Attachment E - Draft POLAR STAR SLEP CDRL.pdf
PDF 975 KB Posted
- Attached to
- Request for Information: USCG POLAR STAR Service Life Extension Project (SLEP) Federal contract opportunity
- Solicitation number
- RFI-USCG-PSTAR-2019-3
About this file
This document is a draft Contract Data Requirements List (CDRL) for the US Coast Guard POLAR STAR Service Life Extension Project (SLEP). It outlines over 100 data items required from the contractor organized by specification work item. Required deliverables include design documents, logistics materials, test plans and reports, quality assurance reports, and air flow balancing reports. Submittal schedules and distribution lists are provided for each data item. The government asserts unlimited rights to all data.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment J - DRAFT High Level PPD Scope USCGC POLAR STAR 2021.pdf | ||
| Attachment D - Draft CLIN Structure.xlsx | XLSX spreadsheet | |
| POLAR_STAR_SLEP RFI-USCG-PSTAR-2019-3.pdf | ||
| Attachment G - Draft Work Breakdown Structure Example.pdf | ||
| Attachment H - POLAR STAR DRAFT Pricing Estimate Template.xlsx | XLSX spreadsheet | |
| Attachment A - POLAR STAR SLEP Draft Solicitation.pdf | ||
| Attachment B - DRAFT POLAR_STAR _SLEP_ Specification.pdf | ||
| Attachment C - SFLC-Std-Spec-0000.pdf | ||
| Attachment I - DRAFT High Level CGMCS Scope for POLAR STAR.pdf | ||
| Attachment F - Draft Mandated_Work_Item_Schedule.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
[Contract Number]
USCGC POLAR STAR (WAGB 10)
Service Life Extension Program (SLEP)
CONTRACT DATA REQUIREMENTS LIST
ATTACHMENT J-X
Prepared by
CG-9323
WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act
(Title 22, U.S.C. Sec 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App
2401, et seq. Violations of these export laws are subject to serve criminal penalties. Disseminate per provisions of
OPNAVINST 5510.161, Withholding of Unclassified Technical Data from Public Disclosure, 29 July 1985.
[Contract Name or Type of Contract] CONTRACT
DATA REQUIREMENTS LIST
ii
FOREWORD
The Data Requirements List (DRL) identifies Contractor Data Item (DI) requirements in support of the POLAR
STAR SLEP. This Foreword provides general guidance to Contractor personnel and is intended to clarify issues of an administrative and procedural nature that are not otherwise addressed. Emergent issues that are not addressed herein or otherwise provided for in source documents shall be referred to the Program Management Office (PMO), CG-9323.
Detailed information concerning the content of the DI requirement is provided in the Glossary. A listing of
Addressees for this DRL is provided immediately following the Glossary.
CONTENT AND FORMAT OF SUBMITTALS
All submittals shall be prepared in the Contractor’s format unless otherwise noted and shall be clear and legible. All submittals shall be prepared in the English language. All calculations and design data shall be provided in metric standard units unless otherwise specified.
Data Items shall be assigned a sequential one-character alphabet designation in the Revision Block to signify a change from the previous submittal. Revision letter designations shall be in alphabetical order. The first submittal of any data item shall be identified as Revision "-". Revisions of submittals shall include a change log or be prepared in a "red line" format to allow for identification of changes from the previous submittal.
Electronic media and digital files shall be compatible with computers using the Windows operating system. Unless otherwise specified, the following electronic format products shall be utilized: Microsoft Office 2010, Microsoft
Project 2010, Adobe Acrobat 10.1, WinZip 11.2, and AutoCAD 2013. The first three characters of each filename shall be the Contractor’s name or acronym. The filename shall include the applicable Data Item number and the
Contractor determined designation, followed by one-character revision letter. The first submittal of each Data Item shall be assigned the revision “-“. Electronic files shall not be password protected.
Electronic media and digital file names shall be revised to reflect each document’s applicable submittal. Each Data
Item shall be submitted with a separate letter of transmittal. Multiple drawings may be submitted under the same letter of transmittal; however subtitles, revision designations and sheet quantities shall be identified. Each letter of transmittal shall provide the following information:
Contractor’s name, correspondence serial number, and actual date of transmittal.
The Contract Number, Task Order (TO) Number, Data Item Number, and Data Item Title.
Applicable revision letter and revision date.
Electronic media or digital file name and respective file date.
Each transmittal letter shall provide a brief explanation of the submittal, the reason for a document’s change, or a more detailed discussion in the content of the submittal.
Distribution and quantity of copies being mailed via United States Postal Service. (Not applicable to data provided at a shared location or emailed).
