The file is a Price Sheet (Appendix A) for the Wayne County, Michigan Rouge Valley Sewage Disposal System (RVSDS) Phase 2C/3C Sewer Rehabilitation Project, Invitation for Bid (IFB) Number 37-24-023. The project involves comprehensive sewer rehabilitation, including approximately 21,000 feet of large diameter sewer rehabilitation, widespread grouting, and spot rehabilitation of a 24-inch diameter sanitary sewer segment. The scope includes installing seven new concrete structures, with primary work focused on Cured in Place Pipe (CIPP) lining of the existing sewer system. The price sheet is divided into five divisions: Project Wide Items, Widespread Grouting, CIPP Lining, Additional Rehabilitations, and Junction Chamber Rehabilitation.
The price sheet provides a detailed breakdown of quantities and line items across multiple categories, with a provisional allowance of $1,100,000.00 for unforeseen conditions. The project involves various technical elements such as mobilization, general conditions, audio-video route surveys, traffic maintenance, flow control, bypass pumping, tree removal, pavement removal, erosion control, video inspections, sewer cleaning and preparation, grouting, structural adjustments, and restoration. The comprehensive pricing document allows bidders to provide unit prices for specific tasks, with quantities specified for each item, enabling a structured and transparent bidding process for the sewer rehabilitation project.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BidForm_Option1
| 37-24-023 APPENDIX A |
| RVSDS SRF Project Plan: Phase 2C/3C Sewer Rehabilitation |
| PRICE SHEET |
| Failure to complete the following form(s) shall result in your Bid being deemed non-responsive and rejected without further evaluations. |
| COMPANY NAME: |
| Division 1: Project Wide Items | |||||
| Item | Description | Qty | Unit | Unit Price | Amount |
| 1 | Mobilization, Max 5% | 1 | LSUM | ||
| 2 | General Conditions | 1 | LSUM | ||
| 3 | Provisional Allowance for Unforseen Conditions | 1 | LSUM | $1,100,000.00 | $1,100,000.00 |
| 4 | Audio Video Route Survey | 1 | LSUM | ||
| 5 | Traffic Maintenance and Control | 1 | LSUM | ||
| 6 | Flow Control, Diversion | 1 | LSUM | ||
| 7 | Bypass Pumping, Furnish | 1 | LSUM | ||
| 8 | Bypass Pumping, Operate | 1 | LSUM |
TOTAL DIVISION 1 COST (ITEMS 1-8)
| Division 2: Widespread Grouting | |||||
| Item | Description | Qty | Unit | Unit Price | Amount |
| 9 | Clearing | 0.51 | Acre | ||
| 10 | Tree, Rem, 19 inch to 36 inch | 16 | Ea | ||
| 11 | Tree, Rem, 6 inch to 18 inch | 89 | Ea | ||
| 12 | Pavt, Rem | 200 | Syd | ||
| 13 | Erosion Control, Silt Fence | 3570 | Ft | ||
| 14 | Pre and Post Grouting Video Inspection, 10 inch | 246 | Ft | ||
| 15 | Pre and Post Grouting Video Inspection, 15 inch | 245 | Ft | ||
| 16 | Pre and Post Grouting Video Inspection, 18 inch | 404 | Ft | ||
| 17 | Pre and Post Grouting Video Inspection, 21 inch | 300 | Ft | ||
| 18 | Pre and Post Grouting Video Inspection, 24 inch | 363 | Ft | ||
| 19 | Pre and Post Grouting Video Inspection, 30 inch | 555 | Ft | ||
| 20 | Pre and Post Grouting Video Inspection, 36 inch | 888 | Ft | ||
| 21 | Pre and Post Grouting Video Inspection, 42 inch | 5449 | Ft | ||
| 22 | Pre and Post Grouting Video Inspection, 48 inch | 14535 | Ft | ||
| 23 | Pre and Post Grouting Video Inspection, 54 inch | 3360 | Ft | ||
