PART 6 ATTACHMENT E2 309 T-101.pdf

PDF 439 KB Posted

Attached to
Design-Build Hadnot Point Facility Repairs, Building 309
Solicitation number
N6247020R6009
Issued by

View the file

Other files

File Type Posted
Amnd 0005 20R6009.pdf PDF
Amnd 0004 20R6009.pdf PDF
20-0040 Part 3 25 June 20.pdf PDF
20-0040 Part 3 062420.pdf PDF
PART 6 ATTACHMENT A6 A105A - BLDG309 SECTION 062420.pdf PDF
20-0040 PART 4 062420.pdf PDF
Amnd 0003 20R6009.pdf PDF
PART 6 ATTACHMENT A7 ARCHITECTURAL SHEETS 062420.pdf PDF
Amnd 0002 20R6009.pdf PDF
20-0040 Part 3 061120 REV.pdf PDF
20-0040 PART 4 061120 REV.pdf PDF
Amnd 0001 20R6009.pdf PDF
Master PPI Form Template.xlsx XLSX spreadsheet
Part 6 ATTACHMENT N EXAMPLE SCREEN WALL.pdf PDF
PART 6 ATTACHMENT A6 A105 BLDG309 WALL SECTION.pdf PDF
Part 6- ATTACHMENT A12- ADA Checklist for Existing Buildings.pdf PDF
20-0040 PART 6 TOC.pdf PDF
PART 6 ATTACHMENT A5 A104 BLDG309 RENO PLAN L2.pdf PDF
Part 6 ATTACHMENT O MCBCL Base-Wide MNS-FACP Construction Requirements.pdf PDF
PART 6 ATTACHMENT M1 309 M-101.pdf PDF
20-0040-PART 3 COVER.pdf PDF
20-0040 PART 2 HADNOT POINT FACILITY REPAIRS BLDG 309.pdf PDF
PART 6 ATTACHMENT A8 ADA CHECKLIST FOR EXISTING BLDGS.pdf PDF
20-0040-PART 2 COVER.pdf PDF
PART 6 ATTACHMENT A4 A103 BLDG309 RENO PLAN L1.pdf PDF
PART 6 ATTACHMENT E1 309 TS101.pdf PDF
PART 6 ATTACHMENT A1 A100 BLDG309 ROOM FINISH SCHEDULE.pdf PDF
PART 6 ATTACHMENT A7 ARCHITECTURAL SHEETS.pdf PDF
PART 6 ATTACHMENT K_MCO 5110.6C.pdf PDF
Part 6 ATTACHMENT D1- ASBESTOS REPORT.pdf PDF
PART 6 ATTACHMENT A9 MCBCL SIGNS STANDARDS-GRAPHICS.pdf PDF
20-0040 PART 4 COVER.pdf PDF
PART 6 ATTACHMENT A2 A101 BLDG309 DEMO PLAN L1.pdf PDF
PART 6 ATTACHMENT G3 1997 Bldg 309 AS BUILTS.pdf PDF
PART 6 ATTACHMENT L MCBCL Mech Design Guidance 7.17.pdf PDF
PART 6 ATTACHMENT G2 56-3564 Modification of Barracks.pdf PDF
Part 6- ATTACHMENT C1 C100 BLDG 309 SITE PLAN.pdf PDF
RFP 20R6009.pdf PDF
PART 6 ATTACHMENT M3 309 M-601.pdf PDF
PART 6 ATTACHMENT F_NPDES PERMIT NCS000290.pdf PDF
PART 6 ATTACHMENT A3 A102 BLDG309 DEMO PLAN L2.pdf PDF
20-0040 PART 6 COVER.pdf PDF
20-0040 PART 5 COVER.pdf PDF
Part 6- ATTACHMENT B- MCB Camp Lejeune Base Exterior Architectural Plan (BEAP).pdf PDF
20-0040 PART 4.pdf PDF
PART 6 ATTACHMENT M2 309 M-102.pdf PDF
20-0040 PART 5 HADNOT POINT FACILITY REPAIRS BLDG 309.pdf PDF
PART 6 ATTACHMENT J_MCO 5530.14A.pdf PDF
Part 6 ATTACHMENT A10 20-0040 GENERAL NOTES.pdf PDF
Part 6 ATTACHMENT D2- APPENDIX D BUILDING INFORMATION CHECKLIST.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROGRESS

DRAWING - DO NOT

USE FOR

CONSTRUCTION

2246 Yaupon Drive

Wilmington, NC 28401

Phone: 910.791.4000

Fax: 910.791.5266 www.cbhfengineers.com

NC# P-0506

c

Copyright 2019 CBHF Engineers, PLLC

Engineers, PLLC

DISCLOSURE OF INFORMATION:

CONTRACTOR SHALL COMPLY AS FOLLOWS:

A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT

OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-

1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL;

OR

2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.

B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING

OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR RELEASE.

C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT.

SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR

TO THE CONTRACTING OFFICER.

1/8" = 1'-0" 0 8' 16'4'1 TYPICAL LOCATION EACH FLOOR

PLAN

NORTH

LEGEND

DUAL DATA OUTLET FOR WIRELESS ACCESS POINT.

GENERAL NOTE:

PLAN SHOWS APPROXIMATE LOCATION OF DATA LOCATIONS TO SUPPORT WAPS. A TOTAL OF 8 WAPS ARE REQUIRED FOR EACH FLOOR FOR A TOTAL OF 16. LOCATIONS SHOWN ARE APPROXIMATE. EOR TO LOCATE

AS REQUIRED FOR FULL BUILDING COVERAGE.

Sheets and Views
E-101
OLE1