9. Sample IRA Project Submittal_ Reporting Form.xlsx

XLSX spreadsheet 3 MB Posted

Attached to
Design Build Contract for Kika De La Garza Land Port of Entry (LPOE) Border Roadway Improvement and Construction (BRIC), Pharr, TX
Solicitation number
47PH0825R0001
Issued by

About this file

This document appears to be a solicitation for a Design Build Contract for the Kika De La Garza Land Port of Entry (LPOE) Border Roadway Improvement and Construction (BRIC) project in Pharr, Texas. The solicitation is funded in part by the Inflation Reduction Act of 2022 and contains numerous IRA-specific requirements related to pricing, invoicing, submittals, materials, and construction. The project involves approximately 515,000 sq. ft. of concrete pavement repair or replacement using low embodied carbon (LEC) materials, including LEC asphalt, concrete, and steel. The contractor must have NAICS code 237310 (Concrete and Asphalt Paving) and the current small business size standard is $45.0 million. The project is anticipated to take approximately 460 calendar days to complete, and the construction cost magnitude is between $20,000,000 and $30,000,000. The procurement is set aside for award to small business firms.

View the file

Other files

File Type Posted
Amendment 6 - 47PH0825R0001 2025 06 10.pdf PDF
Amendment 5 - 47PH0825R0001 2025 01 10.pdf PDF
Pharr LPOE Bid Sheet 2025 01 10.xlsx XLSX spreadsheet
Amendment 4 - 47PH0825R0001 2025 01 08.pdf PDF
Pharr LPOE Bid Sheet 2024 12 20.xlsx XLSX spreadsheet
Amendment 3 - 47PH0825R0001 2024 12 20.pdf PDF
Amendment 2 - 47PH0825R0001 2024 12 13.pdf PDF
Pharr LPOE Bid Sheet_12.10.24 (1).xlsx XLSX spreadsheet
Amendment 1 - 47PH0825R0001 2024 12 05.pdf PDF
FY2024 Metric Waiver FINAL.pdf PDF
14. Bid Bond.pdf PDF
1. GSA Affiliated Custom Accounts (GACA) for Google Drive.pdf PDF
12. Asphalt - GSA IRA Low Embodied Carbon Requirements (Dec. 2023).pdf PDF
3. Past Experience_Past Performance Questionnaire (Factor 2).pdf PDF
Pharr Div 01 Specs.pdf PDF
6. GSA 527-21 - Contractor's Qualifications and Financial Informatio.pdf PDF
2. Past Experience & Performance of Co Questionnaire Factor 1.pdf PDF
Communications Plan Template LPOE project 03 22 posted version.docx DOCX document
13. 2022.08.03 PHAR - Final Concepts Report_3_Rev-Redacted 10-8-24signed.pdf PDF
15. IRA Project Submittal Form and Data Dictionary PDF.pdf PDF
5. TX20240255 Building 2024 08 23.pdf PDF
10. Concrete - GSA IRA Low Embodied Carbon Requirements (Dec. 2023).pdf PDF
8. Award Allocation Form IRA.xlsx XLSX spreadsheet
7. Offeror Representations and Certifications Form Dec 2023 (1).pdf PDF
11. Steel - GSA IRA Low Embodied Carbon Requirements (Dec. 2023).pdf PDF
5. TX20240003 Highway 2024 01 05.pdf PDF
4. Factor 4 LEC Material IRA Sustainability Factor Table.xlsx XLSX spreadsheet
Pharr Solicitation 2024 11 22.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

User Workflow

Click Here for User Workflow Chart https://docs.google.com/drawings/d/1oaECGj2-wo5r56G18gN6DX_vNrEJccTXl9yWmAqIlkI/edit LEC Instructions

#REF!

E&ST and HPGB Instructions

#REF!

