Part 6 ATTACHMENT D1- ASBESTOS REPORT.pdf

PDF 135 KB Posted

Attached to
Design-Build Hadnot Point Facility Repairs, Building 309
Solicitation number
N6247020R6009
Issued by

View the file

Other files

File Type Posted
Amnd 0005 20R6009.pdf PDF
Amnd 0004 20R6009.pdf PDF
20-0040 Part 3 25 June 20.pdf PDF
20-0040 Part 3 062420.pdf PDF
PART 6 ATTACHMENT A6 A105A - BLDG309 SECTION 062420.pdf PDF
20-0040 PART 4 062420.pdf PDF
Amnd 0003 20R6009.pdf PDF
PART 6 ATTACHMENT A7 ARCHITECTURAL SHEETS 062420.pdf PDF
Amnd 0002 20R6009.pdf PDF
20-0040 Part 3 061120 REV.pdf PDF
20-0040 PART 4 061120 REV.pdf PDF
Amnd 0001 20R6009.pdf PDF
Master PPI Form Template.xlsx XLSX spreadsheet
Part 6 ATTACHMENT N EXAMPLE SCREEN WALL.pdf PDF
PART 6 ATTACHMENT A6 A105 BLDG309 WALL SECTION.pdf PDF
Part 6- ATTACHMENT A12- ADA Checklist for Existing Buildings.pdf PDF
20-0040 PART 6 TOC.pdf PDF
PART 6 ATTACHMENT A5 A104 BLDG309 RENO PLAN L2.pdf PDF
Part 6 ATTACHMENT O MCBCL Base-Wide MNS-FACP Construction Requirements.pdf PDF
PART 6 ATTACHMENT M1 309 M-101.pdf PDF
20-0040-PART 3 COVER.pdf PDF
20-0040 PART 2 HADNOT POINT FACILITY REPAIRS BLDG 309.pdf PDF
PART 6 ATTACHMENT A8 ADA CHECKLIST FOR EXISTING BLDGS.pdf PDF
20-0040-PART 2 COVER.pdf PDF
PART 6 ATTACHMENT A4 A103 BLDG309 RENO PLAN L1.pdf PDF
PART 6 ATTACHMENT E1 309 TS101.pdf PDF
PART 6 ATTACHMENT A1 A100 BLDG309 ROOM FINISH SCHEDULE.pdf PDF
PART 6 ATTACHMENT A7 ARCHITECTURAL SHEETS.pdf PDF
PART 6 ATTACHMENT K_MCO 5110.6C.pdf PDF
PART 6 ATTACHMENT A9 MCBCL SIGNS STANDARDS-GRAPHICS.pdf PDF
20-0040 PART 4 COVER.pdf PDF
PART 6 ATTACHMENT A2 A101 BLDG309 DEMO PLAN L1.pdf PDF
PART 6 ATTACHMENT G3 1997 Bldg 309 AS BUILTS.pdf PDF
PART 6 ATTACHMENT L MCBCL Mech Design Guidance 7.17.pdf PDF
PART 6 ATTACHMENT G2 56-3564 Modification of Barracks.pdf PDF
Part 6- ATTACHMENT C1 C100 BLDG 309 SITE PLAN.pdf PDF
RFP 20R6009.pdf PDF
PART 6 ATTACHMENT M3 309 M-601.pdf PDF
PART 6 ATTACHMENT F_NPDES PERMIT NCS000290.pdf PDF
PART 6 ATTACHMENT A3 A102 BLDG309 DEMO PLAN L2.pdf PDF
20-0040 PART 6 COVER.pdf PDF
20-0040 PART 5 COVER.pdf PDF
PART 6 ATTACHMENT E2 309 T-101.pdf PDF
Part 6- ATTACHMENT B- MCB Camp Lejeune Base Exterior Architectural Plan (BEAP).pdf PDF
20-0040 PART 4.pdf PDF
PART 6 ATTACHMENT M2 309 M-102.pdf PDF
20-0040 PART 5 HADNOT POINT FACILITY REPAIRS BLDG 309.pdf PDF
PART 6 ATTACHMENT J_MCO 5530.14A.pdf PDF
Part 6 ATTACHMENT A10 20-0040 GENERAL NOTES.pdf PDF
Part 6 ATTACHMENT D2- APPENDIX D BUILDING INFORMATION CHECKLIST.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SURVEY FINDINGS Building: 309

Friable ACM identified

Non-friable ACM identified

Tested Non ACM or REMOVED Materials

DESCRIPTION LOCATION Date Quantity

DESCRIPTION LOCATION Date Quantity

DESCRIPTION LOCATION Date Quantity

FIBROUS DEBRIS 2 SFFIRST FLOOR CENTRAL INTERIOR

OVERHEAD TRAPPED IN SECOND DECK

MESH (REMNANTS OF ORIGINAL PIPING

SYSTEMS)

9/13/2010

FIBROUS DEBRIS 3 SFFIRST FLOOR CENTRAL INTERIOR

OVERHEAD TRAPPED IN SECOND DECK

MESH (REMNANTS OF ORIGINAL PIPING

SYSTEMS)

8/25/2015

FIBROUS DEBRIS 3 SFFIRST FLOOR CENTRAL INTERIOR

OVERHEAD TRAPPED IN SECOND DECK

MESH (REMNANTS OF ORIGINAL PIPING

SYSTEMS)

4/14/2014

ROOFING SEALANT, BLACK 30 LFEAST AND WEST WINGS, NORTH AND

SOUTH ENTRY WALLS (PREVIOUS

AWNING LOCATIONS)

9/13/2010

ROOFING SEALANT, BLACK 30 LFEAST AND WEST WINGS, NORTH AND

SOUTH ENTRY WALLS (PREVIOUS

AWNING LOCATIONS)

10/23/2013

ROOFING SEALANT, BLACK 30 LFEAST AND WEST WINGS, NORTH AND

SOUTH ENTRY WALLS (PREVIOUS

AWNING LOCATIONS)

8/25/2015

NO SUSPECT ACM IDENTIFIED TOTAL BUILDING RENOVATION CIRCA

2/26/2004

FIREWALL MATERIAL, SOFT PLASTER ATTIC, SOUTH CENTER, EAST AND

WEST FIREWALLS

6/2/2006

TRANSITE PANEL MATERIAL ATTIC EAST, WEST, AND SOUTH

CENTER DORMER SILL PLATES;

CENTRAL ATTIC EAST AND WEST

DORMER SILL PLATES AND DEBRIS

9/13/2010

Friday, October 26, 2018 Page 1 of 2

EXTERIOR CAULKING, SOUTH CENTER WING, NORTH

ATTACHMENT TO MAIN BUILDING AT

BRICK JOINTS

9/13/2010

EXTERIOR CAULKING, METAL WINDOWS AND DOORS,

RESIDUAL FROM PREVIOUS

9/13/2010

12" WHITE FLOOR TILE AND ADHESIVE [NEW] FLOOR COVERINGS

THROUGHOUT

9/13/2010

TAR PAPER, BLACK ROOFING SYSTEM UNDERLAYMENT

AND ATTIC DEBRIS

9/13/2010

DRYWALL AND JOINT MATERIAL [NEW] INTERIOR WALLS THROUGHOUT 9/13/2010

12" WHITE FLOOR TILE AND ADHESIVE CENTER HALL WEST UTILITY CLOSET 9/13/2010

INTERIOR CAULKING, METAL WINDOWS 9/13/2010

Friday, October 26, 2018 Page 2 of 2