Addendum_No._1.pdf
PDF 136 KB Posted
- Attached to
- Van Meter Substation Construction
- Solicitation number
- RFP 26-016-SN
- Issued by
- Polk County, Lake Harbor CDP, Florida
About this file
This is Addendum No. 1 to RFP 26-016-SN for Van Meter Substation Construction issued by Kissimmee Utility Authority (KUA) in Florida on February 17, 2026. The addendum clarifies that construction drawings for the substation project are available via Dropbox and are referenced in Section 3 Scope of Work, Section IV Scope of Services, 1.1 Appendix A. The RFP seeks a qualified contractor to perform substation construction activities, including furnishing all labor, supervision, materials, and equipment not provided by KUA. KUA will supply major equipment such as breakers, substation transformers, PDC switchgear, and the control house, with the contractor responsible for constructing the substation and installing all KUA-furnished materials. Work explicitly excluded from the contractor's scope includes transformer erection and filling, relay control or power cable supply and termination, equipment testing and commissioning, transmission structure installation, URD feeder cable supply and installation, station service transformers, distribution circuit air break cabinet switchgear, and battery system installation. All on-site personnel must be properly trained and qualified, and the contractor must coordinate with KUA Operations crews and other contractors.
The addendum confirms that vendor registration with the utility is required only if a firm is selected for award; bidders are not required to register to submit proposals. Proposers must acknowledge receipt of this addendum by signing and returning the acknowledgment form with their bid response. Only firms with demonstrated experience in substation construction are eligible to submit proposals. All information contained in the addendum is incorporated into the solicitation document and supersedes any verbal or other instructions previously provided to proposers. Specific pricing terms, bid due dates, and award timelines are not detailed within this addendum document itself.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P a g e 1 | 1
TO: All Proposers FROM: Sheila Nelson, CPPB, Senior Buyer DATE: February 17, 2026 RE: RFP 26-016-SN Van Meter Substation Construction
ADDENDUM #1
Bidders are hereby notified that this addendum shall be made a part of the above-named Request for Proposal and agreement documents. The items listed below are issued to add, modify, and/or clarify the solicitation document and agreement documents. The items shall have the same force and effect as the original bidding and agreement documents, and cost involved shall be included in the bid pricing.
Bids, to be submitted, shall confirm with the addition and revision listed herein.
Return this sheet with your bid response.
I. QUESTIONS
Q1. Are there Drawings available for the RFP? Also, will we need to onboard or register with the utility before being allowed to bid?
A1. Yes. Drawings are available. The drawings are provided via Dropbox and are referenced in Section 3 Scope of Work, Section IV Scope of Services, 1.1 Appendix A. Vendor registration is required only if a firm is selected for award.
Bidder(s) must acknowledge receipt of this addendum by signing this form below and returning it with your bid response.
Acknowledgment is hereby made of Addendum #1 to project RFP 26-016-SN Van Meter Substation Construction.
Bidder Signature Date
Bidder Printed Name Company Name
This addendum is issued to provide additional information, clarification, corrections, additions, deletions and/or to answers questions concerning the above referenced solicitation. All information provided in this addendum is incorporated into the solicitation document as if set forth therein. All other parts of the solicitation have been maintained as originally distributed.
This addendum supersedes any verbal or other instructions given to any proposer qualified to respond pursuant to the requirements set forth in the solicitation document.