Design Build Contract for Kika De La Garza Land Port of Entry (LPOE) Border Roadway Improvement and Construction (BRIC), Pharr, TX
Solicitation number
47PH0825R0001
Issued by

About this file

This is Amendment 1 to RFP No. 47PH0825R0001 for the Kika De La Garza Land Port of Entry Border Roadway Improvement and Construction project in Pharr, TX. The amendment updates several sections including Factor 4 Sustainability Language, specifications for payment and submittal procedures, and wage determinations.

Key changes include allowing contractors unable to submit compliant Environmental Product Declarations (EPDs) by the proposal due date to submit an EPD Pledge promising delivery within 120 days of contract award. The amendment clarifies that asphalt EPD remains a requirement, noting that Texas Materials' Laredo plant has an EPD and asphalt can be transported via hot box. Administrative updates include payment documentation requirements (GSA Forms 2419, 1413, AiA G702/G703, GSA 184 a&b, and GSA 1142), submittal procedures through GSA's Project Management System (Kahua), and an updated wage determination TX20240255 dated November 22, 2024. The amendment maintains the project scope of concrete pavement repair/replacement using Low Embodied Carbon materials across approximately 515,000 sf at the Land Port of Entry.

View the file

Other files

File Type Posted
Amendment 6 - 47PH0825R0001 2025 06 10.pdf PDF
Amendment 5 - 47PH0825R0001 2025 01 10.pdf PDF
Pharr LPOE Bid Sheet 2025 01 10.xlsx XLSX spreadsheet
Amendment 4 - 47PH0825R0001 2025 01 08.pdf PDF
Pharr LPOE Bid Sheet 2024 12 20.xlsx XLSX spreadsheet
Amendment 3 - 47PH0825R0001 2024 12 20.pdf PDF
Pharr LPOE Bid Sheet_12.10.24 (1).xlsx XLSX spreadsheet
Amendment 2 - 47PH0825R0001 2024 12 13.pdf PDF
Pharr Div 01 Specs.pdf PDF
6. GSA 527-21 - Contractor's Qualifications and Financial Informatio.pdf PDF
2. Past Experience & Performance of Co Questionnaire Factor 1.pdf PDF
9. Sample IRA Project Submittal_ Reporting Form.xlsx XLSX spreadsheet
7. Offeror Representations and Certifications Form Dec 2023 (1).pdf PDF
11. Steel - GSA IRA Low Embodied Carbon Requirements (Dec. 2023).pdf PDF
5. TX20240003 Highway 2024 01 05.pdf PDF
4. Factor 4 LEC Material IRA Sustainability Factor Table.xlsx XLSX spreadsheet
Pharr Solicitation 2024 11 22.pdf PDF
FY2024 Metric Waiver FINAL.pdf PDF
14. Bid Bond.pdf PDF
1. GSA Affiliated Custom Accounts (GACA) for Google Drive.pdf PDF
12. Asphalt - GSA IRA Low Embodied Carbon Requirements (Dec. 2023).pdf PDF
3. Past Experience_Past Performance Questionnaire (Factor 2).pdf PDF
Communications Plan Template LPOE project 03 22 posted version.docx DOCX document
13. 2022.08.03 PHAR - Final Concepts Report_3_Rev-Redacted 10-8-24signed.pdf PDF
15. IRA Project Submittal Form and Data Dictionary PDF.pdf PDF
5. TX20240255 Building 2024 08 23.pdf PDF
10. Concrete - GSA IRA Low Embodied Carbon Requirements (Dec. 2023).pdf PDF
8. Award Allocation Form IRA.xlsx XLSX spreadsheet
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

RFP No. 47PH082 R000

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

GSA, PBS, Acquisition Management Division 819 Taylor Street, Floor 11 Fort Worth, TX 76210 Attn: Ashley Morgan, Contracting Officer

AMENDMENT 1 – Kika De La Garza Land Port of Entry Border Roadway Improvement and Construction (BRIC), Pharr, TX , RFP No. 47PH0825R0001

This amendment is issued to update the following:

1. Pg 29 of The Solicitation: Factor 4 – Sustainability Language

2. Updated Specifications 01 29 00 Payment Procedures and 01 33 00 Submittal Procedures

3. Answer question received regarding Asphalt EPDs

4. Pg 55 of The Agreement: Update to Administrative Matters (2) Payments. Progress Payment Documentation.

5. Pg 53 of The Agreement: I.H. Statement of Work, Specifications, Drawings, Exhibits, and Other Attachments, (4) Wage Determination TX20240255 has been updated

1. Factor 4

Note 2: For each offeror that is unable to submit any of the compliant EPDs by the proposal due date, the offeror shall submit a statement for each such missing compliant EPD (a) certifying that it is unable to submit a compliant EPD by the proposal due date, and (b) promising to submit a compliant EPD within 120 days from the contract award ((a) and (b) collectively constituting an

“EPD Pledge”). Failure by an offeror to submit either a compliant EPD or an EPD Pledge (as described in the immediately preceding sentence) for each IRA-Eligible Material listed in the IRA

Sustainability Factor Table by the proposal due date shall result in the offeror’s proposal being unacceptable. Offerors submitting an EPD Pledge in lieu of a compliant EPD for a given IRA-

Eligible Material will not be eligible for a Raw Score Supplement for that material, as described above.

