013220 Photographic Documentation.docx

DOCX document 28 KB Posted

Attached to
HUD Granite Facade Replacement Federal contract opportunity
Solicitation number
47PM0120R0008
Issued by
General Services Administration Public Buildings Service

About this file

This document contains a federal solicitation for design-build services to replace the granite facade on the Robert C. Weaver building in Washington D.C. The General Services Administration (GSA) is seeking proposals for repair, alteration, and construction services including survey, removal and reinstallation of existing granite panels, cleaning, installing a new anchoring system, repairing panels and metal roofs, and potential exterior hazard abatement. The estimated price range for this project is between $10-15 million. Interested firms must be registered in the System for Award Management and have a local office within 50 miles of Washington D.C. Proposals are due by August 14, 2020. A virtual pre-proposal conference will be held on July 8, 2020 and any questions are due by July 17, 2020.

View the file

Other files for this federal contract opportunity

Other files attached to HUD Granite Facade Replacement, newest first.
File Type Posted
Past Performance Questionnaire.docx DOCX document
LIVE Bid Spreadsheet_REV 7.23.20.xlsx XLSX spreadsheet
012700 Unit Prices_REV.docx DOCX document
Solicitation Amendment 47PM0120R0008_0002.pdf PDF
Solicitation Amendment 47PM0120R0008_0001 (2).pdf PDF
017350 Fire Prevention Precautions for Hot Work.pdf PDF
017310 Cutting and Patching.pdf PDF
011000 Summary.pdf PDF
Bid Spreadsheet 47PM0120R0008.xlsx XLSX spreadsheet
009040 Competency of Conc Repair Spc.pdf PDF
017810 Project Record Documents.docx DOCX document
013110 Critical Path Method Scheduling.pdf PDF
Optional GFE AFrame Details.pdf PDF
013200 Construction Progress Documentation.pdf PDF
013510 Historic Building Treatment Procedures.pdf PDF
017000 Execution Requirements.pdf PDF
009010 Competency of Specialist for Facade.pdf PDF
015930 Security Regulations.pdf PDF
012900 Payment Procedures.pdf PDF
014050 System Quality Control.docx DOCX document
200408 HUD Mortar Analysis and Permeability Study MTFA D P.pdf PDF
015950 Safety and Health.pdf PDF
Preproposal Agenda 2020 07 08.pdf PDF
020900 Removal and Testing of Lead Based Paint.pdf PDF
018200 Demonstration and Training.docx DOCX document
020890 PCB Abatement Procedures.pdf PDF
017320 Selective Demolition.docx DOCX document
018111 Sustainable Design Requirements.docx DOCX document
017419 Const Nonhaz Waste Mgmt Disp.docx DOCX document
Solicitation Pkg 47PM0120R008.pdf PDF
015000 Temporary Facilities.pdf PDF
017700 Closeout Procedures.pdf PDF
014200 References.pdf PDF
014000 Quality Assurance and Control.pdf PDF
013100 Project Management Coordination.pdf PDF
012700 Unit Prices.pdf PDF
Vol2 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
020850 Asbestos Abatement Procedures.pdf PDF
013000 Electronic Project Management.pdf PDF
HUD Granite Facade Repair Phase 2 Drawings.pdf PDF
013300 Submittal Procedures.docx DOCX document
SOW HUD Ph 2 2020 06 08.pdf PDF
012300 Alternates.pdf PDF
016000 Product Requirements.pdf PDF
011400 Work Restrictions.pdf PDF
012500 Substitution Procedures.docx DOCX document
Vol1 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name Project Location PCN #

[Div 1 Reviewer/Writer Instructions: 1. Turn ON Show/Hide feature in the Home tab to see any hidden instructions that may be embedded in each specification. Turn OFF after completing your final version. 2. Comments in [ ] are guidance for spec. writers to consider during the design phase. Delete in final version.] SECTION 013220 - PHOTOGRAPHIC DOCUMENTATION [Coordinate with ePM section 013000.]

1. GENERAL [Edit according to project specific needs as determined by the regional team. Ensure GSA has ownership and copyrights. See FAR 27.4 for more guidance.]

GENERAL

Revise or add requirements to the following paragraph, if necessary to suit the project demands.

Regular Construction Progress Photos. Contractor shall document on an [Team to edit] basis key components of the contract document.

Webcams [Team to edit if GSA or its CM does not provide or need this.] [Coordinate with A/E or contract as to who shall be required to provide this service.] Professional Project Completion Photos Photographer's Qualifications: Photographer shall have an established reputation as a photographer, shall have experience as a professional architectural photographer. Submit portfolio for review and approval by GSA.

[GSA Team: If appropriate require video: document construction installation for future operations and maintenance requirements during building operations. Work with A/E to identify equipment or systems to video during installation.]

SUBMITTALS

Add additional information to the following paragraphs, if required.

Qualification Data: Submit within [X] calendar days of the NTP to COR or CO photographer's list of completed projects with project names and addresses, and names and addresses of owners and architects.

Key Plan: Submit within [X] calendar days of the NTP to COR or CO key plan of Project site and building with notation of vantage points marked for location and direction of each [photograph] [video recording]. Indicate elevation or story of construction. Include same information as corresponding photographic documentation.

Digital Photographs Contractor shall submit and/or upload to ePM electronic files of each view to the GSA. Submit image files within [3] [__] calendar days of taking photographs.

Digital Camera: Minimum resolution of [X] [Use latest standard & insert number] minimum [10 or X] megapixels.

Format: Minimum [3600 by 2400] pixels, in unaltered original files, with same aspect ratio as the sensor, un-cropped, in folder named by date of photograph, accompanied by key plan file.

Identification: Provide the following information with each image description in file metadata tag:

Name of Project.

Project number.

Building/facility name.

Project region.

Name and contact information for photographer.

Name of Architect.

Name of CMa.

Name of Contractor.

Contract number.

Date photographs were taken.

Weather conditions.

Description of vantage point, indicating location, direction (by compass point), and elevation or story of construction.

Unique sequential identifier keyed to accompanying key plan.

Retain the following paragraph if Contractor is responsible for construction photographs. Delete the paragraph if the government provides the construction photographs. Revise number of prints if necessary to suit project.

Retain the following paragraph if construction videos are required. Team to decide quantity and type of videoes.

Team must decide within [X] calendar days of project completion when all photos are to be submitted to the Design Excellence Program in Central Office Design & Construction (ODC).

Construction Videos: Contractor shall upload to ePM one copy of each video to GSA within 7 [__] days of recording.

Identify each video with the same identification information stated under Digital Photographs.

Transcript: Photographer shall upload on ePM an electronic narrative for each video with each video submission to GSA. Include the same label information as provided on the corresponding video.

Web-Based Photographic Documentation: Submit time-lapse sequence video recordings [simultaneously with recording] [within [Insert number] days of recording]. Comment by MichaelASchiavone: Define further. Coordina te with NCR’s Shapour Ebadi on work on St. E’s.

Submit time-lapse sequence video recordings by posting to [ePM system] [Web-based photographic documentation service provider's Web site] [Insert posting location][ and monthly on digital video disc].

Provide the same identification information stated under Digital Photographs

USAGE RIGHTS

Comply with General Services Administration Acquisition Manual (GSAM) Clause 552.227-70, Government Rights (Unlimited). See the construction contract for more information.

PRODUCTS

PHOTOGRAPHIC MEDIA

Select english or metric dimensions in following subparagraphs, and revise if necessary to suit project. Add any other requirements, such as special mountings, etc.

Retain the following paragraph if digital images of the construction photographs are required by GSA.. Also consider requiring photos in a raw format.

0. Digital Images: JPEG format with minimum sensor size of [Edit accordingly: 10.0 [__] resolution minimum 3600 by 2400 megapixels or greater.] Retain the following paragraph with subparagraphs if construction videos are required. Revise if necessary to suit project.

Video Format: Standard definition DVDs or CDs.

Identification: Each copy shall have an applied label containing the same identification information stated under Digital Photographs [Delete if not required: ] Prints: Smooth surface matte color prints on commercial-grade stock Size: 8 by 10 inch (200 by 250 mm).

Retain one of the following two paragraphs for desired filing or mounting method. Select english or metric dimensions.

1 inch (25 mm) wide margin shall be provided and punched for standard 3-ring binder on left side for vertical shots and on top for horizontal shots.

Photographs shall be mounted on 8-1/2 by 11 inch (215 by 280 mm) hardboard.

Identification: Each photograph shall be labeled on the front in the bottom margin with the same identification information stated under Digital Photographs

EXECUTION

COOPERATION WITH PHOTOGRAPHER Comment by MichaelASchiavone: Coordinate with legal.

Contractor shall cooperate with the photographer's work, including providing auxiliary services as requested, access to the project site, and use of temporary lighting and other facilities.

Retain the following article if construction photographs are required.

CONSTRUCTION PHOTOGRAPHS

Retain the following paragraph with subparagraphs if project requires photographs to show pre-existing conditions Preconstruction Photographs: Before construction is started, photographer shall take photographs of the site and surrounding properties from different points of view selected by GSA. The contractor may choose to provide additional photographs.

Revise number of photographs, etc. in the following subparagraph if necessary to suit project.

Take not less than 10 [Edit accordingly [?] [X]] photographs to show the context of the work area both interior and exterior as required by the scope of services, of existing buildings and conditions adjacent to the project in sufficient detail to record the physical conditions at the start of construction.

Consider retaining the following subparagraph for a large site and multiple building project. Revise if necessary to suit project.

In addition, take not less than [one] [ ] birds-eye aerial photograph from a helicopter or low-flying airplane at an elevation to clearly show the full project site and nearby adjacent conditions.

Delete the following if the government is providing the photographs.

Construction Period Photographs: At intervals during construction, photographer shall take photographs of the project's progress from different points of view. Vantage points shall be selected by the photographer unless otherwise directed by GSA.

Edit the following subparagraphs. Revise if necessary to suit project.

Frequency: Take photographs [monthly] [weekly] coinciding with the cutoff date associated with each application for payment.

Revise number of photographs in following subparagraph if necessary to suit project.

Number: Take not less than [4] [__] photographs each time, to best show the status of construction and progress since taking previous photographs.

Consider retaining the following subparagraph for a large site and multiple building project. Revise if necessary to suit project.

In addition, take not less than one birds-eye aerial photograph monthly from a drone, helicopter or low-flying airplane at an elevation to clearly show the full project site and nearby adjacent conditions.

Special Photographs: In addition to periodic photographs, photographer shall take special photographs of subject matter and from vantage points selected by GSA Revise the following subparagraphs if necessary to suit project.

Frequency: Take special photographs at least [X] or 6 times during construction. Take at least [X] or 8 photographs each time, for a cumulative total of not less than [X] or 48 special photographs.

At the completion of the project, when requested by GSA and working with GSA representatives, provide [35] [ ] exterior and [20] [ ] interior photographs as directed.

Retain the following article if construction videos are required.

CONSTRUCTION VIDEOS [Update with latest video standards and differentiate between progress videos and operations & maintenance training videos.] Video: Camera shall be mounted on a tripod before starting recording, unless otherwise necessary to show area of construction. Continuous running time shall be displayed at all times. At the start of each video, weather conditions shall be recorded, including temperature reading at the project site.

Retain the following two subparagraphs if narration is required.

Narration: Describe scenes on video by dubbing audio narration offsite after video is recorded. Include description of items being viewed, events that have recently happened, and activities that are planned. Describe vantage point.

Transcript: Provide a electronic transcript of the narration. Include images and running time captured from video, displayed opposite the corresponding narration segment.

Add additional subparagraphs if required for the other procedures such as lighting levels and the absence or presence of people.

Retain the following paragraph if project requires video to show pre-existing conditions.

Preconstruction Video: Before construction is started, photographer shall record video of the site and surrounding properties from different points of view selected by GSA.

Construction Period Videos: At intervals during construction, photographer shall record video of the project's progress from different points of view. Vantage points shall be selected by the photographer unless otherwise directed by GSA.

Retain one of the two following subparagraphs. Revise if necessary to suit project.

Frequency: Record videos monthly coinciding with the cutoff date associated with each application for payment.

Frequency: Record videos weekly, with timing each month adjusted to coincide with the cutoff date associated with each application for payment.

Revise minimum recording time in following subparagraph as necessary to suit project.

Recording Time: Minimum recording time for each video session shall be one hour.

Retain the following paragraph when project circumstances justify extensive video requirements. Revise to suit project.

Time-Lapse Sequence Construction Video: Record video to best show status of construction and progress.

Revise the frame frequency time in the following subparagraph if necessary to suit the requirements.

Frequency: During each of the following construction phases, set up video recorder to automatically record one frame of video every five minutes, from the same vantage point each time, to create a time-lapse sequence as follows:

Revise phase description in the following sub-subparagraphs if necessary to suit project.

Commencement of the Work, through completion of subgrade construction.

Above-grade structural framing.

Exterior building enclosure.

Timer: Provide timer to automatically start and stop video recorder so that recording occurs only during daylight construction work hours.

Vantage Points: GSA's Representative will select vantage points.

END OF SECTION 013220