Price Breakout Schedule.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Z2DA--621-22-121 Renovate Bldg. 204 for Cath Lab II - Engineering
Solicitation number
36C24926R0057
Issued by

About this file

This is a Price Breakout Schedule in spreadsheet format for a construction renovation project at the James H. Quillen VA Medical Center in Mountain Home (Johnson City), Tennessee. The project, identified as Z2DA--621-22-121, involves the renovation of Building 204 to establish a Catheterization Laboratory (Cath Lab II). The scope of work encompasses all supervision, labor, materials, equipment, and transportation necessary to complete the renovation in accordance with provided specifications and drawings. The solicitation number is 36C24926R0057, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.

The Price Breakout Schedule serves as the pricing template for contractors to submit detailed cost estimates broken down by labor categories, materials, equipment, and other cost elements related to the Cath Lab II renovation project. This document is essential for bid evaluation and contract pricing purposes, allowing the contracting office to assess the reasonableness and completeness of contractor proposals. Specific pricing terms, line items, and pricing structures would be contained within the spreadsheet itself and should be completed in accordance with the solicitation requirements and any applicable pricing guidance provided in the solicitation documents.

View the file

Other files

File Type Posted
Appendix B - HVAC CUTSHEETS.pdf PDF
07.112_AE112.2 - PHASE TWO ENLARGED PLAN.pdf PDF
36C24926R0057 0004.pdf PDF
00 01 10 - Table Of Contents 29072026.pdf PDF
07 42 13 - Insulated Metal Wall Panels.pdf PDF
28 23 00 - Video Surveillance.pdf PDF
01 45 35 - Special Inspections.pdf PDF
00 01 10 - Table Of Contents.pdf PDF
00 00 00 - Specification Cover.pdf PDF
14.27_EE102.5.3 - PHASE 5 ENLARGED LIGHTING TECH PLAN.pdf PDF
14.16_EE102.1.2 - PHASE 1 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.24_EE102.4.2 - PHASE 4 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.22_EE102.3.2 - PHASE 3 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
11.10_PD102.5 - PLUMBING SECOND FLOOR DEMOLITION PLAN PHASE 5.pdf PDF
2026-0724 Addendum 02 Summary.docx DOCX document
09 54 00 - Operating Room Modular Diffuser System.pdf PDF
23 82 00 - Convection Heating and Cooling Units.pdf PDF
14.38_E600 - PARTIAL SINGLE LINE DIAGRAM.pdf PDF
14.20_EE102.2.2 - PHASE 2 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.13_ED102.5.2 - PHASE 5 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.11_ED102.4.2 - PHASE 4 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
07.704_AF702.4 - PHASE FOUR FINISH PLANS.pdf PDF
13.10_MH102.4 - MECHANICAL SECOND FLOOR HVAC PLAN - PHASE 4.pdf PDF
S-102824-291.pdf PDF
01 45 35a - Schedule of SI.pdf PDF
28 05 00 - Common Work Results for Electronic Safety and Security.pdf PDF
07 41 13 - Insulated Metal Roof Panels.pdf PDF
14.26_EE102.5.2 - PHASE 5 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.08_ED102.3.2 - PHASE 3 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
13.12_MH103 - MECHANICAL ROOF HVAC PLAN.pdf PDF
07.730_AQ732 - OVERALL EQUIPMENT PLAN.pdf PDF
FINAL COORDINATION STUDY -- 12-17-19.pdf PDF
10 51 26 - Plastic Lockers and Bench.pdf PDF
09 05 16 - Subsurface Preparation For Floor Finishes.pdf PDF
01 45 35b - Statement of SI.pdf PDF
14.29_E501 - TECHNOLOGY DETAILS.pdf PDF
14.06_ED102.2.2 - PHASE 2 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
36C24926R0057 0002.pdf PDF
621-22-121 Site Visit Sign in sheet.pdf PDF
36C24926R0057 0001.pdf PDF
2026-0629 Cath Lab II - BID Dwgs - Add 01.pdf PDF
2026-0629 Cath Lab II - BID specs - Add 01.pdf PDF
Calculation of Contractor Self Performed Work.xlsx XLSX spreadsheet
WD TN20260191 2 Jan 2026.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
621-22-121 Renovate B204 for Cath Lab II - Bid Specifications.pdf PDF
36C24926R0057_1.pdf PDF
General Conditions Breakout.xlsx XLSX spreadsheet
Contractor EMR Certification Form.docx DOCX document
621-22-121 Renovate B204 for Cath Lab II - Bid Drawings.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Breakdown LOCATION: Solicitation Number: Project Number Project Title Proposal Date

