Pharr LPOE Bid Sheet 2025 01 10.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- 47PH0825R0001
About this file
This is a bid sheet template for the Kika De La Garza Land Port of Entry (LPOE) Border Roadway Improvement and Construction project in Pharr, TX (RFP #47PH0825R0001). The template is structured to capture pricing for Low Embodied Carbon (LEC) materials across 23 different construction sites/options (CLINs 0001-0023), with separate line items for concrete, asphalt, and steel quantities measured in cubic yards and tons, plus additional CLINs for Division 1, Division 31 (Earthwork), and Division 32 (Exterior Improvements).
The project involves approximately 515,000 sf of concrete pavement repair/replacement using LEC materials and is set aside for small businesses under NAICS 237310 with a size standard of $45M. The construction magnitude is between $20-30 million with an anticipated duration of 460 calendar days. The work will be performed at 9901 S. Cage Blvd. Pharr, TX 78577-8650 and requires phased construction to maintain LPOE operations. The General Services Administration Public Buildings Service will award based on best value, with funding partially provided through the Inflation Reduction Act of 2022.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COST SUMMARY
| Low Embodied Carbon Materials | |
| Pharr LPOE Cost Summary | |
| GSA RFP Number - #47PH0825R0001 | |
| Pharr LPOE Price Proposal | |
| DESCRIPTION | TOTAL |
| Base Scope | |
| CLIN 0001 - IRA BASE SCOPE (Design) | $ - 0 |
| Construction | |
| Option 1 - PORTRD1 | |
| CLIN 0002 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 2 - CIDOCKPK1 | |
| CLIN 0003 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 3 - CIDOCKPK2 | |
| CLIN 0004 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 4 - CIDOCKPK3 | |
| CLIN 0005 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 5 - CIDOCKRD1 | |
| CLIN 0006 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 6 - GANTRYRD1 | |
| CLIN 0007 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 7 - KENNELRD1 | |
| CLIN 0008 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 8 - POVSPK1 | |
| CLIN 0009 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 9 - POVSRD3 | |
| CLIN 0010 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 10 - KENNELPK1 | |
| CLIN 0011 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 11 - KENNELPK2 | |
| CLIN 0012 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 12 - POVPPK1 | |
| CLIN 0013 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 13 - ADMINPK1 | |
| CLIN 0014 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 14 - ADMINPK2 | |
| CLIN 0015 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 15 - CARGORD1 | |
| CLIN 0016 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 16 - COMMPRD1 | |
| CLIN 0017 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 17 - COMMSRD1 | |
| CLIN 0018 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 18 - COMMPRD2 | |
| CLIN 0019 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 19 - POVPRD1 | |
| CLIN 0020 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 20 - ADMINRD1 | |
| CLIN 0021 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 21 - FMCSAPK1 | |
| CLIN 0022 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
| Option 22 - FMCSARD1 | |
| CLIN 0023 - IRA QUANTITIES, ACQUISITION, INSTALLATION & OTHER ASSOCIATED EXPENSES FOR LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | |
| LEC Concrete | $ - 0 |
| LEC Asphalt | $ - 0 |
| LEC Steel | $ - 0 |
CLIN 0024 - DIVISION 1 $ - 0
CLIN 0025 - DIVISION 31 $ - 0
CLIN 0026 - DIVISION 32 $ - 0
TOTAL EVALUATED PRICE $ - 0
| Type or Print Name |
| Title |
| Signature |
| Firm Name |
| Date |
IMPORTANT: This summary sheet shall include ALL costs (summary of) associated expenses for each line item (CLIN). Offerors shall include costs from the Base Scope & IRA Sheet in the numbers shown on this summary sheet.
