This is a design and construction plans document for the Sea Bright to Manasquan FY26 Renourishment project, issued by the U.S. Army Corps of Engineers New York District under Solicitation No. W912DS26BA024. The project encompasses coastal storm risk management through beach fill placement across three communities in Monmouth County, New Jersey: Sea Bright, Monmouth Beach, and Long Branch. The base bid specifies approximately 595,000 cubic yards (CY) of beachfill, with multiple contract options ranging from 155,000 CY to 348,000 CY, for a total optional quantity of 791,000 CY. The project includes a strict environmental no-work period from March 1 through October 15 and an optional remobilization/demobilization provision to accommodate environmental windows. Construction cost is estimated between $50,000,000 and $100,000,000.

The plans document contains 27 detailed sheets including general plans, placement plans for the base Monmouth Beach section (Stations 278+00 to 229+00), Sea Bright base sections (Stations 106+00 to 61+00), Long Branch option (Stations 346+00 to 317+00), Sea Bright North and South options, and cross-sections for all project areas. Design specifications require a 140-foot sand fill berm at elevation 9.3 feet with 1:20 and 1:10 slopes, applying templates where existing ground is below proposed grades. Borrow areas are designated with specific coordinates and maximum allowable cut depths ranging from -54 feet to -77 feet. The survey data is based on Fall 2025 conditions and meets federal accuracy standards (EM 1110-2-1003 and EM 1110-1-1005), with elevations referenced to NAVD88 and horizontal coordinates to NAD 1983 New Jersey State Plane Coordinate System. Contractors are responsible for field verification, debris removal prior to placement, and restoration of any damaged utilities.

View the file

Other files

File Type Posted
W912DS26BA024_Bid Abstract.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004_01 56 10.00 18.pdf PDF
Amendment 0004_1988_80_gsds.pdf PDF
Amendment 0004_1988_78_gsds.pdf PDF
Amendment 0004_1988_74_gsds.pdf PDF
Amendment 0004_1988_71 composite gsd.jpg JPG image
Amendment 0004_1988_74 penetration graphs.jpg JPG image
Amendment 0004_1988_74 composite gsd.jpg JPG image
Amendment 0004_1983_10IndividualGSDs.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004_1988_80 penetration graphs.jpg JPG image
Amendment 0004_1988_78 composite gsd.jpg JPG image
Amendment 0004_1988_78 penetration graphs.jpg JPG image
Amendment 0004_1988_71 gsds.pdf PDF
Amendment 0004_01 45 00.pdf PDF
Amendment 0004_SBOBA_2025_NAD83_2011_NAVD88_30x30 (2) - Copy.txt.txt TXT text file
Amendment 0004_ADDITIONAL BORROW AREA COORDINATES 202660819.docx DOCX document
Amendment 0004_1988_71 penetration graphs.jpg JPG image
Amendment 0003_01 45 00.pdf PDF
Amendment 0003_01 56 10.00 18.pdf PDF
Amendment 0003_Sea Bright FY 26 Renourishment Plan Set Amendment 0003.pdf PDF
Amendment 0003__01 57 19.pdf PDF
Amendment 0003.pdf PDF
Amendment 0003_01 14 00.pdf PDF
Amendment 0002_01 57 19.pdf PDF
Amendment 0002_01 45 00.pdf PDF
Amendment 0002_01 14 00.pdf PDF
Amendment 0002_01 11 00.pdf PDF
Amendment 0002.pdf PDF
Amendment 0002_01 78 00.pdf PDF
Amendment 0002_01 35 30.pdf PDF
Amendment 0002_Section 01 57 19- Monitoring and Protection Plan.pdf PDF
Amendment 0002_01 56 10.00 18.pdf PDF
Amendment 0001.pdf PDF
Specifications.pdf PDF
Solicitation - W912DS26BA024.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

NEW YORK DISTRICT

COASTAL STORM RISK MANAGEMENT

SEA BRIGHT TO MANASQUAN PROJECT

FY26 RENOURISHMENT

MONMOUTH COUNTY, NEW JERSEY

W912DS26BA024

US Army Corps of Engineers ®

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

C O

VE

R

S H

EE

T

AN

D

IN

D

EX

T

O D

R

AW

IN

G

S

G-001

DATE

DATE

APPROVED:

This project was designed by the New York District of the U.S. Army Corps of Engineers.

The initials or signatures and registration designations of individuals appear on these project documents, within the scope of their employment as required by ER 1110-1-8152.

STAN SEDWICK, P.E.

SUBMITTED:

ENCER R. SHAFFER, P.E.

CHIEF, DESIGN BRANCH

CHIEF, ENGINEERING DIVISION

MONMOUTH BASE

LONG BRANCH OPTION

SEA BRIGHT BASE

SEA BRIGHT NORTH OPTION

SEA BRIGHT SOUTH OPTION

INDEX TO DRAWINGS

G-001 COVER SHEET AND INDEX TO DRAWINGS 1 OF 27

G-101 GENERAL PLAN 2 OF 27

C-101 MONMOUTH BEACH BASE PLAN STA 278+00 TO 252+00 3 OF 27

C-102 MONMOUTH BEACH BASE PLAN STA 258+00 TO 229+00 4 OF 27

C-103 SEA BRIGHT BEACH BASE PLAN STA 106+00 TO 77+00 5 OF 27

C-104 SEA BRIGHT BEACH BASE PLAN STA 90+00 TO 61+00 6 OF 27

C-105 LONG BRANCH BEACH OPTION PLAN STA 346+00 TO 317+00 7 OF 27

C-106 SEA BRIGHT BEACH SOUTH OPTION PLAN STA 203+00 TO 174+00 8 OF 27

C-107 SEA BRIGHT BEACH SOUTH OPTION PLAN STA 182+00 TO 153+00 9 OF 27

C-108 SEA BRIGHT BEACH SOUTH OPTION PLAN STA 153+00 TO 124+00 10 OF 27

C-109 SEA BRIGHT BEACH SOUTH OPTION PLAN STA 124+00 TO 95+00 11 OF 27

C-110 SEA BRIGHT BEACH NORTH OPTION PLAN STA 71+00 TO 42+00 12 OF 27

C-111 SEA BRIGHT BEACH NORTH OPTION PLAN STA 42+00 TO 13+00 13 OF 27

C-112 SEA BRIGHT BEACH NORTH OPTION PLAN STA 18+00 TO 0+00 14 OF 27

C-113 BORROW AREA PLAN 15 OF 27

C-114 BORROW AREA PROFILES 16 OF 27

C-301 MONMOUTH BASE CROSS SECTIONS STA 240+00 TO STA 264+00 17 OF 27

C-302 MONMOUTH BASE CROSS SECTIONS STA 267+00 TO STA 273+00 18 OF 27

C-303 SEA BRIGHT BASE CROSS SECTIONS STA 66+00 TO STA 90+00 19 OF 27

C-304 SEA BRIGHT BASE CROSS SECTIONS STA 93+00 TO STA 99+00 20 OF 27

C-305 LONG BRANCH OPTION CROSS SECTIONS STA 321+00 TO STA 342+00 21 OF 27

C-306 SEA BRIGHT SOUTH OPTION CROSS SECTIONS STA 102+00 TO STA 126+00 22 OF 27

C-307 SEA BRIGHT SOUTH OPTION CROSS SECTIONS STA 129+00 TO STA 159+00 23 OF 27

C-308 SEA BRIGHT SOUTH OPTION CROSS SECTIONS STA 162+00 TO STA 186+00 24 OF 27

C-309 SEA BRIGHT NORTH OPTION CROSS SECTIONS STA 9+00 TO STA 33+00 25 OF 27

C-310 SEA BRIGHT NORTH OPTION CROSS SECTIONS STA 36+00 TO STA 60+00 26 OF 27

C-311 SEA BRIGHT NORTH OPTION CROSS SECTIONS STA 63+00 27 OF 27

0+00

10+00

20+00

30+00

40+00

50+00

60+00

70+00

80+00

90+00

100+00

110+00

120+00

130+00

140+00

150+00

160+00

170+00

180+00 190+00

200+00

210+00

220+00

230+00

240+00

250+00

260+00 270+00

280+00

290+00

300+00

310+00

320+00 330+00

340+00

350+00

360+00

370+00

380+00

390+00

400+00

410+00

420+00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

G

EN

ER

AL

P

LA

N

G-101

MONMOUTH BEACH BASELONG BRANCH OPTION SEA BRIGHT SOUTH OPTION SEA BRIGHT BASE SEA BRIGHT NORTH OPTION

BORROW AREA 1

BORROW AREA 2

BORROW AREA 3

BORROW AREA 6

BORROW AREA 5

BORROW AREA 1A EXPANDED

BORROW AREA 4

R1 R2

R3R4R5R6R7R8R9 R10

R11 R12

R13R14 R15R16

R17R19R20 R21R22R23

R25 R26

R27 R28R29

R30R31R32 R34

R36

R18R24

R33 R35

Feet 0 2000 4000

NOTES:

1. THE INFORMATION DEPICTED IN THIS PLAN REPRESENTS THE RESULTS OF A SURVEY MADE BY USACE NEW YORK SURVEY SECTION FROM 06 OCT 2025 TO

05 DEC 2025 AND CAN ONLY BE CONSIDERED AS THE GENERAL CONDITIONS EXISTING AT THAT TIME.

2. THE SURVEY USED FOR THIS PLAN MEETS EM 1110-2-1003 AND EM 1110-1-1005 ACCURACY STANDARDS.

3. COORDINATES REFER TO US STATE PLANE COORDINATE SYSTEM NAD 1983, NEW JERSEY MERCATOR - ZONE 2900, US SURVEY FEET.

4. ELEVATIONS REFER TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88) IN US SURVEY FEET.

5. MEAN HIGH WATER IS 1.8-1.9 FEET ABOVE NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

6. MEAN LOW WATER IS 2.3-2.5 FEET BELOW NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

7. MEAN LOWER LOW WATER IS 2.5-2.7 FEET BELOW NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

8. THE CONTRACTOR IS RESPONSIBLE FOR MAKING THEIR OWN ESTIMATES OF WATER LEVELS WHICH MAY OCCUR DURING CONSTRUCTION.

9. SOUNDINGS SURVEYED FOR THIS PLAN ARE BASED ON A 3' X 3' MEDIAN CELL, SORTED TO A 30' INTERVAL.

10. CONTOURS IN THIS PLAN WERE GENERATED USING THE MAP DATA SET.

11. THE DATA DEPICTED IN THIS PLAN SHOULD NOT BE USED FOR VOLUME CALCULATION PURPOSES.

12. AERIAL IMAGERY PROVIDED BY NJGIN (2020) AND IS FOR ORIENTATION PURPOSES ONLY.

13. THIS SURVEY WAS PERFORMED USING REAL TIME KINEMATIC GPS FROM STATIONS "RTX, NYDOT, SQN SK8, BELMAR AZ MK & CASINO."

14. THE SURVEY USED IN THIS PLAN IS CEPD COMPLIANT IN ACCORDANCE WITH ER 1110-2-8160 AND EM 1110-2-6056.

15. WHERE EXISTING GROUND IS HIGHER THAN PROPOSED, NO FILL IS TO BE PLACED.

16. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR ANY DAMAGE AND RESTORE ANY INTERRUPTIONS TO ANY UTILITY SERVICE THAT MAY BE

CAUSED BY THE CONTRACTOR'S EQUIPMENT OR CONSTRUCTION AT THE CONTRACTOR'S EXPENSE.

17. EXISTING UTILITIES SHALL BE PROTECTED DURING CONSTRUCTION BY CONTRACTORS.

18. THE CONTRACTOR SHALL COLLECT AND REMOVE ALL DEBRIS WITHIN BEACH FILL LIMITS PRIOR TO SAND PLACEMENT (NO DEBRIS SHALL BE BURIED).

19. DESIGN CROSS SECTIONS ARE TAKEN PERPENDICULAR TO THE REFERENCE LINE.

SEA BRIGHT

STAGING AREA

MONMOUTH

STAGING AREA

LONG BRANCH

STAGING AREA

SEA BRIGHT TO MANASQUAN REFERENCE LINE

POINT PI STATION NORTHING EASTING DISTANCE DIRECTION POINT PI STATION NORTHING EASTING DISTANCE DIRECTION

R1 0+00.00 571,057.51' 637,923.43' 1061.96' S08° 52' 31.95"E R19 220+90.25' 549,093.56' 638,808.80' 979.24' S03° 39' 29.52"W

R2 10+61.96' 570,008.26' 638,087.28' 4233.04' S05° 55' 35.26"E R20 230+69.49' 548,116.31' 638,746.32' 1176.30' S08° 03' 37.91"E

R3 52+95.00' 565,797.85' 638,524.35' 3670.45' S02° 49' 41.77"E R21 242+45.79' 546,951.64' 638,911.26' 260.04' S00° 26' 10.58"W

R4 89+65.45' 562,131.87' 638,705.46' 363.01' S00° 40' 54.73"E R22 245+05.83' 546,691.61' 638,909.28' 1789.74' S07° 07' 43.93"W

R5 93+28.46' 561,768.89' 638,709.78' 820.50' S11° 46' 40.40"E R23 262+95.57' 544,915.70' 638,687.17' 402.20' S13° 51' 06.26"W

R6 101+48.96' 560,965.66' 638,877.26' 479.56' S02° 55' 34.70"W R24 266+97.76' 544,525.20' 638,590.88' 625.76' S14° 11' 34.89"W

R7 106+28.52' 560,486.75' 638,852.36' 954.11' S01° 05' 36.96"E R25 273+23.52' 543,918.54' 638,437.45' 1232.21' S12° 28' 47.95"W

R8 115+82.63' 559,532.81' 638,870.57' 645.51' S13° 09' 15.19"E R26 285+55.74' 542,715.44' 638,171.17' 818.83' S05° 56' 03.68"W

R9 122+28.14' 558,904.24' 639,017.47' 670.17' S02° 09' 45.63"E R27 293+74.56' 541,901.00' 638,086.52' 428.01' S03° 54' 41.88"E

R10 128+98.30' 558,234.56' 639,042.76' 272.345' S11° 27' 20.08"E R28 298+02.57' 541,473.99' 638,115.71' 1834.37' S06° 15' 21.77"W

R11 131+70.65' 557,967.63' 639,096.85' 1144.98' S01° 21' 29.64"W R29 316+36.94' 539,650.54' 637,915.82' 872.51' S09° 27' 00.36"E

R12 143+15.63' 556,822.98' 639,069.71' 460.33' S10° 32' 26.69"E R30 325+09.45' 538,789.88' 638,059.07' 2058.37' S09° 28' 41.53"W

R13 147+75.95' 556,370.42' 639,153.92' 1720.74' S00° 46' 07.87"W R31 345+67.83' 536,759.60' 637,720.12' 1221.09' S02° 10' 51.54"W

R14 164+96.69' 554,649.83' 639,130.83' 604.52' S02° 30' 07.30"E R32 357+88.91' 535,539.40' 637,673.65' 901.57' S07° 49' 10.04"W

R15 171+01.21' 554,045.89' 639,157.22' 1373.23' S02° 38' 01.21"W R33 366+90.48' 534,646.21' 637,550.99' 890.30' S08° 26' 14.99"W

R16 184+74.44' 552,674.11' 639,094.12' 1192.81' S13° 56' 35.38"W R34 375+80.78' 533,765.55' 637,420.35' 782.33' S10° 07' 02.60"W

R17 196+67.25' 551,516.45' 638,806.70' 1703.38' S00° 24' 09.48"E R35 383+63.12' 532,995.38' 637,282.92' 2423.49' S09° 32' 04.43"W

R18 213+70.63' 549,813.11' 638,818.67' 719.62' S00° 47' 09.14"W R36 407+86.61' 530,605.37' 636,881.49'

PLAN

NORTH

LOCAL CONTROL DATA

BENCHMARK: SQN SK8

NORTHING: 468,752.68'

EASTING: 622124.32'

ELEVATION: 4.37' (NAVD88)

NSRS BENCHMARK

BENCHMARK: CASINO

NORTHING: 517,699.18'

EASTING: 634022.51'

ELEVATION: 12.79' (NAVD88)

255+00

260+00

265+00

270+00

275+00

-20

-24

-22

-20

-10

-22

-18

-16

-14

-12

-8

-6

-4

-2 -2.4

-16

-14

-12 -10

-8

-6

-4

-2.4 -2

1.92

43.94

8 9.3

1.92 3.94

8 9.310 14

-18

-10

-16

-14

-12

-8

-6

-4

-2.4 -2

0 1.9

3.94

9.3

PI

: 2

+9

5.

