This document is a solicitation for a Design Build Contract for the Kika De La Garza Land Port of Entry (LPOE) Border Roadway Improvement and Construction (BRIC) project in Pharr, Texas. The project is funded in part by the Inflation Reduction Act of 2022 and requires the use of low embodied carbon construction materials such as concrete, asphalt, and steel.
The project consists of repairing or replacing approximately 515,000 square feet of concrete pavement at 22 sites within the LPOE. The work includes complete reconstruction, surface reconstruction, milling and asphalt overlay, joint sealing, patching, and concrete replacement. Construction phasing will be required to maintain LPOE traffic flow during construction. The total construction cost is estimated between $20,000,000 and $30,000,000, and the period of performance is approximately 460 calendar days. This procurement is set-aside for small businesses under NAICS code 237310 (Concrete and Asphalt Paving).
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
47PH0825R0001
x
Acquisition Management Division Program Support Branch 819 Taylor St. STE: 11A09 Fort Worth, TX 76102 USA
7PQA
Via email: ashley.morgan@gsa.gov and temica.stewart@gsa.gov
a. NAME A Ashley Morgan
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS) 817-223-98399
Kika De La Garza Land Port of Entry (LPOE) Border Roadway Improvement and Construction (BRIC) Project, Pharr, TXX Solicitation #47PH0825R0001 November 22, 2024
1 460 xx x Period of Performance xx
1 2:00 PM M
local time 01/06/2025 xx
11/22/2024 1 of 133
AshleyCMorgan Cross-Out
AshleyCMorgan Cross-Out
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
G GSA/PBS Acquisition Management Division (7PQA) 819 Taylor Street: STE 11A09 Fort Worth, TX 76102
GSA/PBS Acquisition Management Division (7PQA) 819 Taylor Street: STE 11A09 Fort Worth, TX 76102
Low Embodied Carbon Materials
Pharr LPOE Cost Summary
GSA RFP Number - #47PH0825R0001
Pharr LPOE Price Proposal
DESCRIPTION TOTAL
Base Scope
CLIN 0001 - IRA BASE SCOPE (Design) ($ - )
Construction
Option 1 - PORTRD1
CLIN 0002 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 2 - CIDOCKPK1
CLIN 0003 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 3 - CIDOCKPK2
CLIN 0004 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 4 - CIDOCKPK3
CLIN 0005 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 5 - CIDOCKRD1
CLIN 0006 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 6 - GANTRYRD1
CLIN 0007 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 7 - KENNELRD1
CLIN 0008 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 8 - POVSPK1
CLIN 0009 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 9 - POVSRD3
CLIN 0010 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 10 - KENNELPK1
CLIN 0011 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 11 - KENNELPK2
CLIN 0012 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 12 - POVPPK1
CLIN 0013 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 13 - ADMINPK1
CLIN 0014 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 14 - ADMINPK2
CLIN 0015 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 15 - CARGORD1
CLIN 0016 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 16 - COMMPRD1
CLIN 0017 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 17 - COMMSRD1
CLIN 0018 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 18 - COMMPRD2
CLIN 0019 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 19 - POVPRD1
CLIN 0020 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 20 - ADMINRD1
CLIN 0021 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 21 - FMCSAPK1
CLIN 0022 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
Option 22 - FMCSARD1
CLIN 0022 - IRA LEC MATERIALS
LEC Concrete ($ - )
LEC Asphalt ($ - )
LEC Steel ($ - )
CLIN 0023 - DIVISION 1 ($ - )
CLIN 0024 - DIVISION 31 ($ - )
CLIN 0025 - DIVISION 32 ($ - )
TOTAL EVALUATED PRICE ($ - )
Type or Print Name
Title
Signature
Firm Name
Date
Low Embodied Carbon Materials
Kika De La Garza (Pharr) LPOE Paving
GSA RFP Number - #47PH0825R0001
Description
BASE SCOPE CLIN 0001 - (Design) IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS COST / TOTAL
CLIN 0001 - DESIGN AND ASSOCIATED EXPENSES ($ - )
IRA LEC OPTIONS (CONSTRUCTION) IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS
CLIN 0002 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) Quantity Unit COST / TOTAL
Clin 0002AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - PORTRD1 C.Y ($ - )
Clin 0002AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - PORTRD1 C.Y ($ - )
Clin 0002AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - PORTRD1 Tons ($ - )
CLIN 0003 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) Quantity Unit COST / TOTAL
Clin 0003AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKPK1 C.Y ($ - )
Clin 0003AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CIDOCKPK1 C.Y ($ - )
Clin 0003AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CIDOCKPK1 Tons ($ - )
CLIN 0004 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) Quantity Unit COST / TOTAL
Clin 0004AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKPK2 C.Y ($ - )
Clin 0004AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CIDOCKPK2 C.Y ($ - )