Drawings shall be submitted in an AutoCAD 2013 compatible format unless otherwise specified. All engineering drawings and associated lists shall be as identified in ASME Y14.24.
Where hard copies are required, the Contractor shall mail Data Item submittals using properly sized envelopes or boxes in accordance with good commercial practice to prevent damage during mailing.
SUBMISSION SCHEDULE
The Contractor shall develop and maintain scheduling data relating to the submission requirements of all individual data items and shall ensure that actual deliveries are made on or before due dates.
QUALITY CONTROL
The Contractor shall maintain internal quality controls to ensure submittals are complete and adequate and shall not rely on US Government review comments to ensure the technical accuracy of data.
iii
The time period for US Government review, identified in each Data Item commences at receipt of the data by the
US Government.
ACRONYMS
An alphabetical list of acronyms follows. The list includes those acronyms used most frequently in the data requirements list.
APM Assistant Program Manager (USN)
ARMADEC Aviation and Missile Research, Development and
Engineering Center
CAGE Contractor and (US) Government Entity
DAC Days After Contract Award
DARC Days After Receipt of US Government Comments
DARP Days After Reporting Period
DI Data Item
DPT Days Prior To
DRL Data Requirements List
ESI Environmentally Sensitive Item
FAR Federal Acquisition Regulation
HAZMAT Hazardous Material
IAW In Accordance With
IUID Item Unique Identification
LT Letter of Transmittal
MTHLY Monthly
NLT No Later Than
NOA Notice Of Availability
OEM Original Equipment Manufacturer
PMS Preventative Maintenance System
PO Purchase Order
POC Point of Contact
R/ASR Revisions as Required
SOW Statement of Work
TO Task Order
SV Site Visit iv
GLOSSARY
The items listed below are explanations of the headings, footers, and blocks on the Data Requirements List (DRL) Data
Items.
1. PREPARED & APPROVED BY: The name and organization responsible for the approval of the Data
Requirements List (DRL).
2. DATE: The date the DRL was approved by the US Government for the Contract.
3. BLOCK 1-DATA ITEM NO.: An identification number to support each data item identified in the DRL.
4. BLOCK 2-DATA ITEM TITLE: The title of the Data Item.
5. BLOCK 3-REFERENCE: The specific location within the Statement of Work or Contract that contains the tasking that generates a requirement for the data.
6. BLOCK 4-DD FORM 250 REQUIREMENT (DD 250 REQ): The applicable code, as listed below, designates the requirements for inspection and acceptance of the data. The DD Form 250 shall be delivered to the first addressee in Block 8, unless otherwise indicated. DD Form 250 applies to final copies only unless otherwise stated.
CODE INSPECTION ACCEPTANCE
SS Source (DD Form 250 required)* Source (DD Form 250 required)*
DD Destination (DD Form 250 required) Destination (DD Form 250 required)
SD Source (DD Form 250 required)* Destination (DD Form 250 required)
DS Destination (DD Form 250 required) Source (DD Form 250 required)*
LT Letter of Transmittal only
NO No inspection or acceptance
XX Inspection and acceptance requirements specified elsewhere in Contract
* Source indicates the Contractor's facility.
7. BLOCK 5-DATA DESCRIPTION: Details regarding the Data Item’s content characteristics and format requirements, if applicable, are described in this block.
8. BLOCK 6-REVIEW REQUIREMENTS: The US Government will review the Contractor’s submittal as indicated in this block. The US Government will comment on Data Items that specify US Government approval is required. If so annotated, the US Government will review and approve the Contractor’s submittal within the timeframe noted. The US Government reserves the right to comment on all data deliverables.
9. BLOCK 7-SUBMITTAL SCHEDULE: The scheduled date for initial data submission, incremental submittals, and re-submittals, as specified. In addition, details regarding Data Item submittal requirements are also included. Submittal dates are often based on Contract events. Days identified are business days unless otherwise identified. Where scheduled date for data submission falls on a Saturday, Sunday or US Federal
Government holiday, the submission due date shall be the following US Federal Government, Washington, D.C. working day. Revisions shall incorporate the resolution of US Government comments.
v
10. BLOCK 8-DISTRIBUTION: The addressees and the number of copies to be provided for the applicable Data
Item will be as identified in each Task Order. Addressees’ street and selected E-Mail addresses are provided in the Addressee Listing, which follows.
11. BLOCK 9-DATA RIGHTS: The Data Rights required by the government.
Reproducible copies shall be posted at a shared electronic location (ARMADEC) or provided via E-Mail distribution or on removable electronic media or digital file formats, unless otherwise specified herein. If reproducible copies are distributed by posting at a shared location, an E-Mail notification shall be submitted to the applicable distribution list.