Any awardee that submitted an EPD Pledge in lieu of a compliant EPD for a given IRA-Eligible

Material will still be bound by IRA Limit Commitments made in their IRA Sustainability Factor

Table. Note as well that the contract resulting from this solicitation shall have the following provision: “Within 120 days after contract award, the Contractor shall submit a compliant EPD for any IRA-Eligible Material for which the Contractor was unable to submit a compliant EPD by the proposal due date (if any). Such EPD must reflect GWP values that comply with the IRA Limit

Commitments incorporated into the contract. GSA shall not issue a Notice to Proceed with construction services to the Contractor until the Contractor has submitted a compliant EPD for each IRA-Eligible Material for which the Contractor was unable to submit a compliant EPD by the proposal due date.”

2. See attached

3. Question: After checking in with local suppliers and online resources tracking EPDs, it has been determined that there is an absence of a local EPD for asphalt. With this in mind, and given that the project is a design-build, can contractors consider not utilizing asphalt and substituting with either concrete or other pre-engineered materials, thereby, omitting the requirement for the submission of an asphalt EPD within the technical proposal?

Answer: The asphalt EPD remains a requirement of the RFP. Using an asphalt hot box or other means, it's possible to transport asphalt for several hours. There are asphalt manufacturers in surrounding areas that have an EPD. For example, Texas Materials – Central Texas Area, Laredo

AMENDMENT 1 – Kika De La Garza Land Port of Entry Border Roadway Improvement and Construction (BRIC), Pharr, TX , RFP No. 47PH0825R0001

Plant at 119 Interstate 35 Frontage Road, Laredo, TX 78045 More information can be found at the National Asphalt Pavement Association (NAPA) Emerald Eco-label EPD program website, https://www.asphaltpavement.org/programs/napa-programs/emerald-eco-label and https://asphaltepd.org/published/all?state=TX .

4. III.H. Administrative Matters

(1) Project Meetings. The Contractor shall attend a preconstruction conference and shall participate in regularly scheduled Project meetings.

(2) Payments. FAR clause 52.232-5, Payments under Fixed-Price Construction Contracts, is supplemented by GSAR 552.232-5 Payments under Fixed-Price Construction Contracts located in Section IV.A. of this Agreement. In accordance with the relevant FAR and GSAR clauses, GSA requires the following data be included with each invoice:

(a) Invoices shall be submitted electronically to the designated billing office specified in this Contract or in individual delivery/work orders. An electronic copy of the invoice shall be sent to the CO and COR as designated after award.

(b) Invoices must include the Account Document Number (ADN) assigned at award.

(c) The Contractor shall submit the following information or documentation with each invoice:

(i) Updated Schedule of Values upon which the payment request is based;

(ii) GSA Form 2419 - Certification of Progress Payments Under Fixed-Price Construction Contract;

(iii) The payment terms that apply for the particular services rendered

(iv) Additional documentation as instructed: GSA 1413, Certified Payrolls (WH347), AiA G702 and G703, GSA 184 a & b, and GSA 1142 (Final Payment)

5. See attached updated Wage Determination for TX20240255, dated November 22, 2024. Wage Determination TX20240003, remains unchanged.

https://www.google.com/maps/search/119+Interstate+35+Frontage+Road,+Laredo,+TX+78045?entry=gmail&source=g https://www.asphaltpavement.org/programs/napa-programs/emerald-eco-label https://asphaltepd.org/published/all?state=TX

SECTION 01 29 00 - PAYMENT PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

A. This Section specifies administrative and procedural requirements necessary to prepare and to process Requests for Payment.

1.2 DEFINITIONS

A. Schedule of Values: A detailed written statement (masterformat/uniformat) furnished by the Contractor outlining the portions of the contract sum, which allocates values (price & percentage) for the various parts of the work and used as the basis for payment application and reviewing progress payments. The Agreement provides further details.

B. Request for Payment: A contractor’s invoice and request for progress payment with substantiating information consistent with approved schedule of values.

1.3 SCHEDULE OF VALUES

A. Coordination: Submit completed Schedule of Values no later than [14] calendar days prior to scheduled date of initial Requests for Payment.

B. Schedules for Phased Work: Where the work is separated into phases, provide Schedules showing values correlated with each phase using the standard format referenced below.

C. Format and Content: Contractor shall be responsible to complete the GSA Schedule of Values Workbook and compile the values into GSA’s Project Management System. Contractor will enter values into the workbook prior to GSA’s Project Management System input and provide associated electronic baseline copy to the contracting officer for record. Contractor will follow guidelines in the Schedule of Values workbook to support GSA’s Project Management System upload.

1. Identification: Complete the following Project Identification fields in the Schedule of Values:

a. Project Name

b. Project Number

c. Project Location, City, State

d. Base Contract Number

e. Task Order Number

f. Modification Number

g. GSA Project Manager

h. Contractor's Name and contact information

i. Date of submittal

2. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Requests for Payment and progress reports.

Kika De La Garza (Pharr) Land Port of Entry Pharr, Texas Kahua #350

October 2023 PAYMENT PROCEDURES 01 29 00 - page 2 of 5

a. Work activity – (by division or specific work activity)

b. Dollar value of each specific work activity – both with an amount in dollars and whole cents, and as a percentage of the Contract Sum to nearest one-hundredth percent.

