LIVE Bid Spreadsheet_REV 7.23.20.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- HUD Granite Facade Replacement Federal contract opportunity
- Solicitation number
- 47PM0120R0008
About this file
This document summarizes a solicitation for design-build services for granite facade replacement work. The General Services Administration is seeking proposals for repair, alteration, and construction services at the Robert C. Weaver building located in Washington, D.C. The scope of work includes surveying, removing, and reinstalling existing granite panels, cleaning panels, installing a new anchoring system, repairing panels as needed, installing roof davits, and repairing metal roofs at stair towers. There may also be some exterior hazardous materials abatement and concrete patching required. Proposals are due by August 14, 2020. The project is set aside for firms located within 50 miles of Washington D.C. Interested parties should attend the virtual pre-proposal conference on July 8, 2020 and submit any questions by July 17, 2020. The estimated price range for this project is between $10-15 million.
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
| Bid spreadsheet for HUD GFR Phase 2 |
| (Revised 12/30/19) |
| Data Input |
| Calculated Amount |
| GSA Fixed Amount |
| CLIN | ITEM | PRICE | |
| 1 | Design Phase Services (Lump Sum, Firm Fixed Price) | ||
| 2 | Construction Phase Services | ||
| 2a | Cost of the Work | ||
| 2b | ACM Abatement & Disposal | ||
| 2c | General Conditions | ||
| 2d | Insurance & Bonds | ||
| 2e | Overhead | ||
| 2f | Profit | ||
| 2g | Total Construction Phase Services (Lump Sum, Firm Fixed Price) | $ - 0 |
Total Contract Value $ - 0
| Item # | Alternates | |
| 1 | Stairwell Roof Replacement (Ref. SOW Section 2.4.1) | |
| Total Alternate Pricing | $ - 0 |
| Item # | Unit Pricing | |
| 1 | Dutchman Stone Repair | |
| 2 | Broken Stone Epoxy Repair | |
| 3 | Mortar Patch Stone Repair | |
| 4 | Stone Crack Repair | |
| 5 | Concrete Patch Repair | |
| Total Unit Pricing | $ - 0 |
| Approach # | Optional Shoring Approaches (fill in either approach 1 or 2) |
| 1 | Maintain existing shoring utilizing GSA's Shoring contractor as the subcontractor |
| Total cost of shoring (Lump Sum) |
OR OR
| 2 | Demobilize GSA Shoring contractor and utilize a different shoring subcontractor | |
| GSA Cost for Demobilization | 12,704 | |
| Lump Sum cost for new shoring | ||
| Total cost of shoring (Lump Sum) | $ 12,704.00 |
Total Evaluated Contract Offer $ 12,704.00
| The following rates and prices will be utilized for changes in accordance with changes clause (FAR 52.243-4) and equitable adjustment clause (GSAM 552.243-71) | |||
| Item # | Overhead Pricing | ||
| 1 | Overhead (Home Office)% | Percent (%) | |
| 2 | Extended Overhead (Field Office) | Per Calendar Day. |
File details come from the government source that posted it. Updated .