Data provided at a shared location shall meet the requirements for digital copies identified herein. Where both reproducible copies and hard copies are required, the date of the last item received by the US Federal Government shall be considered the receipt date.
The first addressee listed is the approving activity for the data, if approval is required. When an Attachment to a Data
Item identifies distribution of hard copies and reproducible copies to Addressees, they shall be provided in addition to the distribution on the front page of the Data Item. Where the words “(LT Only)” follow a distribution quantity, only the
Letter of Transmittal (LT) shall be submitted (no attachments are necessary, if applicable).
ADDRESSEE COMPLETE ADDRESS
Contracting Officer Commandant (CG-9125)
Attn: Jackson McClam
US Coast Guard Stop7828
2703 Martin Luther King JR AVE SE
Washington, DC, 20593-7828
Jackson.McClam@uscg.mil
Contracting Officer’s Representative LCDR Ashley Stone
Ashley.D.Stone@uscg.mil
Data Item No. Data Item
Titles And Subtitles
Contract Reference Asserted
Rights
Proposed
Data
Rights
CFR-01 Condition Found Reports
USCGC POLAR STAR (WAGB 10) Service Life Extension Project (SLEP) Specification for Drydock Repairs and Alterations. Unlimited.
CIR-01 Critical Inspection Reports
USCGC POLAR STAR (WAGB 10) Service
Completion Work item Completion Report
USCGC POLAR STAR (WAGB 10) Service
SLEP-69-01 Key Events Schedule See Specification Work Item 69, Paragraph 3.3.2.1. Unlimited.
SLEP-69-02 Software Requirements
Paragraph 3.4 and all subparagraphs. Unlimited.
SLEP-69-03 Hardware Requirements
Paragraph 3.5 and all subparagraphs. Unlimited.
SLEP-69-04 Installation Drawing Package
Paragraph 3.6 and all subparagraphs. Unlimited.
SLEP-69-05 Installation Plan
Paragraph 3.7 and all subparagraphs. Unlimited.
SLEP-69-06 Test Procedures
Paragraph 3.8. Unlimited.
SLEP-69-07 Engineering Data for Provisioning
Paragraph 3.9. Unlimited.
SLEP-69-08 Commercial Off the Shelf Technical Manuals
Paragraph 3.10. Unlimited.
SLEP-69-09 Status Report
Paragraph 3.11. Unlimited.
SLEP-70-01 Project Management Plan See Specification Work Item 70, Paragraph 3.3 and all subparagraphs. Unlimited.
SLEP-70-02 Integrated Master Schedule
Paragraph 3.5 and all subparagraphs. Unlimited.
SLEP-70-03 Risk Management Plan
Paragraph 3.7. Unlimited.
SLEP-70-04 Arrival Conference
Paragraph 3.8.1. Unlimited.
SLEP-70-05 Collaborative Meeting Agenda/Minutes
Paragraph 3.8.2 and all subparagraphs. Unlimited.
SLEP-70-06 Baseline Schedule Review
Paragraph 3.8.4. Unlimited.
SLEP-70-07 Program Management Review
Paragraph 3.8.6 and all subparagraphs. Unlimited.
SLEP-70-08 Project Status Review
Paragraph 3.8.7. Unlimited.
SLEP-70-09 Task Order Closure Report
SLEP-70-10 Contract Close-Out Report
Paragraph 3.10 and all subparagraphs. Unlimited.
SLEP-70-11 Severe Weather Plan
SLEP-70-12 Environmental Management Plan
Paragraph 3.12. Unlimited.
Contract Reference Asserted
Rights
Proposed
Data
Rights
SLEP-71-01 Weight & Moment Report See Specification Work Item 71, Paragraph 3.3. Unlimited.
SLEP-72-01 CGMCS Coordination Meeting Minutes See Specification Work Item 72, Paragraph 3.4.2. Unlimited.
SLEP-73-01 PPD Coordination Meeting Minutes See Specification Work Item 73, Paragraph 3.4.2. Unlimited.
SLEP-74-01 Installation Design Requirements See Specification Work Item 74, Paragraph 3.4.1. Unlimited.
SLEP-74-02 Logistics Deliverables See Specification Work Item 74, Paragraph 3.5. Unlimited.
SLEP-75-01 Installation Design Requirements See Specification Work Item 75, SLEP-75-02 Logistics Deliverables See Specification Work Item 75, SLEP-76-01 Piping Hydrostatic Test Report See Specification Work Item 76, Paragraph 3.9.4 Unlimited.
