This document contains a pricing sheet for a construction manager as constructor project for fire alarm and life safety upgrades at the Milwaukee Federal Building and U.S. Courthouse. The General Services Administration Public Buildings Service Region 5 issued solicitation number 47PF0021R0019 for the project. The pricing sheet outlines 19 optional line items for services such as designing the fire alarm system, installing sprinklers in various locations, and replacing sidewall sprinkler heads. Contractors must provide pricing for the base design phase services as well as each optional line item. The total evaluated price will be the sum of the base price and selected option prices. The government retains the right to unilaterally modify the contract to exercise the options at its sole discretion.

View the file

Other files

Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Sheet Page

Project: Milwaukee Federal Building and U.S. Courthouse Fire Alarm Project & Life Safety Upgrades.

Solicitation Number: 47PF0021R0019

Contractor Name:

This form must be filled out completely and be provided with the attached GSA Form 1442.

Line Item

Service Description Price

1 BASE - Design Phase Services (Firm Fixed Price)

2 Option # 1 (GMP) - Fire Alarm

3 Option # 1: Fire Alarm costs $

4 Option # 1: Abatement costs for Option #1 $

5 Option # 1: Estimated Cost of Work (ECW)(Lines 3 + 4) $

6 Option # 1: CMc 3% Contingency ((line 5) x .03) $

7 Option # 1: Fee $

8 Option # 1: TOTAL price (add line items 5 + 6 + 7) $

9 Option # 2 - Add Sprinklers to Unprotected Rooms –

Sub-Basement: TOTAL price

10 Option # 3 - Remove and Replace Omega Sprinklers –

Basement: TOTAL price

11 Option # 4 - Add Sprinklers Basement: TOTAL price $

12 Option # 5 - Add Sprinklers to Unprotected Mechanical

Rooms & Storage Rooms - 1st - 7th Floors: TOTAL price

13 Option # 6 - Add Sprinklers to Unprotected Spaces –

Elevator Lobbies - 1st Floor: TOTAL price

14 Option # 7 - Add Sprinklers to Unprotected Spaces –

Elevator Lobbies - 2nd Floor: TOTAL price

15 Option # 8 - Add Sprinklers to Unprotected Spaces –

Elevator Lobbies - 3rd Floor: TOTAL price

16 Option # 9 - Add Sprinklers to Unprotected Spaces –

Elevator Lobbies - 4th Floor: TOTAL price

17 Option # 10 - Add Sprinklers to Unprotected Spaces –

Elevator Lobbies - 5th Floor: TOTAL price

18 Option # 11 - Add Sprinklers to Unprotected Spaces –

Elevator Lobbies - 7th Floor: TOTAL price

19 Option # 12 - Remove and Replace Sidewall Sprinkler

Heads in Historic Corridors: TOTAL price

Total evaluated price (add line items 1+8+9+10+11+12+13+14+15+16+17+18+19)

The Government shall have the right to unilaterally modify the contract to exercise the options. All terms and conditions contained in this contract shall apply to the options exercised. The options shall be exercised upon written notification (mailed or otherwise furnished) to the contractor prior to the expiration of the contract. The exercise of options is at the sole discretion of the Government.

Signature

Name and Title Date