Low Embodied Carbon Materials

RegionContractor NameProject Manager Name
Project Number (in Kahua)Contractor Email AddressProject Manager Email Address
Project Type (non-ESPC or ESPC?)Project Manager Approval Date
Enter Work Item Information Below:Design-Build or Construction Team: Enter LEC Installation Information & OutcomesConstruction Manager as Advisor (CMa) or Commissioning Provider (CxP)

Certify information below:

Combined WI IDRow Has Any ValueMin Requirements MetRow NumberRegionFirst Column AddressDuplicate CheckContractor NameContractor Email AddressProject Manager NameProject Manager Email AddressEnter your email addressMilestone StatusBuilding Number
: Location Code (from REXUS)Building NameProject # (Kahua)Accounting String ID (ASID)
: (8-digit alphanumeric string)Work Item (WI) #
: 4 digit numeric stringBudget Activity Code
: PG Code for LEC projects: PG24LEC Identifier
: Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO ScheduleLEC Material CategoryLEC Material SubcategoryDeclared UnitGWP Limit Specified in the Contract
: Top 20% of Contract Limits by Material SubcategoryNew GWP Limit Specified in the Contract (if Different than Previous Column)Reported Threshold TargetCalculated Threshold AchievedProvide link for Material EPDDescription of Material Installed

: Brief description of what material was used for on the project, supplier, mix type etc.

: Location Code (from REXUS) : (8-digit alphanumeric string) : 4 digit numeric string : PG Code for LEC projects: PG24

: Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO ScheduleQuantityQuantity Reporting UnitProduct Category Rule (PCR)Product Specific GWPConversion Factor AConversion Factor A UnitsConversion Factor BEmbodied Carbon Reduction (Calculated)
Upstream Scope 3Upstream Plant's ENERGY STAR Energy Performance Score

: For glass, upstream cement plant, and steel from integrated mills, ask manufacturer to generate and report their ENERGY STAR Energy Performance Score per: http://www.energystar.gov/epis

Any cement, glass, or integrated steel plant based in the U.S. can use the free ENERGY STAR Energy Performance Indicator tool to generate a score, even if the plant is not ENERGY STAR certified.

: Top 20% of Contract Limits by Material SubcategoryYear of plant's ENERGY STAR Energy Performance ScoreCertify information for this row is accurateCertify the embodied carbon calculations
: Certify that the quantity is accurate, and reported product-specific GWP matches the identified EPDEmail of Certifier
||||FALSEFALSE60L6FALSEFALSEFALSE
||||TRUEFALSE70L7FALSESubmittal 7 - Final Performance Submittal - Milestone 4.691 - Substantial CompletionPG24FALSEFALSE
||||FALSEFALSE80L8FALSEFALSEFALSE
||||FALSEFALSE90L9FALSEFALSEFALSE
||||FALSEFALSE100L10FALSEFALSEFALSE
||||FALSEFALSE110L11FALSEFALSEFALSE
||||FALSEFALSE120L12FALSEFALSEFALSE
||||FALSEFALSE130L13FALSEFALSEFALSE
||||FALSEFALSE140L14FALSEFALSEFALSE
||||FALSEFALSE150L15FALSEFALSEFALSE
||||FALSEFALSE160L16FALSEFALSEFALSE
||||FALSEFALSE170L17FALSEFALSEFALSE
||||FALSEFALSE180L18FALSEFALSEFALSE
||||FALSEFALSE190L19FALSEFALSEFALSE
||||FALSEFALSE200L20FALSEFALSEFALSE
||||FALSEFALSE210L21FALSEFALSEFALSE

https://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edit Emerging & Sustainable Tech and

RegionContractor NameProject Manager Name
Project Number (in Kahua)Contractor Email AddressProject Manager Email Address
Project Type (non-ESPC or ESPC?)Project Manager Approval Date
Enter Work Item Information Below:Design-Build or Construction Team: Enter E&ST / HPGB Installation Information and OutcomesConstruction Manager as Advisor (CMa) or Commissioning Provider (CxP): Validate technology Installation
Combined WI IDRow Has Any ValueMin Requirements MetRow NumberRegionFirst Column AddressDuplicate CheckContractor NameContractor Email AddressProject Manager NameProject Manager Email AddressEnter your email addressMilestone StatusBuilding Number
: Location Code (from REXUS)Building NameProject # (Kahua)Accounting String ID (ASID)
: 8-digit alphanumeric stringWork Item (WI) #
: 4 digit numeric string as reported in IRISBudget Activity Code

: PG Code for HPGB Projects: PG21

PG Code for E&ST Projects: PG27IRA Program (E&ST, HPGB)Select the guiding principle for the material or technologyDeep Energy RetrofitAll Electric BuildingNet Zero EnergySustainable BuildingEnergy Conservation Measure /Water Conservation Measure (ECM/WCM) Identifier
: Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO ScheduleECM/WCM Category
: AoA DropdownECM/WCM Technology
: AoA DropdownQuantity InstalledTO Schedule Technology
: Auto populates based on ECM Category and Technology SelectedEmerging & Sustainable Technology
: Auto populates based on ECM Category and Technology SelectedECM/WCM Default Design Life
: In yearsAlternative ECM Design Life
: In years. If different than default. Max of 30 year design lifePrimary Building Cooling FuelPrimary Building Heating FuelRefrigerant Involved in ECM?Refrigerant TypeRefrigerant Capacity (lbs)Initial ECM/WCM implementation cost ($)Estimated initial savings associated with ECM/WCM installation ($)

: ESPC estimated year one savings e.g. If you install a new high efficiency chiller instead of spending $10,000 to repair the old one, enter $10,000 here. Annual O&M Cost ($/year) : (Enter cost if O&M contracts will change due to ECM Implementation)

Enter negative value if there will be confirmed O&M savingsElectric Savings (kWh/year)
: Enter negative value if there will be an increase in energy useNatural Gas Savings (scf/year)

: Enter negative value if there will be an increase in energy use

1 mmBtu = 974.66 scf Fuel Oil Savings (gal/year) : Enter negative value if there will be an increase in energy use

1 mmBtu = 7.246376812 gal Steam Savings (mmBtu/year) : Enter negative value if there will be an increase in energy use

: Location Code (from REXUS)Chilled Water Savings (mmBtu/year)
: Enter negative value if there will be an increase in energy usePropane Fuel Savings (mmBtu/year)
: Enter negative value if there will be an increase in energy useWater Savings (gal/year)

: Enter negative value if there will be an increase in energy use : 8-digit alphanumeric string : 4 digit numeric string as reported in IRIS : PG Code for HPGB Projects: PG21 PG Code for E&ST Projects: PG27 : Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO Schedule : AoA Dropdown

: AoA DropdownAdditional notes about ECM/WCMCertify technology is installed and working properlyEmail of Certifier
||||FALSEFALSE60L6FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE70L7FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE80L8FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE90L9FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE100L10FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE110L11FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE120L12FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE130L13FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE140L14FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE150L15FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE160L16FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE170L17FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE180L18FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE190L19FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE200L20FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE210L21FALSEFALSEFALSEFALSEFALSE

https://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edit EPD Compliance

Source:How to assess EPD compliance
**LEC Material Category**LEC Example **Select LEC Material Subcategory**Helper ColumnDeclared UnitQuantity Reporting UnitBetter Than Average Limit (kgCO2e/Declared Unit)Top 40% Limit (kgCO2e/Declared Unit)Top 20% Limit (kgCO2e/Declared Unit)Conversion Factors (To Metric)
Concrete (and cement or CMUs)**Select LEC Material Subcategory below**Concrete (and cement or CMUs)-**Select LEC Material Subcategory below**metric ton1
Concrete (and cement or CMUs)≤2499 PSIConcrete (and cement or CMUs)-≤2499 PSIcubic metercubic yard277261228cubic meter1
Concrete (and cement or CMUs)3000 PSIConcrete (and cement or CMUs)-3000 PSIcubic metercubic yard318291257U.S. ton0.907185
Concrete (and cement or CMUs)4000 PSIConcrete (and cement or CMUs)-4000 PSIcubic metercubic yard352326284cubic yard0.764555
Concrete (and cement or CMUs)5000 PSIConcrete (and cement or CMUs)-5000 PSIcubic metercubic yard382357305
Concrete (and cement or CMUs)6000 PSIConcrete (and cement or CMUs)-6000 PSIcubic metercubic yard407374319
Concrete (and cement or CMUs)≥7200 PSIConcrete (and cement or CMUs)-≥7200 PSIcubic metercubic yard402362321
Concrete (and cement or CMUs)HESC≤2499 PSI
: High early strength concrete should be avoided where possible. Is there a need for it in this project?Concrete (and cement or CMUs)-HESC≤2499 PSIcubic metercubic yard360.1339.3296.4
Concrete (and cement or CMUs)HESC3000 PSI
: HESC4000Concrete (and cement or CMUs)-HESC3000 PSIcubic metercubic yard413.4378.3334.1
Concrete (and cement or CMUs)HESC4000 PSI
: HESC4000Concrete (and cement or CMUs)-HESC4000 PSIcubic metercubic yard457.6423.8369.2
Concrete (and cement or CMUs)HESC5000 PSI
: HESC4000Concrete (and cement or CMUs)-HESC5000 PSIcubic metercubic yard496.6464.1396.5
Concrete (and cement or CMUs)HESC6000 PSI
: HESC4000Concrete (and cement or CMUs)-HESC6000 PSIcubic metercubic yard529.1486.2414.7
Concrete (and cement or CMUs)HESC≥7200 PSI
: HESC4000Concrete (and cement or CMUs)-HESC≥7200 PSIcubic metercubic yard522.6470.6417.3
Concrete (and cement or CMUs)Cement