SLEP-76-02 Test Documentation See Specification Work Item 76, SLEP-77-01 Installation Design Requirements See Specification Work Item 77, SLEP-77-02 Logistics Deliverables See Specification Work Item 77, SLEP-78-01 Installation Design Requirements See Specification Work Item 78, SLEP-78-02 Logistics Deliverables See Specification Work Item 78, SLEP-79-01 Test Documentation See Specification Work Item 79, Paragraph 3.4.2.2. Unlimited.
SLEP-79-02 Logistics Deliverables See Specification Work Item 79, SLEP-80-01 Test Documentation See Specification Work Item 80, Paragraph 3.6. Unlimited.
SLEP-81-01 Installation Design Requirements See Specification Work Item 81, SLEP-81-02 Logistics Deliverables See Specification Work Item 81, SLEP-82-01 Installation Design Requirements See Specification Work Item 82, SLEP-82-02 Logistics Deliverables See Specification Work Item 82, SLEP-83-01 Installation Design Requirements See Specification Work Item 83, SLEP-83-02 Logistics Deliverables See Specification Work Item 83, SLEP-84-01 Installation Design Requirements See Specification Work Item 84, SLEP-84-02 Logistics Deliverables See Specification Work Item 84, SLEP-85-01 Installation Design Requirements See Specification Work Item 85, Contract Reference Asserted
Rights
Proposed
Data
Rights
SLEP-85-02 Logistics Deliverables See Specification Work Item 85, SLEP-86-01 Installation Design Requirements See Specification Work Item 86, SLEP-86-02 Logistics Deliverables See Specification Work Item 86, SLEP-87-01 Final Operational Test Documentation See Specification Work Item 87, Paragraph 3.8. Unlimited.
SLEP-88-01 Operating and Maintenance Manuals See Specification Work Item 88, SLEP-89-01 Installation Design Requirements See Specification Work Item 89, SLEP-89-02 Logistics Deliverables See Specification Work Item 89, SLEP-90-01 Installation Design Requirements See Specification Work Item 90, SLEP-90-02 Logistics Deliverables See Specification Work Item 90, SLEP-91-01 Quality Assurance Inspection Report See Specification Work Item 91, SLEP-92-01 Air Flow Testing and Balancing Report See Specification Work Item 92, Paragraph 3.14 and all subparagraphs. Unlimited.
SLEP-93-01 Air Flow Testing and Balancing Report See Specification Work Item 93, SLEP-94-01 Air Flow Testing and Balancing Report See Specification Work Item 94, SLEP-95-01 Air Flow Testing and Balancing Report See Specification Work Item 95, SLEP-96-01 Air Flow Testing and Balancing Report See Specification Work Item 96, SLEP-97-01 Air Flow Testing and Balancing Report See Specification Work Item 97, SLEP-98-01 Air Flow Testing and Balancing Report See Specification Work Item 98, SLEP-99-01 Air Flow Testing and Balancing Report See Specification Work Item 99, SLEP-100-01 Air Flow Testing and Balancing Report See Specification Work Item 100, SLEP-101-01 Air Flow Testing and Balancing Report See Specification Work Item 101, SLEP-102-01 Air Flow Testing and Balancing Report See Specification Work Item 102, SLEP-103-01 Quality Assurance Inspection Report See Specification Work Item 103, SLEP-104-01 Installation Design Requirements See Specification Work Item 104, SLEP-104-02 Logistics Deliverables See Specification Work Item 104, SLEP-105-01 Installation Design Requirements See Specification Work Item 105, Contract Reference Asserted
Rights
Proposed
Data
Rights
SLEP-105-02 Logistics Deliverables See Specification Work Item 105, SLEP-106-01 Installation Design Requirements See Specification Work Item 106, SLEP-106-02 Logistics Deliverables See Specification Work Item 106, SLEP-107-01 Quality Assurance Inspection Report See Specification Work Item 107, Paragraph 3.4. Unlimited.
SLEP-107-02 Operational Test Report See Specification Work Item 107, SLEP-108-01 Quality Assurance Inspection Report See Specification Work Item 108, Paragraph 3.4. Unlimited.
SLEP-108-02 Operational Test Report See Specification Work Item 108, USCGC POLAR STAR SLEP CONTRACT
CONTRACT NO.: TBD CONTRACTOR: TBD
BLOCK 1-DATA ITEM NO.: CFR-01
BLOCK 2-DATA ITEM TITLE: CONDITION FOUND REPORTS
BLOCK 3-REFERENCE: USCGC POLAR STAR (WAGB 10) SERVICE LIFE EXTENSION PROJECT
(SLEP) SPECIFICATION FOR DRYDOCK REPAIRS AND ALTERATIONS.