PI

: 2

+9

7.

PI

: 2

+2

3.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

8+

T

O

+0

M

O N

M O

U

TH

B

EA

C H

B

AS

E

PL

AN

C-101

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

APPROXIMATE TOE OF 1:10 SLOPE

REFERENCE LINE

0'

SA

N

D

FI

LL

BERM AT EL.

9.3'

SL

O

PE

1:

SL

O

PE

1:

SL

O

PE

1:

SL

O

PE

1:

Feet 0 100 200

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLACEMENT PLAN SEE SHEETS C-101 THROUGH C-112.

4. FOR BORROW AREA DATA SEE SHEETS C-113 THROUGH C-114.

5. FOR CROSS SECTIONS SEE C-301 THROUGH C-311.

6. SAND PLACEMENT SHOWN IS BASED ON FALL 2025 SURVEYS. CONTRACTOR TO VERIFY IN FIELD WITH

SURVEYS AS CONDITIONS MAY CHANGE. APPLY TEMPLATE AT THE APPROPRIATE STATIONS AND

PLACE WHERE EXISTING IS BELOW PROPOSED.

STAGING

AREA

ACCESS POINT

OCEAN AVENUE

E639,000 E639,000

N

4, N

5, N

6, N

4, N

5, N

6, PLAN

NORTH

TAPER TO MEET

EXISTING SURFACE

230+00235+00240+00

245+00

250+00

255+00

-18

-16

-20

-10

-22

-18

-16

-14

-12

-8

-6

-4

-2.4-2

1.92

3.9

9.3

-14

-12 -10

-8

-6

-4

-2.4 -2

1.92

43.94

8 9.3

PI

: 2

+6

9.

PI: 242+45.79PI

: 2

+0

5.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

8+

T

O

+0

M

O N

M O

U

TH

B

EA

C H

B

AS

E

PL

AN

C-102

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

APPROXIMATE TOE OF 1:10 SLOPE

REFERENCE LINE

0'

SA

N

D

FI

LL

BERM AT EL.

9.3'SL

O

PE

1:

SL

O

PE

1:

SLO

PE

1:20

SLO

PE

1:10

Feet 0 100 200

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLACEMENT PLAN SEE SHEETS C-101 THROUGH C-112.

4. FOR BORROW AREA DATA SEE SHEETS C-113 THROUGH C-114.

5. FOR CROSS SECTIONS SEE C-301 THROUGH C-311.

6. SAND PLACEMENT SHOWN IS BASED ON FALL 2025 SURVEYS. CONTRACTOR TO VERIFY IN FIELD WITH

SURVEYS AS CONDITIONS MAY CHANGE. APPLY TEMPLATE AT THE APPROPRIATE STATIONS AND

PLACE WHERE EXISTING IS BELOW PROPOSED.

OCEAN AVENUE

E639,000 E639,000

N

6, N

7, N

8, N

6, N

7, N

8, PLAN

NORTH

TAPER TO MEET

80+00

85+00

90+0095+00

100+00

105+00

-20

-10

-22

-18

-16

-14

-12

-8

-8

-6

-6

-8

-4

-6

-2.4-2

1.92 3.94

8 9.3

-20

-10

-18

-16

-14

-12

-8

-22

-6

-4 -2.4-2

1.92 3.94

89.3 1012 1416

PI

: 8

9+

.4

PI

: 9

3+

.4

PI: 101+48.96

PI

: 1

+2

8.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

6+

T

O

7+

SE

A

BR

IG

H T

BE

AC

H B

AS

E

PL

AN

C-103

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

APPROXIMATE TOE OF 1:10 SLOPE

REFERENCE LINE

TAPER INTO EXISTING

GROIN IF NO OPTION

140'

SAN

D

FILL

BERM AT EL.

9.3'

SLO

PE

1:20

SLO

PE

1:10

SLO

PE

1:20

SLO

PE

1:10

SEA BRIGHT SOUTH

OPTION

Feet 0 100 200

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLACEMENT PLAN SEE SHEETS C-101 THROUGH C-112.

4. FOR BORROW AREA DATA SEE SHEETS C-113 THROUGH C-114.

5. FOR CROSS SECTIONS SEE C-301 THROUGH C-311.

6. SAND PLACEMENT SHOWN IS BASED ON FALL 2025 SURVEYS. CONTRACTOR TO VERIFY IN FIELD WITH

SURVEYS AS CONDITIONS MAY CHANGE. APPLY TEMPLATE AT THE APPROPRIATE STATIONS AND

PLACE WHERE EXISTING IS BELOW PROPOSED.

E639,000 E639,000

N

1, N

2, N

3, N

1, N

2, N

3, OCEAN AVENUE

PLAN

NORTH

SEA BRIGHT

BASE

65+00

70+00

75+00

80+00

85+00

90+00

-20

-10

-22

-18

-16

-14

-12

-20

-24

-22

-10 -12

-18

-16

-14

-8

-8

-8

-6

-4 -2.4

1.9 3.9

89.3

12 14

-2

-8

-8

-6

-6

-8

-4

-6

-2.4-2

1.92 3.94

8 9.3

PI

: 8

9+

.4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

+0

TO

1+

SE

A

BR

IG

H

T

BE

AC

H

B

AS

E

PL

AN

C-104

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

APPROXIMATE TOE OF 1:10 SLOPE

REFERENCE LINE

140'

SAN

D

FILL

BERM AT EL.

9.3'

SLO

PE

1:20

SLO

PE

1:10

SLO

PE

1:20

SLO

PE

1:10

Feet 0 100 200

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLACEMENT PLAN SEE SHEETS C-101 THROUGH C-112.

4. FOR BORROW AREA DATA SEE SHEETS C-113 THROUGH C-114.

5. FOR CROSS SECTIONS SEE C-301 THROUGH C-311.

6. SAND PLACEMENT SHOWN IS BASED ON FALL 2025 SURVEYS. CONTRACTOR TO VERIFY IN FIELD WITH

SURVEYS AS CONDITIONS MAY CHANGE. APPLY TEMPLATE AT THE APPROPRIATE STATIONS AND

PLACE WHERE EXISTING IS BELOW PROPOSED.

E639,000 E639,000

N

3, N

4, N

5, N

3, N

4, N

5, OCEAN AVENUE

PLAN

NORTH

SEA BRIGHT

BASE

SEA BRIGHT NORTH

OPTION

TAPER TO MEET

IF NO OPTION

320+00

325+00

330+00

335+00

340+00

345+00

-10

-14

-12

-6

-4

-2.4 -2

0 21.9

2 3.9

9.3

-8

-6 -4

-2.4-2

1.92

3.9

9.3

12 PI

: 3

+3

6.

PI: 325+09.45

PI

: 3

+6

7.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

6+

T

O

+0

LO

N G

B R

AN

C

H B

EA

C

H O

PT

IO

N P

LA

N

C-105

APPROXIMATE TOE OF 1:10 SLOPE

REFERENCE LINE

TAPER INTO

EXISTING GROIN

0'

SA

N

D

FI

LL

BERM AT EL.

