Preproposal Agenda 2020 07 08.pdf

PDF 298 KB Posted

Attached to
HUD Granite Facade Replacement Federal contract opportunity
Solicitation number
47PM0120R0008
Issued by
General Services Administration Public Buildings Service

About this file

This solicitation package outlines requirements for a firm-fixed price design-build contract to repair granite facades at the Robert C. Weaver building in Washington, DC. The General Services Administration seeks proposals to survey, remove, clean, reinstall granite panels, install a new anchoring system, and conduct other repairs on the northeast, northwest, and southeast corners of the building. Proposals are due by August 14, 2020. The period of performance is 1130 calendar days from notice to proceed. Liquidated damages are $1,501 per day for delays. The contractor must pay prevailing wages according to the Davis-Bacon Act and furnish payment and performance bonds as well as proof of insurance meeting the solicitation requirements. A pre-proposal conference was held on July 8, 2020 and all questions were due by July 17, 2020. The estimated price range for the project is $10-15 million.

View the file

Other files for this federal contract opportunity

Other files attached to HUD Granite Facade Replacement, newest first.
File Type Posted
LIVE Bid Spreadsheet_REV 7.23.20.xlsx XLSX spreadsheet
Past Performance Questionnaire.docx DOCX document
012700 Unit Prices_REV.docx DOCX document
Solicitation Amendment 47PM0120R0008_0002.pdf PDF
Solicitation Amendment 47PM0120R0008_0001 (2).pdf PDF
013220 Photographic Documentation.docx DOCX document
013200 Construction Progress Documentation.pdf PDF
013510 Historic Building Treatment Procedures.pdf PDF
017000 Execution Requirements.pdf PDF
009010 Competency of Specialist for Facade.pdf PDF
017350 Fire Prevention Precautions for Hot Work.pdf PDF
017310 Cutting and Patching.pdf PDF
011000 Summary.pdf PDF
Bid Spreadsheet 47PM0120R0008.xlsx XLSX spreadsheet
009040 Competency of Conc Repair Spc.pdf PDF
017810 Project Record Documents.docx DOCX document
013110 Critical Path Method Scheduling.pdf PDF
Optional GFE AFrame Details.pdf PDF
020850 Asbestos Abatement Procedures.pdf PDF
013000 Electronic Project Management.pdf PDF
HUD Granite Facade Repair Phase 2 Drawings.pdf PDF
013300 Submittal Procedures.docx DOCX document
SOW HUD Ph 2 2020 06 08.pdf PDF
012300 Alternates.pdf PDF
016000 Product Requirements.pdf PDF
011400 Work Restrictions.pdf PDF
012500 Substitution Procedures.docx DOCX document
Vol1 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
015930 Security Regulations.pdf PDF
012900 Payment Procedures.pdf PDF
014050 System Quality Control.docx DOCX document
200408 HUD Mortar Analysis and Permeability Study MTFA D P.pdf PDF
015950 Safety and Health.pdf PDF
020900 Removal and Testing of Lead Based Paint.pdf PDF
018200 Demonstration and Training.docx DOCX document
020890 PCB Abatement Procedures.pdf PDF
017320 Selective Demolition.docx DOCX document
018111 Sustainable Design Requirements.docx DOCX document
017419 Const Nonhaz Waste Mgmt Disp.docx DOCX document
Solicitation Pkg 47PM0120R008.pdf PDF
015000 Temporary Facilities.pdf PDF
017700 Closeout Procedures.pdf PDF
014200 References.pdf PDF
014000 Quality Assurance and Control.pdf PDF
013100 Project Management Coordination.pdf PDF
012700 Unit Prices.pdf PDF
Vol2 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-PROPOSAL CONFERENCE AGENDA

July 8, 2020

PROJECT TITLE: Design-Build for Granite Façade Repairs at HUD

MEETING LOCATION: Virtual

Time: 2:00 pm – 3:00 pm

REQUEST FOR PROPOSAL: 47PM0210R0008

GOVERNMENT REPRESENTATIVES:

Isaac Karto GSA Contracting Officer Michele Appello GSA Contract Specialist Hallie Futterman GSA COR / Project Manager Thomas Wong GSA PM Assisting the COR Patrick Audant GSA Project Manager for Phase I Sharon Feeney GSA Historical Preservation

Additional Resources from Phase I (SW Corner Design and Construction) Thomas Johnson AFG – Construction Manager Phase I Ly Huynh AFG – Construction Manager Phase I Dave Whitman McMullan & Associates - A/E Phase I

PROJECT DESCRIPTION:

As defined in the Scope of Work, dated January 4, 2020, the work shall include, but not be limited to, design-build services for the Granite Façade Repairs of the NW, NE, and SE corners of the Robert C. Weaver (HUD) federal building.

