REVISED SHEET 111.pdf

PDF 1 MB Posted

Attached to
RVSDS SRF Project Plan: Phases 2C/3C – Sewer Rehabilitation
Solicitation number
37-24-023
Issued by
Wayne County, Dansville Village, Michigan

About this file

This document is a detailed engineering design sheet (Sheet 111) for the Wayne County Rouge Valley Sewage Disposal System (RVSDS) Phase 2C/3C Pipe Rehabilitation project, specifically focusing on Rehab Location 2: NHV 3-29-28. The sheet, prepared by OHM Advisors, provides comprehensive structural construction details for a sewer rehabilitation project located along Edward N. Hines Drive. The design includes specific technical drawings showing section views, structural details, and site mapping with precise measurements for sewer line configurations, including details for sanitary sewer, control structures, and pipe lining specifications.

The drawing includes technical specifications for multiple structural elements, with a quantities table listing various components such as sewer pipes, structures, and rehabilitation items. The design appears to be part of a larger municipal infrastructure improvement project targeting approximately 21,000 feet of large diameter sewer rehabilitation, with this specific sheet addressing a particular segment of the overall project. The document is dated May 1, 2023, and is marked as part of the Wayne County RVSDS Phase 2C/3C project, suggesting an ongoing municipal infrastructure upgrade initiative focused on sewer system improvement and maintenance.

View the file

Other files

File Type Posted
Addendum 5 - Questions-Answers Sanitary Sewer Rehab IFB 37-24-023 6-21-24.pdf PDF
Appendix F - Envrionmental Assessment 5-15-24.pdf PDF
Appendix J - EGLE Permit Requirements 5-15-24.pdf PDF
W-9 Form v10-18.pdf PDF
114 REHAB LOCATION 5.pdf PDF
33 01 31 - Cured-in-Place Pipe (CIPP) Lining.pdf PDF
Addendum 1 - Pre-Bid Sign-In Sewer Rehab IFB 37-24-023 5-29-24.pdf PDF
Appendix A - Price Sheet_2C3C IFB 37-24-023 5-15-24.xlsx XLSX spreadsheet
Appendix B.3 - Agreement_EJCDC-Std_General Conditions_Construction Contracts 5-15-24.pdf PDF
Appendix E.5 - Buy America Form 5-15-24.pdf PDF
Addendum 4 - Questions-Answers Sanitary Sewer Rehab IFB 37-24-023 6-18-24.pdf PDF
Appendix B.2 - Agreement_0800- Supplementary Conditions-Phase 2C_3C 5-15-24.docx DOCX document
Appendix C - Examples of Surety Forms (Performance and Payment Bonds) 5-15-24.pdf PDF
Appendix E.1 - Labor Standards Provisions_Davis Bacon Requirements 5-15-24.pdf PDF
Appendix E.2 - Davis Bacon Wage Rate Determination 5-15-24.pdf PDF
Appendix I - Historical Drawings 5-15-24.pdf PDF
Ethics Form rev 8-16-21.pdf PDF
First Tier Subcontractor_designation_form 8-2023.pdf PDF
01 10 00 - SUMMARY.pdf PDF
33 40 00 - Temporary Flow Diversion and Bypass Pumping.pdf PDF
Addendum 3 - Questions-Answers Sanitary Sewer Rehab IFB 37-24-023 6-14-24.pdf PDF
Addendum Table 1 - 2C3C Max Liner Thickness.pdf PDF
Appendix B.1 - Agreement-Rouge RVSDS Phase 2C_3C-5-15-24.docx DOCX document
Appendix D - Construction Documents - Requirements and Plans 5-15-24.pdf PDF
Appendix E.3 - DBE Participation Form 5-15-24.docx DOCX document
Appendix E.4 - Debarment Form 5-15-24.pdf PDF
Appendix G - CCTV Inspection and MSI Reports 5-15-24.pdf PDF
Appendix H - Geotechnical Investigation Report 5-15-24.pdf PDF
RVSDS LTCAP Phase 2C3C IFB 37-24-023 5-15-24.pdf PDF
Sheet 95_Addendum1.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Know what's below.

before you dig.Call

R

P:

\0

6_

\0

0_

R

VS

D S_

LT

C

AP

_p h2 _D es ig n_ C

A- C

E\ D ra w in gs

\C iv il\ Li ni ng

\P la ns _C on st

\2

0C

O N

_A D

D L

R

EH

AB

.d w g

J un

2,

- 3 :0

9p m

D R

AW

IN

G P

AT

H

OHM-ADVISORS.COM

ARCHITECTS ENGINEERS PLANNERS

CO

PY

RI

G

HT

O

HM

A

DV

IS

O

RS

. A

LL

D

RA

W

IN

G

S

AN

D W

RI

TT

EN

M

AT

ER

IA

LS

A

PP

EA

RI

NG

H

ER

EI

N

CO

NS

TI

TU

TE

T

HE

O

RI

G

IN

AL

A

ND

U

NP

UB

LI

SH

ED

W

O

RK

O F

O

HM

A

DV

IS

O

RS

A

ND

T

HE

S

AM

E

M

AY

N O

T

BE

D

UP

LI

CA

TE

D, D

IS

TR

IB

UT

ED

, O R

DI

SC

LO

SE

D W

IT

HO

UT

P

RI

O

R W

RI

TT

EN

C

O

NS

EN

T

O F

O

HM

A

DV

IS

O

RS

R

RE

VI

SI

ON

DA

TE

DE

SC

RI

PT

IO

N

PM

PR

OJ

EC

T

NU

MB

ER

IS

SU

ED

F

OR

W

AY

N E

C O

U N

TY

R

VS

D S

PH

AS

E 2C

/3 C

PI

PE

R

EH

AB

IL

IT

AT

IO

N W

AY

NE

C

OU

NT

Y

RE

HA

B

LO

CA

TI

ON

2:

N

HV

3-

-2

-2 3-

NZ

5/0

1/2

AutoCAD SHX Text

42" SAN

AutoCAD SHX Text

42" SAN

AutoCAD SHX Text

42" SAN

AutoCAD SHX Text

66" SAN

AutoCAD SHX Text

48" SAN

AutoCAD SHX Text

18" SAN

AutoCAD SHX Text

42" STM

AutoCAD SHX Text

66" SAN

AutoCAD SHX Text

48" SAN

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

EX GROUND @ SANTIARY SEWER

AutoCAD SHX Text

QUANTITIES THIS SHEET

AutoCAD SHX Text

TOTAL

AutoCAD SHX Text

UNIT

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

AutoCAD SHX Text Syd

AutoCAD SHX Text Clearing

AutoCAD SHX Text

AutoCAD SHX Text Ft

AutoCAD SHX Text Sewer, Rem, 24 inch to 48 inch

AutoCAD SHX Text

AutoCAD SHX Text Syd

AutoCAD SHX Text Pavt, Rem

AutoCAD SHX Text

AutoCAD SHX Text Ft

AutoCAD SHX Text Erosion Control, Silt Fence

AutoCAD SHX Text

AutoCAD SHX Text Syd

AutoCAD SHX Text Aggregate Base, 21AA, 8 inch

AutoCAD SHX Text

AutoCAD SHX Text Ft

AutoCAD SHX Text Sanitary Sewer, CIPP Liner, 42 inch

AutoCAD SHX Text

AutoCAD SHX Text Ft

AutoCAD SHX Text Sanitary Sewer, RCP, 42 inch

AutoCAD SHX Text

AutoCAD SHX Text Syd

AutoCAD SHX Text HMA, 5EML, 2.5 inch Pathway

AutoCAD SHX Text

AutoCAD SHX Text Syd

AutoCAD SHX Text HMA. 5EML, 1.5 inch Roadway

AutoCAD SHX Text

AutoCAD SHX Text Syd

AutoCAD SHX Text Pavt, Nonreinf Conc, 8 inch

AutoCAD SHX Text

AutoCAD SHX Text Ft

AutoCAD SHX Text Fence, Temp

AutoCAD SHX Text

AutoCAD SHX Text Syd

AutoCAD SHX Text Restoration

AutoCAD SHX Text

AutoCAD SHX Text Ea

AutoCAD SHX Text Sanitary Structure, 72 inch dia

AutoCAD SHX Text

AutoCAD SHX Text Ea

AutoCAD SHX Text Sanitary Structure Cover

AutoCAD SHX Text

%%USTRUCTURE CONSTRUCTION DETAILS

AutoCAD SHX Text

%%USECTION A-A

AutoCAD SHX Text NEENAH COVER TYPE 1650-HV SEE DETAIL ON SHEET # # INCLUDED IN SANITARY STRUCTURE, 72 INCH DIA

AutoCAD SHX Text

BOLT IN NEENAH FRAME (TYP) (WRAPIDSEAL OVER BOLTS)