BLOCK 4-DD 250 REQ.: NO
BLOCK 5-DATA DESCRIPTION: SEE SFLC STANDARD SPECIFICATION 0000, PARAGRAPH
3.2.6.1.4 AND APPLICABLE SUBPARAGRAPHS.
BLOCK 6-REVIEW REQUIREMENTS: SEE SFLC STANDARD SPECIFICATION 0000, PARAGRAPH
BLOCK 7-SUBMITTAL SCHEDULE: AS REQUIRED.
BLOCK 8-DISTRIBUTION: CONTRACTING OFFICER & CONTRACTING OFFICER'S
REPRESENTATIVE.
BLOCK 9-DATA RIGHTS: UNLIMITED.
BLOCK 1-DATA ITEM NO.: CIR-01
BLOCK 2-DATA ITEM TITLE: CRITICAL INSPECTION REPORTS
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION GENERAL REQUIREMENTS,
PARAGRAPH 3.14 UNLESS OTHERWISE STATED WITHIN EACH WORK ITEM.
BLOCK 1-DATA ITEM NO.: COMPLETION
BLOCK 2-DATA ITEM TITLE: WORK ITEM COMPLETION REPORT
BLOCK 7-SUBMITTAL SCHEDULE: AS REQUIRED, FOR EACH WORK ITEM.
BLOCK 1-DATA ITEM NO.: SLEP-69-01
BLOCK 2-DATA ITEM TITLE: KEY EVENTS SCHEDULE
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.3.2.1.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.3.2.1.
BLOCK 7-SUBMITTAL SCHEDULE: VARIOUS, DEPENDENT UPON INSTALLATION
AVAILABILITY-PERIOD.
BLOCK 1-DATA ITEM NO.: SLEP-69-02
BLOCK 2-DATA ITEM TITLE: SOFTWARE REQUIREMENTS
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.4 AND ALL
SUBPARAGRAPHS.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.4 AND ALL
BLOCK 1-DATA ITEM NO.: SLEP-69-03
BLOCK 2-DATA ITEM TITLE: HARDWARE REQUIREMENTS
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.5 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.5 AND ALL
BLOCK 1-DATA ITEM NO.: SLEP-69-04
BLOCK 2-DATA ITEM TITLE: INSTALLATION DRAWING PACKAGE
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.6 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.6 AND ALL
BLOCK 1-DATA ITEM NO.: SLEP-69-05
BLOCK 2-DATA ITEM TITLE: INSTALLATION PLAN
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.7 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.7 AND ALL
BLOCK 1-DATA ITEM NO.: SLEP-69-06
BLOCK 2-DATA ITEM TITLE: TEST PROCEDURES
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.8.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.8.
BLOCK 1-DATA ITEM NO.: SLEP-69-07
BLOCK 2-DATA ITEM TITLE: ENGIENERING DATA FOR PROVISIONING
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.9.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.9.
BLOCK 1-DATA ITEM NO.: SLEP-69-08
BLOCK 2-DATA ITEM TITLE: COMMERCIAL OFF THE SHELF TECHNICAL MANUALS
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.10.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.10.
BLOCK 1-DATA ITEM NO.: SLEP-69-09
BLOCK 2-DATA ITEM TITLE: STATUS REPORT
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.11.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 69, PARAGRAPH 3.11.
BLOCK 1-DATA ITEM NO.: SLEP-70-01
BLOCK 2-DATA ITEM TITLE: PROJECT MANAGEMENT PLAN
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.3 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.3 AND ALL
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.3 AND
ALL SUBPARAGRAPHS.
BLOCK 1-DATA ITEM NO.: SLEP-70-02
BLOCK 2-DATA ITEM TITLE: INTEGRATED MASTER SCHEDULE
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.5 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.5 AND ALL
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.5 AND
BLOCK 1-DATA ITEM NO.: SLEP-70-03
BLOCK 2-DATA ITEM TITLE: RISK MANAGEMENT PLAN
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.7.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.7.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.7.
BLOCK 1-DATA ITEM NO.: SLEP-70-04
BLOCK 2-DATA ITEM TITLE: ARRIVAL CONFERENCE
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.8.1.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.8.1.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.8.1.
BLOCK 1-DATA ITEM NO.: SLEP-70-05
BLOCK 2-DATA ITEM TITLE: COLLABORATIVE MEETING AGENDA/MINUTES
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.8.2 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.8.2 AND
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.8.2 AND
BLOCK 1-DATA ITEM NO.: SLEP-70-06
BLOCK 2-DATA ITEM TITLE: BASELINE SCHEDUEL REVIEW
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.8.4.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.8.4.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.8.4.