Adjust the amounts to total to the Contract Sum and the percentages to total 100 percent.

c. Each item in the schedule of values and Requests for Payment shall be complete.

Include total cost and proportionate share of general overhead and profit for each item.

(i.e. no stand-alone item for Overhead, and Profit)

d. Modifications that affect value.

e. Update affected work branches and subordinate line items and

f. resubmit the schedule of values before the next Request for Payment when Modifications result in a change in the Contract Sum

g. Line item for mobilization and demobilization

h. Line item for close out (% to be negotiated with GSA COR)

3. Options: Provide a separate Schedule of Values for each exercised Option.

4. Each item in the Schedule of Values and Requests for Payment shall be complete. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the schedule of values or distributed as general overhead expense, at the government's option.

5. Revise and update workbook in GSA’s Project Management System with all items affecting scope, schedule or cost and resubmit within 14 calendar days as coordinated with project manager or contracting officer. Contractor shall provide a final as-built schedule at project completion.

Update affected work branches and subordinate line items and resubmit the schedule of values before the next Request for Payment when Modifications result in a change in the Contract Sum.

1.4 REQUESTS FOR PAYMENT

A. Requirements for Requests for Payment are in Section III, Terms and Conditions of the Agreement.

B. Provide a completed IRA D&C Submittal: Contract Reporting Form reflecting any necessary updates with each monthly pay application.

C. Each Request for Payment following the initial Request for Payment shall be consistent with previous Requests.

1. Initial Request for Payment, Request for Payment at time of Substantial Completion, and final Request for Payment involve additional requirements.

D. Payment Request Times: Submit Request for Payment to GSA by the 5th of the month. The period covered by each Request for Payment is one month, ending on the 30th.

1. Submit one electronic draft copy of Request for Payment to the CO or enter in GSA’s Project Management System (Kahua) along with construction progress report seven (7) days prior to the due date for review by GSA. Provide documentation evidencing the cost of work performed to be included in the Request for Payment. Resolve questions resulting from GSA review of draft Request for Payment and construction progress report prior to submitting Request for Payment.

PAYMENT PROCEDURES 01 29 00 - page 3 of 5

E. Request Preparation: All payments must be executed by a person authorized to legally bind the Contractor.

1. Entries shall match data on the schedule of values and Contractor's construction schedule. Use updated schedules if revisions were made.

2. Include amounts for work completed following the effective date of the previous

Request for Payment, whether or not payment has been received. Include only amounts for work completed as of effective date of current Request for Payment.

3 Include amounts of Modifications issued before the last day of the construction period covered by Request.

F. Stored Materials: Differentiate between items stored on-site and items stored off-site.

1. Provide certificate of insurance, and consent of surety to payment, for stored materials.

2. Provide supporting documentation that verifies the amount requested, such as paid invoices. Match amount requested with amounts indicated on documentation.

3. Provide summary documentation for stored materials indicating the following:

a. Value of materials previously stored and remaining stored as of the effective date of previous Request for Payment.

b. Value of previously stored materials put in place after the effective date of previous Request for Payment and on or before the effective date of the current Request for Payment.

c. Value of materials stored since effective date of previous Request for Payment and remaining stored as of effective date of current Request for Payment.

B. Initial Request for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Request for Payment include the following:

1. List of subcontractors.

2. Schedule of values.

3. Contractor's construction schedule per Agreement (startup if not final).

4. Products list (preliminary if not final).

5. Sustainable design submission for project materials cost data.

6. Sustainable design action plans.

7. Schedule of unit prices.

8. Submittal schedule (preliminary if not final).

9. List of Contractor's staff assignments.

10. List of Contractor's principal consultants.

11. Copies of authorizations and licenses from authorities having jurisdiction for performance of the Work.

12. Initial progress report.

PAYMENT PROCEDURES 01 29 00 - page 4 of 5

13. Report of preconstruction conference.

G. Certified Payroll: Submit electronic copies of certified payroll and worker-hour report forms, including individual forms for subcontractors of any tier, to the CMa via PMIS. Report form shall include at -site certified payroll and worker-hour information. Even if no work was performed by contractor or subcontractor during reporting period, certified payroll and worker-hour report form shall be submitted for contractors and subcontractors of any tier stating that no work was performed

H. Request for Payment at Substantial Completion: After GSA issues the Notice of Substantial Completion, submit a Request for Payment less previous payments made for portions of the Work claimed as substantially complete.

1. Include documentation supporting the claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum.

2. This Request shall reflect Notices of Substantial Completion issued previously for GSA occupancy of designated portions of the Work.

I. Final Payment Request:

1. Submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:

a. Evidence of completion of Project closeout requirements.

b. Completion of items specified for completion after Substantial Completion.

c. Insurance certificates for products and completed operations where required and proof that taxes, fees, and similar obligations were paid.

d. Updated final statement, accounting for final changes to the Contract Sum.

e. GSA 1142 – Release of Claims Form

f. GSA 2419 Certification of Progress Payments Form

g. 1413 Statement and Acknowledgement

h. Evidence of having returned GSA issued PIV cards

i. Final meter readings for utilities, a measured record of stored fuel, and similar data as of date of Substantial Completion or when CO took possession of and assumed responsibility for corresponding elements of the work.

j. Transmittal of required Project construction records to Contracting Officer.

k. Final As-Built Record Drawings

l. Removal of temporary facilities and services.

m. Removal of surplus materials, rubbish, and similar elements.