PRICE BREAKOUT SCHEDULE
When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.243-70 Contract Changes-Supplement, paragraph (c)(1), the following contractual restrictions apply: Overhead and Contractor's fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the Contractor's overhead and/or fee percentage.
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTDIVISION TOTALS
General Conditions$0.00
Superintendent
Project Manager
Field Office Engineer
Builder's Risk Insurance
Other Project Specific Liability Insurance
Site Maintenance and Protection
Progress Photos (per contract specifications)
Dumpsters
Office Trailer
Storage Trailer/POD/CONEX
Telephone (Cell and/or Landline)
Signage (per contract specifications and/or drawings)
Travel (must comply with Federal Travel Regulations)
Lodging (must comply with Federal Travel Regulations)
Record Document Preparation
As-builts (per contract specifications)
Weather Protection (per contract specifications)
Infection Control (per contract specifications)
Information Technology (Internet, etc.)
DIVISION 1GENERAL REQUIREMENTS$0.00
Shop Drawings, Product Data, & Samples
Safety Requirements
Reference Standards
Quality Control
Testing Laboratory Services
Special Inspections
Temporary Environmental Controls
Construction Waste Management
General Commissioning Requirements
DIVISION 2Existing Conditions$0.00
Site Survey
Demolition
Traditional Asbestos Abatement
DIVISION 3CONCRETE$0.00
Cast in Place Concrete
Cast in Place Concrete (short form)
DIVISION 4MASONRY$0.00
Masonry Mortaring
DIVISION 5Metals$0.00
Structrural Steel Framing
Metal Fabrications
DIVISION 6Wood, plastics and Composites$0.00
Rough Carpentry
Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
Thermal Insulation
Flashing and Sheet Metal
Roof Specialties
Roof Accessories
Firestopping
Joint Sealants
DIVISION 8Openings$0.00
Hollow Metal Doors & Frames
Interior Wood Doors
Intensive Care Unit Entrances
Door Hardware
Low Energy Power Assist Door Operators
Glazing
DIVISION 9FINISHES$0.00
Subsurface Prep for Floor Finishing
Schedule for Finishes
Non Struct Metal Framing
Gypsum Board
Ceramic/Porcelain Tiling
Acoustical Ceilings
Resilient Base and Accessories
Resilient Sheet Flooring
Resilient Tiling Flooring
Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2)
Carpeting
Painting
High-Build Glazed Coatings
DIVISION 10Specialties$0.00
Chalkboards and Markerboards
Signage
Cubicle Curtain Tracks
Wall & Door Protection
Toilet, Bath, & Laundry Accessories
Fire Extinguisher Cabinets

DIVISION 11 EQUIPMENT $0.00

DIVISION 12Furnishings$0.00
Window Shades
Manufactured Metal Casework
Manufactured Wood Casework
Countertops
DIVISION 13Special Construction$0.00
Seismic Restraint Requirements for Non- Structural Components
DIVISION 21Fire Suppression$0.00
Wet-Pipe Sprinkler Systems
DIVISION 22Plumbing$0.00
Common Work Results for Plumbing
Meters and Gages for Plumbing piping
General-Duty Valves for Plumbing Piping
General Motor Requirements for Plumbing Equipment
Meters and Gauges for Plumbing Piping
General Duty Valves for Plumbing Piping
Plumbing Insulation
Facility Water Distribution
Facility Sanitary & Vent Piping
Facility Storm Drainage
Packaged Pedestal Drainage Pump Units
Plumbing Fixtures
Vacuum Systems for Laboratory & Healthcare Facilities
Gas Systems for Laboratory & Healthcare Facilities
DIVISION 23Heating, Ventilating and Air Conditioning HVAC$0.00
Common work results for Boiler and Steam Generation
Common Work Results for HVAC
Testing, Adjusting and Balancing for HVAC
General Motor Requriments for HVAC and Steam Generation Equipment
Noise and Vibration Control for HVAC Piping and Equipment
Testing, Adjusting and Balancing for HVAC
HVAC and Boiler Plant Insulation
Commissioning of HVAC Systems
Instrumentation and Control for Boiler Plant
Boiler Plant Piping System
Direct Digital Control System for HVAC
Hydronic Piping
Hydronic Pumps
Steam & Condensate Heating Piping
Steam Condensate Pumps
HVAC Water Treatment
HVAC Ducts and Casing
HVAC Fans
Air Terminal Units
Air Outlets & Inlets
HVAC Air Cleaning Devices
Indoor Central Station Air Handling units
DIVISION 26ELECTRICAL$0.00
Requirements for Electrical Installations
Low-Voltage Electrical Power Conductors and Cables
Grounding and Bonding for Electrical Systems
Raceway & Boxes for Electrical Systems
Overcurrent Protective Device Coordination Study
Low-voltage Bussed Junction Box
Commissioning of Electrical Systems
DVA/USACE Projects Commissioning of Electrical Systems
Motor Control Centers
Motor Controllers
Lighting Controls
Wiring Devices
Enclosed Switches & Circuit Breakers
Facility Lightening Protection
Interior Lighting
DIVISION 27COMMUNICATIONS$0.00
Requirements for Communications Installations
Raceways & Boxes for Communications Systems
Commissioning of Communications Systems
Control, Communication and Signal Wiring
Communications Equipment Room Fittings
Communications Structured Cabling
Nurse Call & Code Blue Systems
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
Common Work Results for Electronic Safety and Security
Conductors and Cables for Electronic Safety and Security
Conduits & Backboxes for Electronic Safety & Security
Physical Access Control System
Fire Detection & Alarm
DIVISION 31EARTHWORK$0.00
Earthwork
DIVISION 32EXTERIOR IMPROVEMENTS$0.00
Cement & Concrete for Exterior Improvements
DIVISION 33$0.00
Steam Energy Distribution
TOTALS
TOTAL LABOR$0.00

TOTAL MATERIALS $0.00

TAX FOR MATERIALS 6% $0.00

TOTAL EQUIPMENT $0.00

DIVISION GRAND TOTALS $0.00

DIVISION GRAND TOTALS$0INSTRUCTIONS
TAX FOR MATERIALS$0
1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number;
SUBTOTAL$0
OVERHEAD10%$02. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree;
PROFIT10%$0
SUBTOTAL$0
3. Divisions must still be listed even if not applicable to the construction requirement;
BOND/FEE
PERMITS/LICENSES3%$04. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9 -Construction Team as of 6-30-2016. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and

GRAND TOTAL $0

5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9 - Construction as of 6-30-2016.