Clin 0004AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CIDOCKPK2 Tons ($ - )
CLIN 0005 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 0005AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKPK3 C.Y ($ - )
Clin 0005AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CIDOCKPK3 C.Y ($ - )
Clin 0005AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CIDOCKPK3 Tons ($ - )
CLIN 0006 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 0006AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKRD1 C.Y ($ - )
Clin 0006AB - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKRD2 C.Y ($ - )
Clin 0006AC - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKRD3 Tons ($ - )
CLIN 0007 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 0007AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - GANTRYRD1 C.Y ($ - )
Clin 0007AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - GANTRYRD1 C.Y ($ - )
Clin 0007AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - GANTRYRD1 Tons ($ - )
CLIN 0008 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 0008AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - KENNELRD1 C.Y ($ - )
Clin 0008AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - KENNELRD1 C.Y ($ - )
Clin 0008AC - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - KENNELRD2 Tons ($ - )
CLIN 0009 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 009AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - POVSPK1 C.Y ($ - )
Clin 009AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - POVSPK1 C.Y ($ - )
Clin 009AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - POVSPK1 Tons ($ - )
CLIN 0010 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 010AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - POVSRD3 C.Y ($ - )
Clin 010AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - POVSRD3 C.Y ($ - )
Clin 010AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - POVSRD3 Tons ($ - )
CLIN 0011 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 011AA- LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - KENNELPK1 C.Y ($ - )
Clin 011AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - KENNELPK1 C.Y ($ - )
Clin 011AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - KENNELPK1 Tons ($ - )
CLIN 0012 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 004AJ - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - KENNELPK2 C.Y ($ - )
Clin 004AK - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - KENNELPK2 C.Y ($ - )
Clin 004AL - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - KENNELPK2 Tons ($ - )
CLIN 0013 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 013AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - POVPPK1 C.Y ($ - )
Clin 005AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - POVPPK1 C.Y ($ - )
Clin 005AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - POVPPK1 Tons ($ - )
CLIN 0014 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 014AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - ADMINPK1 C.Y ($ - )
Clin 014AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - ADMINPK1 C.Y ($ - )
Clin 014AC- LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - ADMINPK1 Tons ($ - )
CLIN 0015 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 015AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - ADMINPK2 C.Y ($ - )
Clin 015AB- LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - ADMINPK2 C.Y ($ - )
Clin 015AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - ADMINPK2 Tons ($ - )
CLIN 0016 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 016AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CARGORD1 C.Y ($ - )
Clin 016AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CARGORD1 C.Y ($ - )
Clin 016AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CARGORD1 Tons ($ - )
CLIN 0017 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 017AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - COMMPRD1 C.Y ($ - )
Clin 017AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - COMMPRD1 C.Y ($ - )
Clin 017AC- LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - COMMPRD1 Tons ($ - )
CLIN 0018 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 018AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - COMMSRD1 C.Y ($ - )
Clin 018AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - COMMSRD1 C.Y ($ - )
Clin 018AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - COMMSRD1 Tons ($ - )
CLIN 0019 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 006AG - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - COMMPRD2 C.Y ($ - )
Clin 006AH - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - COMMPRD2 C.Y ($ - )
Clin 006AI - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - COMMPRD2 Tons ($ - )
CLIN 0020 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 020AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - POVPRD1 C.Y ($ - )
Clin 020AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - POVPRD1 C.Y ($ - )
Clin 020AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - POVPRD1 Tons ($ - )
CLIN 0021 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 021AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES -ADMINRD1 C.Y ($ - )
Clin 021AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - ADMINRD1 C.Y ($ - )
Clin 021AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - ADMINRD1 Tons ($ - )
CLIN 0022 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 022AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - FMCSAPK1 C.Y ($ - )
Clin 022AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - FMCSAPK1 C.Y ($ - )
Clin 022AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - FMSCAPK1 Tons ($ - )
CLIN 0023 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction) Quantity Unit COST / TOTAL
Clin 023AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - FMCSARD1 C.Y ($ - )
Clin 023AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - FMCSARD1 C.Y ($ - )
Clin 023AC- LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - FMSCARD1 Tons ($ - )
Subtotal - Construction Costs
CLIN 0024 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS COST / TOTAL
Clin 0024 - Division 1 ($ - )
CLIN 0025 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS COST / TOTAL
Clin 0025 - Div. 31 Earthwork ($ - )
CLIN 0026 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS COST / TOTAL
Clin 0026 - Div. 32 Exterior Improvements ($ - )
Overhead 0.00% ($ - )
Profit 0.00% ($ - )
Subtotal - Overhead, Profit
Bond 0.00% ($ - )
Insurance 0.00% ($ - )
Subtotal - Bond, Insurance ($ - )
Total Evaluated Price ($ - )
Type or Print Name
Title
Signature
Firm Name
Date
Design Build Contract for: Kika De La Garza Land Port of Entry Border Roadway
Improvement and Construction (BRIC), Pharr, TX
The Solicitation
Nov 22, 2024
GSA Solicitation No. 47PH0825R0001
Document: DB201A-SB/2 April 2024 (The Solicitation)
CUI
Table of Contents
I. General Information
A. The Solicitation and Contract B. List of Solicitation Documents C. Authorized Representatives D. Pre-Proposal Conference
E. Estimated Price Range F. FAR 52.228-1 Bid Guarantee G. FAR 52.236-27 Site Visit – Construction
H. Receipt of Offers
II. Proposals
A. Proposal Contents B. Proposal Format C. Price Proposal D. Technical Proposal
E. Other Information to be Submitted with Proposal F. Requirements of Joint Venture Offerors
III. General Provisions A. Availability of Funds B. Requests for Clarification or Interpretation
C. Notice to Small Business Firms D. Information Concerning the Disclosure of Solicitation Results E. Affirmative Procurement Program F. Notice Concerning Preparation of Proposals
G. Bond Requirements H. Contractor Performance Information I. Safeguarding and Dissemination of Controlled Unclassified Information (CUI)
Building Information
J. INFORM
IV. FAR/GSAR Solicitation Provisions A. FAR 52.211-1 Availability of Specifications Listed in the GSA Index of Federal
Specifications, Standards and Commercial Item Descriptions, FPMR 101-29 B. FAR 52.216-1 Type Of Contract
C. FAR 52.222-5 Construction Wage Rate Requirements-Secondary Site of Work D. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal
Employment Opportunity for Construction
E. Buy American Requirements F. Buy American Exceptions G. FAR 52.233-2 Service of Protest
H. FAR 52.252-1 Solicitation Provisions Incorporated by Reference I. GSAR 552.102 Incorporating Provisions and Clauses by Reference J. Additional Provisions
(i) GSAR 552.236-74, Evaluation of Options (Mar 2019)
(ii) GSAR Clause 552.236-77, Government’s Right to Exercise Options (Mar 2019)
(The Solicitation)
CUI
V. Instructions to Offerors and Clauses A. FAR 52.215-1 Instructions to Offerors – Competitive Acquisition
VI. Method Of Award
A. Evaluation of Offers B. Determination of Responsibility
C. Price Reasonableness/Price Realism D. Unbalanced Price E. Total Evaluated Price
F. Non Price Factors G. Evaluation of Joint Ventures H. Basis of Award
VII. Attachments
1. GSA Affiliated Custom Accounts (GACA) for Google Drive
2. Past Experience/Past Performance Questionnaire (Factor 1)
3. Past Experience/Past Performance Questionnaire (Factor 2)
4. Factor 4 LEC Material IRA Sustainability Factor Table.
5. Wage Decisions (TX20240003 & TX20240255)
6. GSA 527-21 - Contractor’s Qualifications and Financial Information
7. Offeror Representations and Certifications Form December 2023
8. Award Allocation Form IRA
9. Sample IRA Project Submittal/ Reporting Form
10. Concrete – GSA IRA Low Embodied Carbon Requirements (Dec. 2023)
11. Steel – GSA IRA Low Embodied Carbon Requirements (Dec. 2023)
12. Asphalt – GSA IRA Low Embodied Carbon Requirements (Dec. 2023)
13. Final Concepts Report
14. Standard Form 24 Bid Bond
VII. VIII Reference Materials
1. GSA P. 100 Facilities Standards for the Public Buildings Services (PBS) Dated
May 2024
I. General Information
I.A. The Solicitation and Contract
(1) This Solicitation is set-aside for Small Business Concerns, in accordance with FAR 19. This Solicitation sets forth requirements for proposals for a Contract to construct the Project described in the attached Agreement. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein. The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein.
(2) Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer.
(3) The Offeror's proposal submitted in response to this Solicitation shall constitute a firm offer.
No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror, and delivered to the Contractor a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices.
(4) The Inflation Reduction Act of 2022 (IRA), Pub. L. No. 117-169, enacted in August 2022, provided GSA with significant funding for (a) measures necessary to convert facilities to high-performance green buildings, (b) acquisition and installation of construction materials and products with substantially lower levels of embodied greenhouse gas emissions, and (c) emerging and sustainable technologies. The Contract resulting from this Solicitation will be funded in part by IRA appropriations, and it contains numerous IRA-specific requirements. Requirements include, but are not limited to, requirements regarding pricing, invoicing, submittals, materials, and construction. In addition, please note that this Solicitation contains an evaluation factor favoring certain construction materials with the lowest possible levels of embodied carbon. Offerors shall carefully review this Solicitation, the Agreement, the Statement of Work, the Specifications, and the Drawings. In addition, please note that this Solicitation contains an evaluation factor favoring certain construction materials with the lowest possible levels of embodied carbon. Offerors are responsible for accurately pricing and, if successful, fully performing all Contract requirements.
I.B. List of Solicitation Documents
The Solicitation Documents are comprised of:
(1) The Solicitation
(2) Offeror Representations and Certifications Form
(3) Standard Form (SF) 1442 – Solicitation Offer and Award
(4) The Agreement and Attachments to the Agreement
(5) The Statement of Work
(6) Final Concepts Report
(7) Other Forms Required for Submission with Proposals
(The Solicitation)
CUI
GACA Account: Vendors are required to create or use an existing GSA Affiliated Custom Account (GACA) for access to documents greater than 25MB. GACA instructions are included as an attachment to this Solicitation. Once the account has been created, notify the GSA Contracting Officer Ashley Morgan (Ashley.Morgan@gsa.gov), to receive a link to the Google Drive folder containing all the Solicitation documents (i.e. Attachments, Specifications and other Attachments to the SOW).
I.C. Authorized Representatives
The following individuals are designated as the authorized GSA representatives under this
Solicitation:
Authorized Representative Information:
Contracting Officer’s Information
Name: Ashley Morgan
Address: 819 Taylor Street: Floor 11, Fort Worth, TX 76102
Telephone: (817) 223 - 9839
Email: ashley.morgan@gsa.gov
I.D. Pre-Proposal Conference
Date:December 10, 2024
Time: 9:00 am Central
Pre-Proposal Meeting Location: Virtual
I.E. Estimated Price Range
The estimated price range for the Project is between $20,000,000 and $30,000,000.
I.F. FAR 52.228-1 Bid Guarantee (SEP 96)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(The Solicitation)
CUI
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
I.G. FAR 52.236-27 Site Visit – Construction (Feb 95)
(1) The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.
(2) A site visit will be held at the following date and time:
Date: December 11, 2024
Time: 10:00 am Local Time
(3) All offerors who would like to attend the pre-proposal conference and site visit will need to email the individual names, Company names, email addresses and phones numbers to ashley.morgan@gsa.gov of those planning on attending to receive a meeting invite to the meeting. Those that are interested in attending the site-walk at the Pharr LPOE, will have to also provide, Date of Birth, last four of your social security number, Driver’s License number and state issued, of the individuals that are attending the site-walk. The additional information provided will be submitted to Customs and Border Protection (CBP) to run a background check. This is required as the meeting will be on an active Border Crossing. Once the clearance is approved and final, the individuals will receive an email with the additional information to attend the meeting. Please arrive early as you will have to go through a security checkpoint to be escorted to the meeting room. No walk-ins without an invitation will be permitted to attend the site visit. The maximum number of attendees for a company is three (3). Offerors must submit the request no later than Thursday December 5, 2024, at 12:00 p.m. CST. Failure to submit on time will exclude you from the meeting and if you are not cleared by CBP you will not be allowed on-site for the walk through.
For further information about the site visit or access requirements, please contact:
Name: Ashley Morgan
Telephone: (817) 223-9839
Email: ashley.morgan@gsa.gov https://www.acquisition.gov/far/part-52#FAR_52_236_2 https://www.acquisition.gov/far/part-52#FAR_52_236_3
(The Solicitation)
CUI
I.H. Receipt of Offers
(1) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 2:00 pm local time on the following date and at the following address.
Date: January 6, 2025
Address: ashley.morgan@gsa.gov and temica.stewart@gsa.gov
Electronic Submission of Proposals
Electronic Submission of Proposals: Offers must be received by the email address of the GSA Point of Contact (POC) listed herein on or before the date and time established for receipt of offers. The date and time of receipt will be established according to the Government computer system’s documentation showing the exact official time of receipt by the GSA POC listed herein and not by the time the electronic proposal was sent by the Offeror or received by the GSA server. It is the Offeror’s responsibility to ensure proposals are complete and submitted early enough to be received by the GSA POC before the deadline, and to confirm receipt before the deadline. Proposals or portions of proposals which are received by the GSA POC later than the time noted within will be rejected and will not be considered.
NOTE: The maximum file size is 25 MB. GSA has occasionally experienced delays in delivery of emails from the GSA server to an email account. Therefore contractors/offerors need to plan accordingly.
WARNING: Consistent with GAO case law on the issue of “late-is-late rule” related to electronically submitted proposals, GSA will strictly comply with and enforce FAR
52.215-1(c)(3)(ii)(A). Pursuant to GAO’s application of FAR 52.215-1(c)(3)(ii)(A), an electronically submitted proposal that is received late will not be considered unless (1) it is received before award is made, (2) the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition and (3) it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals. FAR 52.215-1 (c)(3)(ii)(A)(1).
II. Proposals
II.A. Proposal Contents
Proposals shall consist of the following documents, completed and executed in accordance with this Solicitation:
1. Price Proposal
2. Technical Proposal
3. Representations and Certifications
4. Standard Form 24, Bid Bond mailto:ashley.morgan@gsa.gov mailto:temica.stewart@gsa.gov
(The Solicitation)
CUI
5. GSA Form 527 – Contractor’s Qualification and Financial Information
6. Other Documents as Required
II.B. Proposal Format
Firms shall submit one (1) electronic copy of the technical proposal, one (1) electronic copy of the price proposal and attachment 4 (LEC Spreadsheet in both PDF and Excel). The submission should be organized to correspond with the evaluation factors listed below.
Electronic copies must be submitted by email to ashley.morgan@gsa.gov. Electronic copies must be received by the date and time listed in this solicitation. The proposal is considered received upon the date and the time stamp showing receipt by the Contracting Officer’s Government email inbox and not when the contractor sent the email.
The total technical proposal submission should not exceed 40 pages one sided, 8 ½” x 11”, vertical (portrait) format pages, consisting only of the specified materials described in this solicitation. The reference questionnaires, and Environmental Product Declarations (EPD’s) required will not count toward the page number limit.
References: The questionnaire form or the FINAL evaluation from the Contractor Performance Assessment Reporting System (CPARS) shall be submitted for each project presented in the
RFP. Offeror will submit the questionnaire or Final CPARS with their technical proposal set forth in the RFP. The Government may consider all past performance information that it becomes aware of during the evaluation process.
The proposal should include a cover page with the firm’s point of contact, phone number and email. Also included is the company's DUNs number, UEI number, and TIN number and name, phone number, email of the person who is authorized to negotiate on behalf of the offeror.
The price proposal section portion of the proposal does not count towards the 40-page limit.
This solicitation does not commit the Government to pay any costs incurred in the submission of any proposals. Nor does it commit the Government to procure or contract for said services. The Contracting Officer is the only individual who can commit the Government to the expenditure of public funds in connection with this proposed procurement.
II.C. Price Proposal
(1) Contents
The Price Proposal shall consist of:
a. Standard Form (SF) 1442 blocks 14, 15, 16, 17, 19, & 20a,b,c signed and dated by an authorized individual. Please include the offeror UEI number in Block 14 of the SF1442 (note: Block 14 “code” and “facility code” can be left blank). Indicate the Base Contract Price plus options in Block 17 of the SF 1442, which must be fully executed by the
Offeror.
b. Pricing Sheet (excel and signed PDF), with prices and/or rates
(The Solicitation)
CUI
indicated for each price element shown on the pricing sheet with a signature by an authorized individual on the pricing sheet. Pricing Sheet total shall match what is listed on the 1442.
c. The Bid Bond in accordance with FAR 52.228-1 Bid Guarantee
d. Acknowledgement of all amendments in Block 19 of the SF1442.
(2) Qualifications, Exclusions and Conditions
If the Offeror communicates in its proposal any qualifications, exclusions, or conditions to the proposed prices not provided for in the Contract Documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.
(3) GSA is required to track spending for each of the three appropriations it received under the Inflation Reduction Act of 2022 (IRA) -- for low-embodied carbon (LEC) materials, emerging and sustainable technologies, and high-performance green building measures -- and has established “budget activities” for each of these appropriations. A contract line-item number (CLIN) for each of these budget activities has been included in the Agreement as necessary. In addition, sub-CLINs will be used to track spending on each of the LEC materials designated for IRA funding -- asphalt, concrete, glass, and steel. Offerors must include separate prices for IRA work under the corresponding IRA CLINs and sub-CLINs.
Amounts for each IRA CLIN should reflect all expenses necessary to accomplish acquisition and installation of IRA work elements. A list of possible expenses follows below; this list is not exhaustive.
● Expenses of acquiring and transporting products and materials required for IRAfunded work to the construction site;
● Labor, general and administrative expenses, and overhead and profit reasonably attributable to installation of IRA-funded work;
● Expenses for materials, tools, riggings and equipment (including safety equipment) required to install IRA-funded work;
● Design, submittal and documentation expenses reasonably attributable to IRA funded work;
● Demolition and disposal expenses reasonably necessary for and attributable to IRA-funded work;
● Expenses necessary to return space to its condition preceding IRA-funded work;
● Environmental remediation expenses required in execution of IRA-funded work;
and
● Phasing and commissioning expenses reasonably attributable to IRA-funded work.
II.D. Technical Proposal
The Technical Proposal shall include the information requested below for the non-price factors described in Section VI. Non-Price Factors, when combined, are significantly more important than Total Evaluated Price.
(The Solicitation)
CUI
The term "similar projects" shall be defined for evaluation purposes projects that meet all three elements of size, complexity, and type as further defined herein. The project requires the phased working of various aspects of the project as day-to-day functions of the Land Port of Entry are accommodated for the full duration of construction with minimal impact on operations.
Each project need not contain every element, but the combination of projects should demonstrate the ability to perform these services in a satisfactory manner.
Similar in size projects are:
● Exceed $5,000,000 in total construction costs, two (2) projects completed in the last eight (8) years from the date of the Solicitation. One (1) of the two (2) project submissions can be incomplete, however it must be 75% complete from the date of the proposal submission.
Similar in complexity projects are:
● Design and construction of roadway repair and replacement of 300,000 SF of concrete pavement 8” or more in depth
● Phasing and planning of work to include road/lane closures
● Project is occupied during normal business hours to allow traffic flow to continue during construction
Similar in type projects are:
● A project consisting of major modernization or renovation for road repair of a
Land Port of Entry (LPOE), complex, military base, commercial docks, or facility area, University Campuses, and highway road construction repair projects.
Additional examples include, but are not limited to, highways, airport runways, tarmacs, commercial dock areas, bridges, and distribution center projects.
● Projects involving POV and commercial primary inspection lanes with booths, secondary POV inspection area with inspection canopies, and road and paving site work that meet the minimum depth (8 inches thick) of concrete.
Projects NOT considered similar:
● Stand-alone parking lots, sidewalks, and driveways
GSA’s asphalt, concrete (and cement), glass and steel requirements establish numeric global warming potential (GWP) limits for each of the EPA-approved construction materials: concrete
(and cement), asphalt, steel, and glass (IRA-Eligible Materials). For each IRA-Eligible Material, GWP limits have been established for the best performing 20% of materials in terms of embodied carbon, as reported in terms global warming potential (Top 20% Limits), the best performing 40% of materials in terms of embodied carbon (Top 40% Limits) and better than industry average (Better Than Average Limit). In accordance with its proposal, Contractor shall provide all IRA-Eligible Materials required for performance of the Contract in compliance with the following IRA Limits.
IRA-Eligible Material* IRA Limit (e.g., Top 20% Limit, Top 40%, Better than Average)
GWP Value for IRA Limit https://www.gsa.gov/system/files/Asphalt%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Concrete%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Glass%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Steel%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf
(The Solicitation)
CUI
Concrete Specified concrete strength class (compressive strength [f'c] in pounds per square inch [PSI])
≤ 2499 PSI [CO to specify each limit as applicable - limits for the Top 20%, Top 40% and Better than Average prepopulated below]
228 261 277 kgCO2e/m3
3000 PSI 257 291 318 kgCO2e/m3
4000 PSI 284 326 352 kgCO2e/m3
5000 PSI 305 357 382 kgCO2e/m3
6000 PSI 319 374 407 kgCO2e/m3
≥7200 PSI 321 362 402 kgCO2e/m3
Cement** 751 819 858 kgCO2e/metric ton
Concrete Masonry Units 217 256 290 kgCO2e/m3
Asphalt 55.4 64.8 72.6 kgCO2e/metric ton
Steel
Fabricated Rebar 728 794 850 kgCO2e/metric ton
Unfabricated Rebar 611 716 760 kgCO2e/metric ton
Hollow Structural Sections (fabricated)
1,778 1,854 1,898 kgCO2e/metric ton
Hollow Structural Sections from Electric Arc Furnaces (unfabricated)
1,580 1,620 1,652 kgCO2e/metric ton
Hot-Rolled Sections (fabricated)
1,022 1,128 1,163 kgCO2e/metric ton
Hot-Rolled Sections (unfabricated)
686 713 869 kgCO2e/metric ton
Cold-Formed and Galvanized (stud, track, framing, etc.)
2,228 2,324 2,408 kgCO2e/metric ton
Structural Steel Plate from Electric Arc Furnaces (unfabricated)
987 1,152 1,190 kgCO2e/metric ton
Flat Glass 1,331 1,370 1,401 kgCO2e/metric ton
* Required construction product assemblies (such as window assemblies) are included in IRA-Eligible Material categories, and are bound by IRA Limits. At least 80% of the assembly’s total cost or total weight must be composed of compliant IRA-Eligible
Materials.
** Where provision of concrete that qualifies under these GSA IRA Limits is impractical, GSA’s IRA Limits for cement may be applied to the cement being used in the concrete mix.
Contractor compliance with IRA Limits will be verified by reference to provided materials’ environmental product declarations (EPDs). EPDs must meet the standards reflected in
GSA’s asphalt, concrete (and cement), glass and steel requirements (see Compliance
Documentation criteria listed for each IRA-Eligible Material - Attachments 10., 11. & 12.).
1. Factors and Weights
Factor Evaluation Criteria Elements Weight
1 Past Experience and Performance of the Company
35%
2 Past Performance, Experience and Qualifications of Key Personnel (Design/Build Project Team)
30%
3 Technical and Management Approach 20%
4 Sustainability - LEC Construction Materials 15%
Total 100%
2. Scoring of Technical Factors
Each technical factor will be given a score of 0-10 based on how they relate to the standard
(see Evaluation Criteria Scoring table below). After each technical factor has been evaluated, the overall technical score will be established by calculating the sum of all factors. Each factor https://www.gsa.gov/system/files/Concrete%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Asphalt%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Concrete%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Glass%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Steel%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf is weighted accordance with weights shown in the table below. The highest overall technical score possible is 10, and the lowest overall technical score possible is 0. SCORE shall be carried to the tenth place.
EVALUATION CRITERIA SCORING
UNSATISFACTORY MARGINAL SATISFACTORY VERY
GOOD
EXCEPTIONAL
0 - 1 2 - 3 4 - 5 6 - 7 8 - 10
Does not meet the minimum requirements. Major revisions are required to make the proposal acceptable.
Major deficiencies and/or weaknesses are not readily correctable.
Meets some of the minimum requirements, but lacks in some areas.
Lacks essential information.
Significant deficiencies and/or weaknesses.
Meets, but does not exceed the minimum requirements.
Weaknesses are deemed correctable. No deficiencies
Meets the minimum requirements and exceeds in some areas. No deficiencies or weaknesses
Significantly exceeds the standard.
Innovative, comprehensive proposal which is complete in all details. No deficiencies or weaknesses
1. FACTOR 1 – Past Experience and Performance of the Company
Weight: 35%
a. FACTOR DESCRIPTION
Factor 1 considers the Offeror’s past experience and performance demonstrating excellence as it relates to quality of work, timeliness of performance, business relations, sustainability experience, and overall customer satisfaction.
b. MINIMUM STANDARDS
The minimum standard is met when the Offeror demonstrates past experience indicating the following:
• Two (2) similar projects that have been completed within the last eight (8) years (from the date of this Solicitation) with a satisfactory/good rating or better, as evidenced by a minimum of one reference per project who indicates he/she would contract with the firm again for the same services. Offeror must explain how the characteristics of the project relate to the characteristics of this project.
• The firm must have completed at least one (1) project and the other being at least 75% completed, on-time (no liquidated damages assessed), within budget and in accordance with contract requirements.
• Experience in managing concrete placement, and removal of construction and demolition waste.
• Experience of Design and Construction of major modernization or renovation of a Land Port of Entry (LPOE), University campuses, military base, commercial docks, facility area, and highway road construction repair projects. Additional examples include, but are not limited to, highways, airport runways, tarmacs, commercial dock areas, bridges, and distribution center projects.
• Experience with project sites that are open and require phasing of lane closures and coordination with end users.
• Experience with each project need not contain every element, but the combination of projects should demonstrate the ability to perform these services in a satisfactory manner.
Some examples of when the standard is exceeded include:
• The prime contractor has successfully completed two or more similar projects and received a
Very Good or greater rating from two or more references.
• One or more of the projects was successfully executed by multiple members of the proposed Team working together. Experience reflected in written recommendations from references / customers that indicated exceptional customer service.
• Experience with modernization or renovation work on occupied southern border LPOEs, including but not limited to POV and commercial primary inspection lanes with booths, secondary POV inspection area with inspection canopies, and road and paving site work that meet the minimum depth (8 inches thick) of concrete.
c. SUBMITTAL REQUIREMENTS:
The Offeror shall submit a minimum of two (2) projects that demonstrate the history of successful team project delivery, based upon the standards listed above, for similar projects completed within the last eight (8) years. If one (1) of the projects is not complete, it must be 75% complete from the date of the proposal submission.
The offeror shall submit two (2) corresponding questionnaires (Attachment 2 of the Solicitation) or the FINAL evaluation from the Contractor Performance Assessment Reporting System
(CPARS). Questionnaires shall be from the end-user representing who was involved during the design and construction of the referenced projects. Offeror will submit the questionnaire or Final CPARs with their technical proposal by the due date and time set forth in the Solicitation. The reference must be available to be contacted by the Government.
The Government also reserves the right to use other government data available in its assessment of the offeror. The quality of the reference information supplied will be considered.
In accordance with FAR 15.306, If award will be made without conducting discussions, offerors may be given the opportunity to clarify certain aspects of proposals (e.g., the relevance of an offeror’s past performance information and adverse past performance information to which the offeror has not previously had an opportunity to respond) or to resolve minor or clerical.
Project references are not included in the proposal page count limit.
Offeror is encouraged to provide information on problems encountered on the identified projects/contracts and the Offeror’s Team corrective actions.
For each project presented, the Offeror shall submit the following data/information:
1. Project Title.
2. Owner and/or Occupants/Tenants
3. Location
4. Project team including the subcontractors that performed major divisions of work
5. Description including square footage of work area
6. Any special considerations or plans associated with working in occupied space
7. Contract Award Date
8. Contract Type and Contractor’s Responsibilities
9. Date of Substantial Completion
10. Date of Final Completion
11. Contract Award Amount
12. Contract Award Amount at Completion
13. Original Scheduled Completion Time at Contract Award (Calendar Days).
14. Actual Completion Time (Calendar Days)
15. Number of Change Orders
16. Reasons for Change Orders
17. Describe the similarities to this project
2. FACTOR 2 – Past Performance, Experience and Qualifications of Key Personnel
Weight: 30%
a. FACTOR DESCRIPTION
Factor 2 considers the qualifications, past performance, and experience of key personnel on the Offeror’s team. The Offeror shall submit the information requested in the Solicitation and resumes for the Design Build contractor’s key personnel noted below: The Offeror shall also include any relevant credentials or specialized training for each individual.
• Design Firm Project Manager
• General Contractor’s Project Manager (Construction)
• Project Superintendent
• Quality Control Manager
b. MINIMUM STANDARDS
The minimum standard is met for each resume when:
● The key individuals identified have the appropriate qualifications and document experience required for the position to be assigned for this project.
● Each individual has a minimum of 7 years experience in their respective role and completed at least two similar projects within the past 8 years..
● One similar project for each individual must have the construction successfully completed or has reached substantial completion within the past eight (8) years.
Some examples of when the standard is exceeded include:
● Key personnel successfully completed more than 2 similar projects within the past eight (8) years.
● Key personnel have worked together and successfully completed similar projects in the past.
Offerors shall submit resumes, with a narrative description for each individual, along with a list of relevant projects. The resume shall include education, general job experience, and any trade or professional credentials or accreditations.
The offeror shall submit a total of four (4) corresponding questionnaires (one for each
Key Personnel) (Attachment 3 of the Solicitation). Questionnaires shall be from the end-user representing who was involved during the construction of the referenced projects. Offeror will submit the questionnaire with their technical proposal by the due date and time set forth in the
RFP. The reference must be available to be contacted by the Government.
For key personnel, the Offeror shall provide information on two or more recent projects not to exceed four that each individual has worked on with at least one similar project that reached substantial completion within the past eight (8) years. For each project listed, there should be a statement of what percentage of the individual’s time was dedicated to that project.
For projects not included in the Firm’s Past Performance projects,…