BASE SCOPE & IRA
| Low Embodied Carbon Materials | |||||
| Kika De La Garza (Pharr) LPOE Paving | |||||
| GSA RFP Number - #47PH0825R0001 | |||||
| Description | |||||
| BASE SCOPE CLIN 0001 - (Design) IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS | COST / TOTAL | ||||
| Clin 0001 - DESIGN AND ASSOCIATED EXPENSES | Shown on Summary Sheet | $ - 0 | $ - 0 | ||
| IRA LEC OPTIONS (CONSTRUCTION) IRA ACQUISITION AND INSTALLATION OF LOW EMBODIED CARBON MATERIALS | |||||
| CLIN 0002 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL | ||
| Clin 0002AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - PORTRD1 | C.Y | $ - 0 | $ - 0 | $ - 0 | |
| Clin 0002AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - PORTRD1 | C.Y | $ - 0 | $ - 0 | $ - 0 | |
| Clin 0002AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - PORTRD1 | Tons | $ - 0 | $ - 0 | $ - 0 |
| CLIN 0003 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL | ||
| Clin 0003AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKPK1 | C.Y | $ - 0 | 0 | 0 | |
| Clin 0003AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CIDOCKPK1 | C.Y | $ - 0 | 0 | 0 | |
| Clin 0003AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CIDOCKPK1 | Tons | $ - 0 | 0 | 0 |
| CLIN 0004 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 0004AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKPK2 | C.Y | $ - 0 | |
| Clin 0004AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CIDOCKPK2 | C.Y | $ - 0 | |
| Clin 0004AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CIDOCKPK2 | Tons | $ - 0 |
| CLIN 0005 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 0005AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKPK3 | C.Y | $ - 0 | |
| Clin 0005AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CIDOCKPK3 | C.Y | $ - 0 | |
| Clin 0005AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CIDOCKPK3 | Tons | $ - 0 |
| CLIN 0006 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 0006AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CIDOCKRD1 | C.Y | $ - 0 | |
| Clin 0006AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CIDOCKRD1 | C.Y | $ - 0 | |
| Clin 0006AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CIDOCKRD1 | Tons | $ - 0 |
| CLIN 0007 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 0007AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - GANTRYRD1 | C.Y | $ - 0 | |
| Clin 0007AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - GANTRYRD1 | C.Y | $ - 0 | |
| Clin 0007AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - GANTRYRD1 | Tons | $ - 0 |
| CLIN 0008 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 0008AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - KENNELRD1 | C.Y | $ - 0 | |
| Clin 0008AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - KENNELRD1 | C.Y | $ - 0 | |
| Clin 0008AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - KENNELRD1 | Tons | $ - 0 |
| CLIN 0009 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 009AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - POVSPK1 | C.Y | $ - 0 | |
| Clin 009AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - POVSPK1 | C.Y | $ - 0 | |
| Clin 009AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - POVSPK1 | Tons | $ - 0 |
| CLIN 0010 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 010AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - POVSRD3 | C.Y | $ - 0 | |
| Clin 010AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - POVSRD3 | C.Y | $ - 0 | |
| Clin 010AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - POVSRD3 | Tons | $ - 0 |
| CLIN 0011 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 011AA- LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - KENNELPK1 | C.Y | $ - 0 | |
| Clin 011AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - KENNELPK1 | C.Y | $ - 0 | |
| Clin 011AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - KENNELPK1 | Tons | $ - 0 |
| CLIN 0012 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 004AJ - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - KENNELPK2 | C.Y | $ - 0 | |
| Clin 004AK - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - KENNELPK2 | C.Y | $ - 0 | |
| Clin 004AL - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - KENNELPK2 | Tons | $ - 0 |
| CLIN 0013 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 013AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - POVPPK1 | C.Y | $ - 0 | |