9.3'

SL

O

PE

1:

SL

O

PE

1:

SLO

PE

1:20

SLO

PE

1:10

Feet 0 100 200

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLACEMENT PLAN SEE SHEETS C-101 THROUGH C-112.

4. FOR BORROW AREA DATA SEE SHEETS C-113 THROUGH C-114.

5. FOR CROSS SECTIONS SEE C-301 THROUGH C-311.

6. SAND PLACEMENT SHOWN IS BASED ON FALL 2025 SURVEYS. CONTRACTOR TO VERIFY IN FIELD WITH

SURVEYS AS CONDITIONS MAY CHANGE. APPLY TEMPLATE AT THE APPROPRIATE STATIONS AND

PLACE WHERE EXISTING IS BELOW PROPOSED.

STAGING

AREA

ACCESS POINTS

E638,000 E638,000

N

7, N

8, N

9, N

7, N

8, N

9, OCEAN AVENUE N

JO

LIN

E AVE

OCEAN AVENUE N

SEAVIEW

AVE

O C

EAN

TER

R

AC

E

C O

O

PER

AVE

G R

EELEY TER

R

AC

E

W H

ITM

AN

TER

R

AC

E

M

AD

ISO

N

AVE

M

AR

IN

E TER

R

AC

E

MCKINLEY ST

GRANT ST

PLAN

NORTH

MERGE INTO

175+00

180+00

185+00

190+00

195+00

200+00

-20

-22

-18

-16

-14

-20

-10

-22

-18

-16

-14

-12

-8

-6

-4 -2.4-2

1.92 3.94

9.310

-24

-26

-12 -10 -8

-6

-4 -2.4-2

1.92 3.94

9.3

PI

: 1

+7

4.

PI

: 1

+6

7.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

3+

T

O

+0

SE

A

BR

IG

H

T

BE

AC

H

S O

U

TH

O

PT

IO

N

P

LA

N

C-106

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

APPROXIMATE TOE OF 1:10 SLOPE

REFERENCE LINE

0'

SA

N

D

FI

LL

BERM AT EL.

9.3'

SL

O

PE

1:

SL

O

PE

1:

10 SL

O

PE

1:

SL

O

PE

1:

Feet 0 100 200

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLACEMENT PLAN SEE SHEETS C-101 THROUGH C-112.

4. FOR BORROW AREA DATA SEE SHEETS C-113 THROUGH C-114.

5. FOR CROSS SECTIONS SEE C-301 THROUGH C-311.

6. SAND PLACEMENT SHOWN IS BASED ON FALL 2025 SURVEYS. CONTRACTOR TO VERIFY IN FIELD WITH

SURVEYS AS CONDITIONS MAY CHANGE. APPLY TEMPLATE AT THE APPROPRIATE STATIONS AND

PLACE WHERE EXISTING IS BELOW PROPOSED.

E639,000 E639,000

N

1, N

2, N

3, N

1, N

2, N

3, OCEAN AVE

PLAN

NORTH

TAPER INTO

155+00

160+00

165+00

170+00

175+00

180+00

-20

-10

-24

-22

-18

-16

-14

-12

-8

-18

-16

-20

-22

-24

-26

-14

-12

-10

-8

-6

-4

-2.4-2 1.92 3.94

9.310

-26

-28

-6

-4 -2.4-2

1.92 3.94

9.310

PI

: 1

+9

6.

PI

: 1

+0

1.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

2+

T

O

+0

SE

A

BR

IG

H

T

BE

AC

H

S O

U

TH

O

PT

IO

N

P

LA

N

C-107

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

APPROXIMATE TOE OF 1:10 SLOPE

REFERENCE LINE

0'

SAN

D

FILL

BERM AT EL.

9.3'

SL

O

PE

1:

SL

O

PE

1:

SL

O

PE

1:

Feet 0 100 200

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLACEMENT PLAN SEE SHEETS C-101 THROUGH C-112.

4. FOR BORROW AREA DATA SEE SHEETS C-113 THROUGH C-114.

5. FOR CROSS SECTIONS SEE C-301 THROUGH C-311.

6. SAND PLACEMENT SHOWN IS BASED ON FALL 2025 SURVEYS. CONTRACTOR TO VERIFY IN FIELD WITH

SURVEYS AS CONDITIONS MAY CHANGE. APPLY TEMPLATE AT THE APPROPRIATE STATIONS AND

PLACE WHERE EXISTING IS BELOW PROPOSED.

E640,000 E640,000

N

3, N

4, N

5, N

3, N

4, N

5, PLAN

NORTH

125+00

130+00

135+00

140+00

145+00150+00

-18

-16

-14

-12

-20

-18

-16

-14

-12

-10

-8

-6

-4

-4

-2.4

-2

9.3

1.92 3.94

-10 -8

-6

-4 -2.4-2

1.92

3.94

9.310

PI

: 1

+9

8.

PI: 131+70.65

PI

: 1

+1

5.

PI: 147+75.95

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

3+

T

O

+0

SE

A

BR

IG

H

T

BE

AC

H

S O

U

TH

O

PT

IO

N

P

LA

N

C-108

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

APPROXIMATE TOE OF 1:10 SLOPE

REFERENCE LINE

140'

SA

N

D

FI

LL

BERM AT EL.

9.3'

SL

O

PE

1:

SLO

PE

1:20

SLO

PE

1:10

Feet 0 100 200

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLACEMENT PLAN SEE SHEETS C-101 THROUGH C-112.

4. FOR BORROW AREA DATA SEE SHEETS C-113 THROUGH C-114.

5. FOR CROSS SECTIONS SEE C-301 THROUGH C-311.

6. SAND PLACEMENT SHOWN IS BASED ON FALL 2025 SURVEYS. CONTRACTOR TO VERIFY IN FIELD WITH

SURVEYS AS CONDITIONS MAY CHANGE. APPLY TEMPLATE AT THE APPROPRIATE STATIONS AND

PLACE WHERE EXISTING IS BELOW PROPOSED.

STAGING

AREA

ACCESS POINT

E639,000 E639,000

N

6, N

7, N

8, N

6, N

7, N

8, BERM AT EL.

9.3'

SA

N

D

FI

LL

OCEAN AVE

E C H

U R

C H

ST

95+00

100+00

105+00

110+00

115+00

120+00

-26

-24

-20

-10

-18

-16

-14

-12

-8

-22

-6

-4 -2.4-2

1.92 3.94

89.3 1012 1416

-20

-18

-16

-14

-12

-10-8

-6

-4

-2.4 -2

1.92

3.94

9.3

14 16

PI: 101+48.96

PI

: 1

+2

8.

PI

: 1

+8

2.

PI: 122+28.14

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

4+

T

O

5+

SE

A

BR

IG

H T

BE

AC

H S

O U

TH

O

PT

IO

N P

LA

N

C-109

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

APPROXIMATE TOE OF 1:10 SLOPE

REFERENCE LINE

140'

SAN

D

FILL

BERM AT EL.

9.3'

SLO

PE

1:20

SLO

PE

1:10

SLO

PE

1:20

SLO

PE

1:10

Feet 0 100 200

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLACEMENT PLAN SEE SHEETS C-101 THROUGH C-112.

4. FOR BORROW AREA DATA SEE SHEETS C-113 THROUGH C-114.

5. FOR CROSS SECTIONS SEE C-301 THROUGH C-311.

6. SAND PLACEMENT SHOWN IS BASED ON FALL 2025 SURVEYS. CONTRACTOR TO VERIFY IN FIELD WITH

SURVEYS AS CONDITIONS MAY CHANGE. APPLY TEMPLATE AT THE APPROPRIATE STATIONS AND

PLACE WHERE EXISTING IS BELOW PROPOSED.