| 24 | Pre and Post Grouting Video Inspection, 60 inch | 9050 | Ft | ||
| 25 | Pre and Post Grouting Video Inspection, 66 inch | 8582 | Ft | ||
| 26 | Pre and Post Grouting Video Inspection, 72 inch | 180 | Ft | ||
| 27 | Pre and Post Grouting Video Inspection, 78 inch | 3547 | Ft | ||
| 28 | Sanitary Sewer, Cleaning and Prep, 10 inch | 246 | Ft | ||
| 29 | Sanitary Sewer, Cleaning and Prep, 15 inch | 245 | Ft | ||
| 30 | Sanitary Sewer, Cleaning and Prep, 18 inch | 404 | Ft | ||
| 31 | Sanitary Sewer, Cleaning and Prep, 21 inch | 300 | Ft | ||
| 32 | Sanitary Sewer, Cleaning and Prep, 24 inch | 363 | Ft | ||
| 33 | Sanitary Sewer, Cleaning and Prep, 30 inch | 555 | Ft | ||
| 34 | Sanitary Sewer, Cleaning and Prep, 36 inch | 888 | Ft | ||
| 35 | Sanitary Sewer, Cleaning and Prep, 42 inch | 5449 | Ft | ||
| 36 | Sanitary Sewer, Cleaning and Prep, 48 inch | 14535 | Ft | ||
| 37 | Sanitary Sewer, Cleaning and Prep, 54 inch | 3360 | Ft | ||
| 38 | Sanitary Sewer, Cleaning and Prep, 60 inch | 9050 | Ft | ||
| 39 | Sanitary Sewer, Cleaning and Prep, 66 inch | 8582 | Ft | ||
| 40 | Sanitary Sewer, Cleaning and Prep, 72 inch | 180 | Ft | ||
| 41 | Sanitary Sewer, Cleaning and Prep, 78 inch | 3547 | Ft | ||
| 42 | Structure Adjustment | 8 | Ea | ||
| 43 | Restoration | 5802 | Syd | ||
| 44 | Aggregate Base, 21AA, 6inch | 200 | Syd | ||
| 45 | HMA, 5EML, 2.5 inch pathway | 200 | Syd | ||
| 46 | Sanitary Structure Cover | 1 | Ea | ||
| 47 | Sanitary Structure, Deconstruct and Reconstruct, Case D | 7 | Ea | ||
| 48 | Sanitary Sewer, Grout | 1758 | Gal | ||
| 49 | Sanitary Sewer, Injection Grouting, 10 inch | 1 | Ea | ||
| 50 | Sanitary Sewer, Injection Grouting, 15 inch | 6 | Ea | ||
| 51 | Sanitary Sewer, Injection Grouting, 18 inch | 1 | Ea | ||
| 52 | Sanitary Sewer, Injection Grouting, 21 inch | 2 | Ea | ||
| 53 | Sanitary Sewer, Injection Grouting, 24 inch | 1 | Ea | ||
| 54 | Sanitary Sewer, Injection Grouting, 30 inch | 2 | Ea | ||
| 55 | Sanitary Sewer, Injection Grouting, 36 inch | 3 | Ea | ||
| 56 | Sanitary Sewer, Injection Grouting, 42 inch | 35 | Ea | ||
| 57 | Sanitary Sewer, Injection Grouting, 48 inch | 50 | Ea | ||
| 58 | Sanitary Sewer, Injection Grouting, 54 inch | 7 | Ea | ||
| 59 | Sanitary Sewer, Injection Grouting, 60 inch | 28 | Ea | ||
| 60 | Sanitary Sewer, Injection Grouting, 66 inch | 32 | Ea | ||
| 61 | Sanitary Sewer, Injection Grouting, 72 inch | 1 | Ea | ||
| 62 | Sanitary Sewer, Injection Grouting, 78 inch | 4 | Ea | ||
| 63 | Sanitary Sewer, Joint Pointing, 54 inch | 21 | Ea | ||
| 64 | Sanitary Sewer, Joint Pointing, 60 inch | 57 | Ea | ||
| 65 | Sanitary Sewer, Joint Pointing, 66 inch | 67 | Ea | ||
| 66 | Sanitary Sewer, Joint Pointing, 78 inch | 13 | Ea |
TOTAL DIVISION 2 COST (ITEMS 9-66)
| Division 3: CIPP Lining | |||||
| Item | Description | Qty | Unit | Unit Price | Amount |
| 67 | Clearing | 2.25 | Acre | ||
| 68 | Tree, Rem, 6 inch to 18 inch | 26 | Ea | ||
| 69 | Pavt, Rem | 3149 | Syd | ||
| 70 | Non Haz Contaminated Material Handling and Disposal, LM | 100 | Cyd | ||
| 71 | Erosion Control, Silt Fence | 5705 | Ft | ||
| 72 | Aggregate Base, 21AA, 6 inch | 1999 | Syd | ||
| 73 | Aggregate Base, 21AA, 8 inch | 1402 | Syd | ||
| 74 | Aggregate Surface Course, 21AA, Limestone, 12 inch | 17773 | Syd | ||
| 75 | Maintenance Aggregate, 21AA, Limestone | 875 | Ton | ||