2. Issuance of Certificate for Payment will constitute representations made separately by the CMa to the CO - based on their individual observations at Site and data comprising Application for Payment - that work has progressed to point indicated and that - to the best of Construction Manager's knowledge, information, and belief - quality of work is in accordance with Contract Documents.

PAYMENT PROCEDURES 01 29 00 - page 5 of 5

J. Foregoing representations are subject to evaluation of work for conformance with Contract Documents upon Substantial Completion, to results of subsequent tests and inspections, to minor deviations from Contract Documents correctable prior to completion, and to specific qualifications expressed by CMa.

K. Issuance of Certificate for Payment will further constitute representation that Contractor is entitled to payment in amount certified. However, issuance of Certificate for Payment will not be representation that the CMa has:

1. Made exhaustive or continuous on-site inspections to check quality or quantity of work.

2. Reviewed construction means, methods, techniques, sequences or procedures.

3. Reviewed copies of requisitions received from subcontractors and material suppliers and other data requested by Contracting Officer to substantiate Contractor's right to payment.

4. Made examination to ascertain how or for what purpose the Contractor has used money previously paid on account of Contract Sum.

L. The CMa may decide not to certify payment and may withhold Certificate for Payment in whole or in part, to extent reasonably necessary to protect the Government, if in CMa's opinion representations to CO required in above paragraph cannot be made. If the CMa is unable to certify payment in amount of Application, CMa will notify Contractor and CO in writing of CMa's reasons for withholding certification in whole or in part. If Contractor and CMa cannot agree on a revised amount, the CMa will promptly issue Certificate for Payment for the amount for which the CMa is able to make such representations to the CO.

M. The CMa may also decide not to certify payment or, because of subsequently discovered evidence or subsequent observations, may nullify whole or part of Certificate for Payment previously issued, to such extent as may be necessary in the CMa's opinion to protect the CO from loss because of:

1. Defective work not remedied.

2. Third party claims filed or reasonable evidence indicating probable filing of such claims.

3. Failure of Contractor to make payments properly to Subcontractors or for labor, materials, or equipment.

4. Reasonable evidence that work cannot be completed for unpaid balance of Contract Sum.

5. Damage to Contracting Officer or another contractor.

6. Reasonable evidence that work will not be completed within the Contract Time and that unpaid balance would not be adequate to cover actual or liquidated damages for anticipated delay.

7. Persistent failure to carry out work in accordance with the Contract Documents.

N. Neither CO or designated representative nor CMa shall have obligation to pay or to see to payment of money to a Subcontractor except as may otherwise be required by law.

2. PRODUCTS (Not Used)

3. EXECUTION (Not Used)

END OF SECTION 01 29 00

SECTION 01 33 00 - SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

A. This Section includes certain administrative and procedural requirements for shop drawings, coordination drawings, schedules, samples and certain other quality assurance submittals.

B. This section does not include requirements and timelines for the following submittals that are included in their respective sections:

1. Inspection and test reports specified in GSA FY23 01 40 00 QUALITY ASSURANCE & QUALITY

CONTROL REQUIREMENTS.

2. Warranties specified in GSA FY23 01 60 00 PRODUCT REQUIREMENTS.

3. Closeout submittals specified in GSA FY23 01 77 00 CLOSEOUT PROCEDURES.

4. Record documents specified in GSA FY23 01 78 10 PROJECT RECORD DOCUMENTS.

5. Operation, maintenance and instruction manuals specified in GSA FY23 01 78 22 OPERATION and MAINTENANCE DOCUMENTATION.

6. Reports, schedules and other submittals specified in GSA FY23 01 32 00 CONSTRUCTION

PROGRESS DOCUMENTATION.

7. Construction Safety and Health Plan as described in GSA FY23 01 59 50 SAFETY and HEALTH.

8. Contractor's Hazard Communication Plan (HCP) as described in GSA FY23 01 59 50 SAFETY and HEALTH.

9. Waste Management Plan as described in GSA FY23 01 31 00 PROJECT MANAGEMENT & COORDINATION and GSA FY23 01 74 19 CONSTRUCTION NONHAZARDOUS WASTE

MANAGEMENT & DISPOSAL.

10. Contractor's Quality-Control Plan as described in GSA FY23 01 40 00 QUALITY ASSURANCE &

QUALITY CONTROL REQUIREMENTS.

11. Cutting and Patching Plan as described in GSA FY23 01 73 10 CUTTING & PATCHING.

C. Shop drawings, coordination drawings and schedules are further categorized and defined as follows:

1. Shop drawings include drawings and schedules prepared for specific parts of the project, except for coordination drawings.

2. Coordination drawings are specified in GSA FY23 01 31 00 PROJECT MANAGEMENT &

COORDINATION.