: Cement may only be used where provision of qualifying concrete is impractical.

: High early strength concrete should be avoided where possible. Is there a need for it in this project?

: HESC4000

: HESC4000

: HESC4000

: HESC4000

: HESC4000Concrete (and cement or CMUs)-Cementmetric tonmetric ton858819751
Concrete (and cement or CMUs)Concrete Masonry UnitsConcrete (and cement or CMUs)-Concrete Masonry Unitscubic metercubic meter290256217
Asphalt**Select LEC Material Subcategory below**Asphalt-**Select LEC Material Subcategory below**
AsphaltAsphaltAsphalt-Asphaltmetric tonU.S. ton72.664.855.4
Steel**Select LEC Material Subcategory below**Steel-**Select LEC Material Subcategory below**
SteelRebar (fabricated)Steel-Rebar (fabricated)metric tonmetric ton850794728
SteelRebar (unfabricated)Steel-Rebar (unfabricated)metric tonmetric ton760716611
SteelHollow Structural Sections (fabricated)Steel-Hollow Structural Sections (fabricated)metric tonmetric ton1,89818541778
SteelHollow Structural Sections from Electric Arc Furnaces (unfabricated)Steel-Hollow Structural Sections from Electric Arc Furnaces (unfabricated)metric tonmetric ton1,65216201580
SteelHot-Rolled Sections (fabricated)Steel-Hot-Rolled Sections (fabricated)metric tonmetric ton1,16311281022
SteelHot-Rolled Sections (unfabricated)Steel-Hot-Rolled Sections (unfabricated)metric tonmetric ton869713686
SteelCold-Formed and Galvanized (stud, track, framing, etc.)Steel-Cold-Formed and Galvanized (stud, track, framing, etc.)metric tonmetric ton2,40823242228
SteelStructural Steel Plate from Electric Arc Furnaces (unfabricated)Steel-Structural Steel Plate from Electric Arc Furnaces (unfabricated)metric tonmetric ton1,1901152987
Glass**Select LEC Material Subcategory below**Glass-**Select LEC Material Subcategory below**
GlassFlat GlassGlass-Flat Glassmetric tonmetric ton1,40113701331

https://docs.google.com/presentation/d/10JM8-LF0kUJwtvaxAisV-IeyoZzLveKlUtMwCflCRQM/edit E&ST_HPGB Dropdowns #REF! Filtered Region Filtered Location Code Filtered Building Name #REF!

: Import range from ECM Design life tab. Any updates to E&S / TO alignment can be made in that sheet (https://docs.google.com/spreadsheets/d/1a_41ZddtVfM_VrZU2vYW7gQQUAp5gPwEolsrFzwPUTQ/edit#gid=339106882)

ECM type/category list aligns with CTSECM TechnologyFiltered IRA Milestones
#N/A#N/A

LEC_Dropdowns

#REF!Filtered RegionFiltered Location CodeFiltered Building Name#REF!LEC Material SubcategoriesUnit ConversionsFiltered IRA Milestones#REF!#REF!
#N/Acubic meter/cubic yard0.764555#N/A
metric ton/kilogram0.001
metric ton/U.S. ton0.907185
metric ton/metric ton1
cubic meter/cubic meter1

: HESC4000

: HESC4000

: HESC4000

: HESC4000

: Cement may only be used where provision of qualifying concrete is impractical.

: High early strength concrete should be avoided where possible. Is there a need for it in this project?

: HESC4000

Metadata

LEC InformationE&ST Information
Project NumberHeaderRowsColsA1 ReferenceFormulas On Blank RowProject NumberHeaderRowsColsA1 ReferenceFormulas On Blank Row
50421150518

Data Dictionary

File details come from the government source that posted it. Updated .