011000 Summary.pdf

PDF 31 KB Posted

Attached to
HUD Granite Facade Replacement Federal contract opportunity
Solicitation number
47PM0120R0008
Issued by
General Services Administration Public Buildings Service

About this file

This solicitation requests proposals for a design-build contract to replace granite panels on the facade of the Robert C. Weaver building in Washington, DC. The General Services Administration is seeking a local firm within 50 miles of Washington DC to survey, remove, and reinstall existing granite; clean panels; install a new anchoring system; repair panels; install roof davits; repair metal roofs; and complete exterior hazard abatement and waterproofing. The work will be located on the northeast, northwest, and southeast corners of the building facade. Proposals are due by August 14, 2020. A virtual pre-proposal conference will be held on July 8, 2020. The estimated price range for this project is between $10 million and $15 million.

View the file

Other files for this federal contract opportunity

Other files attached to HUD Granite Facade Replacement, newest first.
File Type Posted
Past Performance Questionnaire.docx DOCX document
LIVE Bid Spreadsheet_REV 7.23.20.xlsx XLSX spreadsheet
012700 Unit Prices_REV.docx DOCX document
Solicitation Amendment 47PM0120R0008_0002.pdf PDF
Solicitation Amendment 47PM0120R0008_0001 (2).pdf PDF
017350 Fire Prevention Precautions for Hot Work.pdf PDF
017310 Cutting and Patching.pdf PDF
Bid Spreadsheet 47PM0120R0008.xlsx XLSX spreadsheet
009040 Competency of Conc Repair Spc.pdf PDF
017810 Project Record Documents.docx DOCX document
013110 Critical Path Method Scheduling.pdf PDF
Optional GFE AFrame Details.pdf PDF
013220 Photographic Documentation.docx DOCX document
013200 Construction Progress Documentation.pdf PDF
013510 Historic Building Treatment Procedures.pdf PDF
017000 Execution Requirements.pdf PDF
009010 Competency of Specialist for Facade.pdf PDF
020850 Asbestos Abatement Procedures.pdf PDF
013000 Electronic Project Management.pdf PDF
HUD Granite Facade Repair Phase 2 Drawings.pdf PDF
013300 Submittal Procedures.docx DOCX document
SOW HUD Ph 2 2020 06 08.pdf PDF
012300 Alternates.pdf PDF
016000 Product Requirements.pdf PDF
011400 Work Restrictions.pdf PDF
012500 Substitution Procedures.docx DOCX document
Vol1 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
015930 Security Regulations.pdf PDF
012900 Payment Procedures.pdf PDF
014050 System Quality Control.docx DOCX document
200408 HUD Mortar Analysis and Permeability Study MTFA D P.pdf PDF
015950 Safety and Health.pdf PDF
Preproposal Agenda 2020 07 08.pdf PDF
020900 Removal and Testing of Lead Based Paint.pdf PDF
018200 Demonstration and Training.docx DOCX document
020890 PCB Abatement Procedures.pdf PDF
017320 Selective Demolition.docx DOCX document
018111 Sustainable Design Requirements.docx DOCX document
017419 Const Nonhaz Waste Mgmt Disp.docx DOCX document
Solicitation Pkg 47PM0120R008.pdf PDF
015000 Temporary Facilities.pdf PDF
017700 Closeout Procedures.pdf PDF
014200 References.pdf PDF
014000 Quality Assurance and Control.pdf PDF
013100 Project Management Coordination.pdf PDF
012700 Unit Prices.pdf PDF
Vol2 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Robert C Weaver Federal Building, Granite Façade Repairs, Phase 2 Washington, DC Project Number # VDC00213

FY15 Update Oct. 1, 2014 Summary 011000 - 1

SECTION 011000 – SUMMARY

PART 1 - GENERAL

1.1 PROJECT INFORMATION

A. Project Name and Location:

Robert C. Weaver Federal Building Granite Facade Repairs 451 7 th Street, SW

Washington, DC 20410

B. Project Summary Description: The project is divided into three phases of work, one for each façade elevation to be repaired.

1. The work includes but is not limited to the following:

a. Obtain all necessary permits and approvals from local jurisdictions and GSA.

b. Obtain all necessary security clearances.

c. Provide site and building protection for the work areas to include traffic barriers, traffic controls, signage, lights, overhead protections, and fencing.

d. Install and/or remove all necessary shoring and bracing as described in the

Contractor’s work plan in an approved safe sequence coordinated with the work.

e. Install scaffolding to access the facade.

f. Build mockups and obtain approvals.

g. Survey stones and mark locations of stone damage.

h. Arrange for Contracting Officers Technical Representative to review results of survey.

i. Remove stones, install new supports and reinstall existing stones.

j. Repair damaged stones.

k. Replace all mortar and sealant joints.

l. Install expansion joints as indicated on approved D/B’s design drawings.

m. If Alternate is awarded, install roof anchors and replace flashing and roofing. See

Specification 012300 - Alternates for more information.

n. Clean stones.

o. Identify and repair cracks and spalls in the concrete walls.

C. Architect/Engineer: The term Architect/Engineer (A/E) refers to the Design/Builder’s Architect/Engineer of Record.

D. Project Delivery Method: Design/build

E. Contracting Officer’s Representative: The Contracting Officer’s Representative's status relative to the construction will be delineated in writing by the Contracting Officer prior to the pre-construction conference.

F. The Contracting Officer for the project is:

Mr. Isaac Karto US General Services Administration 1800 F Street, NW Washington, DC 20405

Robert C Weaver Federal Building, Granite Façade Repairs, Phase 2 Washington, DC Project Number # VDC00213

FY15 Update Oct. 1, 2014 Summary 011000 - 2

Telephone: (202) 568-3849 Email: Isaac.Karto@gsa.gov

G. The Project Manager for the project is:

Ms. Hallie Futterman PBS NCR Office of Design & Construction, Capital Projects Division US General Services Administration 1800 F Street, NW Washington, DC 20405 Telephone: (202) 570-2071 E-mail: Hallie.Futterman@gsa.gov

1.2 WORK BY OTHER CONTRACTORS

A. The Contractor shall cooperate with other contractors performing related work, including providing labor, materials and other costs necessary to satisfactorily coordinate the Contract work with work performed under other contracts.

1.5 MISCELLANEOUS PROVISIONS

A. Work in existing facilities shall correspond in all respects with the existing conditions to which it connects, or to similar existing conditions, in materials, workmanship and finish.

B. Alterations to Existing Conditions: Existing conditions shall be cut, drilled, removed, temporarily removed, or removed and replaced, as necessary for performance of Work under the Contract.

Work out of alignment where exposed by removal of existing work shall be called to the attention of GSA. Necessary corrective work shall be as directed.

1. Replacements of existing conditions that are removed shall match similar existing conditions.

2. Unless otherwise indicated, existing structural members shall not be cut or altered without authorization by both the A/E’s Structural Engineer and the Contracting Officer.

3. Conditions remaining in place, which are damaged or defaced during the Work, shall be restored to the condition existing at time of award of Contract.

4. Discolored or unfinished surfaces exposed by removal of existing conditions, that are indicated to be final exposed surfaces, shall be refinished or replaced as necessary to produce uniform and harmonious contiguous surfaces.

C. Existing structures will remain in place.

D. Existing utility services with related meters and equipment will remain in place.

E. Removed items indicated to remain the property of the Government shall be stored on site where directed by the Contracting Officer.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF SECTION 011000