AutoCAD SHX Text PRECAST REINFORCED CONCRETE FLAT SLAB TOP SEE MDOT SPECIAL DETAIL R-1-SERIES FOR THICKNESS AND REINFORCEMENT REQUIREMENTS ALL COSTS INCLUDED IN SANITARY STRUCTURE, 72 INCH DIA

AutoCAD SHX Text

42" INV OUTLET

AutoCAD SHX Text SANITARY STRUCTURE, 72 INCH DIA SEE MDOT SPECIAL DETAIL R-1-SERIES FOR THICKNESS AND REINFORCEMENT REQUIREMENTS FOR 72" DIA MANHOLES *ALTERNATE STRUCTURES MAY BE PROVIDED PENDING APPROVAL FROM THE ENGINEER **CONTRACTOR SHALL VERIFY INVERT LOCATIONS AND DEPTH OR ACCOUNT FOR ADJUSTMENT AS NECESSARY

AutoCAD SHX Text

APPLY BUTYL SEALANT (TYP ALL JOINTS)

AutoCAD SHX Text

APPLY BUTYL SEALANT AROUND JOINT ON BOTH SIDES OF BOLTS (TYP)

AutoCAD SHX Text

OVERLAP WRAPIDSEAL PER MANUFACTURER'S RECOMMENDATIONS (TYP)

AutoCAD SHX Text

INSTALL WRAPIDSEAL (OR APPROVED EQUAL) AROUND TOP OF MANHOLE AND FRAMES (TYP)

AutoCAD SHX Text

T/CAST = XXX.XX*

AutoCAD SHX Text

FINISHED GRADE = XXX.XX*

AutoCAD SHX Text

42" INV INLET

AutoCAD SHX Text

SANITARY STRUCTURE, 72 INCH DIA

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text

EXISTING AS-BUILTS INDICATE (12) 7.5°SEGMENTED PIPES TO CREATE THE 90° BEND.

AutoCAD SHX Text REMOVE AND REPLACE EXISTING SANITARY SEWER AS NEEDED TO INSTALL THE SANITARY STRUCTURE, PAYMENT INCLUDED IN THE RELATIVE SANITARY SEWER AND REMOVAL PAY ITEMS

