018111 Sustainable Design Requirements.docx

DOCX document 22 KB Posted

Attached to
HUD Granite Facade Replacement Federal contract opportunity
Solicitation number
47PM0120R0008
Issued by
General Services Administration Public Buildings Service

About this file

This document contains a federal contract opportunity solicitation for design-build services to replace the granite facade of the Robert C. Weaver building in Washington D.C. The General Services Administration is seeking proposals for survey, removal, and reinstallation of existing granite panels; cleaning; installing a new anchoring system; repairing panels; installing roof davits; repairing metal roofs at stair towers; potential exterior hazardous materials abatement; and waterproofing of the existing wall facade. A small amount of concrete patching is also required. The work sites are the northeast, northwest, and southeast exterior corners of the building. The North American Industry Classification System code for this work is 236220. This solicitation is limited to firms within a 50-mile radius of Washington D.C. with a local office. Interested firms must register in the System for Award Management and submit representations and certifications. A virtual pre-proposal conference will be held on July 8, 2020, and questions are due by July 17, 2020. Proposals for this design-build project with an estimated price range of $10-15 million are due by August 14, 2020.

View the file

Other files for this federal contract opportunity

Other files attached to HUD Granite Facade Replacement, newest first.
File Type Posted
Past Performance Questionnaire.docx DOCX document
LIVE Bid Spreadsheet_REV 7.23.20.xlsx XLSX spreadsheet
012700 Unit Prices_REV.docx DOCX document
Solicitation Amendment 47PM0120R0008_0002.pdf PDF
Solicitation Amendment 47PM0120R0008_0001 (2).pdf PDF
017350 Fire Prevention Precautions for Hot Work.pdf PDF
017310 Cutting and Patching.pdf PDF
011000 Summary.pdf PDF
Bid Spreadsheet 47PM0120R0008.xlsx XLSX spreadsheet
009040 Competency of Conc Repair Spc.pdf PDF
017810 Project Record Documents.docx DOCX document
013110 Critical Path Method Scheduling.pdf PDF
Optional GFE AFrame Details.pdf PDF
020850 Asbestos Abatement Procedures.pdf PDF
013000 Electronic Project Management.pdf PDF
HUD Granite Facade Repair Phase 2 Drawings.pdf PDF
013300 Submittal Procedures.docx DOCX document
SOW HUD Ph 2 2020 06 08.pdf PDF
012300 Alternates.pdf PDF
016000 Product Requirements.pdf PDF
011400 Work Restrictions.pdf PDF
012500 Substitution Procedures.docx DOCX document
Vol1 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
013220 Photographic Documentation.docx DOCX document
013200 Construction Progress Documentation.pdf PDF
013510 Historic Building Treatment Procedures.pdf PDF
017000 Execution Requirements.pdf PDF
009010 Competency of Specialist for Facade.pdf PDF
015930 Security Regulations.pdf PDF
012900 Payment Procedures.pdf PDF
014050 System Quality Control.docx DOCX document
200408 HUD Mortar Analysis and Permeability Study MTFA D P.pdf PDF
015950 Safety and Health.pdf PDF
Preproposal Agenda 2020 07 08.pdf PDF
020900 Removal and Testing of Lead Based Paint.pdf PDF
018200 Demonstration and Training.docx DOCX document
020890 PCB Abatement Procedures.pdf PDF
017320 Selective Demolition.docx DOCX document
017419 Const Nonhaz Waste Mgmt Disp.docx DOCX document
Solicitation Pkg 47PM0120R008.pdf PDF
015000 Temporary Facilities.pdf PDF
017700 Closeout Procedures.pdf PDF
014200 References.pdf PDF
014000 Quality Assurance and Control.pdf PDF
013100 Project Management Coordination.pdf PDF
012700 Unit Prices.pdf PDF
Vol2 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name Project Location PCN #

[Div 1 Reviewer/Writer Instructions: 1. Turn ON Show/Hide feature in the Home tab to see any hidden instructions that may be embedded in each specification. Turn OFF after completing your final version. 2. Comments in [ ] are guidance for spec. writers to consider during the design phase. Delete in final version.]

SECTION 018111 -- SUSTAINABLE DESIGN REQUIREMENTS [Prior to editing this, review with your Architect/Engineer the P100 requirements, which is updated often. Coordinate with your contracting officer, your Sustainability Coordinator and the contract templates. Also contact Martin Weiland for how to set project goals using the new Tier system in P100. See the Whole Building Design Guide as a way to setting and monitoring goals: http://npbdg.wbdg.org (National Performance-Based Design Guide (NPBDG)]

PART 1 – GENERAL

1. SUMMARY

A. This Section describes general requirements and procedures to comply with the Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings, Executive Orders 13423 and 13514, the Energy Policy Act of 2005 (EPAct 2005), and the Energy Independence and Security Act of 2007 (EISA 2007).

B. Contractor shall be required to coordinate with subsequent technical sections herein as to the sustainability requirements.

1.1 OBJECTIVES

A. [Identify here the contractor’s responsibilities for purchasing, constructing and documenting use of sustainable products. See latest GSA Green Purchasing Plan and latest GSA sustainability policies.]

B. [gBuild (Green Building Upgrade Information Lifecycle Database is GSA’s system for tracking and reporting high-performance green building (HPGB) related data. gBUILD allows project teams to collaborate in a centralized secure environment that reduces and streamlines data calls for program-wide reporting. Internal GSA users and external users will be provided usernames and passwords.) GSA Project Team during A/E procurement include this work in your scope of work with them. Coordinate with A/E sow and identify what the construction contractor’s gBuild responsibilities are here.]

1.2 RELATED DOCUMENTS

The Government is providing the references included in this sub-section for information purposes only and is not intended to provide a comprehensive, all-inclusive list of any and all potentially relevant portions of the Contract Documents.

A. Section 017410 Construction Indoor Air Quality Management

B. Section 017419 Construction Nonhazardous Waste & Management Disposal

C. Section 018109 Testing for Indoor Air Quality [This section is not part of GSA’s base division one set. Have A/E provide this section and edit accordingly.]

D. Section 019113 Commissioning

1.3 SUBMITTALS

A. Shall meet LEED documentation requirements. In the event that the Contractor's submittal cannot comply with both standards, then the more stringent standard shall apply. [Required for Capital Projects, and for small or TI projects when applicable. Coordinate above with 1.1 Objectives, ePM and gBUILD.] B. Commissioning: See Section 019113 Commissioning for submittal requirements.

C. Sustainable Design Progress Reports: Concurrent with each Application for Payment, submit reports for the following:

1. Construction Waste Management: Waste reduction progress reports and logs complying with the requirements of Section 017419 Construction Nonhazardous Waste & Management Disposal.

2. Construction IAQ Management: See section 017410 Construction Indoor Air Quality Management for Construction IAQ management progress report requirements.

1.4 QUALITY CONTROL

A. Preconstruction Meeting: After award of Contract and prior to the commencement of the Work, schedule and conduct meeting with Owner, Architect, and all Subcontractors to discuss sustainability requirements, expected submittals, the Construction Waste Management Plan, and the required Construction Indoor Air Quality (IAQ) Management Plan. The purpose of this meeting is to develop a mutual understanding of the project’s sustainable design requirements and coordination of the Contractor’s management of these requirements with the Contracting Officer and the Construction Quality Manager.

B. Construction Job Conferences: The status of compliance with the sustainable design requirements of these specifications will be an agenda item at all regular job meetings conducted during the course of work at the site.

PART 2 - PRODUCTS

Products and processes that minimize environmental impact to the extent currently possible have been included in the Construction Documents. These products include but are not limited to paint, gypsum wall board, carpet, acoustic ceiling tile and concrete. The Contractor is responsible for maintaining and supporting these objectives in developing means and methods for performing the work of this Contract and in proposing product substitutions and/or changes to specified processes.

END OF SECTION 018111

FY15 Update Oct. 1, 2014 Sustainable Design Requirements 018111 -- 2 image1.png

File details come from the government source that posted it. Updated .