Pharr LPOE Bid Sheet 2025 01 10.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Design Build Contract for Kika De La Garza Land Port of Entry (LPOE) Border Roadway Improvement and Construction (BRIC), Pharr, TX
Solicitation number
47PH0825R0001
Issued by

About this file

This is a bid sheet template for the Kika De La Garza Land Port of Entry (LPOE) Border Roadway Improvement and Construction project in Pharr, TX (RFP #47PH0825R0001). The template is structured to capture pricing for Low Embodied Carbon (LEC) materials across 23 different construction sites/options (CLINs 0001-0023), with separate line items for concrete, asphalt, and steel quantities measured in cubic yards and tons, plus additional CLINs for Division 1, Division 31 (Earthwork), and Division 32 (Exterior Improvements).

The project involves approximately 515,000 sf of concrete pavement repair/replacement using LEC materials and is set aside for small businesses under NAICS 237310 with a size standard of $45M. The construction magnitude is between $20-30 million with an anticipated duration of 460 calendar days. The work will be performed at 9901 S. Cage Blvd. Pharr, TX 78577-8650 and requires phased construction to maintain LPOE operations. The General Services Administration Public Buildings Service will award based on best value, with funding partially provided through the Inflation Reduction Act of 2022.

View the file

Other files

File Type Posted
Amendment 6 - 47PH0825R0001 2025 06 10.pdf PDF
Amendment 5 - 47PH0825R0001 2025 01 10.pdf PDF
Amendment 4 - 47PH0825R0001 2025 01 08.pdf PDF
Pharr LPOE Bid Sheet 2024 12 20.xlsx XLSX spreadsheet
Amendment 3 - 47PH0825R0001 2024 12 20.pdf PDF
Amendment 2 - 47PH0825R0001 2024 12 13.pdf PDF
Pharr LPOE Bid Sheet_12.10.24 (1).xlsx XLSX spreadsheet
Amendment 1 - 47PH0825R0001 2024 12 05.pdf PDF
12. Asphalt - GSA IRA Low Embodied Carbon Requirements (Dec. 2023).pdf PDF
3. Past Experience_Past Performance Questionnaire (Factor 2).pdf PDF
14. Bid Bond.pdf PDF
10. Concrete - GSA IRA Low Embodied Carbon Requirements (Dec. 2023).pdf PDF
15. IRA Project Submittal Form and Data Dictionary PDF.pdf PDF
Communications Plan Template LPOE project 03 22 posted version.docx DOCX document
6. GSA 527-21 - Contractor's Qualifications and Financial Informatio.pdf PDF
Pharr Div 01 Specs.pdf PDF
5. TX20240255 Building 2024 08 23.pdf PDF
2. Past Experience & Performance of Co Questionnaire Factor 1.pdf PDF
1. GSA Affiliated Custom Accounts (GACA) for Google Drive.pdf PDF
13. 2022.08.03 PHAR - Final Concepts Report_3_Rev-Redacted 10-8-24signed.pdf PDF
8. Award Allocation Form IRA.xlsx XLSX spreadsheet
FY2024 Metric Waiver FINAL.pdf PDF
5. TX20240003 Highway 2024 01 05.pdf PDF
9. Sample IRA Project Submittal_ Reporting Form.xlsx XLSX spreadsheet
7. Offeror Representations and Certifications Form Dec 2023 (1).pdf PDF
11. Steel - GSA IRA Low Embodied Carbon Requirements (Dec. 2023).pdf PDF
Pharr Solicitation 2024 11 22.pdf PDF
4. Factor 4 LEC Material IRA Sustainability Factor Table.xlsx XLSX spreadsheet
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COST SUMMARY

Low Embodied Carbon Materials
Pharr LPOE Cost Summary
GSA RFP Number - #47PH0825R0001
Pharr LPOE Price Proposal
DESCRIPTIONTOTAL
Base Scope
CLIN 0001 - IRA BASE SCOPE (Design)$ - 0
Construction
Option 1 - PORTRD1
CLIN 0002 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 2 - CIDOCKPK1
CLIN 0003 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 3 - CIDOCKPK2
CLIN 0004 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 4 - CIDOCKPK3
CLIN 0005 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 5 - CIDOCKRD1
CLIN 0006 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 6 - GANTRYRD1
CLIN 0007 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 7 - KENNELRD1
CLIN 0008 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 8 - POVSPK1
CLIN 0009 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 9 - POVSRD3
CLIN 0010 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 10 - KENNELPK1
CLIN 0011 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 11 - KENNELPK2
CLIN 0012 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 12 - POVPPK1
CLIN 0013 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 13 - ADMINPK1
CLIN 0014 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 14 - ADMINPK2
CLIN 0015 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 15 - CARGORD1
CLIN 0016 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 16 - COMMPRD1
CLIN 0017 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 17 - COMMSRD1
CLIN 0018 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 18 - COMMPRD2
CLIN 0019 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 19 - POVPRD1
CLIN 0020 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 20 - ADMINRD1
CLIN 0021 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 21 - FMCSAPK1
CLIN 0022 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0
Option 22 - FMCSARD1
CLIN 0023 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)
LEC Concrete$ - 0
LEC Asphalt$ - 0
LEC Steel$ - 0

CLIN 0024 - DIVISION 1 $ - 0

CLIN 0025 - DIVISION 31 $ - 0

CLIN 0026 - DIVISION 32 $ - 0

TOTAL EVALUATED PRICE $ - 0

Type or Print Name
Title
Signature
Firm Name
Date

IMPORTANT: This summary sheet shall include ALL costs (summary of) associated expenses for each line item (CLIN). Offerors shall include costs from the Base Scope & IRA Sheet in the numbers shown on this summary sheet.

BASE SCOPE & IRA

Low Embodied Carbon Materials
Kika De La Garza (Pharr) LPOE Paving
GSA RFP Number - #47PH0825R0001
Description
BASE SCOPE CLIN 0001 - (Design) IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALSCOST / TOTAL
Clin 0001 - DESIGN AND ASSOCIATED EXPENSESShown on Summary Sheet$ - 0$ - 0
IRA LEC OPTIONS (CONSTRUCTION) IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS
CLIN 0002 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 0002AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - PORTRD1C.Y$ - 0$ - 0$ - 0
Clin 0002AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - PORTRD1C.Y$ - 0$ - 0$ - 0
Clin 0002AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - PORTRD1Tons$ - 0$ - 0$ - 0
CLIN 0003 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 0003AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKPK1C.Y$ - 000
Clin 0003AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CIDOCKPK1C.Y$ - 000
Clin 0003AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CIDOCKPK1Tons$ - 000
CLIN 0004 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 0004AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKPK2C.Y$ - 0
Clin 0004AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CIDOCKPK2C.Y$ - 0
Clin 0004AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CIDOCKPK2Tons$ - 0
CLIN 0005 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 0005AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKPK3C.Y$ - 0
Clin 0005AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CIDOCKPK3C.Y$ - 0
Clin 0005AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CIDOCKPK3Tons$ - 0
CLIN 0006 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 0006AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKRD1C.Y$ - 0
Clin 0006AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CIDOCKRD1C.Y$ - 0
Clin 0006AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CIDOCKRD1Tons$ - 0
CLIN 0007 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 0007AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - GANTRYRD1C.Y$ - 0
Clin 0007AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - GANTRYRD1C.Y$ - 0
Clin 0007AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - GANTRYRD1Tons$ - 0
CLIN 0008 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 0008AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - KENNELRD1C.Y$ - 0
Clin 0008AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - KENNELRD1C.Y$ - 0
Clin 0008AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - KENNELRD1Tons$ - 0
CLIN 0009 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 009AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - POVSPK1C.Y$ - 0
Clin 009AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - POVSPK1C.Y$ - 0
Clin 009AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - POVSPK1Tons$ - 0
CLIN 0010 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 010AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - POVSRD3C.Y$ - 0
Clin 010AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - POVSRD3C.Y$ - 0
Clin 010AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - POVSRD3Tons$ - 0
CLIN 0011 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 011AA- LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - KENNELPK1C.Y$ - 0
Clin 011AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - KENNELPK1C.Y$ - 0
Clin 011AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - KENNELPK1Tons$ - 0
CLIN 0012 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 004AJ - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - KENNELPK2C.Y$ - 0
Clin 004AK - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - KENNELPK2C.Y$ - 0
Clin 004AL - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - KENNELPK2Tons$ - 0
CLIN 0013 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 013AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - POVPPK1C.Y$ - 0
Clin 005AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - POVPPK1C.Y$ - 0
Clin 005AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - POVPPK1Tons$ - 0
CLIN 0014 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 014AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - ADMINPK1C.Y$ - 0$ - 0$ - 0
Clin 014AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - ADMINPK1C.Y$ - 0$ - 0$ - 0
Clin 014AC- LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - ADMINPK1Tons$ - 0$ - 0$ - 0
CLIN 0015 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 015AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - ADMINPK2C.Y$ - 0
Clin 015AB- LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - ADMINPK2C.Y$ - 0
Clin 015AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - ADMINPK2Tons$ - 0
CLIN 0016 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 016AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CARGORD1C.Y$ - 0
Clin 016AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CARGORD1C.Y$ - 0
Clin 016AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CARGORD1Tons$ - 0
CLIN 0017 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 017AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - COMMPRD1C.Y$ - 0
Clin 017AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - COMMPRD1C.Y$ - 0
Clin 017AC- LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - COMMPRD1Tons$ - 0
CLIN 0018 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 018AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - COMMSRD1C.Y$ - 0
Clin 018AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - COMMSRD1C.Y$ - 0
Clin 018AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - COMMSRD1Tons$ - 0
CLIN 0019 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 006AG - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - COMMPRD2C.Y$ - 0
Clin 006AH - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - COMMPRD2C.Y$ - 0
Clin 006AI - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - COMMPRD2Tons$ - 0
CLIN 0020 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 020AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - POVPRD1C.Y$ - 0
Clin 020AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - POVPRD1C.Y$ - 0
Clin 020AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - POVPRD1Tons$ - 0
CLIN 0021 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 021AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES -ADMINRD1C.Y$ - 0
Clin 021AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - ADMINRD1C.Y$ - 0
Clin 021AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - ADMINRD1Tons$ - 0
CLIN 0022 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 022AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - FMCSAPK1C.Y$ - 0
Clin 022AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - FMCSAPK1C.Y$ - 0
Clin 022AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - FMSCAPK1Tons$ - 0
CLIN 0023 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION)QuantityUnitCOST / TOTAL
Clin 023AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - FMCSARD1C.Y$ - 0
Clin 023AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - FMCSARD1C.Y$ - 0
Clin 023AC- LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - FMSCARD1Tons$ - 0
Subtotal - Construction Quantities Costs
CLIN 0024COST / TOTAL
Clin 0024 - Division 1Shown on Summary Sheet
CLIN 0025COST / TOTAL
Clin 0025 - Div. 31 EarthworkShown on Summary Sheet
CLIN 0026COST / TOTAL
Clin 0026 - Div. 32 Exterior ImprovementsShown on Summary Sheet
Overhead0.00%$ - 0
Profit0.00%$ - 0
Subtotal - Overhead, Profit$
Bond0.00%$ - 0
Insurance0.00%$ - 0
Subtotal - Bond, Insurance$ - 0
Total Evaluated PriceShown on Summary Sheet
Type or Print Name
Title
Signature
Firm Name
Date