AutoCAD SHX Text

EDWARD N HINES DR

AutoCAD SHX Text feet

AutoCAD SHX Text GRAPHIC SCALE: 1 inch =

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

REHAB LOCATION 2: NHV 3-29-28

AutoCAD SHX Text

SANITARY STRUCTURE, 72 INCH. 1 EA1 EA

AutoCAD SHX Text

SANITARY STRUCTURE, 72 INCH, 1 EA1 EA

AutoCAD SHX Text

EROSION CONTROL, SILT FENCE, 80 FT80 FT

AutoCAD SHX Text

EROSION CONTROL, SILT FENCE, 250 FT250 FT

AutoCAD SHX Text

SANITARY SEWER, CIPP LINER, 42 INCH, FULL LENGTH, 89 FT FT

AutoCAD SHX Text NOTE: 1. THE CONTRACTOR SHALL RESTORE IMPACTED AREAS PER WAYNE COUNTY DEPARTMENT OF PUBLIC SERVICES PARKS DIVISION STANDARDS AS DETAILED IN THE PROJECT SPECIFICATIONS. THE CONTRACTOR SHALL RESTORE IMPACTED AREAS PER WAYNE COUNTY DEPARTMENT OF PUBLIC SERVICES PARKS DIVISION STANDARDS AS DETAILED IN THE PROJECT SPECIFICATIONS. 2. ALL DISTURBED AREAS WITHIN ROAD R.O.W. OR DRAIN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN ALL DISTURBED AREAS WITHIN ROAD R.O.W. OR DRAIN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN DISTURBED AREAS WITHIN ROAD R.O.W. OR DRAIN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN DISTURBED AREAS WITHIN ROAD R.O.W. OR DRAIN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN AREAS WITHIN ROAD R.O.W. OR DRAIN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN AREAS WITHIN ROAD R.O.W. OR DRAIN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN WITHIN ROAD R.O.W. OR DRAIN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN WITHIN ROAD R.O.W. OR DRAIN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN ROAD R.O.W. OR DRAIN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN ROAD R.O.W. OR DRAIN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN R.O.W. OR DRAIN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN R.O.W. OR DRAIN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN OR DRAIN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN OR DRAIN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN DRAIN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN DRAIN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN EASEMENT SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN SHALL BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN BE RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN RESTORED WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN WITH 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN 3 INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN INCHES TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN TOPSOIL, SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN SEED MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN MIX, THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN THM AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN AND MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN MULCH OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN OF WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN WITH EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN EXCELSIOR EROSION CONTROL BLANKETS. SLOPES STEEPER THAN EROSION CONTROL BLANKETS. SLOPES STEEPER THAN EROSION CONTROL BLANKETS. SLOPES STEEPER THAN CONTROL BLANKETS. SLOPES STEEPER THAN CONTROL BLANKETS. SLOPES STEEPER THAN BLANKETS. SLOPES STEEPER THAN BLANKETS. SLOPES STEEPER THAN SLOPES STEEPER THAN SLOPES STEEPER THAN STEEPER THAN STEEPER THAN THAN THAN 1 ON 3 AND DITCH BOTTOMS SHALL BE RESTORED WITH 2 INCHES OF TOPSOIL AND SOD. ALL SOD SHALL BE STAKED IN PLACE WHEN INSTALLED IN A DITCH, DRAIN, OR ON ANY SLOPE. 3. PAY ITEMS ARE BASED ON ORIGINAL HOST PIPE SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR PAY ITEMS ARE BASED ON ORIGINAL HOST PIPE SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR ITEMS ARE BASED ON ORIGINAL HOST PIPE SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR ITEMS ARE BASED ON ORIGINAL HOST PIPE SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR ARE BASED ON ORIGINAL HOST PIPE SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR ARE BASED ON ORIGINAL HOST PIPE SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR BASED ON ORIGINAL HOST PIPE SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR BASED ON ORIGINAL HOST PIPE SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR ON ORIGINAL HOST PIPE SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR ON ORIGINAL HOST PIPE SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR ORIGINAL HOST PIPE SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR ORIGINAL HOST PIPE SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR HOST PIPE SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR HOST PIPE SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR PIPE SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR PIPE SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR SIZE. CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR CONTRACTOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR SHALL ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR ANTICIPATE SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR SOME CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR CORROSION IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR IN ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR ACCORDANCE WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR WITH TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR TEH MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR MSI REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR REPORTS AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR AND WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR WILL BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR BE REQURED TO MAKE PRE-LINING MEASUREMENTS FOR REQURED TO MAKE PRE-LINING MEASUREMENTS FOR REQURED TO MAKE PRE-LINING MEASUREMENTS FOR TO MAKE PRE-LINING MEASUREMENTS FOR TO MAKE PRE-LINING MEASUREMENTS FOR MAKE PRE-LINING MEASUREMENTS FOR MAKE PRE-LINING MEASUREMENTS FOR PRE-LINING MEASUREMENTS FOR PRE-LINING MEASUREMENTS FOR MEASUREMENTS FOR MEASUREMENTS FOR FOR FOR THE LINER DESIGN PRIOR TO COMMENCING WORK. ADDITIONAL PAYMENT WILL NOT BE MADE ON THIS BASIS.

AutoCAD SHX Text EXISTING SANITARY MANHOLE LOCAL MUNICIPALITY EXISTING SANITARY MANHOLE CIPP LINE EXISTING SANITARY SEWER GEOTEXTILE SILT FENCE EXISTING JUNCTION CHAMBER

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text S http://www.ohm-advisors.com AutoCAD SHX Text

SANITARY SEWER, CIPP LINER, 42 INCH, FULL LENGTH, 69 FT FT

AutoCAD SHX Text

SANITARY SEWER, CIPP LINER, 42 INCH, FULL LENGTH, 94 FT FT

Sheets and Views
111 REHAB LOCATION 2

File details come from the government source that posted it. Updated .