RFP_26-016-SN_Notice_of_Intent_to_Negotiate.pdf

PDF 159 KB Posted

Attached to
Van Meter Substation Construction
Solicitation number
RFP 26-016-SN
Issued by
Polk County, Lake Harbor CDP, Florida

About this file

This is a Notice of Intent to Negotiate issued by the Kissimmee Utility Authority (KUA) Finance & Administration Procurement Division for RFP 26-016-SN regarding Van Meter Substation Construction. The project involves the construction of a new greenfield 69-kilovolt substation located in Polk County, Lake Harbor CDP, Florida. KUA will furnish major equipment including two 69KV transmission takeoff bay structures, four 69KV SF6 breakers, twelve 69KV air break switches, two 69/13.2KV 44.8MVA transformers, two 15KV PDC switchgears, and a control house, while the selected contractor will be responsible for all labor, supervision, materials, and equipment not provided by KUA to complete the substation construction. The mandatory pre-bid conference was held on February 23, 2026, with questions and comments due by February 27, 2026, and the proposal submission deadline was March 17, 2026. The anticipated construction start date is May 11, 2026, with station energization expected in April 2027. KUA has ranked four firms for negotiation in the following order: MasTec/Energy Erectors, Inc.; Elite Construction of Ocala, Inc.; Terry's Electric, Inc.; and Haugland Energy Group LLC.

Pricing is to be submitted on a firm-fixed basis with all costs including labor, supervision, overhead, profit, materials, supplies, equipment, tools, mobilization, demobilization, travel, transportation, and taxes included in the lump sum price, supplemented by time-and-materials pricing options for potential change orders. The evaluation criteria weighted proposals at 50 points for pricing, 15 points each for management and personnel qualifications and approach to delivery of services, and 5 points each for relevant experience, prior KUA projects, technical exceptions, and contractual exceptions. Mandatory qualifications require demonstrated experience completing at least one full-scale 69KV greenfield substation project and one brownfield rebuild/expansion project within the past four years, current Florida electrical contracting licensure, and provision of as-built and redline record documents. Required insurance for this Construction Tier C project includes General Liability of $1,000,000 per occurrence with $2,000,000 annual aggregate, an Excess/Umbrella policy of $10,000,000, Vehicle coverage of $1,000,000 combined single limit, Workers' Compensation of $1,000,000, and Builders Risk insurance before construction start. A 100% Performance Bond is required, payable within ten days of award notification. No set-asides are indicated in the solicitation. Any person adversely affected by the award decision must file a written protest with the Vice President of Finance and Administration within seventy-two hours, excluding weekends and legal holidays.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Finance & Administration Procurement Division

1701 W Carroll St Kissimmee, Florida 34741

(407) 933-9809

NOTICE OF INTENT TO NEGOTIATE

April 27, 2026

To: All Interested Parties

RE: RFP 26-016-SN Van Meter Substation Construction

All, Kissimmee Utility Authority (“KUA”) hereby provides notification of its intent to negotiate the above referenced solicitation.

KUA will enter negotiations with the highest ranked firm. If negotiations are unsuccessful, KUA reserves the right to discontinue negotiations and proceed to the next ranked firm, in order of ranking.

KUA intends to negotiate with the following firm(s) as ranked:

1. MasTec/Energy Erectors, Inc.

2. Elite Construction of Ocala, Inc.

3. Terry’s Electric, Inc.

4. Haugland Energy Group LLC.

This Notice of Intent to Negotiate is subject to final approval by the KUA Board of Directors, as applicable. Therefore, this Notice of Intent does not constitute the formation of a contract between KUA and the apparent successful bidder. The successful bidder shall not acquire any legal or equitable rights relative to this solicitation until a contract or purchase order, containing terms and conditions acceptable to KUA, is duly approved and executed by KUA.

KUA reserves the right to reject all submittals, cancel the solicitation, re-solicit at a later date, or withdraw this Notice of Intent at any time prior to execution of a contract or purchase order.

Thank you for your interest in doing business with KUA. We look forward to receiving your submittals in the future.

Sincerely, Sheila Hernandez, CPPB Senior Buyer cc: project file

Any person adversely affected by the decision or intended decision of award must file a written notice of protest to the Vice President of Finance and Administration within seventy-two (72) hours (excluding Saturday, Sundays, and legal holidays) after the posting of KUA’s decision or intended decision.

KUA Procurement personnel should be contacted to obtain comprehensive written protest procedures prior to filing a written notice of protest.