3. Product data includes manufacturer's standard catalogs, pamphlets and other printed materials that show and describe materials and items, and includes but is not limited to the https://docs.google.com/document/d/1I7UEpr13Mukxuvt8ipwEDhu41WHJhL4McNHaHQwp6fA/edit#heading=h.gr4lybxa5rc3 https://docs.google.com/document/d/1I7UEpr13Mukxuvt8ipwEDhu41WHJhL4McNHaHQwp6fA/edit#heading=h.gr4lybxa5rc3 https://docs.google.com/document/d/1yV_uSxGEi5osvSzaplZYiFTUlTADgBRQJm8_bYIq2Wg/edit#heading=h.su6cy8ntqx37 https://docs.google.com/document/d/18SxnzcXRpHEQT_7IdN1e5voH_5XJ9xCrbXw7z8eeyqQ/edit https://docs.google.com/document/d/1UpLb5Gy8L4l3bSSyMvMo2RglzvfG-lCuoCTRbi59l4Q/edit#heading=h.h2wbq7h6lxje https://docs.google.com/document/d/1Xo5WL-EWDKH0vS1M2hb4RJGQ629AFKFZT6Q7fF_4UxE/edit https://docs.google.com/document/d/1Xo5WL-EWDKH0vS1M2hb4RJGQ629AFKFZT6Q7fF_4UxE/edit https://docs.google.com/document/d/106eKHRtdHw7uspB2Upxn4WHhrimVBlPI9aqPdyNjeTs/edit#heading=h.c98fl1vjdjqa https://docs.google.com/document/d/106eKHRtdHw7uspB2Upxn4WHhrimVBlPI9aqPdyNjeTs/edit#heading=h.c98fl1vjdjqa https://docs.google.com/document/d/1Iu0_uhiS7kQ-sDcJberfSqSUXLkMBn-sKKdrV71xdUo/edit#heading=h.d4stvmaw2v3q https://docs.google.com/document/d/1Iu0_uhiS7kQ-sDcJberfSqSUXLkMBn-sKKdrV71xdUo/edit#heading=h.d4stvmaw2v3q https://docs.google.com/document/d/1Iu0_uhiS7kQ-sDcJberfSqSUXLkMBn-sKKdrV71xdUo/edit#heading=h.d4stvmaw2v3q https://docs.google.com/document/d/1yskqQGjz0fEJYPg42DtQWsmfj2RP4iAIsMaVAqck4IE/edit#heading=h.k8q7qkmpzv8n https://docs.google.com/document/d/1yskqQGjz0fEJYPg42DtQWsmfj2RP4iAIsMaVAqck4IE/edit#heading=h.k8q7qkmpzv8n https://docs.google.com/document/d/1Nep0qW26K-p2xElEcxj-QrrqoLmvgkNzryWAlZbRaBg/edit#heading=h.6huqsft7k8xg https://docs.google.com/document/d/1Nep0qW26K-p2xElEcxj-QrrqoLmvgkNzryWAlZbRaBg/edit#heading=h.6huqsft7k8xg https://docs.google.com/document/d/1I7UEpr13Mukxuvt8ipwEDhu41WHJhL4McNHaHQwp6fA/edit#heading=h.gr4lybxa5rc3 https://docs.google.com/document/d/1I7UEpr13Mukxuvt8ipwEDhu41WHJhL4McNHaHQwp6fA/edit#heading=h.gr4lybxa5rc3 https://docs.google.com/document/d/1-nporn2q5Sg3bAPmBzQP_iZkgmQxsFZYkNk491X4Ybs/edit#heading=h.icbiznx4ek42 https://docs.google.com/document/d/1yskqQGjz0fEJYPg42DtQWsmfj2RP4iAIsMaVAqck4IE/edit#heading=h.k8q7qkmpzv8n https://docs.google.com/document/d/1yskqQGjz0fEJYPg42DtQWsmfj2RP4iAIsMaVAqck4IE/edit#heading=h.k8q7qkmpzv8n

Submittal Procedures 01 33 00 - 2 following:

a. Product specifications.

b. Installation instructions.

c. Rough-in diagrams and templates.

d. Mill reports.

D. Samples of actual materials and items shall be provided at such scale to allow delivery for review, as well as for field samples or mock-ups of full-size physical examples erected on-site or elsewhere, to establish a true-scale standard by which the corresponding work will be judged or a standard for compliance testing.

E. Other quality assurance submittals include materials specifically prepared for the project, except drawings and schedules, and include but are not limited to the following:

1. Design data and calculations.

2. Certifications of compliance or conformance.

3. Manufacturer's instructions and field reports.

F. Approvals do not supersede requirements of the contract documents.

1.2 GENERAL SUBMITTAL REQUIREMENTS

A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities and with the Submittal Schedule specified in GSA FY23 01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION. Unless otherwise specified, submittals shall be transmitted via GSA’s electronic Project Management (GSA’s Project Management System) system as PDF electronic files to GSA according to the contractor’s approved construction schedule and submittal schedule. Transmit each submittal sufficiently in advance of the scheduled performance of related construction activities to avoid delaying the Work, allowing for the review times specified for submittals.

1. Coordinate each submittal with other submittals and related activities that require sequential scheduling, to allow for testing, purchase, fabrication and product delivery in a timely manner.

2. Schedule transmittal of different categories of submittals for the same element of Work and for different elements of related parts of the Work at the same time. Notwithstanding the foregoing sentence, the Contractor shall provide a complete submittal package for each Division of the specification so as to enable the Government to review the related sections together. Coordinate submittals to enable approvals and acceptances so as not to inhibit orderly progress of the Work.

