Pharr LPOE Bid Sheet_12.10.24 (1).xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Design Build Contract for Kika De La Garza Land Port of Entry (LPOE) Border Roadway Improvement and Construction (BRIC), Pharr, TX
Solicitation number
47PH0825R0001
Issued by

About this file

This is a bid sheet template for the Pharr Land Port of Entry (LPOE) project, specifically focused on Low Embodied Carbon (LEC) materials pricing under RFP #47PH0825R0001. The template contains 26 Contract Line Item Numbers (CLINs) covering design work (CLIN 0001) and 22 construction options (CLINs 0002-0023) for different areas of the LPOE, plus Division 1, 31, and 32 costs (CLINs 0024-0026).

The bid sheet breaks down pricing for three types of LEC materials - concrete (measured in cubic yards), asphalt (measured in cubic yards), and steel (measured in tons) - across various project areas including port roads, cargo docks, kennels, POV areas, admin buildings, and FMCSA facilities. The template includes spaces for overhead, profit, bond, and insurance percentages, leading to a total evaluated price. This corresponds to a small business set-aside design-build project with an estimated construction magnitude of $20-30 million, to be completed in 460 calendar days at the Kika De La Garza LPOE in Pharr, Texas.

View the file

Other files

File Type Posted
Amendment 6 - 47PH0825R0001 2025 06 10.pdf PDF
Amendment 5 - 47PH0825R0001 2025 01 10.pdf PDF
Pharr LPOE Bid Sheet 2025 01 10.xlsx XLSX spreadsheet
Amendment 4 - 47PH0825R0001 2025 01 08.pdf PDF
Pharr LPOE Bid Sheet 2024 12 20.xlsx XLSX spreadsheet
Amendment 3 - 47PH0825R0001 2024 12 20.pdf PDF
Amendment 2 - 47PH0825R0001 2024 12 13.pdf PDF
Amendment 1 - 47PH0825R0001 2024 12 05.pdf PDF
12. Asphalt - GSA IRA Low Embodied Carbon Requirements (Dec. 2023).pdf PDF
3. Past Experience_Past Performance Questionnaire (Factor 2).pdf PDF
14. Bid Bond.pdf PDF
10. Concrete - GSA IRA Low Embodied Carbon Requirements (Dec. 2023).pdf PDF
15. IRA Project Submittal Form and Data Dictionary PDF.pdf PDF
Communications Plan Template LPOE project 03 22 posted version.docx DOCX document
6. GSA 527-21 - Contractor's Qualifications and Financial Informatio.pdf PDF
Pharr Div 01 Specs.pdf PDF
5. TX20240255 Building 2024 08 23.pdf PDF
2. Past Experience & Performance of Co Questionnaire Factor 1.pdf PDF
1. GSA Affiliated Custom Accounts (GACA) for Google Drive.pdf PDF
13. 2022.08.03 PHAR - Final Concepts Report_3_Rev-Redacted 10-8-24signed.pdf PDF
8. Award Allocation Form IRA.xlsx XLSX spreadsheet
FY2024 Metric Waiver FINAL.pdf PDF
5. TX20240003 Highway 2024 01 05.pdf PDF
9. Sample IRA Project Submittal_ Reporting Form.xlsx XLSX spreadsheet
7. Offeror Representations and Certifications Form Dec 2023 (1).pdf PDF
11. Steel - GSA IRA Low Embodied Carbon Requirements (Dec. 2023).pdf PDF
Pharr Solicitation 2024 11 22.pdf PDF
4. Factor 4 LEC Material IRA Sustainability Factor Table.xlsx XLSX spreadsheet
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COST SUMMARY

Low Embodied Carbon Materials
Pharr LPOE Cost Summary
GSA RFP Number - #47PH0825R0001
Pharr LPOE Price Proposal
DESCRIPTIONTOTAL
Base Scope
CLIN 0001 - IRA BASE SCOPE (Design)$ - 0
Construction
Option 1 - PORTRD1
CLIN 0002 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 2 - CIDOCKPK1
CLIN 0003 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 3 - CIDOCKPK2
CLIN 0004 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 4 - CIDOCKPK3
CLIN 0005 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 5 - CIDOCKRD1
CLIN 0006 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 6 - GANTRYRD1
CLIN 0007 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 7 - KENNELRD1
CLIN 0008 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 8 - POVSPK1
CLIN 0009 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 9 - POVSRD3
CLIN 0010 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 10 - KENNELPK1
CLIN 0011 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 11 - KENNELPK2
CLIN 0012 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 12 - POVPPK1
CLIN 0013 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 13 - ADMINPK1
CLIN 0014 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 14 - ADMINPK2
CLIN 0015 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 15 - CARGORD1
CLIN 0016 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 16 - COMMPRD1
CLIN 0017 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 17 - COMMSRD1
CLIN 0018 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 18 - COMMPRD2
CLIN 0019 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 19 - POVPRD1
CLIN 0020 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 20 - ADMINRD1
CLIN 0021 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 21 - FMCSAPK1
CLIN 0022 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 22 - FMCSARD1
CLIN 0023 - IRA LEC MATERIALS
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0

CLIN 0024 - DIVISION 1 $ - 0

CLIN 0025 - DIVISION 31 $ - 0

CLIN 0026 - DIVISION 32 $ - 0

TOTAL EVALUATED PRICE $ - 0

Type or Print Name
Title
Signature
Firm Name
Date

BASE SCOPE & IRA

Low Embodied Carbon Materials
Kika De La Garza (Pharr) LPOE Paving
GSA RFP Number - #47PH0825R0001
Description
BASE SCOPE CLIN 0001 - (Design) IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALSCOST / TOTAL
Clin 0001 - DESIGN AND ASSOCIATED EXPENSES$ - 0$ - 0$ - 0
IRA LEC OPTIONS (CONSTRUCTION) IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS
CLIN 0002 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 0002AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - PORTRD1C.Y$ - 0$ - 0$ - 0
Clin 0002AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - PORTRD1C.Y$ - 0$ - 0$ - 0
Clin 0002AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - PORTRD1Tons$ - 0$ - 0$ - 0
CLIN 0003 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 0003AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKPK1C.Y$ - 000
Clin 0003AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CIDOCKPK1C.Y$ - 000
Clin 0003AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CIDOCKPK1Tons$ - 000
CLIN 0004 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 0004AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKPK2C.Y$ - 0
Clin 0004AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CIDOCKPK2C.Y$ - 0
Clin 0004AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CIDOCKPK2Tons$ - 0
CLIN 0005 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 0005AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKPK3C.Y$ - 0
Clin 0005AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CIDOCKPK3C.Y$ - 0
Clin 0005AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CIDOCKPK3Tons$ - 0
CLIN 0006 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 0006AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKRD1C.Y$ - 0
Clin 0006AB - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKRD2C.Y$ - 0
Clin 0006AC - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKRD3Tons$ - 0
CLIN 0007 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 0007AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - GANTRYRD1C.Y$ - 0
Clin 0007AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - GANTRYRD1C.Y$ - 0
Clin 0007AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - GANTRYRD1Tons$ - 0
CLIN 0008 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 0008AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - KENNELRD1C.Y$ - 0
Clin 0008AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - KENNELRD1C.Y$ - 0
Clin 0008AC - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - KENNELRD2Tons$ - 0
CLIN 0009 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 009AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - POVSPK1C.Y$ - 0
Clin 009AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - POVSPK1C.Y$ - 0
Clin 009AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - POVSPK1Tons$ - 0
CLIN 0010 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 010AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - POVSRD3C.Y$ - 0
Clin 010AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - POVSRD3C.Y$ - 0
Clin 010AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - POVSRD3Tons$ - 0
CLIN 0011 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 011AA- LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - KENNELPK1C.Y$ - 0
Clin 011AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - KENNELPK1C.Y$ - 0
Clin 011AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - KENNELPK1Tons$ - 0
CLIN 0012 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 004AJ - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - KENNELPK2C.Y$ - 0
Clin 004AK - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - KENNELPK2C.Y$ - 0
Clin 004AL - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - KENNELPK2Tons$ - 0
CLIN 0013 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 013AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - POVPPK1C.Y$ - 0
Clin 005AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - POVPPK1C.Y$ - 0
Clin 005AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - POVPPK1Tons$ - 0
CLIN 0014 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 014AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - ADMINPK1C.Y$ - 0$ - 0$ - 0
Clin 014AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - ADMINPK1C.Y$ - 0$ - 0$ - 0
Clin 014AC- LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - ADMINPK1Tons$ - 0$ - 0$ - 0
CLIN 0015 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 015AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - ADMINPK2C.Y$ - 0
Clin 015AB- LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - ADMINPK2C.Y$ - 0
Clin 015AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - ADMINPK2Tons$ - 0
CLIN 0016 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 016AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CARGORD1C.Y$ - 0
Clin 016AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CARGORD1C.Y$ - 0
Clin 016AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CARGORD1Tons$ - 0
CLIN 0017 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 017AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - COMMPRD1C.Y$ - 0
Clin 017AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - COMMPRD1C.Y$ - 0
Clin 017AC- LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - COMMPRD1Tons$ - 0
CLIN 0018 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 018AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - COMMSRD1C.Y$ - 0
Clin 018AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - COMMSRD1C.Y$ - 0
Clin 018AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - COMMSRD1Tons$ - 0
CLIN 0019 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 006AG - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - COMMPRD2C.Y$ - 0
Clin 006AH - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - COMMPRD2C.Y$ - 0
Clin 006AI - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - COMMPRD2Tons$ - 0
CLIN 0020 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 020AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - POVPRD1C.Y$ - 0
Clin 020AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - POVPRD1C.Y$ - 0
Clin 020AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - POVPRD1Tons$ - 0
CLIN 0021 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 021AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES -ADMINRD1C.Y$ - 0
Clin 021AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - ADMINRD1C.Y$ - 0
Clin 021AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - ADMINRD1Tons$ - 0
CLIN 0022 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 022AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - FMCSAPK1C.Y$ - 0
Clin 022AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - FMCSAPK1C.Y$ - 0
Clin 022AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - FMSCAPK1Tons$ - 0
CLIN 0023 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS (Construction)QuantityUnitCOST / TOTAL
Clin 023AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - FMCSARD1C.Y$ - 0
Clin 023AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - FMCSARD1C.Y$ - 0
Clin 023AC- LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - FMSCARD1Tons$ - 0
Subtotal - Construction Costs
CLIN 0024 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALSCOST / TOTAL
Clin 0024AA - Division 1$ - 0
CLIN 0025 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALSCOST / TOTAL
Clin 0025AA - Div. 31 Earthwork$ - 0
CLIN 0026 - IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALSCOST / TOTAL
Clin 0026AA - Div. 32 Exterior Improvements$ - 0
Overhead0.00%$ - 0
Profit0.00%$ - 0
Subtotal - Overhead, Profit
Bond0.00%$ - 0
Insurance0.00%$ - 0
Subtotal - Bond, Insurance$ - 0
Total Evaluated Price$ - 0
Type or Print Name
Title
Signature
Firm Name
Date

File details come from the government source that posted it. Updated .