BLOCK 1-DATA ITEM NO.: SLEP-70-07
BLOCK 2-DATA ITEM TITLE: PROGRAM MANAGEMENT REVIEW
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.8.6 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.8.6 AND
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.8.6 AND
BLOCK 1-DATA ITEM NO.: SLEP-70-08
BLOCK 2-DATA ITEM TITLE: PROJECT STATUS REVIEW
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.8.7.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.8.7.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.8.7.
BLOCK 1-DATA ITEM NO.: SLEP-70-09
BLOCK 2-DATA ITEM TITLE: TASK ORDER CLOSURE REPORT
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.9.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.9.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.9.
BLOCK 1-DATA ITEM NO.: SLEP-70-10
BLOCK 2-DATA ITEM TITLE: CONTRACT CLOSE-OUT REPORT
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.10 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.10 AND
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.10 AND
BLOCK 1-DATA ITEM NO.: SLEP-70-11
BLOCK 2-DATA ITEM TITLE: SEVERE WEATHER PLAN
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.11.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.11.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.11.
BLOCK 1-DATA ITEM NO.: SLEP-70-12
BLOCK 2-DATA ITEM TITLE: ENVIRONMENTAL MANAGEMENT PLAN
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.12.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.12.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 70, PARAGRAPH 3.12.
BLOCK 1-DATA ITEM NO.: SLEP-71-01
BLOCK 2-DATA ITEM TITLE: WEIGHT & MOMENT REPORT
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 71, PARAGRAPH 3.3.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 71, PARAGRAPH 3.3.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 71, PARAGRAPH 3.3.
BLOCK 1-DATA ITEM NO.: SLEP-72-01
BLOCK 2-DATA ITEM TITLE: CGMCS COORDINATION MEETING MINUTES
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 72, PARAGRAPH 3.4.2.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 72, PARAGRAPH 3.4.2.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 72, PARAGRAPH 3.4.3 AND
ALL SUBPARAGRAPHS
BLOCK 1-DATA ITEM NO.: SLEP-73-01
BLOCK 2-DATA ITEM TITLE: PPD COORDINATION MEETING MINUTES
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 73, PARAGRAPH 3.4.2.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 73, PARAGRAPH 3.4.2.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 73, PARAGRAPH 3.4.3 AND
ALL SUBPARAGRAPHS
BLOCK 1-DATA ITEM NO.: SLEP-74-01
BLOCK 2-DATA ITEM TITLE: INSTALLATION DESIGN REQUIREMENTS
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 74, PARAGRAPH 3.4.1.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 74, PARAGRAPH 3.4.1.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 74, PARAGRAPH 3.4.1
BLOCK 1-DATA ITEM NO.: SLEP-74-02
BLOCK 2-DATA ITEM TITLE: LOGISTICS DELIVERABLES
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 74, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 74, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 74, PARAGRAPH 3.5 AND
TABLE 1
BLOCK 1-DATA ITEM NO.: SLEP-75-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 75, PARAGRAPH 3.4.1.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 75, PARAGRAPH 3.4.1.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 75, PARAGRAPH 3.4.1.
BLOCK 1-DATA ITEM NO.: SLEP-75-02
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 75, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 75, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 75, PARAGRAPH 3.5 AND
TABLE 2.
BLOCK 1-DATA ITEM NO.: SLEP-76-01
BLOCK 2-DATA ITEM TITLE: PIPING HYDROSTATIC TEST REPORT
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 76, PARAGRAPH 3.9.4
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 76, PARAGRAPH 3.9.4
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 76, PARAGRAPH 3.9.4
BLOCK 1-DATA ITEM NO.: SLEP-76-02
BLOCK 2-DATA ITEM TITLE: TEST DOCUMENTATION
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 76, PARAGRAPH 3.9.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 76, PARAGRAPH 3.9.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 76, PARAGRAPH 3.9.
BLOCK 1-DATA ITEM NO.: SLEP-77-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 77, PARAGRAPH 3.4.1.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 77, PARAGRAPH 3.4.1.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 77, PARAGRAPH 3.4.1.
BLOCK 1-DATA ITEM NO.: SLEP-77-02
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 77, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 77, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 77, PARAGRAPH 3.5 AND
BLOCK 1-DATA ITEM NO.: SLEP-78-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 78, PARAGRAPH 3.4.1.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 78, PARAGRAPH 3.4.1.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 78, PARAGRAPH 3.4.1.
