Appendix E.5 - Buy America Form 5-15-24.pdf

PDF 580 KB Posted

Attached to
RVSDS SRF Project Plan: Phases 2C/3C – Sewer Rehabilitation
Solicitation number
37-24-023
Issued by
Wayne County, Dansville Village, Michigan

About this file

The document is an American Iron and Steel (AIS) Contract Language appendix from the Michigan Department of Environmental Quality, specifically Appendix E.5 - Buy American Contract Language. This contract language is designed to ensure that all iron and steel products used in projects funded by the State Revolving Fund and/or Drinking Water Revolving Fund are produced within the United States, supporting domestic manufacturing requirements.

The contract language requires contractors to verify and warrant that all iron and steel used in the project will be produced in the United States in compliance with AIS Requirements. Contractors must provide verified information and certifications of compliance, and they can be held financially responsible for any losses, expenses, or costs incurred by the Purchaser or State due to non-compliance. The document emphasizes that while the contractor may not have direct contractual relationship with the State, the State is considered a third-party beneficiary and must provide written consent for any amendments or waivers to the AIS provisions.

View the file

Other files

File Type Posted
Appendix J - EGLE Permit Requirements 5-15-24.pdf PDF
Appendix B.3 - Agreement_EJCDC-Std_General Conditions_Construction Contracts 5-15-24.pdf PDF
Appendix E.1 - Labor Standards Provisions_Davis Bacon Requirements 5-15-24.pdf PDF
Addendum 4 - Questions-Answers Sanitary Sewer Rehab IFB 37-24-023 6-18-24.pdf PDF
RVSDS LTCAP Phase 2C3C IFB 37-24-023 5-15-24.pdf PDF
Addendum 3 - Questions-Answers Sanitary Sewer Rehab IFB 37-24-023 6-14-24.pdf PDF
01 10 00 - SUMMARY.pdf PDF
Appendix G - CCTV Inspection and MSI Reports 5-15-24.pdf PDF
First Tier Subcontractor_designation_form 8-2023.pdf PDF
W-9 Form v10-18.pdf PDF
Addendum 5 - Questions-Answers Sanitary Sewer Rehab IFB 37-24-023 6-21-24.pdf PDF
Appendix B.2 - Agreement_0800- Supplementary Conditions-Phase 2C_3C 5-15-24.docx DOCX document
Appendix I - Historical Drawings 5-15-24.pdf PDF
33 40 00 - Temporary Flow Diversion and Bypass Pumping.pdf PDF
Addendum Table 1 - 2C3C Max Liner Thickness.pdf PDF
Appendix E.4 - Debarment Form 5-15-24.pdf PDF
Appendix D - Construction Documents - Requirements and Plans 5-15-24.pdf PDF
Sheet 95_Addendum1.pdf PDF
Appendix E.2 - Davis Bacon Wage Rate Determination 5-15-24.pdf PDF
Appendix F - Envrionmental Assessment 5-15-24.pdf PDF
Ethics Form rev 8-16-21.pdf PDF
Appendix B.1 - Agreement-Rouge RVSDS Phase 2C_3C-5-15-24.docx DOCX document
Appendix H - Geotechnical Investigation Report 5-15-24.pdf PDF
Appendix E.3 - DBE Participation Form 5-15-24.docx DOCX document
Appendix C - Examples of Surety Forms (Performance and Payment Bonds) 5-15-24.pdf PDF
Addendum 1 - Pre-Bid Sign-In Sewer Rehab IFB 37-24-023 5-29-24.pdf PDF
33 01 31 - Cured-in-Place Pipe (CIPP) Lining.pdf PDF
REVISED SHEET 111.pdf PDF
114 REHAB LOCATION 5.pdf PDF
Appendix A - Price Sheet_2C3C IFB 37-24-023 5-15-24.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

American Iron and Steel Contract Language

The Contractor acknowledges to and for the benefit of the city of _____________ (“Purchaser”) and the Michigan Department of Environmental Quality (the “State”) that it understands the goods and services under this Agreement are being funded with monies made available by the State Revolving Fund and/or the Drinking Water Revolving Fund and such law contains provisions commonly known as “American Iron and Steel (AIS);”

that requires all iron and steel products used in the project be produced in the United States (“AIS Requirements”) including iron and steel provided by the Contractor pursuant to this Agreement. The Contractor hereby represents and warrants to and for the benefit of the Purchaser and the State that (a) the Contractor has reviewed and understands the AIS Requirements, (b) all iron and steel used in the project will be and/or have been produced in the United States in a manner that complies with the AIS Requirements, unless a waiver of the requirements is approved or the State made the determination in writing that the AIS Requirements do not apply to the project, and (c) the Contractor will provide any further verified information, certification or assurance of compliance with this paragraph, or information necessary to support a waiver of the AIS requirements, as may be requested by the Purchaser. Notwithstanding any other provision of this Agreement, any failure to comply with this paragraph by the Contractor shall permit the Purchaser or State to recover as damages against the Contractor any loss, expense or cost (including without limitation attorney’s fees) incurred by the Purchaser or State resulting from any such failure (including without limitation any impairment or loss of funding, whether in whole or in part, from the State or any damages owed to the State by the Purchaser). While the Contractor has no direct contractual privity with the State, as a lender to the Purchaser for the funding of its project, the Purchaser and the Contractor agree that the State is a third-party beneficiary and neither this paragraph (nor any other provision of this Agreement necessary to give this paragraph force or effect) shall be amended or waived without the prior written consent of the State.

Appendix E.5 - Buy American Contract Language

File details come from the government source that posted it. Updated .