3. Post electronic submittals as PDF electronic files directly to the GSA’s Project Management System specifically established for the Project. GSA will return an annotated file. Annotate and retain one copy of file as an electronic project record document file.

https://docs.google.com/document/d/106eKHRtdHw7uspB2Upxn4WHhrimVBlPI9aqPdyNjeTs/edit#heading=h.c98fl1vjdjqa https://docs.google.com/document/d/106eKHRtdHw7uspB2Upxn4WHhrimVBlPI9aqPdyNjeTs/edit#heading=h.c98fl1vjdjqa

Submittal Procedures 01 33 00 - 3

4. Allow sufficient time for submittal review, corrections following the initial review, and re-submittal review before activities scheduled after the submittal approval.

5. Failure on the part of the Contractor to indicate approval or acceptance on submittals prior to submission to Contracting Officer will result in their being returned to the Contractor without being acted upon.

6. Any resubmission required after Government review shall be made within 10 calendar days after return of the submittal, unless specifically authorized otherwise by GSA.

7. Submittals which are determined to be incomplete or otherwise substandard will be returned to the Contractor with no further review. Delays due to incomplete or rejected submittals will not be excused.

8. Construction will not be allowed to proceed if submittals are not received in a timely manner, and will not result in an extension to the Contractor's Construction Schedule.

9. Failure by the Contractor to provide the required submittals in a timely manner may result in withheld payments until submittals are up-to-date.

10. Maintain one complete set of submittals at project site.

11. Maintain an organized submittal register at project site. This will be an agenda item for progress meetings.

12. The contractor to schedule and allow a minimum of ten working days for the Architect/Engineer submittal review. The comment period initiates upon the receipt of the submission by the office performing the primary review. The period commences upon issue of the submittal by the office performing the primary review. In the event the architect/engineer receives an extraordinary lengthy or complex submittal whose review may not be able to be accomplished within the stipulated submittal review period, architect/engineer to notify the Construction Manager Agency (CMa) in writing with a request for extended review period within 3 working days of receipt of the submittal. Such submittals may include structural steel, curtain wall, or complex systems requiring coordination with other systems.

B. Submittal Identification and Information: Identify and incorporate information in each electronic submittal file as follows:

1. Assemble each submittal item into a single indexed file incorporating submittal requirements of a single Specification Section and transmittal form with links enabling navigation to each submittal item.

2. Name file with submittal number or other unique identifier, including revision identifier.

a. File name shall use Contract number and Specification Section number followed by a decimal point and then a sequential number (e.g., LNHS-061000.01). Re-submittals shall include an alphabetic suffix after another decimal point (e.g., LNHS- 061000.01.A).

3. Provide means for insertion to permanently record Contractor's review and approval markings

Submittal Procedures 01 33 00 - 4 and action taken by GSA.

4. Transmittal Form for Electronic Submittals: Use software-generated form from electronic project management software acceptable to GSA. (Kahua)

a. Project name.

b. GSA project number.

c. Date.

d. Name and address of Architect.

e. Name of Contractor.

f. GSA contract number.

g. Name of firm or entity that prepared the submission.

h. Names of subcontractor, manufacturer, and supplier.

i. Category and type of submittal.

j. Submittal purpose and description.

k. Specification Section number and title.

l. Specification paragraph number or drawing designation and generic name for each of multiple items.

m. Drawing number and detail references, as appropriate.

n. Location(s) where product is to be installed, as appropriate.

o. Related physical samples submitted directly.

p. Indication of full or partial submission.

q. Transmittal number, numbered consecutively.

r. Submittal and transmittal distribution record.

s. Other necessary identification.

5. Include the following information as keywords in the electronic file metadata:

a. Project name.

b. GSA project number.

c. Contract number.

Submittal Procedures 01 33 00 - 5

d. Number and title of appropriate Specification Section.

e. Specification paragraph number and generic name of each item.

f. Manufacturer name.

g. Product name and model number.

1.3 SHOP DRAWINGS AND COORDINATION DRAWINGS

A. Submit originally prepared information, drawn accurately to scale. Do not reproduce Contract Documents or copy standard printed materials as the basis for Shop Drawings and Coordination Drawings.

B. Include at minimum the following information on Shop Drawings and Coordination Drawings:

1. Dimensions.

2. Identification of products and materials.

3. Compliance with specified standards.

4. Notation of coordination requirements.

5. Notation of dimensions established by field measurements.

6. Highlighted or circled deviations from the Contract Documents.

C. Sheet size: Except for templates, patterns and similar full-size drawings, submit Shop Drawings and Coordination Drawings on sheets of at least 8-1/2 by 11 inches but no larger than 30 by 40 inches.

D. Submittals: Unless otherwise indicated, submit one electronic file (.pdf) of each drawing submission through GSA’s Project Management System. The file will be marked with action taken and returned.

E. Distribution: When submittal is approved or accepted, Contractor shall prepare final electronic files, for the following purposes.