| Clin 005AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - POVPPK1 | C.Y | $ - 0 | |
| Clin 005AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - POVPPK1 | Tons | $ - 0 |
| CLIN 0014 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL | ||
| Clin 014AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - ADMINPK1 | C.Y | $ - 0 | $ - 0 | $ - 0 | |
| Clin 014AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - ADMINPK1 | C.Y | $ - 0 | $ - 0 | $ - 0 | |
| Clin 014AC- LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - ADMINPK1 | Tons | $ - 0 | $ - 0 | $ - 0 |
| CLIN 0015 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 015AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - ADMINPK2 | C.Y | $ - 0 | |
| Clin 015AB- LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - ADMINPK2 | C.Y | $ - 0 | |
| Clin 015AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - ADMINPK2 | Tons | $ - 0 |
| CLIN 0016 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 016AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - CARGORD1 | C.Y | $ - 0 | |
| Clin 016AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - CARGORD1 | C.Y | $ - 0 | |
| Clin 016AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - CARGORD1 | Tons | $ - 0 |
| CLIN 0017 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 017AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - COMMPRD1 | C.Y | $ - 0 | |
| Clin 017AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - COMMPRD1 | C.Y | $ - 0 | |
| Clin 017AC- LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - COMMPRD1 | Tons | $ - 0 |
| CLIN 0018 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 018AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - COMMSRD1 | C.Y | $ - 0 | |
| Clin 018AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - COMMSRD1 | C.Y | $ - 0 | |
| Clin 018AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - COMMSRD1 | Tons | $ - 0 |
| CLIN 0019 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 006AG - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - COMMPRD2 | C.Y | $ - 0 | |
| Clin 006AH - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - COMMPRD2 | C.Y | $ - 0 | |
| Clin 006AI - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - COMMPRD2 | Tons | $ - 0 |
| CLIN 0020 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 020AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - POVPRD1 | C.Y | $ - 0 | |
| Clin 020AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - POVPRD1 | C.Y | $ - 0 | |
| Clin 020AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - POVPRD1 | Tons | $ - 0 |
| CLIN 0021 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 021AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES -ADMINRD1 | C.Y | $ - 0 | |
| Clin 021AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - ADMINRD1 | C.Y | $ - 0 | |
| Clin 021AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - ADMINRD1 | Tons | $ - 0 |
| CLIN 0022 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 022AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - FMCSAPK1 | C.Y | $ - 0 | |
| Clin 022AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - FMCSAPK1 | C.Y | $ - 0 | |
| Clin 022AC - LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - FMSCAPK1 | Tons | $ - 0 |
| CLIN 0023 - QUANITIES OF LOW EMBODIED CARBON MATERIALS (CONSTRUCTION) | Quantity | Unit | COST / TOTAL |
| Clin 023AA - LOW EMBODIED CARBON CONCRETE AND ASSOCIATED EXPENSES - FMCSARD1 | C.Y | $ - 0 | |
| Clin 023AB - LOW EMBODIED CARBON ASPHALT AND ASSOCIATED EXPENSES - FMCSARD1 | C.Y | $ - 0 | |
| Clin 023AC- LOW EMBODIED CARBON STEEL AND ASSOCIATED EXPENSES - FMSCARD1 | Tons | $ - 0 | |
| Subtotal - Construction Quantities Costs |
| CLIN 0024 | COST / TOTAL |
| Clin 0024 - Division 1 | Shown on Summary Sheet |
| CLIN 0025 | COST / TOTAL |
| Clin 0025 - Div. 31 Earthwork | Shown on Summary Sheet |
| CLIN 0026 | COST / TOTAL |
| Clin 0026 - Div. 32 Exterior Improvements | Shown on Summary Sheet |
| Overhead | 0.00% | $ - 0 | |
| Profit | 0.00% | $ - 0 | |
| Subtotal - Overhead, Profit | $ | ||
| Bond | 0.00% | $ - 0 | |
| Insurance | 0.00% | $ - 0 | |
| Subtotal - Bond, Insurance | $ - 0 | ||
| Total Evaluated Price | Shown on Summary Sheet | ||
| Type or Print Name | |||
| Title | |||
| Signature | |||
| Firm Name | |||
| Date |
File details come from the government source that posted it. Updated .