E639,000 E639,000

N

9, N

0, N

1, N

9, N

0, N

1, OCEAN AVE

PLAN

NORTH

SEA BRIGHT SOUTH

OPTION

SEA BRIGHT

BASE

45+0050+0055+00

60+00

65+00

70+00

-20 -24

-22

-20

-18

-16

-14 -12

-10-8

-8

-8

-6 -4

-2.4

1.9 3.9

9.3

-2

-10 -12

-18

-16

-14

-8

-8

-8

-6

-4 -2.4

1.9 3.9

89.3

12 14

-2

PI: 52+95.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

+0

TO

2+

SE

A

BR

IG

H

T

BE

AC

H

N O

R

TH

O

PT

IO

N

P

LA

N

C-110

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

APPROXIMATE TOE OF 1:10 SLOPE

REFERENCE LINE

140'

SAN

D

FILL

BERM AT EL.

9.3'

SLO

PE

1:20

SLO

PE

1:10SLO

PE

1:20

SLO

PE

1:10

Feet 0 100 200

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLACEMENT PLAN SEE SHEETS C-101 THROUGH C-112.

4. FOR BORROW AREA DATA SEE SHEETS C-113 THROUGH C-114.

5. FOR CROSS SECTIONS SEE C-301 THROUGH C-311.

6. SAND PLACEMENT SHOWN IS BASED ON FALL 2025 SURVEYS. CONTRACTOR TO VERIFY IN FIELD WITH

SURVEYS AS CONDITIONS MAY CHANGE. APPLY TEMPLATE AT THE APPROPRIATE STATIONS AND

PLACE WHERE EXISTING IS BELOW PROPOSED.

E639,000 E639,000

N

4, N

5, N

6, N

4, N

5, N

6, OCEAN AVE

PLAN

NORTH

SEA BRIGHT

BASE

SEA BRIGHT NORTH

OPTION

15+0020+0025+0030+0035+0040+00

-10

-18

-16

-14

-12

-8

-14

-12

-16

-18

-20 -22

-24

-10

-8

-6 -4

3.9

9.3

-2.4

-2

-8

-8

-6

-4 -2.4

1.9 3.9

8 9.3 12 14

-2

1.9

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

+0

TO

3+

SE

A

BR

IG

H

T

BE

AC

H

N O

R

TH

O

PT

IO

N

P

LA

N

C-111

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

APPROXIMATE TOE OF 1:10 SLOPE

REFERENCE LINE

140'

SAN

D

FILL

BERM AT EL.

9.3'

SLO

PE

1:20

SLO

PE

1:10

SLO

PE

1:20

SLO

PE

1:10

Feet 0 100 200

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLACEMENT PLAN SEE SHEETS C-101 THROUGH C-112.

4. FOR BORROW AREA DATA SEE SHEETS C-113 THROUGH C-114.

5. FOR CROSS SECTIONS SEE C-301 THROUGH C-311.

6. SAND PLACEMENT SHOWN IS BASED ON FALL 2025 SURVEYS. CONTRACTOR TO VERIFY IN FIELD WITH

SURVEYS AS CONDITIONS MAY CHANGE. APPLY TEMPLATE AT THE APPROPRIATE STATIONS AND

PLACE WHERE EXISTING IS BELOW PROPOSED.

E639,000 E639,000

N

7, N

8, N

9, N

7, N

8, N

9, OCEAN AVE

VIA R

IPA W

AY

0+00

5+00

10+0015+0020+00

-14

-12

-10

-16

-14

-12

-8

-8

-8

-6

-18

-20

-4 -2-2.4

21.9

4 3.9

9.3

-16

-18

-10

-8

-6 -4

3.9

9.3

-2.4

-2

1.9

PI: 10+61.96

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

+0

TO

+0

SE

A

BR

IG

H

T

BE

AC

H

N O

R

TH

O

PT

IO

N

P

LA

N

C-112

M

AT

C H

L

IN

E C

-1

M

AT

C H

L

IN

E C

-1

APPROXIMATE TOE OF 1:10 SLOPE

REFERENCE LINE

140'

SAN

D

FILL

BERM AT EL.

9.3'

SLO

PE

1:20

SLO

PE

1:10

SLO

PE

1:20

SLO

PE

1:10

Feet 0 100 200

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLACEMENT PLAN SEE SHEETS C-101 THROUGH C-112.

4. FOR BORROW AREA DATA SEE SHEETS C-113 THROUGH C-114.

5. FOR CROSS SECTIONS SEE C-301 THROUGH C-311.

6. SAND PLACEMENT SHOWN IS BASED ON FALL 2025 SURVEYS. CONTRACTOR TO VERIFY IN FIELD WITH

SURVEYS AS CONDITIONS MAY CHANGE. APPLY TEMPLATE AT THE APPROPRIATE STATIONS AND

PLACE WHERE EXISTING IS BELOW PROPOSED.

E638,000 E638,000

N

0, N

1, N

2, N

0, N

1, N

2, OCEAN AVE

PLAN

NORTH

TAPER INTO

-50

-40

-55

-45

-35

-60

-55

-55

-70

-60 -60

-65

-60

-55

-65

-50

-50

-40 -45

-35

-50 -55-45 -40

-60

-60

-60

-55

-55

-55

85-02

85-03

85-04

85-12

85-13

86-32

86-34

88-53 88-54 88-55

88-60

88-61

88-62

88-64

88-65

88-68 88-72 88-73

88-81

89-01

89-03

89-04 89-05

89-06

89-09

89-14 89-18

AV-1

AV-2

AV-3

AV-4 AV-5

AV-6

AV-7

AV-8

AV-9

AV-10

AV-11

AV-12

AV-23

AV-25

AV-26

AV-22 AV-28

AV-29

AV-27

AV-24

AV-30

AV-14

AV-16

AV-17

AV-13 AV-19

AV-20

AV-18AV-15 AV-21

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

BO

R R

O W

A R

EA

P

LA

N

C-113

Feet 0 1000 2000

1-A

1-B

1-C

1-D

2-A

2-B2-C

2-D

3-A

3-B

3-C

3-D

3-E 3-F

3-G

4-A

4-B4-C

4-D

4-E

4-F

5-A

5-B5-C

5-D

5-E

5-F

6-A

6-B

6-C

6-D

1A-A

1A-B 1A-C

1A-D 1A-E

1A-F

1A-G

1A-H 1A-I

1A-J

1A-K1A-L

1A-M

NOTES:

1. THERE SHALL BE A 100 FT X 100 FT BUFFER AROUND THE AVOIDANCE CENTER

COORDINATES. THERE SHALL BE NO WORK IN THESE AVOIDANCE AREAS.