1. One file shall be marked and retained as a "Record Document."

2. Unless otherwise requested, one file shall be provided to the Contracting Officer.

3. Additional prints shall be provided to the entities involved in the construction.

4. Prints will be included in the Operation and Maintenance manuals.

1.4 PRODUCT DATA

A. Collect Product Data into a single submittal for each system or element of construction. Mark each copy to show specific product choices and options applicable to the project. Product Data shall include the following

Submittal Procedures 01 33 00 - 6 information, where applicable:

1. Manufacturer's printed recommendations.

2. Compliance with recognized trade association standards.

3. Compliance with recognized testing standards.

4. Applicability of testing agency labels and seals.

5. Notation of dimensions verified for fit by field measurements.

6. Notation of coordination requirements.

B. Preliminary Submittal: Prior to submission of complete Product Data, submit a preliminary single copy of that part of Product Data when selection of options is required, such as for color charts. Preliminary submittal will be returned, with selection noted, for the Contractor's use in subsequent submittals.

C. Submittals: Unless otherwise indicated, submit one electronic copy of each Product Data submittal. One original copy will be retained, and a copy will be marked with action taken and returned to the contractor.

D. Distribution: When submittal is approved or accepted, Contractor shall distribute copies for the following purposes:

1. One copy shall be marked and retained as a "Record Document."

2. Additional copies shall be provided to the manufacturers, subcontractors, suppliers, installers, governing authorities and others as required for performance of the applicable construction activities.

3. Copies required for operation and maintenance manuals

1.5 SAMPLES

A. Submit full-size, fully fabricated samples, cured and finished in the manner specified. Samples shall be physically identical to the material or product proposed for use.

B. Mount, display, or package samples to facilitate review of kind, color, pattern, texture and other qualities indicated, as a final check of these characteristics with other elements and for comparison of these characteristics with those of the actual component delivered and installed.

C. Where variation in color, pattern, texture or other characteristic is inherent in the material or product, submit at least 3 multiple units that show approximate limits of the variations.

D. Refer to other specification sections for requirements for samples that illustrate workmanship, fabrication techniques, and details of assembly, connections, operations and similar construction characteristics.

E. Refer to other specification sections for samples to be returned to the Contractor for incorporation in the Work. Such samples must be in undamaged condition at time of use.

Submittal Procedures 01 33 00 - 7

F. Preliminary Submittal: Where color, pattern, texture or similar characteristics are specified to be selected from a manufacturer's range of standard choices, submit a preliminary single set sample of available choices prior to submission of the complete sample. Preliminary submittal will be returned, with selection noted, for the Contractor's use in subsequent submittals.

G. Submittals: Unless otherwise indicated and except for field samples or mock-ups of full-size physical examples erected on-site or elsewhere, submit not less than two (2) of each sample submittal. One copy will be marked with action taken and returned. Comply with requirements in the individual specification section for field samples and mockups.

H. Distribution: Except for field samples or mockups, when submittal is approved, Contractor shall distribute approved copies for the following purposes:

1. One copy shall be marked and retained as a "Record Document" at the Project Site, and shall be available for comparison throughout the course of construction activity.

2. Additional copies shall be provided to manufacturers, subcontractors, suppliers, installers, governing authorities and others as required for performance of the applicable construction activities.

1.6 OTHER QUALITY CONTROL SUBMITTALS

A. Submit other quality control submittals in compliance with requirements in the individual specification sections, including Division 1.

B. Certifications: Submit notarized certifications indicating compliance with specified requirements.

Certifications shall be signed by an individual authorized to sign on behalf of the Contractor.

C. IRA Submittal Instructions for Projects Requiring LEC Construction Materials:

1. Environmental product declaration (EPD) compliant with the Compliance Documentation criteria listed for each IRA-Eligible Material in GSA’s asphalt, concrete (and cement), glass and steel requirements;

2. EPD-reported GWP, in kilograms of carbon dioxide equivalent [kgCO2e] per unit of material;

3. Product category rule (PCR) identified on the EPD;

4. IRA Limit Commitment specified in the Contract;

5. Total quantity being installed (e.g., from bill of materials); and

6. For concrete, cement, steel, and glass: (i) the ENERGY STAR Energy Performance Score(s) for plants producing supply chain materials: cement, steel from integrated steel mills, or flat glass; (ii) the manufacturing plant name(s) and location(s); and (iii) the data period of the Energy Performance Score(s) at the time of purchase. Please see “How to Request an ENERGY STAR Energy Performance Score” for more information.

https://www.gsa.gov/system/files/Asphalt%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Concrete%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Glass%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Steel%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Steel%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://docs.google.com/document/d/1SuEU2wh_1UlJoy9EMdrWk4Jx2AeyvMkTtm7gntKB43M/edit#bookmark=id.fghxylk8ewwg https://www.gsa.gov/cdnstatic/Interim%20IRA%20LEC%20Material%20Requirements%20-%20used%20in%20Pilot%20May%202023%2005162023.pdf https://www.gsa.gov/cdnstatic/Interim%20IRA%20LEC%20Material%20Requirements%20-%20used%20in%20Pilot%20May%202023%2005162023.pdf

Submittal Procedures 01 33 00 - 8

1.7 REVIEW ACTION ON SUBMITTALS

A. For electronic submittals:

1. Submit electronic submittals via GSA’s Project Management System as PDF electronic files.

a. GSA will return an annotated file. Annotate and retain one copy of file as an electronic Project record document file.

B. Compliance with specified characteristics is the Contractor's responsibility and is not part of the Contracting Officer's review and indication of action taken.

The contract documents shall prevail in case of review action conflict.

C. Submittals without approval or acceptance shall not be used.

D. Action Stamp:

1. For paper or non-electronic submittal: Each submittal will be stamped with a uniform action stamp. The stamp shall be marked to indicate one of the following actions taken:

a. For electronic submittal: Provide a digital signature with digital certificate on electronically submitted certificates and certifications where indicated. For notarized signature if required, provide paper copies for signature.

b. Final Unrestricted Release: Where marked "Approved" or "Accepted", the work covered by the submittal may proceed, provided it complies with the requirements of the Contract Documents.

c. Final But Restricted Release: Where marked "Approved " or "Accepted" "As Noted", the work covered by the submittal may proceed, provided it complies with the notations or corrections on the submittal and with the requirements of the Contract Documents.

d. Return for Re-submittal: Where marked "Not Approved" or "Not Accepted", ``Revise and Resubmit", do not proceed with the work covered by the submittal, including purchasing, fabrication, delivery or any other activity. Revise or prepare a new submittal according to the notations on the submittal or on the return transmittal.

Resubmit without delay, repeating as necessary to obtain a final release action mark.

e. No Action: Where a submittal is for the record or for information or for another purpose not requiring review action, the submittal may not be returned or may be returned and marked "Action Not Required."

E. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submission because standard published data are not suitable for use, submit as Shop Drawings, not as Product Data.

Submittal Procedures 01 33 00 - 9

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information as applicable:

a. Manufacturer's catalog cuts.

b. Manufacturer's product specifications.

c. Statement of compliance with specified referenced standards.

d. Testing by a recognized testing agency.

e. Application of testing agency labels and seals.

f. Notation of coordination requirements.

g. Availability and delivery time information.

4. For equipment, include the following in addition to the above, as applicable:

a. Clearances required to other construction, if not indicated on accompanying Shop Drawings.

5. Submit Product Data before or concurrent with Samples.

6. Submit Product Data in the following format:

a. PDF electronic file.

1.8 SUBSTITUTION REQUEST PROCEDURES

A. Substitution Requests: Refer to GSA FY23 01 25 00 SUBSTITUTION PROCEDURES.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not applicable)

END OF SECTION 01 33 00

https://docs.google.com/document/d/1bD_AZPOW11uyzwZjzdk7y5wdVHza8COsiH3TsVrVoYg/edit#heading=h.gjdgxs

"General Decision Number: TX20240255 11/22/2024

Superseded General Decision Number: TX20230255

State: Texas

Construction Type: Building

County: Hidalgo County in Texas.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2024 1 08/23/2024

2 11/22/2024

BOIL0074-003 07/01/2023

Rates Fringes

BOILERMAKER......................$ 37.00 24.64

ENGI0178-005 06/01/2020

Rates Fringes

POWER EQUIPMENT OPERATOR

(1) Tower Crane.............$ 32.85 13.10

(2) Cranes with Pile Driving or Caisson Attachment and Hydraulic Crane 60 tons and above.....$ 28.75 10.60

(3) Hydraulic cranes 59 Tons and under..............$ 32.35 13.10

* IRON0084-011 06/01/2024

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 28.26 8.13

PLUM0412-004 01/02/2024

Rates Fringes

PLUMBER..........................$ 40.74 15.35

* SUTX2014-031 07/21/2014

Rates Fringes

BRICKLAYER.......................$ 16.17 ** 0.00

CARPENTER........................$ 14.21 ** 2.22

CEMENT MASON/CONCRETE FINISHER...$ 12.46 ** 0.00

ELECTRICIAN......................$ 18.44 4.53

INSULATOR - MECHANICAL

(Duct, Pipe & Mechanical System Insulation)...............$ 11.54 ** 2.17

IRONWORKER, REINFORCING..........$ 12.01 ** 0.00

IRONWORKER, STRUCTURAL...........$ 15.04 ** 4.34

LABORER: Common or General......$ 8.00 ** 0.00

LABORER: Mason Tender - Brick...$ 10.00 ** 0.00

LABORER: Mason Tender - Cement/Concrete..................$ 10.89 ** 0.96

LABORER: Pipelayer..............$ 11.00 ** 3.47

LABORER: Roof Tearoff...........$ 10.06 ** 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 14.04 ** 1.01

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 13.93 ** 0.00

OPERATOR: Bulldozer.............$ 18.29 1.31

OPERATOR: Drill.................$ 16.22 ** 0.34

OPERATOR: Forklift..............$ 14.83 ** 0.00

OPERATOR: Grader/Blade..........$ 10.00 ** 0.00

OPERATOR: Loader................$ 12.87 ** 0.70

OPERATOR: Mechanic..............$ 17.00 ** 0.00

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 16.03 ** 0.00

OPERATOR: Roller................$ 12.70 ** 0.00

PAINTER (Brush, Roller, and Spray)...........................$ 11.27 ** 0.00

PIPEFITTER.......................$ 15.22 ** 3.16

ROOFER...........................$ 11.42 ** 0.00

SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 18.40 2.12

SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 21.13 6.53

TILE FINISHER....................$ 11.22 ** 0.00

TILE SETTER......................$ 12.15 ** 0.00

TRUCK DRIVER: Dump Truck........$ 12.39 ** 1.18

TRUCK DRIVER: Flatbed Truck.....$ 19.65 8.57

TRUCK DRIVER: Semi-Trailer Truck............................$ 12.50 ** 0.00

TRUCK DRIVER: Water Truck.......$ 12.00 ** 4.11

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .