This is a Monthly Progress Report template for the Base Ops Program under the U.S. Army Corps of Engineers, Engineering and Support Center, Huntsville. The template is designed for contractors to submit monthly status reports under contract W912DY-XX-X-XXXX and serves as Technical Exhibit 4 in the Performance Work Statement (PWS).
The report template requires contractors to provide nine key sections: current available funds by Contract Line Item Number (CLIN) with approved and submitted Service Order (SO) balances; Service Order overview tracking metrics including status categories (requested, in preparation, submitted, approved, executed, disapproved/cancelled, and in-progress) with associated costs and completion timelines; Preventative Maintenance overview showing required and completed maintenance visits at designated frequencies (monthly, quarterly, semi-annual, and annual); Safety information including reportable incidents and training/briefings; Representative photographs of maintenance repair work; updated schedules for anticipated corrective maintenance work; a ranking of the top 10 maintenance/repair items to identify trends; Points of Contact information; and three appendices containing detailed Safety Reports, Before/After Photographs with Service Order numbers and descriptions, and schedules. Reports must include submission date, contractor company name, and digital signature, with all supporting documentation organized in the appendices.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
PWS Technical Exhibit 4 FYXX B1 <PROJECT> Monthly Progress Report
Monthly Report Template
Base Ops Program U.S. Army Corps of Engineers- Engineering and Support Center, Huntsville
Monthly Status Report
Contract No. W912DY-XX-X-XXXX
Submission Date: Date/ Month/ Year
Submitted By:
Company Name
Digital Signature
TABLE OF CONTENTS
1.0 CURRENT AVAILABLE FUNDS
2.0 SERVICE ORDER OVERVIEW
3.0 PREVENTATIVE MAINTENANCE OVERVIEW
4.0 SAFETY
5.0 PHOTOGRAPHS
6.0 SCHEDULE
7.0 TOP 10 MAINTENANCE REPAIR ITEMS (to identify trends)
8.0 POINTS OF CONTACT
9.0 APPENDICES
Appendix A - Safety Report Appendix B - Photographs (Before and after with SO# and short description) Appendix C - Schedule
1.0 CURRENT AVAILABLE FUNDS
CLIN Amount Balance
(Approved SOs)
Balance (Submitted
SOs)
Comments
2.0 SERVICE ORDER OVERVIEW
Service Order Overview- Up to date current option
SO Category Number of SOs
Total
Cost
Requested by /Submitted to Customer
In preparation (working to submit)
Submitted to HNC
Approved by HNC
Executed (work completed)
Disapproved / Cancelled by customer or HNC
In-Progress (working in field)
Average Days of Completion
Service Order Metrics- During this Period
SO Category RSO ESO Urgent Long Lead Total Cost
Requested by /Submitted to Customer
In preparation (working to submit)
Submitted to HNC:
Approved by HNC
Executed (work completed)
Disapproved / Cancelled by customer or HNC
In-Progress (working in field)
Average Days of Completion
3.0 PREVENTATIVE MAINTENANCE OVERVIEW
Table 1 Required & Completed Maintenance Visits
Up to Date Current Option
Description Facility
ID
Monthly Quarterly Semi-Annual Annual
Required Completed Required Completed Required Completed Required Completed
Table 1 Required & Completed Maintenance Visits
Completed during this period
Description Facility
ID
Monthly Quarterly Semi-Annual Annual
Required Completed Required Completed Required Completed Required Completed
4.0 SAFETY
A. Reportable Incidents this period:
B. Safety training/briefings this period and attendees: Safety reports are included in
Appendix A.
5.0 PHOTOGRAPHS
Representative photographs of maintenance repair work are included in Appendix B.
6.0 SCHEDULE
The updated schedule for anticipated CM work is included in Appendix C.
7.0 TOP 10 MAINTENANCE REPAIR ITEMS (to identify trends)
Rank Maintenance/Repair Number
8.0 POINTS OF CONTACT
Contractor Maintenance Manager - Johnny Smith, 555-555-5555, johnny.smith@abc.com
9.0 APPENDICES
Appendix A - Safety Report
Appendix B - Photographs (Before and after with SO# and short description)
Appendix C - Schedule