Past Performance Questionnaire.docx

DOCX document 25 KB Posted

Attached to
HUD Granite Facade Replacement Federal contract opportunity
Solicitation number
47PM0120R0008
Issued by
General Services Administration Public Buildings Service

About this file

This solicitation requests proposals for a design-build contract to replace the granite facade of the Robert C. Weaver building in Washington DC. The General Services Administration is seeking a contractor to survey, remove, and reinstall existing granite panels; clean panels; install a new anchoring system; repair panels as required; install roof davits; repair metal roofs at stair towers; and conduct potential exterior hazardous material abatement and waterproofing of the existing wall facade. Interested firms must be located within a 50-mile radius of the project site and registered in the System for Award Management. A pre-proposal conference will be held on July 8, 2020, and proposals are due by August 14, 2020. The estimated price range for this project is between $10,000,000 to $15,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to HUD Granite Facade Replacement, newest first.
File Type Posted
012700 Unit Prices_REV.docx DOCX document
Solicitation Amendment 47PM0120R0008_0002.pdf PDF
LIVE Bid Spreadsheet_REV 7.23.20.xlsx XLSX spreadsheet
Solicitation Amendment 47PM0120R0008_0001 (2).pdf PDF
015930 Security Regulations.pdf PDF
012900 Payment Procedures.pdf PDF
014050 System Quality Control.docx DOCX document
200408 HUD Mortar Analysis and Permeability Study MTFA D P.pdf PDF
015950 Safety and Health.pdf PDF
Preproposal Agenda 2020 07 08.pdf PDF
020900 Removal and Testing of Lead Based Paint.pdf PDF
018200 Demonstration and Training.docx DOCX document
020890 PCB Abatement Procedures.pdf PDF
017320 Selective Demolition.docx DOCX document
018111 Sustainable Design Requirements.docx DOCX document
017419 Const Nonhaz Waste Mgmt Disp.docx DOCX document
Solicitation Pkg 47PM0120R008.pdf PDF
015000 Temporary Facilities.pdf PDF
017700 Closeout Procedures.pdf PDF
014200 References.pdf PDF
014000 Quality Assurance and Control.pdf PDF
013100 Project Management Coordination.pdf PDF
012700 Unit Prices.pdf PDF
Vol2 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
017350 Fire Prevention Precautions for Hot Work.pdf PDF
017310 Cutting and Patching.pdf PDF
011000 Summary.pdf PDF
Bid Spreadsheet 47PM0120R0008.xlsx XLSX spreadsheet
009040 Competency of Conc Repair Spc.pdf PDF
017810 Project Record Documents.docx DOCX document
013110 Critical Path Method Scheduling.pdf PDF
Optional GFE AFrame Details.pdf PDF
020850 Asbestos Abatement Procedures.pdf PDF
013000 Electronic Project Management.pdf PDF
HUD Granite Facade Repair Phase 2 Drawings.pdf PDF
013300 Submittal Procedures.docx DOCX document
SOW HUD Ph 2 2020 06 08.pdf PDF
012300 Alternates.pdf PDF
016000 Product Requirements.pdf PDF
011400 Work Restrictions.pdf PDF
012500 Substitution Procedures.docx DOCX document
Vol1 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
013220 Photographic Documentation.docx DOCX document
013200 Construction Progress Documentation.pdf PDF
013510 Historic Building Treatment Procedures.pdf PDF
017000 Execution Requirements.pdf PDF
009010 Competency of Specialist for Facade.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA Solicitation No. 47PM0120R0008 HUD GFR Phase II

PAST PERFORMANCE QUESTIONNAIRE

Please complete and submit this reference directly to the GSA Contracting Specialist (michele.appello@gsa.gov) and the GSA Contracting Officer (isaac.karto@gsa.gov) no later than Friday, August 14, 2020 at 4:00 PM ET.

Section 1 – To be completed by the Contractor

Contractor’s Name:

Address:

Telephone Number:

Point of Contact (POC):

Role of the POC:

Section 2 – To be completed by the Reference Please complete the following questionnaire on behalf of the contractor listed in Section 1. Only the project listed in Section 1 shall be considered for this evaluation. For each question below, select the rating that best describes the Contractor’s performance. Please provide a narrative explanation where appropriate; any narrative comments are greatly appreciated. If the contractor has completed other work for your agency/organization in the last five (5) years, you may note that as additional comments.

The completed questionnaire should be emailed directly to the Contracting Office to ensure the confidentially of your responses. Your responses will be reviewed solely for the purposes of a past performance evaluation and no one other than the selection committee will see your response.

Name of Respondent:

Title/Company Name:

Role of Respondent on the Project being Referenced:

Telephone:

Email:

If you have additional comments to provide, please add them at the end of the attached questionnaire. Thank you, in advance, for your time and providing GSA with this valuable feedback.

QUALITY

1. Overall, how well did the quality of the work conform to the contract requirements?

Excellent - 5 4 3 2 1 - Poor

BUDGET

2. Overall, how was the contractor’s performance with regards to budget?

Excellent - 5 4 3 2 1 - Poor

3. Was the project completed within the original contract budget? Yes No If not, please provide the reason for actual cost differences. (e.g. owner driven changes, differing site conditions, errors and omissions, etc…)

4. Was change order work pricing determined fair and responsible? Yes No If there were issues with change order pricing, please explain.

SCHEDULE

5. Overall, how was the contractor’s performance with regards to schedule?

Excellent - 5 4 3 2 1 - Poor

6. Did the contractor complete the project within the original contract schedule? Yes No If not, what were the reasons for changes to the schedule?

MANAGEMENT & STAFFING

7. Did the Contractor staff the job adequately? (PM, Superintendent, etc.)YesNo
8. Were key personnel adequately qualified for their positions?YesNo

9. How well did the prime contractor manage his subcontractors? (e.g. Coordinating trades, updating subs on changes to the SOW, prompt payment, performance issues, etc…)

Excellent - 5 4 3 2 1 - Poor

10. How effective was the Contractor at communicating with key project stakeholders?

Excellent - 5 4 3 2 1 - Poor

11. How well did the Contractor demonstrate sensitivity to client/tenant concerns? (e. g. Coordination issues, site cleanliness, noise, etc…)

Excellent - 5 4 3 2 1 - Poor

ADMINISTRATION

12. How responsive and responsible was the contractor in administrative areas? (e.g. Documenting progress, responding to RFI’s, processing payments, tracking changes, etc.)

Excellent - 5 4 3 2 1 - Poor

OVERALL

13. How would you rate this Contractor’s overall performance?

Excellent - 5 4 3 2 1 - Poor

File details come from the government source that posted it. Updated .