E650,000 E650,000

N

0, N

0, N

0, N

0, N

0, N

0, BORROW AREA 1

COORDINATES

POINT EASTING NORTHING

1-A 644232 585676

1-B 645238.71 585676

1-C 645238.71 584600

1-D 644232 584600

MAX ALLOWABLE CUT DEPTH = -54 FT

BORROW AREA 2

COORDINATES

POINT EASTING NORTHING

2-A 648415.645 586150

2-B 650593 586150

2-C 650593 584481

2-D 648415.645 584481

MAX ALLOWABLE CUT DEPTH = -58 FT

BORROW AREA 3

COORDINATES

POINT EASTING NORTHING

3-A 643000 574003

3-B 649444.085 574003

3-C 647470.935 572070

3-D 647470.935 570457

3-E 646175.93 570457

3-F 646175.93 572070

3-G 643000 572070

MAX ALLOWABLE CUT DEPTH = -57 FT

BORROW AREA 4

COORDINATES

POINT EASTING NORTHING

4-A 646983.715 576020

4-B 650430.65 576020

4-C 650430.65 573293

4-D 649444.085 573293

4-E 649444.085 574003

4-F 646983.715 574003

MAX ALLOWABLE CUT DEPTH = -57 FT

BORROW AREA 5

COORDINATES

POINT EASTING NORTHING

5-A 650671.345 574391

5-B 653135.146 574391

5-C 653135.146 571330

5-D 652286.76 571330

5-E 652286.76 570763.151

5-F 650671.345 570763.151

MAX ALLOWABLE CUT DEPTH = -77 FT

BORROW AREA 6

COORDINATES

POINT EASTING NORTHING

6-A 648624.585 567172

6-B 647557 567172

6-C 647557 570457

6-D 648624.585 570457

MAX ALLOWABLE CUT DEPTH = -67 FT

BORROW AREA 1A

EXPANDED

POINT EASTING NORTHING

1A - A 573900 647800

1A - B 573900 650600

1A - C 583200 650600

1A - D 583200 647800

1A - E 581507.11 647800

1A - F 581507.11 648654.24

1A - G 579778 648632

1A - H 579406 649339

1A - I 579290 649387

1A - J 578713 649184

1A - K 578713.56 648545.69

1A - L 577516.04 648544.64

1A - M 577516.04 647800

MAX ALLOWABLE DEPTH = -57 FT

BORROW AREA CORE COORDINATES

NAME EASTING NORTHING NAME EASTING NORTHING

85-02 644762.686 572540.578 88-65 643659.398 573398.575

85-03 645810.84 572674.589 88-68 647965.1 577700

85-04 651448.977 571962.03 88-72 647998.8 579674.8

85-12 643083.416 572846.713 88-73 647998.8 581809.6

85-13 646788.865 571669.842 88-81 644716.932 585463.421

86-32 643970.729 572524.072 89-01 648781.289 585322.769

86-34 647568.659 572665.276 89-03 649666 582001.4

88-53 651509.834 570822.026 89-04 649503 579851.9

88-54 651544.689 572879.761 89-05 649594 577756

88-55 651559.737 573972.627 89-06 649813 576132.7

88-60 646017.914 572191.245 89-09 652890.314 572747.237

88-61 647513.206 574554.199 89-14 648831.58 568419.305

88-62 647926.274 575677.312 89-18 648949.484 569440.985

88-64 644541.675 573056.944

AVOIDANCE AREA CENTER COORDINATES

POINT EASTING NORTHING POINT EASTING NORTHING

AV-1 652332 571517 AV-16 648950 576842

AV-2 642874 573082 AV-17 649101 576842

AV-3 648421 573983 AV-18 649251 576842

AV-4 648321 573983 AV-19 648950 576992

AV-5 648321 574083 AV-20 649101 576992

AV-6 648421 574083 AV-21 649251 576992

AV-7 647265 575147 AV-22 649171 582400

AV-8 651164 575355 AV-23 649322 582400

AV-9 648218 575404 AV-24 649472 582400

AV-10 648118 575404 AV-25 649171 582550

AV-11 648118 575504 AV-26 649322 582550

AV-12 648218 575504 AV-27 649472 582550

AV-13 648950 576691 AV-28 649171 582701

AV-14 649101 576691 AV-29 649322 582701

AV-15 649251 576691 AV-30 649472 582701

PLAN

NORTH

BORROW AREA 1

BORROW AREA 2

BORROW AREA 3

BORROW AREA 6

BORROW AREA 5

BORROW AREA 1A EXPANDED

BORROW AREA 4

SHEET LEGEND

CORE SAMPLE POINT

AVOIDANCE AREA CENTER POINT

-50

-40

-55

-45

-35

-60

-55

-55

-70

-60 -60

-65

-60

-55

-65

-50

-50

-40 -45

-35

-50 -55-45 -40

-60

-60

-60

-55

-55

-55

BA 2

BA

1A X

BA

BA

BA 4

BA 3

-60

-50

-40

-30

-60

-50

-40

-30

ST

A

0+

ST

A

5+

ST

A

+0

ST

A

+7

-70

-60

-50

-40

-70

-60

-50

-40

ST

A

0+

ST

A

5+

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+7

-70

-60

-50

-40

-70

-60

-50

-40

ST

A

0+

ST

A

5+

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+4

-70

-60

-50

-40

-70

-60

-50

-40

ST

A

0+

ST

A

5+

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+4

-80

-70

-60

-50

-80

-70

-60

-50

ST

A

0+

ST

A

5+

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+2

-70

-60

-50

-40

-70

-60

-50

-40

ST

A

0+

ST

A

5+

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+8

-70

-60

-50

-40

-70

-60

-50

-40

ST

A

0+

ST

A

5+

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

ST

A

+0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

BO

R R

O W

A R

EA

P

R O

FI

LE

S

C-114

Feet 0 1000 2000

BORROW AREA 1

BORROW AREA 2

BORROW AREA 3

BORROW AREA 6

BORROW AREA 5

BORROW AREA 1A EXPANDED

BORROW AREA 4

BORROW AREA 1 BORROW AREA 3 BORROW AREA 5

BORROW AREA 6BORROW AREA 4

BORROW AREA 1A EXPANDED

BORROW AREA 2

EXISTING

DREDGING LIMIT

MAX SLOPE 1:5

500' 1000'0

20' 40'0

SCALE: 1"H=500'

SCALE: 1"V=20'

E650,000 E650,000

N

0, N

0, N

0, N

0, N

0, N

0, R L

240+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

243+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

246+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

249+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

252+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

255+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

258+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

261+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

264+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

140.00'

EL. 9.3'

EL. 3.9'

MHW

MLW

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

0+

T

O S

TA

+0

M

O N

M O

U

TH

B

AS

E C

R O

SS

S

EC

TI

O N

S

C-301

100' 200'0

10' 20'0

SCALE: 1"H=100'

SCALE: 1"V=10'

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLAN VIEWS SEE SHEETS C-101 THROUGH C-112.

4. FOR CROSS SECTIONS SEE SHEETS C-301 THROUGH C-311.

-- CROSS SECTIONS FROM STA 9+00 TO STA 63+00 DEPICT THE SEA BRIGHT NORTH OPTION.

-- CROSS SECTIONS FROM STA 66+00 TO STA 99+00 DEPICT THE BASE SEA BRIGHT PLACEMENT.

-- CROSS SECTIONS FROM STA 102+00 TO 186+00 DEPICT THE SEA BRIGHT SOUTH OPTION.

-- CROSS SECTIONS FROM STA 240+00 TO 273+00 DEPICT THE BASE MONMOUTH PLACEMENT.

-- CROSS SECTIONS FROM STA 321+00 TO 342+00 DEPICT THE LONG BRANCH OPTION.

5. EXISTING MATERIAL ABOVE THE DESIGN TEMPLATE SHALL BE LEFT AS-IS.

6. CROSS SECTIONS ARE PERPENDICULAR TO THE REFERENCE LINE.

7. MEAN HIGH WATER IS 1.8-1.9 FEET ABOVE NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

8. MEAN LOW WATER IS 2.3-2.5 FEET BELOW NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

1' TOLERANCE

267+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

270+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

273+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

140.00'

EL. 9.3'

EL. 3.9'

MHW

MLW

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

7+

T

O S

TA

+0

M

O N

M O

U

TH

B

AS

E C

R O

SS

S

EC

TI

O N

S

C-302

100' 200'0

10' 20'0

SCALE: 1"H=100'

SCALE: 1"V=10'

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLAN VIEWS SEE SHEETS C-101 THROUGH C-112.

4. FOR CROSS SECTIONS SEE SHEETS C-301 THROUGH C-311.

-- CROSS SECTIONS FROM STA 9+00 TO STA 63+00 DEPICT THE SEA BRIGHT NORTH OPTION.

-- CROSS SECTIONS FROM STA 66+00 TO STA 99+00 DEPICT THE BASE SEA BRIGHT PLACEMENT.

-- CROSS SECTIONS FROM STA 102+00 TO 186+00 DEPICT THE SEA BRIGHT SOUTH OPTION.

-- CROSS SECTIONS FROM STA 240+00 TO 273+00 DEPICT THE BASE MONMOUTH PLACEMENT.

-- CROSS SECTIONS FROM STA 321+00 TO 342+00 DEPICT THE LONG BRANCH OPTION.

