114 REHAB LOCATION 5.pdf

PDF 4 MB Posted

Attached to
RVSDS SRF Project Plan: Phases 2C/3C – Sewer Rehabilitation
Solicitation number
37-24-023
Issued by
Wayne County, Dansville Village, Michigan

About this file

This document is a rehabilitation location site plan (Location 5: NHV 4A-08-07) prepared by OHM Advisors for the Wayne County Rouge Valley Sewage Disposal System (RVSDS) Sewer Rehabilitation Project. The plan details a specific segment of sewer rehabilitation along Edward N. Hines Drive, featuring a topographical map and engineering profile view that illustrates the proposed rehabilitation area. The site plan includes precise geographical measurements, elevation details, and technical specifications for the sewer infrastructure rehabilitation, which is part of a larger project involving approximately 21,000 feet of large diameter sewer line rehabilitation using Cured in Place Pipe (CIPP) lining techniques.

The document provides technical details about the project's scope, including quantities of work and specific site conditions. The plan indicates multiple rehabilitation zones with varying lengths and elevations, and includes a quantities sheet detailing different types of work such as sewer, bend, and fence installations. The site plan is part of Phase 2C/3C of the RVSDS project and appears to be a critical technical document supporting the county's infrastructure improvement efforts, specifically focusing on sewer system rehabilitation and modernization along the Middle Rouge River area in Michigan.

View the file

Other files

File Type Posted
Appendix J - EGLE Permit Requirements 5-15-24.pdf PDF
Appendix B.3 - Agreement_EJCDC-Std_General Conditions_Construction Contracts 5-15-24.pdf PDF
Appendix E.1 - Labor Standards Provisions_Davis Bacon Requirements 5-15-24.pdf PDF
Addendum 4 - Questions-Answers Sanitary Sewer Rehab IFB 37-24-023 6-18-24.pdf PDF
RVSDS LTCAP Phase 2C3C IFB 37-24-023 5-15-24.pdf PDF
Addendum 3 - Questions-Answers Sanitary Sewer Rehab IFB 37-24-023 6-14-24.pdf PDF
01 10 00 - SUMMARY.pdf PDF
Appendix G - CCTV Inspection and MSI Reports 5-15-24.pdf PDF
First Tier Subcontractor_designation_form 8-2023.pdf PDF
W-9 Form v10-18.pdf PDF
Addendum 5 - Questions-Answers Sanitary Sewer Rehab IFB 37-24-023 6-21-24.pdf PDF
Appendix B.2 - Agreement_0800- Supplementary Conditions-Phase 2C_3C 5-15-24.docx DOCX document
Appendix I - Historical Drawings 5-15-24.pdf PDF
33 40 00 - Temporary Flow Diversion and Bypass Pumping.pdf PDF
Addendum Table 1 - 2C3C Max Liner Thickness.pdf PDF
Appendix E.4 - Debarment Form 5-15-24.pdf PDF
Appendix D - Construction Documents - Requirements and Plans 5-15-24.pdf PDF
Sheet 95_Addendum1.pdf PDF
Appendix E.2 - Davis Bacon Wage Rate Determination 5-15-24.pdf PDF
Appendix F - Envrionmental Assessment 5-15-24.pdf PDF
Ethics Form rev 8-16-21.pdf PDF
Appendix B.1 - Agreement-Rouge RVSDS Phase 2C_3C-5-15-24.docx DOCX document
Appendix H - Geotechnical Investigation Report 5-15-24.pdf PDF
Appendix E.3 - DBE Participation Form 5-15-24.docx DOCX document
Appendix C - Examples of Surety Forms (Performance and Payment Bonds) 5-15-24.pdf PDF
Addendum 1 - Pre-Bid Sign-In Sewer Rehab IFB 37-24-023 5-29-24.pdf PDF
33 01 31 - Cured-in-Place Pipe (CIPP) Lining.pdf PDF
REVISED SHEET 111.pdf PDF
Appendix E.5 - Buy America Form 5-15-24.pdf PDF
Appendix A - Price Sheet_2C3C IFB 37-24-023 5-15-24.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RDaavettila Text Box

ADDENDUM # 4

File details come from the government source that posted it. Updated .