BLOCK 1-DATA ITEM NO.: SLEP-78-02
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 78, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 78, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 78, PARAGRAPH 3.5 AND
TABLE 1.
BLOCK 1-DATA ITEM NO.: SLEP-79-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 79, PARAGRAPH 3.4.2.2.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 79, PARAGRAPH 3.4.2.2.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 79, PARAGRAPH 3.4.2.2.
BLOCK 1-DATA ITEM NO.: SLEP-79-02
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 79, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 79, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 79, PARAGRAPH 3.5.
BLOCK 1-DATA ITEM NO.: SLEP-80-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 80, PARAGRAPH 3.6.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 80, PARAGRAPH 3.6.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 80, PARAGRAPH 3.6.
BLOCK 1-DATA ITEM NO.: SLEP-81-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 81, PARAGRAPH 3.4.1.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 81, PARAGRAPH 3.4.1.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 81, PARAGRAPH 3.4.1.
BLOCK 1-DATA ITEM NO.: SLEP-81-02
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 81, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 81, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 81, PARAGRAPH 3.5 AND
TABLE 3.
BLOCK 1-DATA ITEM NO.: SLEP-82-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 82, PARAGRAPH 3.4.1.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 82, PARAGRAPH 3.4.1.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 82, PARAGRAPH 3.4.1.
BLOCK 1-DATA ITEM NO.: SLEP-82-02
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 82, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 82, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 82, PARAGRAPH 3.5 AND
BLOCK 1-DATA ITEM NO.: SLEP-83-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 83, PARAGRAPH 3.4.1.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 83, PARAGRAPH 3.4.1.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 83, PARAGRAPH 3.4.1.
BLOCK 1-DATA ITEM NO.: SLEP-83-02
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 83, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 83, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 83, PARAGRAPH 3.5 AND
BLOCK 1-DATA ITEM NO.: SLEP-84-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 84, PARAGRAPH 3.4.1.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 84, PARAGRAPH 3.4.1.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 84, PARAGRAPH 3.4.1.
BLOCK 1-DATA ITEM NO.: SLEP-84-02
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 84, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 84, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 84, PARAGRAPH 3.5 AND
BLOCK 1-DATA ITEM NO.: SLEP-85-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 85, PARAGRAPH 3.4.1.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 85, PARAGRAPH 3.4.1.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 85, PARAGRAPH 3.4.1.
BLOCK 1-DATA ITEM NO.: SLEP-85-02
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 85, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 85, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 85, PARAGRAPH 3.5 AND
BLOCK 1-DATA ITEM NO.: SLEP-86-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 86, PARAGRAPH 3.4.1.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 86, PARAGRAPH 3.4.1.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 86, PARAGRAPH 3.4.1.
BLOCK 1-DATA ITEM NO.: SLEP-86-02
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 86, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 86, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 86, PARAGRAPH 3.5 AND
BLOCK 1-DATA ITEM NO.: SLEP-87-01
BLOCK 2-DATA ITEM TITLE: FINAL OPERATIONAL TEST DOCUMENTATION
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 87, PARAGRAPH 3.8.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 87, PARAGRAPH 3.8.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 87, PARAGRAPH 3.8.
BLOCK 1-DATA ITEM NO.: SLEP-88-01
BLOCK 2-DATA ITEM TITLE: OPERATING AND MAINTENANCE MANUALS
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 88, PARAGRAPH 3.11.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 88, PARAGRAPH 3.11.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 88, PARAGRAPH 3.11.
BLOCK 1-DATA ITEM NO.: SLEP-89-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 89, PARAGRAPH 3.4.1.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 89, PARAGRAPH 3.4.1.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 89, PARAGRAPH 3.4.1.
BLOCK 1-DATA ITEM NO.: SLEP-89-02
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 89, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 89, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 89, PARAGRAPH 3.5 AND
BLOCK 1-DATA ITEM NO.: SLEP-90-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 90, PARAGRAPH 3.4.1.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 90, PARAGRAPH 3.4.1.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 90, PARAGRAPH 3.4.1.
BLOCK 1-DATA ITEM NO.: SLEP-90-02
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 90, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 90, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 90, PARAGRAPH 3.5 AND
BLOCK 1-DATA ITEM NO.: SLEP-91-01
BLOCK 2-DATA ITEM TITLE: QUALITY ASSURANCE INSPECTION REPORT
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 91, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 91, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 91, PARAGRAPH 3.5.
BLOCK 1-DATA ITEM NO.: SLEP-92-01
BLOCK 2-DATA ITEM TITLE: AIR FLOW TESTING AND BALANCING REPORT
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 92, PARAGRAPH 3.14 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 92, PARAGRAPH 3.14 AND
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 92, PARAGRAPH 3.14.
BLOCK 1-DATA ITEM NO.: SLEP-93-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 93, PARAGRAPH 3.7 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 93, PARAGRAPH 3.7 AND ALL
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 93, PARAGRAPH 3.7.
BLOCK 1-DATA ITEM NO.: SLEP-94-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 94, PARAGRAPH 3.14 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 94, PARAGRAPH 3.14 AND
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 94, PARAGRAPH 3.14.
BLOCK 1-DATA ITEM NO.: SLEP-95-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 95, PARAGRAPH 3.14 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 95, PARAGRAPH 3.14 AND
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 95, PARAGRAPH 3.14.
BLOCK 1-DATA ITEM NO.: SLEP-96-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 96, PARAGRAPH 3.7 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 96, PARAGRAPH 3.7 AND ALL
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 96, PARAGRAPH 3.7.
BLOCK 1-DATA ITEM NO.: SLEP-97-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 97, PARAGRAPH 3.7 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 97, PARAGRAPH 3.7 AND ALL
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 97, PARAGRAPH 3.7.
BLOCK 1-DATA ITEM NO.: SLEP-98-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 98, PARAGRAPH 3.7 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 98, PARAGRAPH 3.7 AND ALL
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 98, PARAGRAPH 3.7.
BLOCK 1-DATA ITEM NO.: SLEP-99-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 99, PARAGRAPH 3.7 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 99, PARAGRAPH 3.7 AND ALL
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 99, PARAGRAPH 3.7.
BLOCK 1-DATA ITEM NO.: SLEP-100-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 100, PARAGRAPH 3.7 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 100, PARAGRAPH 3.7 AND
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 100, PARAGRAPH 3.7.
BLOCK 1-DATA ITEM NO.: SLEP-101-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 101, PARAGRAPH 3.14 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 101, PARAGRAPH 3.14 AND
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 101, PARAGRAPH 3.14.
BLOCK 1-DATA ITEM NO.: SLEP-102-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 102, PARAGRAPH 3.14 AND ALL
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 102, PARAGRAPH 3.14 AND
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 102, PARAGRAPH 3.14.
BLOCK 1-DATA ITEM NO.: SLEP-103-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 103, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 103, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 103, PARAGRAPH 3.5.
BLOCK 1-DATA ITEM NO.: SLEP-104-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 104, PARAGRAPH 3.4.1.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 104, PARAGRAPH 3.4.1.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 104, PARAGRAPH 3.4.1.
BLOCK 1-DATA ITEM NO.: SLEP-104-02
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 104, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 104, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 104, PARAGRAPH 3.5 AND
BLOCK 1-DATA ITEM NO.: SLEP-105-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 105, PARAGRAPH 3.4.1.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 105, PARAGRAPH 3.4.1.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 105, PARAGRAPH 3.4.1.
BLOCK 1-DATA ITEM NO.: SLEP-105-02
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 105, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 105, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 105, PARAGRAPH 3.5 AND
TABLE 20.
BLOCK 1-DATA ITEM NO.: SLEP-106-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 106, PARAGRAPH 3.4.1.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 106, PARAGRAPH 3.4.1.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 106, PARAGRAPH 3.4.1.
BLOCK 1-DATA ITEM NO.: SLEP-106-02
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 106, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 106, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 106, PARAGRAPH 3.5 AND
BLOCK 1-DATA ITEM NO.: SLEP-107-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 107, PARAGRAPH 3.4.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 107, PARAGRAPH 3.4.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 107, PARAGRAPH 3.4.
BLOCK 1-DATA ITEM NO.: SLEP-107-02
BLOCK 2-DATA ITEM TITLE: OPERATIONAL TEST REPORT
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 107, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 107, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 107, PARAGRAPH 3.5.
BLOCK 1-DATA ITEM NO.: SLEP-108-01
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 108, PARAGRAPH 3.4.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 108, PARAGRAPH 3.4.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 108, PARAGRAPH 3.4.
BLOCK 1-DATA ITEM NO.: SLEP-108-02
BLOCK 2-DATA ITEM TITLE: OPERATIONAL TEST REPORT
BLOCK 3-REFERENCE: SEE SPECIFICATION WORK ITEM 108, PARAGRAPH 3.5.
BLOCK 5-DATA DESCRIPTION: SEE SPECIFICATION WORK ITEM 108, PARAGRAPH 3.5.
BLOCK 7-SUBMITTAL SCHEDULE: SEE SPECIFICATION WORK ITEM 108, PARAGRAPH 3.5.
File details come from the government source that posted it. Updated .