5. EXISTING MATERIAL ABOVE THE DESIGN TEMPLATE SHALL BE LEFT AS-IS.

6. CROSS SECTIONS ARE PERPENDICULAR TO THE REFERENCE LINE.

7. MEAN HIGH WATER IS 1.8-1.9 FEET ABOVE NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

8. MEAN LOW WATER IS 2.3-2.5 FEET BELOW NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

66+00

-20

-15

-10

-5

-20

-15

-10

-5

0 1000-100-200-300-400-500

R L

69+00

-20

-15

-10

-5

-20

-15

-10

-5

0 1000-100-200-300-400-500

R L

72+00

-20

-15

-10

-5

-20

-15

-10

-5

0 1000-100-200-300-400-500

R L

75+00

-20

-15

-10

-5

-20

-15

-10

-5

0 1000-100-200-300-400-500

R L

78+00

-20

-15

-10

-5

-20

-15

-10

-5

0 1000-100-200-300-400-500

R L

81+00

-20

-15

-10

-5

-20

-15

-10

-5

0 1000-100-200-300-400-500

R L

84+00

-20

-15

-10

-5

-20

-15

-10

-5

0 1000-100-200-300-400-500

R L

87+00

-20

-15

-10

-5

-20

-15

-10

-5

0 1000-100-200-300-400-500

R L

90+00

-20

-15

-10

-5

-20

-15

-10

-5

0 1000-100-200-300-400-500

140.00'

EL. 9.3'

EL. 3.9'

MHW

MLW

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

+0

TO

S

TA

0+

SE

A

BR

IG

H

T

BA

SE

C

R O

SS

S

EC

TI

O N

S

C-303

100' 200'0

10' 20'0

SCALE: 1"H=100'

SCALE: 1"V=10'

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLAN VIEWS SEE SHEETS C-101 THROUGH C-112.

4. FOR CROSS SECTIONS SEE SHEETS C-301 THROUGH C-311.

-- CROSS SECTIONS FROM STA 9+00 TO STA 63+00 DEPICT THE SEA BRIGHT NORTH OPTION.

-- CROSS SECTIONS FROM STA 66+00 TO STA 99+00 DEPICT THE BASE SEA BRIGHT PLACEMENT.

-- CROSS SECTIONS FROM STA 102+00 TO 186+00 DEPICT THE SEA BRIGHT SOUTH OPTION.

-- CROSS SECTIONS FROM STA 240+00 TO 273+00 DEPICT THE BASE MONMOUTH PLACEMENT.

-- CROSS SECTIONS FROM STA 321+00 TO 342+00 DEPICT THE LONG BRANCH OPTION.

5. EXISTING MATERIAL ABOVE THE DESIGN TEMPLATE SHALL BE LEFT AS-IS.

6. CROSS SECTIONS ARE PERPENDICULAR TO THE REFERENCE LINE.

7. MEAN HIGH WATER IS 1.8-1.9 FEET ABOVE NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

8. MEAN LOW WATER IS 2.3-2.5 FEET BELOW NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

93+00

-20

-15

-10

-5

-20

-15

-10

-5

0 1000-100-200-300-400-500

R L

96+00

-20

-15

-10

-5

-20

-15

-10

-5

0 1000-100-200-300-400-500

R L

99+00

-20

-15

-10

-5

-20

-15

-10

-5

0 1000-100-200-300-400-500

140.00'

EL. 9.3'

EL. 3.9'

MHW

MLW

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

+0

TO

S

TA

9+

SE

A

BR

IG

H

T

BA

SE

C

R O

SS

S

EC

TI

O N

S

C-304

100' 200'0

10' 20'0

SCALE: 1"H=100'

SCALE: 1"V=10'

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLAN VIEWS SEE SHEETS C-101 THROUGH C-112.

4. FOR CROSS SECTIONS SEE SHEETS C-301 THROUGH C-311.

-- CROSS SECTIONS FROM STA 9+00 TO STA 63+00 DEPICT THE SEA BRIGHT NORTH OPTION.

-- CROSS SECTIONS FROM STA 66+00 TO STA 99+00 DEPICT THE BASE SEA BRIGHT PLACEMENT.

-- CROSS SECTIONS FROM STA 102+00 TO 186+00 DEPICT THE SEA BRIGHT SOUTH OPTION.

-- CROSS SECTIONS FROM STA 240+00 TO 273+00 DEPICT THE BASE MONMOUTH PLACEMENT.

-- CROSS SECTIONS FROM STA 321+00 TO 342+00 DEPICT THE LONG BRANCH OPTION.

5. EXISTING MATERIAL ABOVE THE DESIGN TEMPLATE SHALL BE LEFT AS-IS.

6. CROSS SECTIONS ARE PERPENDICULAR TO THE REFERENCE LINE.

7. MEAN HIGH WATER IS 1.8-1.9 FEET ABOVE NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

8. MEAN LOW WATER IS 2.3-2.5 FEET BELOW NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

321+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

324+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

327+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

330+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

333+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

336+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

339+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

342+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

140.00'

EL. 9.3'

EL. 3.9'

MHW

MLW

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

1+

T

O S

TA

+0

LO

N G

B R

AN

C

H O

PT

IO

N C

R O

SS

S

EC

TI

O N

S

C-305

100' 200'0

10' 20'0

SCALE: 1"H=100'

SCALE: 1"V=10'

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLAN VIEWS SEE SHEETS C-101 THROUGH C-112.

4. FOR CROSS SECTIONS SEE SHEETS C-301 THROUGH C-311.

-- CROSS SECTIONS FROM STA 9+00 TO STA 63+00 DEPICT THE SEA BRIGHT NORTH OPTION.

-- CROSS SECTIONS FROM STA 66+00 TO STA 99+00 DEPICT THE BASE SEA BRIGHT PLACEMENT.

-- CROSS SECTIONS FROM STA 102+00 TO 186+00 DEPICT THE SEA BRIGHT SOUTH OPTION.

-- CROSS SECTIONS FROM STA 240+00 TO 273+00 DEPICT THE BASE MONMOUTH PLACEMENT.

-- CROSS SECTIONS FROM STA 321+00 TO 342+00 DEPICT THE LONG BRANCH OPTION.

5. EXISTING MATERIAL ABOVE THE DESIGN TEMPLATE SHALL BE LEFT AS-IS.

6. CROSS SECTIONS ARE PERPENDICULAR TO THE REFERENCE LINE.

7. MEAN HIGH WATER IS 1.8-1.9 FEET ABOVE NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

8. MEAN LOW WATER IS 2.3-2.5 FEET BELOW NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

102+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

105+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

108+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

111+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

114+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

117+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

120+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

123+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

126+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

140.00'

EL. 9.3'

EL. 3.9'

MHW

MLW

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

2+

T

O S

TA

+0

SE

A

BR

IG

H

T

SO

U

TH

O

PT

IO

N

C R

O

SS

S

EC

TI

O

N S

C-306

100' 200'0

10' 20'0

SCALE: 1"H=100'

SCALE: 1"V=10'

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLAN VIEWS SEE SHEETS C-101 THROUGH C-112.

4. FOR CROSS SECTIONS SEE SHEETS C-301 THROUGH C-311.

-- CROSS SECTIONS FROM STA 9+00 TO STA 63+00 DEPICT THE SEA BRIGHT NORTH OPTION.

-- CROSS SECTIONS FROM STA 66+00 TO STA 99+00 DEPICT THE BASE SEA BRIGHT PLACEMENT.

-- CROSS SECTIONS FROM STA 102+00 TO 186+00 DEPICT THE SEA BRIGHT SOUTH OPTION.

-- CROSS SECTIONS FROM STA 240+00 TO 273+00 DEPICT THE BASE MONMOUTH PLACEMENT.

-- CROSS SECTIONS FROM STA 321+00 TO 342+00 DEPICT THE LONG BRANCH OPTION.

5. EXISTING MATERIAL ABOVE THE DESIGN TEMPLATE SHALL BE LEFT AS-IS.

6. CROSS SECTIONS ARE PERPENDICULAR TO THE REFERENCE LINE.

7. MEAN HIGH WATER IS 1.8-1.9 FEET ABOVE NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

8. MEAN LOW WATER IS 2.3-2.5 FEET BELOW NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

129+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

132+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

135+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

144+00

-10

-5

-10

-5

00-100-200-300-400-500-600

R L

147+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

150+00

-10

-5

-10

-5

00-100-200-300-400-500-600

R L

153+00

-10

-5

-10

-5

00-100-200-300-400-500-600

R L

156+00

-10

-5

-10

-5

00-100-200-300-400-500-600

R L

159+00

-10

-5

-10

-5

00-100-200-300-400-500-600

140.00'

EL. 9.3'

EL. 3.9'

MHW

MLW

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

9+

T

O S

TA

+0

SE

A

BR

IG

H

T

SO

U

TH

O

PT

IO

N

C R

O

SS

S

EC

TI

O

N S

C-307

100' 200'0

10' 20'0

SCALE: 1"H=100'

SCALE: 1"V=10'

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLAN VIEWS SEE SHEETS C-101 THROUGH C-112.

4. FOR CROSS SECTIONS SEE SHEETS C-301 THROUGH C-311.

-- CROSS SECTIONS FROM STA 9+00 TO STA 63+00 DEPICT THE SEA BRIGHT NORTH OPTION.

-- CROSS SECTIONS FROM STA 66+00 TO STA 99+00 DEPICT THE BASE SEA BRIGHT PLACEMENT.

-- CROSS SECTIONS FROM STA 102+00 TO 186+00 DEPICT THE SEA BRIGHT SOUTH OPTION.

-- CROSS SECTIONS FROM STA 240+00 TO 273+00 DEPICT THE BASE MONMOUTH PLACEMENT.

-- CROSS SECTIONS FROM STA 321+00 TO 342+00 DEPICT THE LONG BRANCH OPTION.

5. EXISTING MATERIAL ABOVE THE DESIGN TEMPLATE SHALL BE LEFT AS-IS.

6. CROSS SECTIONS ARE PERPENDICULAR TO THE REFERENCE LINE.

7. MEAN HIGH WATER IS 1.8-1.9 FEET ABOVE NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

8. MEAN LOW WATER IS 2.3-2.5 FEET BELOW NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

162+00

-10

-5

-10

-5

00-100-200-300-400-500-600

R L

165+00

-10

-5

-10

-5

00-100-200-300-400-500-600

R L

168+00

-10

-5

-10

-5

00-100-200-300-400-500-600

R L

171+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

174+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

177+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

180+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

183+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

186+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

140.00'

EL. 9.3'

EL. 3.9'

MHW

MLW

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

2+

T

O S

TA

+0

SE

AB

R

IG

H

T

SO

U

TH

O

PT

IO

N

C R

O

SS

S

EC

TI

O

N S

C-308

100' 200'0

10' 20'0

SCALE: 1"H=100'

SCALE: 1"V=10'

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLAN VIEWS SEE SHEETS C-101 THROUGH C-112.

4. FOR CROSS SECTIONS SEE SHEETS C-301 THROUGH C-311.

-- CROSS SECTIONS FROM STA 9+00 TO STA 63+00 DEPICT THE SEA BRIGHT NORTH OPTION.

-- CROSS SECTIONS FROM STA 66+00 TO STA 99+00 DEPICT THE BASE SEA BRIGHT PLACEMENT.

-- CROSS SECTIONS FROM STA 102+00 TO 186+00 DEPICT THE SEA BRIGHT SOUTH OPTION.

-- CROSS SECTIONS FROM STA 240+00 TO 273+00 DEPICT THE BASE MONMOUTH PLACEMENT.

-- CROSS SECTIONS FROM STA 321+00 TO 342+00 DEPICT THE LONG BRANCH OPTION.

5. EXISTING MATERIAL ABOVE THE DESIGN TEMPLATE SHALL BE LEFT AS-IS.

6. CROSS SECTIONS ARE PERPENDICULAR TO THE REFERENCE LINE.

7. MEAN HIGH WATER IS 1.8-1.9 FEET ABOVE NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

8. MEAN LOW WATER IS 2.3-2.5 FEET BELOW NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

12+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

15+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

18+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

21+00

-10

-5

-10

-5

00-100-200-300-400-500-600

R L

24+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

27+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

30+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

33+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

9+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

140'

EL. 9.3'

EL. 3.9'

MHW

MLW

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

9+

T O

S

TA

3+

SE

A

BR

IG

H

T N

O R

TH

O

PT

IO

N C

R O

SS

S

EC

TI

O N

S

C-309

100' 200'0

10' 20'0

SCALE: 1"H=100'

SCALE: 1"V=10'

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLAN VIEWS SEE SHEETS C-101 THROUGH C-112.

4. FOR CROSS SECTIONS SEE SHEETS C-301 THROUGH C-311.

-- CROSS SECTIONS FROM STA 9+00 TO STA 63+00 DEPICT THE SEA BRIGHT NORTH OPTION.

-- CROSS SECTIONS FROM STA 66+00 TO STA 99+00 DEPICT THE BASE SEA BRIGHT PLACEMENT.

-- CROSS SECTIONS FROM STA 102+00 TO 186+00 DEPICT THE SEA BRIGHT SOUTH OPTION.

-- CROSS SECTIONS FROM STA 240+00 TO 273+00 DEPICT THE BASE MONMOUTH PLACEMENT.

-- CROSS SECTIONS FROM STA 321+00 TO 342+00 DEPICT THE LONG BRANCH OPTION.

5. EXISTING MATERIAL ABOVE THE DESIGN TEMPLATE SHALL BE LEFT AS-IS.

6. CROSS SECTIONS ARE PERPENDICULAR TO THE REFERENCE LINE.

7. MEAN HIGH WATER IS 1.8-1.9 FEET ABOVE NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

8. MEAN LOW WATER IS 2.3-2.5 FEET BELOW NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

36+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

39+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

42+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

45+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

48+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

51+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

54+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

57+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

R L

60+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

140.00'

EL. 9.3'

EL. 3.9'

MHW

MLW

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

N

BK

G

ST

A

+0

TO

S

TA

0+

SE

A

BR

IG

H

T N

O R

TH

O

PT

IO

N C

R O

SS

S

EC

TI

O N

S

C-310

100' 200'0

10' 20'0

SCALE: 1"H=100'

SCALE: 1"V=10'

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. FOR GENERAL PLAN, GENERAL NOTES, AND REFERENCE LINE DATA SEE SHEET G-101.

3. FOR PLAN VIEWS SEE SHEETS C-101 THROUGH C-112.

4. FOR CROSS SECTIONS SEE SHEETS C-301 THROUGH C-311.

-- CROSS SECTIONS FROM STA 9+00 TO STA 63+00 DEPICT THE SEA BRIGHT NORTH OPTION.

-- CROSS SECTIONS FROM STA 66+00 TO STA 99+00 DEPICT THE BASE SEA BRIGHT PLACEMENT.

-- CROSS SECTIONS FROM STA 102+00 TO 186+00 DEPICT THE SEA BRIGHT SOUTH OPTION.

-- CROSS SECTIONS FROM STA 240+00 TO 273+00 DEPICT THE BASE MONMOUTH PLACEMENT.

-- CROSS SECTIONS FROM STA 321+00 TO 342+00 DEPICT THE LONG BRANCH OPTION.

5. EXISTING MATERIAL ABOVE THE DESIGN TEMPLATE SHALL BE LEFT AS-IS.

6. CROSS SECTIONS ARE PERPENDICULAR TO THE REFERENCE LINE.

7. MEAN HIGH WATER IS 1.8-1.9 FEET ABOVE NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

8. MEAN LOW WATER IS 2.3-2.5 FEET BELOW NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1).

63+00

-20

-15

-10

-5

-20

-15

-10

-5

00-100-200-300-400-500-600

140.00'

EL. 9.3'

EL. 3.9'

MHW

MLW

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

C O

AS

TA

L

ST

O R

M R

IS

K

M

AN

AG

EM

EN

T

SE

A

BR

IG

H T

TO

M

AN

AS

Q U

AN

P

R O

JE

C

T

FY

R

EN

O

U R

IS

H

M

EN

T M

O N

M O

U

TH

C O

U N

TY

, N

J

0%

S U

BM

IS

SI

O

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .