3. Past Experience_Past Performance Questionnaire (Factor 2).pdf

PDF 87 KB Posted

Attached to
Design Build Contract for Kika De La Garza Land Port of Entry (LPOE) Border Roadway Improvement and Construction (BRIC), Pharr, TX
Solicitation number
47PH0825R0001
Issued by

About this file

This document is a Past Performance Questionnaire that is part of the solicitation for a Design Build Contract for the Kika De La Garza Land Port of Entry (LPOE) Border Roadway Improvement and Construction (BRIC) project in Pharr, TX. The questionnaire requests information about the past performance and experience of key personnel for the proposed contractor, including their roles, coordination of subcontractors, responsiveness, and quality of work. The overall federal contract opportunity is for a Design Build project to address approximately 515,000 sq ft of concrete pavement repairs and replacements using low embodied carbon materials such as asphalt, concrete, and steel. The project is estimated to cost between $20-30 million and will take approximately 460 calendar days to complete. The opportunity is set aside for small business firms with the NAICS code 237310 (Concrete and Asphalt Paving). The contract will be funded in part by the Inflation Reduction Act of 2022 and includes IRA-specific requirements.

View the file

Other files

File Type Posted
Amendment 6 - 47PH0825R0001 2025 06 10.pdf PDF
Pharr LPOE Bid Sheet 2025 01 10.xlsx XLSX spreadsheet
Amendment 5 - 47PH0825R0001 2025 01 10.pdf PDF
Amendment 4 - 47PH0825R0001 2025 01 08.pdf PDF
Pharr LPOE Bid Sheet 2024 12 20.xlsx XLSX spreadsheet
Amendment 3 - 47PH0825R0001 2024 12 20.pdf PDF
Amendment 2 - 47PH0825R0001 2024 12 13.pdf PDF
Pharr LPOE Bid Sheet_12.10.24 (1).xlsx XLSX spreadsheet
Amendment 1 - 47PH0825R0001 2024 12 05.pdf PDF
Communications Plan Template LPOE project 03 22 posted version.docx DOCX document
13. 2022.08.03 PHAR - Final Concepts Report_3_Rev-Redacted 10-8-24signed.pdf PDF
15. IRA Project Submittal Form and Data Dictionary PDF.pdf PDF
5. TX20240255 Building 2024 08 23.pdf PDF
10. Concrete - GSA IRA Low Embodied Carbon Requirements (Dec. 2023).pdf PDF
8. Award Allocation Form IRA.xlsx XLSX spreadsheet
FY2024 Metric Waiver FINAL.pdf PDF
14. Bid Bond.pdf PDF
1. GSA Affiliated Custom Accounts (GACA) for Google Drive.pdf PDF
12. Asphalt - GSA IRA Low Embodied Carbon Requirements (Dec. 2023).pdf PDF
Pharr Div 01 Specs.pdf PDF
6. GSA 527-21 - Contractor's Qualifications and Financial Informatio.pdf PDF
2. Past Experience & Performance of Co Questionnaire Factor 1.pdf PDF
9. Sample IRA Project Submittal_ Reporting Form.xlsx XLSX spreadsheet
7. Offeror Representations and Certifications Form Dec 2023 (1).pdf PDF
11. Steel - GSA IRA Low Embodied Carbon Requirements (Dec. 2023).pdf PDF
5. TX20240003 Highway 2024 01 05.pdf PDF
4. Factor 4 LEC Material IRA Sustainability Factor Table.xlsx XLSX spreadsheet
Pharr Solicitation 2024 11 22.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA Solicitation No. TBD

PAST PERFORMANCE, EXPERIENCE AND QUALIFICATIONS

OF KEY PERSONNEL QUESTIONNAIRE

FACTOR 2

CONTRACTOR:_________________________________________________

KEY PERSONNEL:_______________________________________________

Reference Information:

Name:_______________________________________________________ Company:____________________________________________________ Telephone No.:________________________________________________ Title:_________________________________________________________ Contract No.:__________________________________________________ Location of Contract Performance:_________________________________ Completion date:_______________________________________________ Length of time contractor employed:________________________________ Estimated price/cost for services:__________________________________ Type of space/building:__________________________________________ Type of Contract:_______________________________________________ Actual Square Footage:____________ New Construction_______________

Number of Stories of Bldg.:______ Renovation______________________

Questions:(Some questions may not apply to roles.)

1. What position/role did this person hold during this project? What was the actual work performed by the individual? Did the individual work on the entire project? If not, what percentage of the project did this individual work?

2. How well did the individual coordinate the work of his subcontractors/consultants/workers?

Unacceptable ____ Poor ____ Marginal ____ Acceptable ____ Very Good _____ Excellent _____

COMMENTS:

GSA Solicitation No. 47PH08240004

3. How would you describe the cooperation and commitment of the key personnel to the project?

Unacceptable ____ Poor ____ Marginal ____ Acceptable ____ Very Good _____ Excellent _____

COMMENTS:

4. How responsive was the person in administrative areas (e.g. submitting/processing necessary paperwork)?

Unacceptable ____ Poor ____ Marginal ____ Acceptable ____ Very Good _____ Excellent _____

COMMENTS:

5. Was this individual responsible for processing RFIs? If so, did he/she process them successfully?

6. Did the key personnel complete the project within the original contract schedule and budget? If not, why not?

7. Did the key personnel ensure that the finished product/project met your requirements as set forth in the contract documents?

8. Did the individual readily address ripple effect, such as time extensions, on change orders?

9. How would you describe the quality of work? How would you rate the key personnel’s overall performance?

Unacceptable ____ Poor ____ Marginal ____ Acceptable ____ Very Good _____ Excellent _____

COMMENTS:

10. Was the person active in solving problems? Did the person possess the capability to do his/her job well?

GSA Solicitation No. 47PH08240004

11. If you had a choice, would you work with the key personnel again? Why or Why not?

12. Do you know of any other projects performed by this individual? Any other comments?

Evaluator:_______________________________________ Date:________________

File details come from the government source that posted it. Updated .