This document provides an ACM and LBP summary and details for the Milwaukee Federal Building and U.S. Courthouse Fire & Life Safety Upgrades Project. Testing found asbestos-containing materials in the east and west utility/electrical/telecom closets at flooring and mastic. Drywall systems in Room 119 and a fifth floor room tested at or below the 1% asbestos threshold but OSHA worker protection rules will still apply. Lead-based paint was found throughout the north side of the building, particularly in cream and white paints, and the red and gold paint in the Atrium area also tested positive. Lead-based paint is present but to a lesser extent on the south side of the building. Safe work practices to control dust will be required along with OSHA worker protections given the asbestos-containing and lead-based paint findings.

The related federal contract opportunity is a solicitation from the General Services Administration Public Buildings Service Region 5 for a Construction Manager as Constructor for the Milwaukee Federal Building and US Courthouse Fire Life Safety project. Offerors should review the attached Request for Proposal documents for more details on products, services, response dates and other requirements.

View the file

Other files

Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Milwaukee Fire & Life Safety Upgrades 1

GSA Public Buildings Service www.gsa.gov

Summary

Project

Fire & Life Safety Upgrades Project Milwaukee Federal Building and U.S. Courthouse 517 East Wisconsin Avenue, Milwaukee, WI 53202

Date: January 5, 2021

ACM & LBP Summary Findings

Note: Full Report will be available from AECOM in approximately two weeks.

A. ASBESTOS-CONTAINING MATERIALS

1. Testing focused on areas for wall penetrations or hanging of pipe/conduit

2. 200+ samples analyzed

3. East side and West side utility/electrical/telecom closets have ACM at flooring and/or mastic

4. Drywall assembly in Room 119 (proposed Command Center) and room on 5th Floor tested at 2-3%, but was not composited. Updated lab results for point count and composite results indicate drywall system components are below the 1% threshold. OSHA rules for worker protection will still apply.

B. LEAD-BASED PAINT

1. LBP found throughout North side of building, in particular the cream and white paints

a. Red and gold paint in Atrium area also tested positive for LBP

2. LBP present in South side of building, but not to same extent as North

C. SUMMARY

1. Safe work practices to not generate dust will need to be followed, along with OSHA worker protection rules.

2. For ACM, less found than expected

3. For LBP, about as expected based on history of building and 2005 Report.