| 76 | HMA, 5EML, 1.5 inch Roadway | 1901 | Syd | ||
| 77 | HMA, 5EML, 2.5 inch Pathway | 1249 | Syd | ||
| 78 | Pavt, Nonreinf Conc, 8 inch | 1901 | Syd | ||
| 79 | Fence, Temp | 2000 | Ft | ||
| 80 | Pavt Mrkg, Ovly Cold Plastic, 6 inch, White | 680 | Ft | ||
| 81 | Pavt Mrkg, Ovly Cold Plastic, 6 inch, Yellow | 480 | Ft | ||
| 82 | Restoration | 23863 | Syd | ||
| 83 | Pre and Post Lining Video Inspection, 54 inch | 4450 | Ft | ||
| 84 | Pre and Post Lining Video Inspection, 60 inch | 3540 | Ft | ||
| 85 | Pre and Post Lining Video Inspection, 66 inch | 9337 | Ft | ||
| 86 | Pre and Post Lining Video Inspection, 78 inch | 3600 | Ft | ||
| 87 | Sanitary Sewer Cleaning and Prep, 54 inch | 4450 | Ft | ||
| 88 | Sanitary Sewer Cleaning and Prep, 60 inch | 3540 | Ft | ||
| 89 | Sanitary Sewer Cleaning and Prep, 66 inch | 7428 | Ft | ||
| 90 | Sanitary Sewer Cleaning and Prep, 78 inch | 3600 | Ft | ||
| 91 | Sanitary Sewer, CIPP Liner, 54 inch | 4450 | Ft | ||
| 92 | Sanitary Sewer, CIPP Liner, 60 inch | 3540 | Ft | ||
| 93 | Sanitary Sewer, CIPP Liner, 66 inch | 7428 | Ft | ||
| 94 | Sanitary Sewer, CIPP Liner, 78 inch | 3600 | Ft | ||
| 95 | Sanitary Structure Cover | 51 | Ea | ||
| 96 | Sanitary Structure, Deconstruct and Reconstruct, Case A | 4 | Ea | ||
| 97 | Sanitary Structure, Deconstruct and Reconstruct, Case B | 37 | Ea | ||
| 98 | Sanitary Structure, Deconstruct and Reconstruct, Case C | 10 | Ea | ||
| 99 | Temporary 4 Foot Dia Barrel Section, As-Needed | 14 | Ea | ||
| 100 | Temporary 5 Foot Dia Barrel Section, As-Needed | 27 | Ea | ||
| 101 | Temporary 6 Foot Dia Barrel Section, As-Needed | 10 | Ea |
TOTAL DIVISION 3 COST (ITEMS 67-101)
| Division 4: Additional Rehabilitations | |||||
| Item | Description | Qty | Unit | Unit Price | Amount |
| 102 | Location 1: _____ Rehabilitation | 1 | LSUM | ||
| 103 | Location 3: _____ Rehabilitation | 1 | LSUM | ||
| 104 | Location 4: _____ Rehabilitation | 1 | LSUM | ||
| 105 | Location 6: _____ Rehabilitation | 1 | LSUM | ||
| 106 | Clearing | 934 | Syd | ||
| 107 | Sewer, Rem, 24 inch to 48 inch | 120 | Ft | ||
| 108 | Pavt, Rem | 23 | Syd | ||
| 109 | Exploratory Excavation | 25 | Ft | ||
| 110 | Erosion Control, Silt Fence | 1005 | Ft | ||
| 111 | Aggregate Base, 21AA, 8 inch | 23 | Syd | ||
| 112 | Maintenance Aggregate, 21AA, Limestone | 250 | Ton | ||
| 113 | Pre and Post Lining Video Inspection, 24 inch | 403 | Ft | ||
| 114 | Sanitary Sewer Cleaning and Prep, 24 inch | 403 | Ft | ||
| 115 | Sanitary Sewer, CIPP Liner, 24 inch | 403 | Ft | ||
| 116 | Sanitary Sewer, CIPP Liner, 42 inch | 88 | Ft | ||
| 117 | Sanitary Sewer, RCP, 24 inch | 40 | Ft | ||
| 118 | Sanitary Sewer, RCP, 42 inch | 80 | Ft | ||
| 119 | HMA, 5EML, 2.5 inch Pathway | 23 | Syd | ||
| 120 | HMA. 5EML, 1.5 inch Roadway | 27 | Syd | ||
| 121 | Pavt, Nonreinf Conc, 8 inch | 27 | Syd | ||
| 122 | Fence, Temp | 1400 | Ft | ||
| 123 | Restoration | 1431 | Syd | ||
| 124 | Sanitary Structure, 72 inch dia | 2 | Ea | ||
| 125 | Sanitary Structure Cover | 2 | Ea |
| TOTAL DIVISION 4 COST (ITEMS 102-125) | |||||
| Division 5: Junction Chamber Rehabilitation | |||||
| Item | Description | Qty | Unit | Unit Price | Amount |
| 126 | Geopolymer Rehab JC 3-21 | 1 | LSUM | ||
| 127 | Geopolymer Rehab JC 2-35 | 1 | LSUM |
TOTAL DIVISION 5 COST (ITEMS 126-127)
TOTAL CONSTRUCTION COST ALL DIVISIONS (ITEMS 1-127)