Bid Spreadsheet 47PM0120R0008.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
HUD Granite Facade Replacement Federal contract opportunity
Solicitation number
47PM0120R0008
Issued by
General Services Administration Public Buildings Service

About this file

This document summarizes a solicitation for design-build services for granite facade replacement on a federal building. The General Services Administration is seeking a firm-fixed price contract for survey, removal and reinstallation of existing granite panels, cleaning, installing a new anchoring system, and repairs on the exterior facade of three sides of the Robert C. Weaver building located at 451 7th Street SW in Washington, DC. Work will also include potential exterior hazardous materials abatement, waterproofing, and minor concrete patching. The estimated price range for this project is between $10-15 million. Interested parties must be located within 50 miles of the project site and registered in SAM. The pre-proposal conference will be held virtually on July 8, 2020, and questions are due by July 17. Proposals for this opportunity are due by August 14, 2020.

View the file

Other files for this federal contract opportunity

Other files attached to HUD Granite Facade Replacement, newest first.
File Type Posted
LIVE Bid Spreadsheet_REV 7.23.20.xlsx XLSX spreadsheet
Past Performance Questionnaire.docx DOCX document
012700 Unit Prices_REV.docx DOCX document
Solicitation Amendment 47PM0120R0008_0002.pdf PDF
Solicitation Amendment 47PM0120R0008_0001 (2).pdf PDF
013220 Photographic Documentation.docx DOCX document
013200 Construction Progress Documentation.pdf PDF
013510 Historic Building Treatment Procedures.pdf PDF
017000 Execution Requirements.pdf PDF
009010 Competency of Specialist for Facade.pdf PDF
017350 Fire Prevention Precautions for Hot Work.pdf PDF
017310 Cutting and Patching.pdf PDF
011000 Summary.pdf PDF
009040 Competency of Conc Repair Spc.pdf PDF
017810 Project Record Documents.docx DOCX document
013110 Critical Path Method Scheduling.pdf PDF
Optional GFE AFrame Details.pdf PDF
020850 Asbestos Abatement Procedures.pdf PDF
013000 Electronic Project Management.pdf PDF
HUD Granite Facade Repair Phase 2 Drawings.pdf PDF
013300 Submittal Procedures.docx DOCX document
SOW HUD Ph 2 2020 06 08.pdf PDF
012300 Alternates.pdf PDF
016000 Product Requirements.pdf PDF
011400 Work Restrictions.pdf PDF
012500 Substitution Procedures.docx DOCX document
Vol1 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
015930 Security Regulations.pdf PDF
012900 Payment Procedures.pdf PDF
014050 System Quality Control.docx DOCX document
200408 HUD Mortar Analysis and Permeability Study MTFA D P.pdf PDF
015950 Safety and Health.pdf PDF
Preproposal Agenda 2020 07 08.pdf PDF
020900 Removal and Testing of Lead Based Paint.pdf PDF
018200 Demonstration and Training.docx DOCX document
020890 PCB Abatement Procedures.pdf PDF
017320 Selective Demolition.docx DOCX document
018111 Sustainable Design Requirements.docx DOCX document
017419 Const Nonhaz Waste Mgmt Disp.docx DOCX document
Solicitation Pkg 47PM0120R008.pdf PDF
015000 Temporary Facilities.pdf PDF
017700 Closeout Procedures.pdf PDF
014200 References.pdf PDF
014000 Quality Assurance and Control.pdf PDF
013100 Project Management Coordination.pdf PDF
012700 Unit Prices.pdf PDF
Vol2 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet2

Bid spreadsheet for HUD GFR Phase 2
(Revised 12/30/19)
Data Input
Calculated Amount
GSA Fixed Amount
CLINITEMPRICE
1Design Phase Services (Lump Sum, Firm Fixed Price)
2Construction Phase Services
2aCost of the Work
2bACM Abatement & Disposal
2cGeneral Conditions
2dInsurance & Bonds
2eOverhead
2fProfit
2gTotal Construction Phase Services (Lump Sum, Firm Fixed Price)$ - 0

Total Contract Value $ - 0

Item #Alternates - TBD
1Stairwell Roof Replacement (Ref. SOW Section 2.4.1)
Total Alternate Pricing$ - 0
Item #Unit Pricing - TBD
1Dutchman Stone Repair
2Broken Stone Epoxy Repair
3Mortar Patch Stone Repair
4Stone Crack Repair
5Concrete Patch Repair
Approach #Optional Shoring Approaches (fill in either approach 1 or 2)
1Maintain existing shoring utilizing GSA's Shoring contractor as the subcontractor
Total cost of shoring (Lump Sum)

OR OR

2Demobilize GSA Shoring contractor and utilize a different shoring subcontractor
GSA Cost for Demobilization12,704
Total cost of shoring (Lump Sum, be sure to include $12,704 in your total)

Total Evaluated Contract Offer $ - 0

The following rates and prices will be utilized for changes in accordance with changes clause (FAR 52.243-4) and equitable adjustment clause (GSAM 552.243-71)
Item #Overhead Pricing
1Overhead (Home Office)%Percent (%)
2Extended Overhead (Field Office)Per Calendar Day.