Bid Spreadsheet 47PM0120R0008.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- HUD Granite Facade Replacement Federal contract opportunity
- Solicitation number
- 47PM0120R0008
About this file
This document summarizes a solicitation for design-build services for granite facade replacement on a federal building. The General Services Administration is seeking a firm-fixed price contract for survey, removal and reinstallation of existing granite panels, cleaning, installing a new anchoring system, and repairs on the exterior facade of three sides of the Robert C. Weaver building located at 451 7th Street SW in Washington, DC. Work will also include potential exterior hazardous materials abatement, waterproofing, and minor concrete patching. The estimated price range for this project is between $10-15 million. Interested parties must be located within 50 miles of the project site and registered in SAM. The pre-proposal conference will be held virtually on July 8, 2020, and questions are due by July 17. Proposals for this opportunity are due by August 14, 2020.
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
| Bid spreadsheet for HUD GFR Phase 2 |
| (Revised 12/30/19) |
| Data Input |
| Calculated Amount |
| GSA Fixed Amount |
| CLIN | ITEM | PRICE | |
| 1 | Design Phase Services (Lump Sum, Firm Fixed Price) | ||
| 2 | Construction Phase Services | ||
| 2a | Cost of the Work | ||
| 2b | ACM Abatement & Disposal | ||
| 2c | General Conditions | ||
| 2d | Insurance & Bonds | ||
| 2e | Overhead | ||
| 2f | Profit | ||
| 2g | Total Construction Phase Services (Lump Sum, Firm Fixed Price) | $ - 0 |
Total Contract Value $ - 0
| Item # | Alternates - TBD | |
| 1 | Stairwell Roof Replacement (Ref. SOW Section 2.4.1) | |
| Total Alternate Pricing | $ - 0 |
| Item # | Unit Pricing - TBD |
| 1 | Dutchman Stone Repair |
| 2 | Broken Stone Epoxy Repair |
| 3 | Mortar Patch Stone Repair |
| 4 | Stone Crack Repair |
| 5 | Concrete Patch Repair |
| Approach # | Optional Shoring Approaches (fill in either approach 1 or 2) |
| 1 | Maintain existing shoring utilizing GSA's Shoring contractor as the subcontractor |
| Total cost of shoring (Lump Sum) |
OR OR
| 2 | Demobilize GSA Shoring contractor and utilize a different shoring subcontractor | |
| GSA Cost for Demobilization | 12,704 | |
| Total cost of shoring (Lump Sum, be sure to include $12,704 in your total) |
Total Evaluated Contract Offer $ - 0
| The following rates and prices will be utilized for changes in accordance with changes clause (FAR 52.243-4) and equitable adjustment clause (GSAM 552.243-71) | |||
| Item # | Overhead Pricing | ||
| 1 | Overhead (Home Office)% | Percent (%) | |
| 2 | Extended Overhead (Field Office) | Per Calendar Day. |