RFP_26016SN_Van_Meter_Substation_BID_Tabulation.pdf

PDF 119 KB Posted

Attached to
Van Meter Substation Construction
Solicitation number
RFP 26-016-SN
Issued by
Polk County, Lake Harbor CDP, Florida

About this file

This is a bid tabulation document from the Kissimmee Utility Authority (KUA) Procurement Division for the Van Meter Substation Construction project (RFP 26-016-SN). Seven vendors submitted timely proposals for this greenfield 69-kilovolt substation construction project located in Polk County, Lake Harbor CDP, Florida. The scope encompasses site preparation, civil works, structural construction, electrical equipment installation, grounding systems, and delivery of a fully operational substation compliant with applicable standards. KUA will furnish major equipment including transmission takeoff bay structures, breakers, switches, transformers, PDC switchgears, and a control house, while the contractor is excluded from transformer erection and filling, relay control or power cable supply and termination, equipment testing and commissioning, and certain other specialized work. The virtual public bid opening occurred on March 17, 2026, at 2:00 PM EST, with a mandatory pre-bid conference and site visit held on February 23, 2026. Anticipated construction is scheduled to commence on May 11, 2026, with station energization expected in April 2027. The contract award was recommended for MasTec/Energy Erectors at a negotiated bid total of $5,148,240.11 following evaluation and board approval.

Bid prices as submitted ranged from $5,263,383.40 (Elite Construction of Ocala, Inc) to $11,349,667.00 (Irby Construction Company), with estimated days to completion ranging from 150 to 407 days. The pricing structure is firm-fixed with all costs including labor, supervision, overhead, profit, materials, supplies, equipment, tools, mobilization, demobilization, travel, transportation, and taxes included in the lump sum price, supplemented by time-and-materials pricing options for change orders. No set-asides are identified in this bid tabulation. Required insurance includes General Liability of $1,000,000 per occurrence with $2,000,000 annual aggregate, an Excess/Umbrella policy of $10,000,000, Vehicle coverage of $1,000,000 combined single limit, Workers' Compensation of $1,000,000, and Builders Risk insurance before construction start. A 100% Performance Bond payable within ten days of award notification is mandated, and no bid bond is required.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Procurement Division 1701 W. Carroll Street Kissimmee, Florida 34741 Phone: (407) 933-9809

VENDOR NAME→

Elite

Construction of Ocala, Inc

ENGETECNICA

USA LLC

Haugland Energy Group

LLC

Irby Construction Company

MASTEC/Energy Erectors

Service Electric Company

Terry`s Electric, Inc

Van Meter Substation Construction - TOTAL BID PRICE AS SUBMITTED $5,263,383.40 $7,485,000.00 $5,567,594.50 $ 11,349,667.00 $ 5,309,722.22 $5,625,338.20 $6,739,449.00

TOTAL BID PRICE - FOR

EVALUATION PURPOSES $5,263,383.40 $7,485,000.00 $5,567,594.50 $11,349,667.00 $5,309,722.22 $5,625,338.20 $6,739,449.00

ESTIMATED DAYS OF COMPLETION 210 280 150 259 407 310 330

OPENED BY: Sheila Hernandez

NOTE: Award recommendation approved for MasTec/Energy Erectors at a negotiated bid total of $5,148,240.11

Remarks: Offers from the vendors listed herein are the only offers received timely as of the above opening date and time. All other offers submitted in response to this solicitation, if any, are hereby rejected as non responsive. Shaded or circled pricing indicates the awarded firm following evaluation, negotiations, and Board approval.

Rules: All bids accepted by Kissimmee Utility Authority are subject to the Agencies terms and conditions and any and all additional terms and conditions submitted by the bidders are rejected and shall have no force and effect unless receiving prior consideration and approval of the Authority in the form of Addenda to this bid.

Solicitation Tabulation

VERIFIED BY: Jennifer Grieves

2:00 PM EST

03/17/26

RFP 26-016-SNSolicitation Number:

Solicitation Title Solicitation Opening Date:

Solicitation Opening Time

Van Meter Substation Construction

RFP 26-016-SN Van Meter Substation BID Tabulation.xlsx page 1 of 1