHD-NDI NX.4.2.2 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BK 5 Each FHD-NDI NX.4.3.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BL 5 Each FHD-NDI NX.4.3.2 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BM 5 Each FHD-NDI NX.4.3.4 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BN 5 Each FHD-NDI NX.4.6.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BP 5 Each FHD-NDI NX.4.7.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BQ 5 Each FHD-NDI NX.5.1.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BR 5 Each FHD-NDI NX.5.2.2 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BS 5 Each FHD-NDI NX.5.4.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BT 5 Each FHD-NDI NX.6.2.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BU 5 Each FHD-NDI NX.6.2.2 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BV 5 Each FHD-NDI NX.6.2.3 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BW 5 Each FHD-NDI NX.6.2.4 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BX 5 Each FHD-NDI NX.6.2.5 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

1002BY 5 Each FHD-NDI NX.1.1.1 Option Year 1

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

Unscheduled Maintenance Opt 1

FFP

1003AA 55,000 Hours Over and Above (O&A) - Option Year 1

FFP

The contractor shall perform KC-130J Unscheduled Maintenance, O&A, in accordance with the attached PWS.

1003AB 16,500 Hours TD and Aircraft Mods - Option Year 1

FFP

The contractor shall perform KC-130J Technical Directives (TD) and Aircraft Modifications in accordance with the attached PWS.

1003AC 500 Hours Customer Service Requests (CSR) - Opt 1

FFP

The contractor shall perform KC-130J Unscheduled Maintenance, CSR, in accordance with the attached PWS

1003AD 500 Hours In-Service Repairs - Option Year 1

FFP

The contractor shall perform KC-130J Unscheduled Maintenance, In-Service Repairs (ISR) in accordance with the attached PWS.

1003AE Hours Reserved

FFP

1004 5 Each Full Supply Support Opt 1

FFP

The contractor shall provide Full Supply Support, in accordance with the attached

PWS.

CDRL Deliverables Opt 1

FFP

Data Call (Reporting) identified with Contractor Data Requirement List (CDRL).

See Exhibits A001 - L001.

1006 500 Hours Accelerated Delivery Opt 1

FFP

The contractor shall perform accelerated work in accordance with the PWS.

GFM Handling Opt 1

1007AA 1 Lot Preserve & Pack - Opt 1

FFP

The contractor shall perform Preservation and Packing of Government Furnished Material (GFM) in accordance with the PWS.

1007AB 1 Lot Ship & Transport - Opt 1

FFP

The contractor shall perform Ship and Transport in accordance with the PWS.

Travel Opt 1

FFP

Additional costs incurred when the Contractor is required to travel for the required

1008AA 1 Lot Travel - Opt 1

FFP

Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.

1008AB 1 Lot Ferry Flight - Opt 1

FFP

The contractor shall perform KC-130J Unscheduled Maintenance, Ferry Flights, in accordance with the attached PWS.

1009 1 Each Reserved Opt 1

FFP

FOB: Origin (Shipping Point)

Scheduled Maintenance Opt 2

FFP

2001AA 5 Each KC-130J PMI - Opt 2

FFP

The contractor shall perform KC-130J Scheduled Maintenance in accordance with the attached PWS.

Repetitive Maintenance Opt 2

FFP

2002AA 5 Each Restoration Aircraft Exterior - Opt 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Complete Restoration of Aircraft Exterior, in accordance with the attached PWS.

2002AB 5 Each Scuff, Sand, Overspray - Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Scuff, Sand, and Overspray - Aircraft Exterior, in accordance with the attached PWS.

2002AC 5 Each Weight & Balance - Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Aircraft Weight and Balance, in accordance with the attached PWS.

2002AD 5 Each Corrosion Control - Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Aircraft Corrosion Control, in accordance with the attached PWS.

2002AE

Reserved Option Year 2

FFP

2002AF 5 Each FHD-NDI NX.1.7.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002AG 5 Each FHD-NDI NX.2.3.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002AH 5 Each FHD-NDI NX.2.4.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002AJ 5 Each FHD-NDI NX.3.1.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002AK 5 Each FHD-NDI NX.3.1.3 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002AL 5 Each FHD-NDI NX.3.1.4.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002AM 5 Each FHD-NDI NX.3.1.4.2 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002AN 5 Each FHD-NDI NX.3.3.3 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002AP 5 Each FHD-NDI NX.3.3.4 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002AQ 5 Each FHD-NDI NX.3.3.5 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002AR 5 Each FHD-NDI NX.3.3.8 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002AS 5 Each FHD-NDI NX.3.3.9 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002AT 5 Each FHD-NDI NX.3.3.11 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002AU 5 Each FHD-NDI NX.3.3.12 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002AV 5 Each FHD-NDI NX.3.3.13 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002AW