This project is referred to as Phase 2. The project includes repairs to the remaining three granite façades of the Robert C. Weaver building including: Removing all stone panels and resetting them with a new anchoring system; structural and architectural concrete repairs;

complete repointing and re-sealing of the facade; miscellaneous granite panels crack repairs; kerf repairs; cleaning of the granite façade; installation of tie off anchors at each stair tower; repairs to the stair roof and flashing associated with the work as well as the use of scaffold and pedestrian protection and shoring on three corners.

Due to site limitations the stone panels will need to be transported off site to a secure facility until they can be repaired prior to being reinstalled on the building. To minimize disruption to the department of Housing and Urban Development and to work within site constraints, it is preferred that the work proceeds one corner at a time, although the contractor will be allowed to start erection of scaffold ahead of time to allow for a continuous work flow for the specialists attaching and removing the stone panels..

PURPOSE:

The purpose of this Pre-Proposal Conference is to afford the contractors and the Government representatives the opportunity to discuss and answer any questions or concerns you may have regarding the contract provisions and requirements for this project.

All questions shall be submitted in writing, via email, to the Contract Specialist at michele.appello@gsa.gov mailto:michele.appello@gsa.gov

No oral statements made by a Government representative at this Pre-Proposal Meeting or at any Site Visit, nor any written record of such oral statements as may be made or furnished to the offeror will qualify or be deemed to have the effect of adding to, modifying, or otherwise varying from the written provisions of the Request for Proposal.

In the event the discussion or questions raised during a Site Visit or Pre-Proposal Meeting indicate a need to modify the Request for Proposal, an amendment to the solicitation will be issued in writing. Any amendment issued to the solicitation must be acknowledged in your response to the RFP.

In order to prevent unnecessary extension of the proposal due date, any questions you may have during, as well as following, this meeting must be submitted in writing by 4:00pm on Friday, Jul 17, 2020.

CONTRACTUAL PREVIEW:

a. CONTRACT TYPE: Firm-Fixed Price.

b. WAGE AND FRINGE BENEFITS: Contractors are to pay wage and fringe benefits according to the Davis-Bacon Act. The minimum wages and fringe benefits are set forth in the prevailing wage determination contained in the RFP. Offerors should not include in their proposal any price increases scheduled to take effect beyond the first year of performance.

c. PERIOD OF PERFORMANCE: The period of performance requires that the project shall be completed within 1130 calendar days of the issuance of the notice to proceed.

d. LIQUIDATED DAMAGES: $1,501/day

e. BONDING / INSURANCE REQUIREMENTS: After contract award and before the contract start date, the contractor must furnish the Contract Specialist with Payment and Performance Bonds, as well as a current Certificate of Insurance, listing the Government as an additional insured and meeting the requirements specified in this solicitation.

f. REQUEST FOR SENSITIVE BUT UNCLASSIFIED DOCUMENTS: This solicitation includes Sensitive But Unclassified (SBU) building information.

SBU documents provided under this RFP are intended for use by authorized users only. In support of this requirement, GSA requires offerors to exercise reasonable care when handling documents relating to SBU building information per the solicitation. The contractor and all subcontractors agree that they will abide by this agreement and will only disseminate Sensitive But Unclassified (SBU) building information to other authorized users under the conditions set forth above.

g. SUBCONTRACTING PLAN: A Small Business Subcontracting Plan, as required under FAR 52.219-9, is required to be submitted with offers.

TECHNICAL PROPOSAL:

Technical proposals shall respond to ALL requirements of the NON-PRICE FACTORS as defined in Section II.D. Technical Proposal of the solicitation

Technical proposal shall also include

GSA 527

Most Recent Financial Statement

SFLL

PRICING PROPOSAL:

a. METHOD OF AWARD: Your total evaluated price proposal will be composed of the price elements contained in your response to the RFP.

PROPOSAL DUE DATE AND LOCATION:

a. TECHNICAL AND PRICE PROPOSAL DUE DATE:

Friday, August 14, 2020 4:00 PM ET

b. SUBMIT PROPOSAL TO:

Michele.Appello@gsa.gov and Isaac.Karto@gsa.gov

Please remember to include the BID SHEET Please remember to sign and date your proposal Please remember to acknowledge all amendments

SITE VISIT:

Robert C. Weaver (HUD) building 451 7th Street SW, Washington DC 20410

The entirety of the project is on the exterior of the building; therefore offerors may visit the site at any time.