Reserved

FFP

2002AX 5 Each FHD-NDI NX.3.5.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002AY 5 Each FHD-NDI NX.3.6.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002AZ 5 Each FHD-NDI NX.3.7.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BA 5 Each FHD-NDI NX.4.1.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BB 5 Each FHD-NDI NX.4.1.2 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BC 5 Each FHD-NDI NX.4.1.3 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BD 5 Each FHD-NDI NX.4.1.5 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BE 5 Each FHD-NDI NX.4.1.10 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BF 5 Each FHD-NDI NX.4.1.11 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BG 5 Each FHD-NDI NX.4.1.11.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BH 5 Each FHD-NDI NX.4.2.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BJ 5 Each FHD-NDI NX.4.2.2 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BK 5 Each FHD-NDI NX.4.3.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BL 5 Each FHD-NDI NX.4.3.2 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BM 5 Each FHD-NDI NX.4.3.4 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BN 5 Each FHD-NDI NX.4.6.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BP 5 Each FHD-NDI NX.4.7.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BQ 5 Each FHD-NDI NX.5.1.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BR 5 Each FHD-NDI NX.5.2.2 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BS 5 Each FHD-NDI NX.5.4.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BT 5 Each FHD-NDI NX.6.2.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BU 5 Each FHD-NDI NX.6.2.2 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BV 5 Each FHD-NDI NX.6.2.3 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BW 5 Each FHD-NDI NX.6.2.4 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BX 5 Each FHD-NDI NX.6.2.5 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

2002BY 5 Each FHD-NDI NX.1.1.1 Option Year 2

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

Unscheduled Maintenance Opt 2

FFP

2003AA 55,000 Hours Over and Above (O&A) - Option Year 2

FFP

The contractor shall perform KC-130J Unscheduled Maintenance, O&A, in accordance with the attached PWS.

2003AB 16,500 Hours TD and Aircraft Mods - Option Year 2

FFP

The contractor shall perform KC-130J Technical Directives (TD) and Aircraft Modifications in accordance with the attached PWS.

2003AC 500 Hours Customer Service Requests (CSR) - Opt 2

FFP

The contractor shall perform KC-130J Unscheduled Maintenance, CSR, in accordance with the attached PWS

2003AD 500 Hours In-Service Repairs - Option Year 2

FFP

The contractor shall perform KC-130J Unscheduled Maintenance, In-Service Repairs (ISR) in accordance with the attached PWS.

2003AE Hours Reserved

FFP

2004 5 Each Full Supply Support Opt 2

FFP

The contractor shall provide Full Supply Support, in accordance with the attached

PWS.

CDRL Deliverables Opt 2

FFP

Data Call (Reporting) identified with Contractor Data Requirement List (CDRL).

See Exhibits A001 - L001.

2006 500 Hours Accelerated Delivery Opt 2

FFP

The contractor shall perform accelerated work in accordance with the PWS.

GFM Handling Opt 2

2007AA 1 Lot Preserve & Pack - Opt 2

FFP

The contractor shall perform Preservation and Packing of Government Furnished Material (GFM) in accordance with the PWS.

2007AB 1 Lot Ship & Transport - Opt 2

FFP

The contractor shall perform Ship and Transport in accordance with the PWS.

Travel Opt 2

FFP

Additional costs incurred when the Contractor is required to travel for the required

2008AA 1 Lot Travel - Opt 2

FFP

Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.

2008AB 1 Lot Ferry Flight - Opt 2

FFP

The contractor shall perform KC-130J Unscheduled Maintenance, Ferry Flights, in accordance with the attached PWS.

2009 1 Each Reserved Opt 2

FFP

FOB: Origin (Shipping Point)

Scheduled Maintenance Opt 3

FFP

3001AA 5 Each KC-130J PMI Opt 3

FFP

The contractor shall perform KC-130J Scheduled Maintenance in accordance with the attached PWS.

Repetitive Maintenance Opt 3

FFP

3002AA 5 Each Restoration Aircraft Exterior - Opt 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Complete Restoration of Aircraft Exterior, in accordance with the attached PWS.

3002AB 5 Each Scuff, Sand, Overspray - Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Scuff, Sand, and Overspray - Aircraft Exterior, in accordance with the attached PWS.

3002AC 5 Each Weight & Balance - Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Aircraft Weight and Balance, in accordance with the attached PWS.

3002AD 5 Each Corrosion Control - Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Aircraft Corrosion Control, in accordance with the attached PWS.

3002AE

Reserved Option Year 3

FFP

3002AF 5 Each FHD-NDI NX.1.7.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002AG 5 Each FHD-NDI NX.2.3.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002AH 5 Each FHD-NDI NX.2.4.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002AJ 5 Each FHD-NDI NX.3.1.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002AK 5 Each FHD-NDI NX.3.1.3 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002AL 5 Each FHD-NDI NX.3.1.4.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002AM 5 Each FHD-NDI NX.3.1.4.2 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002AN 5 Each FHD-NDI NX.3.3.3 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002AP 5 Each FHD-NDI NX.3.3.4 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002AQ 5 Each FHD-NDI NX.3.3.5 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002AR 5 Each FHD-NDI NX.3.3.8 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002AS 5 Each FHD-NDI NX.3.3.9 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002AT 5 Each FHD-NDI NX.3.3.11 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002AU 5 Each FHD-NDI NX.3.3.12 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002AV 5 Each FHD-NDI NX.3.3.13 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002AW

Reserved

FFP

3002AX 5 Each FHD-NDI NX.3.5.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002AY 5 Each FHD-NDI NX.3.6.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002AZ 5 Each FHD-NDI NX.3.7.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BA 5 Each FHD-NDI NX.4.1.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BB 5 Each FHD-NDI NX.4.1.2 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BC 5 Each FHD-NDI NX.4.1.3 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BD 5 Each FHD-NDI NX.4.1.5 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BE 5 Each FHD-NDI NX.4.1.10 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BF 5 Each FHD-NDI NX.4.1.11 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BG 5 Each FHD-NDI NX.4.1.11.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BH 5 Each FHD-NDI NX.4.2.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BJ 5 Each FHD-NDI NX.4.2.2 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BK 5 Each FHD-NDI NX.4.3.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BL 5 Each FHD-NDI NX.4.3.2 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BM 5 Each FHD-NDI NX.4.3.4 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BN 5 Each FHD-NDI NX.4.6.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BP 5 Each FHD-NDI NX.4.7.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BQ 5 Each FHD-NDI NX.5.1.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BR 5 Each FHD-NDI NX.5.2.2 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BS 5 Each FHD-NDI NX.5.4.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BT 5 Each FHD-NDI NX.6.2.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BU 5 Each FHD-NDI NX.6.2.2 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BV 5 Each FHD-NDI NX.6.2.3 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BW 5 Each FHD-NDI NX.6.2.4 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BX 5 Each FHD-NDI NX.6.2.5 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

3002BY 5 Each FHD-NDI NX.1.1.1 Option Year 3

FFP

The contractor shall perform KC-130J As Required Maintenance - Flight Hour Dependent NDI, in accordance with the attached PWS.

Unscheduled Maintenance Opt 3

FFP

3003AA 55,000 Hours Over and Above (O&A) - Option Year 3

FFP

The contractor shall perform KC-130J Unscheduled Maintenance, O&A, in accordance with the attached PWS.

3003AB 16,500 Hours TD and Aircraft Mods - Option Year 3

FFP

The contractor shall perform KC-130J Technical Directives (TD) and Aircraft Modifications in accordance with the attached PWS.

3003AC 500 Hours Customer Service Requests (CSR) - Opt 3

FFP

The contractor shall perform KC-130J Unscheduled Maintenance, CSR, in accordance with the attached PWS

3003AD 500 Hours In-Service Repairs - Option Year 3

FFP

The contractor shall perform KC-130J Unscheduled Maintenance, In-Service Repairs (ISR) in accordance with the attached PWS.

3003AE Hours Reserved

FFP

3004 5 Each Full Supply Support Opt 3

FFP

The contractor shall provide Full Supply Support, in accordance with the attached

PWS.

CDRL Deliverables Opt 3

FFP

Data Call (Reporting) identified with Contractor Data Requirement List (CDRL).

See Exhibits A001 - L001.

3006 500 Hours Accelerated Delivery Opt 3

FFP

The contractor shall perform accelerated work in accordance with the PWS.

GFM Handling Opt 3

3007AA 1 Lot Preserve & Pack - Opt 3

FFP

The contractor shall perform Preservation and Packing of Government Furnished Material (GFM) in accordance with the PWS.

3007AB 1 Lot Ship & Transport - Opt 3

FFP

The contractor shall perform Ship and Transport in accordance with the PWS.

Travel Opt 3

FFP

Additional costs incurred when the Contractor is required to travel for the required

3008AA 1 Lot Travel - Opt 3

FFP

Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.

3008AB 1 Lot Ferry Flight - Opt 3

FFP

The contractor shall perform KC-130J Unscheduled Maintenance, Ferry Flights, in accordance with the attached PWS.

3009 1 Each Reserved Opt 3

FFP

FOB: Origin (Shipping Point)

Scheduled Maintenance Opt 4

FFP

4001AA 5 Each KC-130J PMI Opt 4

FFP

The contractor shall perform KC-130J Scheduled Maintenance in accordance with the attached PWS.

Repetitive Maintenance Opt 4

FFP

with the