20-0040 Part 3 061120 REV.pdf

PDF 272 KB Posted

Attached to
Design-Build Hadnot Point Facility Repairs, Building 309
Solicitation number
N6247020R6009
Issued by

View the file

Other files

File Type Posted
Amnd 0005 20R6009.pdf PDF
Amnd 0004 20R6009.pdf PDF
20-0040 Part 3 25 June 20.pdf PDF
20-0040 Part 3 062420.pdf PDF
PART 6 ATTACHMENT A6 A105A - BLDG309 SECTION 062420.pdf PDF
20-0040 PART 4 062420.pdf PDF
Amnd 0003 20R6009.pdf PDF
PART 6 ATTACHMENT A7 ARCHITECTURAL SHEETS 062420.pdf PDF
Amnd 0002 20R6009.pdf PDF
20-0040 PART 4 061120 REV.pdf PDF
Amnd 0001 20R6009.pdf PDF
Master PPI Form Template.xlsx XLSX spreadsheet
Part 6 ATTACHMENT N EXAMPLE SCREEN WALL.pdf PDF
PART 6 ATTACHMENT A6 A105 BLDG309 WALL SECTION.pdf PDF
Part 6- ATTACHMENT A12- ADA Checklist for Existing Buildings.pdf PDF
20-0040 PART 6 TOC.pdf PDF
PART 6 ATTACHMENT A5 A104 BLDG309 RENO PLAN L2.pdf PDF
Part 6 ATTACHMENT O MCBCL Base-Wide MNS-FACP Construction Requirements.pdf PDF
PART 6 ATTACHMENT M1 309 M-101.pdf PDF
20-0040-PART 3 COVER.pdf PDF
20-0040 PART 2 HADNOT POINT FACILITY REPAIRS BLDG 309.pdf PDF
PART 6 ATTACHMENT A8 ADA CHECKLIST FOR EXISTING BLDGS.pdf PDF
20-0040-PART 2 COVER.pdf PDF
PART 6 ATTACHMENT A4 A103 BLDG309 RENO PLAN L1.pdf PDF
PART 6 ATTACHMENT E1 309 TS101.pdf PDF
PART 6 ATTACHMENT A1 A100 BLDG309 ROOM FINISH SCHEDULE.pdf PDF
PART 6 ATTACHMENT A7 ARCHITECTURAL SHEETS.pdf PDF
PART 6 ATTACHMENT K_MCO 5110.6C.pdf PDF
Part 6 ATTACHMENT D1- ASBESTOS REPORT.pdf PDF
PART 6 ATTACHMENT A9 MCBCL SIGNS STANDARDS-GRAPHICS.pdf PDF
20-0040 PART 4 COVER.pdf PDF
PART 6 ATTACHMENT A2 A101 BLDG309 DEMO PLAN L1.pdf PDF
PART 6 ATTACHMENT G3 1997 Bldg 309 AS BUILTS.pdf PDF
PART 6 ATTACHMENT L MCBCL Mech Design Guidance 7.17.pdf PDF
PART 6 ATTACHMENT G2 56-3564 Modification of Barracks.pdf PDF
Part 6- ATTACHMENT C1 C100 BLDG 309 SITE PLAN.pdf PDF
RFP 20R6009.pdf PDF
PART 6 ATTACHMENT M3 309 M-601.pdf PDF
PART 6 ATTACHMENT F_NPDES PERMIT NCS000290.pdf PDF
PART 6 ATTACHMENT A3 A102 BLDG309 DEMO PLAN L2.pdf PDF
20-0040 PART 6 COVER.pdf PDF
20-0040 PART 5 COVER.pdf PDF
PART 6 ATTACHMENT E2 309 T-101.pdf PDF
Part 6- ATTACHMENT B- MCB Camp Lejeune Base Exterior Architectural Plan (BEAP).pdf PDF
20-0040 PART 4.pdf PDF
PART 6 ATTACHMENT M2 309 M-102.pdf PDF
20-0040 PART 5 HADNOT POINT FACILITY REPAIRS BLDG 309.pdf PDF
PART 6 ATTACHMENT J_MCO 5530.14A.pdf PDF
Part 6 ATTACHMENT A10 20-0040 GENERAL NOTES.pdf PDF
Part 6 ATTACHMENT D2- APPENDIX D BUILDING INFORMATION CHECKLIST.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Renovation to Building 309 Project #20-0040 MCB Camp Lejeune, Camp Lejeune, NC

PART 3 - Page | 1

Part 3 Statement of Work / Project Program

Table of Contents

CHAPTERS

1. PROJECT DESCRIPTION

2. PROJECT OBJECTIVES

3. SITE ANALYSIS

4. BUILDING REQUIREMENTS

5. ROOM REQUIREMENTS

6. ENGINEERING SYSTEMS

REQUIREMENTS

B10 SUPERSTRUCTURE

B20 EXTERIOR ENCLOSURE

B30 ROOFING

C10 INTERIOR CONSTRUCTION

C30 INTERIOR FINISHES

D20 PLUMBING

D30 HVAC

D40 FIRE PROTECTION

D50 ELECTRICAL POWER AND LIGHTING

E20 FURNISHINGS

G10 SITE PREPARATION

G20 SITE IMPROVEMENTS

G30 SITE CIVIL/MECHANICAL UTILITES

G40 SITE ELECTRICAL UTILITIES

PART 3 - Page | 2

1 PROJECT DESCRIPTION

A. GENERAL DESIGN INTENT

1. Camp Lejeune H-Style 300 series Building 309 is a 2-story 27,472 square foot facilities originally constructed in 1942 as bachelor enlisted quarters with a few offices. In 1955, an addition of a central 2-story wing was added to the facility to support office spaces. At this time, the building was converted to billeting and administrative spaces and has had renovations within the last 15 years. This Design-Build full building renovation effort is to repair all the damage as a result of Hurricane Florence. Buildings 309 will have minor changes to the current floor plan.

2. Floor plans for building 309 indicating the conceptual design are included in Part 6 of this RFP.

The Design-Build Team shall meet with the tenants at the CDW to confirm the appropriateness of the plan, evaluate the necessity and propriety of the scope of work indicated, and incorporate all revisions identified as a result of these meetings. Full Design Packages are required for building 309.

3. Site Improvements include the redesign of the parking lot associated with building309 and any associated utility work.

4. General Statements for the design of Buildings 309:

a) Any extra space within the floor layout due to mechanical design efficiencies are to be assumed converted to office space and should meet the office space room requirements.

b) Provide quantity and type of plumbing fixtures required for the occupancy, use, and functions described for the facilities per International Building Code. If current number of fixtures in the building exceeds the minimum amount per code requirement, then maintain the current number of fixtures.

c) New floor plans and site work must meet Accessibility requirements in UFC 1-200-01 to maximum extent without major changes to the existing structure. Reference document in Part 6- Attachment A12- ADA Checklist for Existing buildings.

d) Replace the existing fire alarm system with a modern code-compliant Fire Alarm / Mass Notification system.

e) Collect, analyze, and provide results for asbestos and lead base paint sampling. Contractor shall collect and analyze thirty (30) asbestos and thirty (30) lead paint samples. Contractor shall collect samples representative of all materials and media that may be demolished or disturbed during renovation. Properly abate and dispose of all lead and asbestos materials.

f) All under slab piping, sewer and water, must be removed and replaced up to 5’ from the building.

g) All exterior work must comply with SHPO requirements for the historic district.

h) Interior Room Signage- refer to Part 6- Attachment A9

i) Refer to General Notes- Part 6- Attachment A10

5. As-built Drawing Package- must be included in final submittal package to include AutoCAD files.

2 PROJECT OBJECTIVES

A. MISSION

The mission of this project is to maximize the space utilization for billeting functions renovation of the Historic H-style facility 309 aboard Camp Lejeune.

PART 3 - Page | 3

B. DESIGN RESPONSIBILITY

It shall be the priority for the Design-Build Team to acknowledge and exercise its duty to complete field investigations, validate Activity’s needs and develop a definitive design to meet the needs of the Activity as well as fit within the project’s site and criteria parameters. Attention is directed to Specifications section 01 31 19.05 20 in which the Design-Build Contractor are required to undertake a Concept Design Workshop, a 3 day long, client-interactive process by which the project’s definitive concept design shall be established and agreed to by all parties. The combined PAK and CDW meeting shall be undertaken in immediate proximity to Marine Corps Base Camp Lejeune; and the Design-Build Contractor shall bear all travel, lodging, subsistence and related costs of its personnel, associated A&E personnel, and any others that may require participation.

C. SUSTAINABLE DESIGN

Specific sustainability requirements are found in this document.

D. WORKFLOW PROCESS

1. Buildings 309 will be empty at time of demolition.

2. Tenants for Building 309 will be housed in trailers associated with Building 313 D/B Renovation.

3 SITE ANALYSIS

A. EXISTING CONDITIONS

Building 309 is located along Holcomb Blvd onboard Marine Corps Base, Camp Lejeune. Existing Utilities include water lines, sanitary sewer main, storm water, overhead electric and underground telephone.

B. SITE WORK

1. Parking Lot supporting Building 309

a) Redesign the parking lot make maximize parking capacity and improve traffic flow. The design must comply with ADA requirements. Parking lot parameters from McHugh Blvd to extents of newly resurfaced parking lot between 309 and 313.

b) Resurface and stripe parking lot per UFC 3-210-02

c) Provide a safety plan.

d) Demolish existing pad mounted transformer brick surround, gate, transformer and concrete pad. See electrical for transformer demolition requirements.

e) There is no existing site survey and geotechnical report for this area and must be included for the design.

4 BUILDING REQUIREMENTS

A. EXTERIOR WORK

1. Buildings 309

a) Exterior wall details- refer to drawing A105 in Part 6- Attachment A5

b) Replace exterior windows- Must comply with SHPO requirements for Historic District.

c) Replace exterior doors and hardware. Provide entry keypad all exterior doors.

d) Modify or demolish exterior stairs, railing, concrete pads, etc. as necessary to comply with current code standards.

e) Exterior Access Points- landings, stairs, ramps and railing must be brought up to code.

PART 3 - Page | 4

f) Entry canopies: Paint columns, fascia, trim, ceiling, etc. and replace asphalt shingles with SSMR roofing system to match the main building.

g) Design and construct Brick Screen Walls for large Mechanical Equipment for each building

• Refer to example in drawing in Part 6 Attachment N

• Screen Wall must comply with the MCB Camp Lejeune Base Exterior

Architectural Plan, BEAP in Part 6 Attachment B

• Screen Wall must comply with the State Historic Preservation Office, SHPO, requirements for the Hadnot Point district.

h) Relocate any sidewalks that conflict with the placement of new Mechanical and/or Electrical

Equipment.

i) Concrete repair- repair cracked and spalling concrete on all exterior concrete structures.

Upgrade sidewalks to meet ADA requirements.

j) Demolish steam and condensate lines and steam pit. Fill in foundation wall voids where steam/condensate was removed from foundation wall with CMU blocks. Back fill with well drained fill. Provide sod as necessary to match adjacent area.

k) Demolish steam pit to a minimum of 12” below grade. Install #57 stone in the steam pit to a height of 12’ below grade. Cover stone with fabric and well-drained soil. Provide sod over soil to match adjacent areas.

B. Full Building Renovation to Building 313 309

1. Demolish all interior components of the building

a) Sheetrock – walls and ceilings

b) Drop Ceilings

c) All wall and floor finishes

d) All interior plumbing, electrical and mechanical components.

e) Provide base two weeks notification to remove government owned equipment prior to the start of demolition.

2. Furniture:

• Contractor shall transport furniture identified as “serviceable” by Base Property to Base Property (Building 1212).

• Contractor shall properly dispose of furniture identified as “unserviceable” by taking items to DRMO. The tenant will provide DRMS documents to the Contractor.

• Any remaining furniture is the responsibility of the contractor to dispose of off-site.

3. New floor plans required to be design and developed for Building 309- reference drawings in Part 6 Attachment A103, A104 and As-built I3

a) 1st Floor N wing- Open billeting approx. 3865SF to accommodate approx.. 70 racks

• Provide cable drop and blocking for TV mount center of North exterior wall.

b) 1st Floor E Central Wing – Janitor room with mop sink, approx.. 80sf

c) 1st Floor E Central Wing – Linen room, approx. 110 sf

d) 1st Floor E Central Wing – Storage room accessed through Linen room, approx.. 110 sf

e) 1st Floor E Central Wing – Laundry room for 10 washer machines, 10 dryers. Approx 500 sf

f) 1st Floor E Central Wing – Duty Hut, approx. 80 sf

g) 1st Floor E Central Wing – Laundry room for 10 washer machines, 10 dryers. Approx 500 sf

PART 3 - Page | 5

h) 1st Floor E Central Wing – Galley. Provide base and wall cabinetry, double oven, stand alone full size refrigerator, stand alone full size freezer, double sink, range, approx. 225 sf

i) 1st Floor E Central Wing – Lobby, approx. 300sf

j) 1st Floor Central Wing – 2 VIP Sleeping rooms, approx. 150 sf each. Each VIP Sleeping Room to have Head with shower, WC and Lav.

k) 1st Floor Central Wing – Add area for 2 vending machines tucked into Mechanical space, open to Corridor.

l) 1st Floor S Wing- Open billeting approx. 3000SF to accommodate approx. 50 racks

• Provide cable drop and blocking for TV mount center of North exterior wall.

m) 1st Floor S Wing – Conference room, approx. 800 sf to accommodate min. 20 people. Provide audio/video capabilities, and blocking for TV mount.

n) 2nd Floor N Wing- Open billeting approx. 3865SF to accommodate approx. 70 racks

• Provide cable drop and blocking for TV mount center of North exterior wall.

o) 2nd Floor E Central Wing- Lounge area approx. 280SF

• Provide cable drop and blocking for TV mount center of North exterior wall.

p) 2nd Floor Central Wing – 2 VIP Sleeping rooms, approx. 150 sf each. Each VIP Sleeping Room to have Head with shower, WC and Lav.

q) 2nd Floor Central Wing – Add area for 2 vending machines tucked into Mechanical space, open to Corridor.

r) 2nd Floor S Wing- Open billeting approx. 3865SF to accommodate approx. 70 racks

• Provide cable drop and blocking for TV mount center of North exterior wall.

4. See Room Requirements table for finishes

5. Replace carpet, vinyl flooring and ceiling finishes throughout the corridors, lobbies, offices, and activity rooms.

6. Provide new acoustic panel ceilings and replace all hard ceilings.

7. Replace all doors, door frames and hardware

8. Modernize the toilet rooms and reconfigured as required to provide accessibility per ADA requirements on the first floor. Replace all wall and floor tiles to include in shower area, solid surface countertops (ensure that it is coordinated with plumbing specs regarding SS sinks or integral solid surface tops and sinks , vanity cabinets, mirrors, stainless steel integral towel dispenser/trash receptacle, soap dispenser, stainless steel fixtures, flush valve water closets, toilet accessories (stainless steel:

tissue dispenser, grab bars, sanitary napkin disposal), phenolic partitions (floor and ceiling mounted) and stainless steel shower accessories (robe hook, shower rod, soap dispenser and shower shelf)

9. Paint all walls, hard ceilings and exposed structural floor construction, including ductwork and utilities where applicable.

10. Provide new Communications, electrical, plumbing and mechanical support.

a) Refer to Part 6 Attachments E1, E2, M1a, M2e-M2h

b) Refer to Part 6 Attachment L, MCBCL Mechanical Design Guidance 7.17

Part 3 - Page | 6

5 ROOM REQUIREMENTS

1. Provide complete building code analysis.

2. Occupant Load Factor per NFPA 101 Life Safety unless shown otherwise in Part 3, Chapter 4

- Building Requirements above.

3. Provide lighting, switches and convenience & data outlets per code, regulation and requirements; coordinate with user.

4. Special requirements: Refer to Part 3, Chapter 4-Building Requirements for other items not listed in spaces below.

5. Provide finishes based on drawing A100 in Part 6 Attachment A1.

6. Provide room signage. Reference MCBCL Sign Standards and Graphics in Part 6 Attachment A9.

Part 3 - Page | 7

Space Name: TYPICAL PRIVATE OFFICE SPACES

Space Characteristics

Function/Adjacencies: The space is used for Private office space

Minimum Ceiling Height: First Floor: 7’-6” minimum above finish floor; Second Floor: 8’-0” minimum above finish floor Acoustics: Wall STC 45 / Door & Frame STC 42 Access: Staff Number of Occupants/Workstations: 1 cupant Load Factor per NFPA 101 Life Safety Code: Occupant Load per NFPA 101 Life Safety is to be calculated as Business Use

1/100 NSF

FF&E Info: N/A Audio/Visual System Info: N/A Security System Info: N/A

Uniformat Section

Description Qty Size Specific Requirements

B202001 Exterior Windows Provide windows for natural light emission.

B202004 Exterior Glazing Insulated – Low ‘E’ Glazing or Spectral glazing.

C101001 Fixed Partitions SF GWB on metal studs to underside of deck.

C102001 Interior Doors 1 3’-0” x 7’-0” Provide solid core wood door in hollow metal frame. Solid core wood doors with stain finish and steel frames factory-primed, field painted.

C102007 Interior Door Hardware A/R Lever type handle for ADA compliance

C103004 Identifying Devices A/R Provide signage- Coordinate room signage with the user.

C3010 Wall Finish SF Impact Resistant GWB. Paint

C3020 Floor Finish SY Epoxy

C3020 Wall Base Finish LF 4” Resilient Base

C3030 Ceiling Finish SF 24”X24” Suspended Acoustical Ceiling Tiles

C3030 Suspension Systems Suspended exposed grid compatible with ACT system

D3040 HVAC Provide ducted supply and return.

D502001 Branch Wiring A/R Branch Circuits & Outlets per ESR

D50202 Lighting Equipment A/R General Lighting: Provide in compliance with UFC 3-530-01.

Provide in compliance with ASHRAE 90.1 2010.

D503001 Telecommunications A/R compliance with Specification 27 10 00

D503002 Public Address System A/R

D503004 CCTV & CATV

D503090 Other Alarms Mass Notification

E201002 Window Treatment A/R Provide horizontal mini-blinds at all exterior windows.

Part 3 - Page | 8

Space Name: TYPICAL CONFERENCE ROOM SPACES

Function/Adjacencies: Shared meeting space for small groups in the public non-secured area of the building.

Minimum Ceiling Height: First Floor: 7’-6” minimum above finish floor; Second Floor: 8’-0” minimum above finish floor Acoustics: Wall STC 45 / Door & Frame STC 42 Access: Staff Number of Occupants/Workstations: 25 Occupant Load Factor per NFPA 101 Life Safety Code: Occupant Load per NFPA 101 Life Safety is to be calculated as Assembly Use

1/15 NSF

FF&E Info: N/A Audio/Visual System Info: Projector Mount, Projector screen mount, 1- wall mounted 42" monitor Security System Info: N/A

Uniformat Section

Description Qty Size Specific Requirements

B202001 Exterior Windows Provide windows for natural light emission.

B202004 Exterior Glazing Insulated – Low ‘E’ Glazing or Spectral glazing.

C101001 Fixed Partitions SF GWB on metal studs to underside of deck.

C102001 Interior Doors 1 3’-0” x 7’-0” Provide solid core wood door in hollow metal frame. Solid core wood doors with stain finish and steel frames factory-primed, field painted.

C102007 Interior Door Hardware A/R Lever type handle for ADA compliance

C103004 Identifying Devices A/R Provide signage- Coordinate room signage with the user.

C3010 Wall Finish SF Impact Resistant GWB. Paint

C3020 Floor Finish SF Epoxy

C3020 Wall Base Finish LF 4” Resilient Base

C303001 Ceiling Finish SF 24”X24” Suspended Acoustical Ceiling Tiles

C303005 Suspension Systems Suspended exposed grid compatible with ACT system

D3040 HVAC Provide ducted supply and return.

D502001 Branch Wiring A/R Branch Circuits & Outlets per ESR Provide necessary power, cable & data at required height for AV Equipment

D502002 Lighting Equipment A/R General Lighting: Provide in compliance with UFC 3-530-01.

Provide in compliance with ASHRAE 90.1 2010.

D503001 Telecommunications A/R compliance with Specification 27 10 00

D503002 Public Address System A/R

D503090 Other Alarms Mass Notification

D509002 Emergency Lighting and Power

A/R Provide means of egress emergency lighting

Part 3 - Page | 9

Space Name: TYPICAL WAITING ROOM SPACES

D503004 CCTV & CATV

CATV where shown on A103 & A104 Coordinate with tenant during CDW

E102009 Audio- Visual Equipment Ceiling Mount for projector; Wall Mount for Monitors

Function/Adjacencies: The area is to provide waiting area for visitors meeting building occupants.

Minimum Ceiling Height: First Floor: 7’-6” minimum above finish floor; Second Floor: 8’-0” minimum above finish floor

Access: Accessed from corridor.

Number of Occupants/Workstations: 10-30

Occupant Load Factor per NFPA 101 Life Safety Code: Occupant Load per NFPA 101 Life Safety is to be calculated as Assembly Use

1/15 NSF

FF&E Info: N/A Audio/Visual System Info: 1- wall mounted 42" monitor Security System Info: N/A

Uniformat Section

Description Qty Size Specific Requirements

B202001 Exterior Windows Provide windows for natural light emission.

B202004 Exterior Glazing Insulated – Low ‘E’ Glazing or Spectral glazing.

C101001 Fixed Partitions SF GWB on metal studs to underside of deck.

C102001 Interior Doors 1 3’-0” x 7’-0” Provide solid core wood door with side light at entry in hollow metal frame. Solid core wood doors with stain finish and steel frames factory-primed, field painted.

C102007 Interior Door Hardware A/R Lever type handle for ADA compliance

C103004 Identifying Devices A/R Provide signage- Coordinate room signage with the user.

C3010 Wall Finish SF Impact Resistant GWB. Paint

C3020 Floor Finish SY Epoxy

C3020 Wall Base Finish LF 4” Resilient Base

C3030 Ceiling Finish SF 24”X24” Suspended Acoustical Ceiling Tiles

C3030 Suspension Systems SF Suspended exposed grid compatible with ACT system

D3040 HVAC Provide ducted supply and return.

D502001 Branch Wiring A/R Branch Circuits & Outlets per ESR

D50202 Lighting Equipment A/R General Lighting: Provide in compliance with UFC 3-530-01.

Provide in compliance with ASHRAE 90.1 2010.

D503001 Telecommunications A/R compliance with Specification 27 10 00

Part 3 - Page | 10

Space Name: TYPICAL OPEN OFFICE SPACES

D503002 Public Address System A/R

D503004 CCTV & CATV CATV Coordinate with tenant during CDW

D503090 Other Alarms Mass Notification

D509002 Emergency Lighting and Power

A/R Provide means of egress emergency lighting

Function/Adjacencies: The space is office work area for building occupants. Billeting to be treated as Open Office Space for Room

Requirement purposes.

Minimum Ceiling Height: First Floor: 7’-6” minimum above finish floor; Second Floor: 8’-0” minimum above finish floor

Acoustics: Wall STC 45 / Door & Frame STC 42

Access: Accessed from corridor.

Number of Occupants/Workstations: see occupant requirements in Part 3 ant Load per NFPA 101 Life Safety is to be calculated as part of Business use 1/100 NSF. Other/Special Req’

FF&E Info: N/A Audio/Visual System Info: 1- wall mounted 42" monitor Security System Info: CCTV Bldg 318- Division Psych Central Wing 1st and 2nd Floor

Uniformat Section

Description Qty Size Specific Requirements

B202001 Exterior Windows Provide windows for natural light emission.

B202004 Exterior Glazing Insulated – Low ‘E’ Glazing or Spectral glazing.

C101001 Fixed Partitions SF GWB on metal studs to underside of deck.

C102001 Interior Doors 1 3’-0” x 7’-0” Provide solid core wood door with side light at entry in hollow metal frame. Solid core wood doors with stain finish and steel frames factory-primed, field painted.

C102007 Interior Door Hardware A/R Lever type handle for ADA compliance

C103004 Identifying Devices A/R Provide signage- Coordinate room signage with the user.

C3010 Wall Finish SF Impact Resistant GWB. Paint

C3020 Floor Finish SF Epoxy

C30200 Wall Base Finish LF 4” Resilient Base

C3030 Ceiling Finish SF 24”X24” Suspended Acoustical Ceiling Tiles

C303005 Suspension Systems SF Suspended exposed grid compatible with ACT system

D3040 HVAC Provide ducted supply and return.

D502001 Branch Wiring A/R Branch Circuits & Outlets per ESR

D50202 Lighting Equipment A/R General Lighting: Provide in compliance with UFC 3-530-01.

Provide in compliance with ASHRAE 90.1 2010.

Part 3 - Page | 11

Space Name: TYPICAL RESTROOM/SHOWER/LOCKER SPACES

D503002 Public Address System A/R

D503004 CCTV & CATV

D503090 Other Alarms Mass Notification

D509002 Emergency Lighting and Power

A/R Provide means of egress emergency lighting

Function/Adjacencies: The space is for men’s or women’s restroom/shower/locker areas for building occupants. Provide alcove off main corridor for entry door into toilet facilities.

Minimum Ceiling Height: First Floor: 7’-6” minimum above finish floor; Second Floor: 8’-0” minimum above finish floor

Acoustics: Wall STC 45 / Door & Frame STC 42

Access: All building occupants. Do not allow direct views into this area.

Number of Occupants/Workstations: see occupant requirements in Part 3 ant Load per NFPA 101 Life Safety is to be calculated as part of Business use 1/100 GSF. Other/Special Req’

FF&E Info: N/A Audio/Visual System Info:

Security System Info: N/A

Uniformat Section

Description Qty Size Specific Requirements

B202001 Exterior Windows Provide windows for natural light emission.

B202004 Exterior Glazing Insulated – Low ‘E’ Glazing or Spectral glazing.

C101001 Fixed Partitions SF GWB on metal studs to underside of deck.

C102001 Interior Doors 2 3’-0” x 7’-0” Provide solid core wood door with side light at entry in hollow metal frame. Solid core wood doors with stain finish and steel frames factory-primed, field painted.

C102007 Interior Door Hardware 2 sets Lever type handle for ADA compliance

C103001 Toilet Partitions Varies Phenolic partitions- floor to ceiling mounted

C103002 Toilet and Bath Accessories

A/R

Include mirror the full length of the counter over the lavatories (Minimum 36" high);

STAINLESS STEEL: 1- double toilet paper dispensers per toilet stall; 1-Coat hook on back of each toilet partition door;

Grab bars as required in accessible WC and shower stalls; 1- Soap dispensers per lav; 4- Electric hand dryers ; Shower seat in accessible stall; Shower rods at all showers; 1 - coat hook per shower stall. 1- semi recessed wall mounted trash receptacle.

C103004 Identifying Devices A/R Provide signage- Coordinate room signage with the user.

C103005 Lockers 60 15” X15” Provide stacked half height metal (Steel) ventilated lockers.

Lockers shall have 6” high front and end closed base.

C103008 Counters Solid Surfaces

Part 3 - Page | 12

C3010 Ceramic Tile Wall System Finishes

SF 8”x 8” Thin- set, Unglazed Ceramic Tile; epoxy grout

C3010 Wall Finish SF Moisture Resistant Gypsum Wallboard – Paint above tile

C3020 Tile Floor Finish SF 12”x12” Nonslip Ceramic tile; epoxy grout

C3020 Shower Floor Finish SF 2”X2” Ceramic tile; epoxy grout

C3030 Ceiling Finish SF Moisture Resistant Gypsum Wallboard with veneer plaster (level 5) finish and epoxy paint.

D201001 Plumbing Fixtures Water Closets- floor mounted – dual function flush valve

D201004 Plumbing fixtures Countertop sinks

D201005 Shower 10 Solid surface enclosure

D203003 Floor Drain with trap primer

6 Located as required with chrome plated strainers

D3040 HVAC Provide supply and exhaust

D502001 Branch Wiring A/R Branch Circuits & Outlets per ESR. Provide GFI convenience receptacles above counters- one for every two lavatories.

D502002 Lighting Equipment A/R General Lighting: Provide in compliance with UFC 3-530-01.

Provide in compliance with ASHRAE 90.1 2010.

D503090 Other Alarms Mass Notification

D509002 Emergency Lighting and Power

A/R Provide means of egress emergency lighting

D5020 Electrical Devices Hand/Hair Dryers

E201003 Fixed Seating Benches

Part 3 - Page | 13

Space Name: MECHANICAL/ELECTRICAL/TELECOMMUNNICATION SPACES

Function/Adjacencies: Primary use for mechanical, electrical or telecommunications requirements- each must have a dedicated space.

Special Dimensions: Minimum size as required to accommodate and allow for servicing equipment.

Minimum Ceiling Height: No Ceiling

Acoustics: Provide sound and vibration isolation from all occupied spaces.

Access: Access from corridor or as shown on A103 & A104.

pant Load per NFPA 101 Life Safety is to be calculated as part of Storage use 1/500 GSF.

Audio/Visual System Info: N/A Security System Info: N/A

Uniformat Section

Description Qty Size Specific Requirements

B202001 Exterior Windows Provide windows for natural light emission.

B202004 Exterior Glazing Insulated – Low ‘E’ Glazing or Spectral glazing.

C101001 Fixed Partitions SF GWB on metal studs to underside of deck.

C102001 Electrical and Telecommunication Interior Doors

1 3’-0” x 7’-0”

Provide solid core wood door with hollow metal frame. Solid core wood doors with stain finish and steel frames factory-primed, field painted. Telecommunications door swing outward.

C102001 Mechanical Interior Doors Double Doors- Provide solid core wood doors with hollow metal frame. Solid core wood doors with stain finish and steel frames factory-primed, field painted.

C102007 Interior Door Hardware A/R Lever type handle for ADA compliance

C103004 Identifying Devices A/R Provide signage- Coordinate room signage with the user.

C3010 Wall Finish Impact Resistant GWB. Paint

C3010 Other wall Finishes SF Telecommunications Room- Plywood backer board

C3020 Hardeners and Sealers SF Hardened and sealed concrete

C3020 Wall Base Finish LF 4” Resilient Base

C3030 Ceiling Finish Exposed, painted structure

Part 3 - Page | 14

D202003 Backflow Preventer 1 Mechanical Room- RPZ Type for domestic CW and Boiler make-up

D202003 Recirculation Pump 1 Mechanical Room- for domestic hot water

D203003 Floor Drains 1 min In Mechanical Room- provide as required for equipment. Slope to drain.

D303002 HVAC

Telecommunications Room- provide ductless DX split system, cooling only

D3040 HVAC

Provide exhaust fan & unit heater for mechanical and electrical rooms, if required.

D502001 Branch Wiring A/R Branch Circuits & Outlets per ESR

D50202 Lighting Equipment A/R General Lighting: Provide in compliance with UFC 3-530-01.

Provide in compliance with ASHRAE 90.1 2010. Suspended Fixtures

D5030 Telecommunications A/R compliance with Specification 27 10 00

D503001 Telecommunications Telecommunications outlets are needed for direct digital controller and fire panel.

D503001 Telecommunications Telecom Room: Provide lockable server cabinets for all horizontal copper terminations. Provide ¾” plywood A/C grade on walls.

D503002 Public Address System A/R

D503090 Other Alarms Mass Notification

D509002 Emergency Lighting and Power

A/R Provide means of egress emergency lighting

Part 3 - Page | 15

Space Name: TYPICAL CORRIDOR SPACES

Function/Adjacencies: This area is for circulation space.

Minimum Ceiling Height: First Floor: 7’-6” minimum above finish floor; Second Floor: 8’-0” minimum above finish floor

Acoustics: Wall STC 45 / Door & Frame STC 42 Access:

Number of Occupants/Workstations: NA cupant Load Factor per NFPA 101 Life Safety Code: Occupant Load per NFPA 101 Life Safety is to be calculated as Business Use

1/100 GSF

Audio/Visual System Info: N/A Security System Info: N/A

Uniformat Section

Description Qty Size Specific Requirements

B201006 Handrails A/R Upgrade existing or provide new to meet ADA

B202001 Exterior Windows A/R Provide windows for natural light emission.

B202002 Storefronts A/R Entrance to H-Style Wings

B20200 Exterior Glazing A/R Insulated – Low ‘E’ Glazing or Spectral glazing.

B2030 Exterior Doors A/R

Hollow metal insulated galvanized steel doors and steel frames.

Provide through bolt frame anchor for exterior frames. Doors and frames shall be factory primed and field painted. Provide fully weather stripped, thermally insulated doors as required.

Provide Rainguard.

B203008 Exterior Door Hardware A/R

C101001 Fixed Partitions SF GWB on metal studs to underside of deck.

C101006 Interior Glazing A/R Coordinate with user for locations

C102001 Interior Doors A/R 3’-0” x 7’-0” Provide solid core wood door in hollow metal frame. Solid core wood doors with stain finish and steel frames factory-primed, field painted.

C102001 Interior Doors to suites A/R Provide solid core wood door with side light in hollow metal frame. Solid core wood doors with stain finish and steel frames factory-primed, field painted.

C102002 Glazed Interior Doors A/R Coordinate with user for locations. Provide wire glass in fire rated conditions

Part 3 - Page | 16

Space Name: JANITOR’S SPACES

C102003 Fire Doors A/R Provide in all fire rated walls

C102007 Interior Door Hardware A/R Lever type handle for ADA compliance

C103004 Identifying Devices A/R Provide ADA directional signage- Coordinate room signage with the user.

C103007 Fire Extinguisher Cabinet A/R Coordinate location with user

C103012 Fire Stopping Penetrations

A/R Provide at all fire rated walls

C103014 Entrance Floor Grilles & Matts

A/R Provide recessed entrance matts at H-Style entrance wings.

Modify existing slab as necessary

C201001 Interior & Exterior Stairs A/R Upgrade existing or provide new to comply with requirements

C201002 Fire Escapes A/R Upgrade existing or provide new to comply with requirements

C201060 Handrails A/R Upgrade existing or provide new to comply with requirements

C3010 Wall Finish SF Heavy Duty High Impact Resistant GWB, provide corner guards. Paint

C3020 Floor Finish SF Epoxy

C3020 Wall Base Finish LF 4” Resilient Base

C3030 Ceiling Finish SF 24”X24” Suspended Acoustical Ceiling Tiles

C3030 Suspension Systems SF Suspended exposed grid compatible with ACT system

D201006 Plumbing A/R

D3040 HVAC A/R Provide ducted supply and return.

D502001 Branch Wiring A/R Branch Circuits & Outlets per ESR

D50202 Lighting Equipment A/R General Lighting: Provide in compliance with UFC 3-530-01.

Provide in compliance with ASHRAE 90.1 2010.

D503001 Telecommunications A/R compliance with Specification 27 10 00

D503002 Public Address System A/R

D503090 Other Alarms A/R Mass Notification

D509002 Emergency Lighting and Power

A/R Provide means of egress emergency lighting

Part 3 - Page | 17

Space Name: TYPICAL KITCHEN SPACES

Function/Adjacencies: Closet for housekeeping supplies.

Special Dimensions:

Minimum Ceiling Height: No Ceiling - Exposed Acoustics:

Access: Access from head

FPA 101 Life Safety Code: Occupant Load per NFPA 101 Life Safety is to be calculated as part of Business use 1/100 GSF.

FF&E Info: N/A Audio/Visual System Info: N/A Security System Info: N/A

Uniformat Section

Description Qty Size Specific Requirements

B202001 Exterior Windows Provide windows for natural light emission.

B202004 Exterior Glazing Insulated – Low ‘E’ Glazing or Spectral glazing.

C101001 Fixed Partitions SF GWB on metal studs to underside of deck.

C102001 Interior Doors 1 3’-0” x 7’-0”

Provide solid core wood door with hollow metal frame. Solid core wood doors with stain finish and steel frames factory-primed, field painted. Telecommunications door swing outward.

C102007 Interior Door Hardware A/R Lever type handle for ADA compliance

C103004 Identifying Devices A/R Provide signage- Coordinate room signage with the user.

C103006 Utility Shelving A/R 48”wide X 12” deep

Utility shelf with mop & broom holder

C3010 Wall Finish SF 8”x8” Impact Resistant GWB. Ceramic Tile Wainscot (full length) at Mop sink. Epoxy paint above wainscot and walls not covered with ceramic tile.

C3020 Ceramic mosaic SF 2”x2”

C3020 Wall Finish sf 8”X8” Ceramic tile

C3030 Ceiling Finish SF Moisture resistant GWB. Paint

D201004 Sinks 1 30”X30” min Mop Sink and faucet

D203003 Floor Drains 1 min Trap primer. Slope to drain.

D3040 HVAC Provide supply and exhaust fan.

D502001 Branch Wiring A/R Branch Circuits & Outlets per ESR

D50202 Lighting Equipment A/R General Lighting: Provide in compliance with UFC 3-530-01.

Provide in compliance with ASHRAE 90.1 2010. Suspended Fixtures

D5030 Telecommunications A/R compliance with Specification 27 10 00

Part 3 - Page | 18

Function/Adjacencies: The area is to provide a space for lunch breaks for building occupants.

Minimum Ceiling Height: First Floor: 7’-6” minimum above finish floor; Second Floor: 8’-0” minimum above finish floor Acoustics: Wall STC 45 / Door & Frame STC 42 Access: Accessed from corridor.

Number of Occupants/Workstations: 6 Occupant Load Factor per NFPA 101 Life Safety Code: Occupant Load per NFPA 101 Life Safety is to be calculated as Assembly Use

1/15 NSF

Oher/Special Req’: Provide space for base cabinet & countertop, full size Refrigerator, Microwave, Coffee Maker, sink, Two Vending machines.

Audio/Visual System Info: N/A Security System Info: N/A

Uniformat Section

Description Qty Size Specific Requirements

B202001 Exterior Windows A/R Provide windows for natural light emission.

B202004 Exterior Glazing A/R Insulated – Low ‘E’ Glazing or Spectral glazing.

C101001 Fixed Partitions SF GWB on metal studs to underside of deck.

C102001 Interior Doors 1 3’-0” x 7’-0” Provide solid core wood door with side light at entry in hollow metal frame. Solid core wood doors with stain finish and steel frames factory-primed, field painted.

C102007 Interior Door Hardware A/R Lever type handle for ADA compliance

C103004 Identifying Devices A/R Provide signage- Coordinate room signage with the user.

C103008 Counters LF 12’ Plastic laminate covered tops with 4” high splash. Preformed factory splash not allowed.

C103309 Cabinets LF 12’ Provide costume millwork consisting of plastic laminate wall & base cabinets

C3010 Wall Finish Impact Resistant GWB. Paint

C3020 Floor Finish SF Epoxy

C3020 Wall Base Finish LF 4” Resilient Base

C3030 Ceiling Finish SF 24”X24” Suspended Acoustical Ceiling Tiles

C303005 Suspension Systems SF Suspended exposed grid compatible with ACT system

D201004 Sink 1 Provide stainless Steel undermount sink with electric faucet with aerator

D3040 HVAC Provide ducted supply and return.

D502001 Branch Wiring A/R Branch Circuits & Outlets per ESR Provide outlets for countertop microwave & coffee maker, Refrigerator

D50202 Lighting Equipment A/R General Lighting: Provide in compliance with UFC 3-530-01.

Provide in compliance with ASHRAE 90.1 2010.

D503002 Public Address System A/R

Part 3 - Page | 19

D503004 CCTV & CATV CATV Coordinate with tenant during CDW

Part 3 - Page | 20

Space Name: TYPICAL STORAGE SPACES

Function/Adjacencies: The space is to provide storage of miscellaneous items.

Minimum Ceiling Height: First Floor: 7’-6” minimum above finish floor; Second Floor: 8’-0” minimum above finish floor

Access: Accessed from corridor.

Number of Occupants/Workstations: see occupant requirements in Part 3

FPA 101 Life Safety Code: Occupant Load per NFPA 101 Life Safety is to be calculated as part of Business use 1/100 NSF.

Other/Special Req’

FF&E Info: N/A Audio/Visual System Info: 1- wall mounted 42" monitor Security System Info: N/A

Uniformat Section

Description Qty Size Specific Requirements

B202001 Exterior Windows A/R Provide windows for natural light emission.

B202004 Exterior Glazing A/R Insulated – Low ‘E’ Glazing or Spectral glazing.

C101001 Fixed Partitions SF GWB on metal studs to underside of deck.

C102001 Interior Doors 1 3’-0” x 7’-0” Provide solid core wood door in hollow metal frame. Solid core wood doors with stain finish and steel frames factory-primed, field painted.

C102007 Interior Door Hardware A/R Lever type handle for ADA compliance

C103004 Identifying Devices A/R Provide signage- Coordinate room signage with the user.

C3010 Wall Finish SF Impact Resistant GWB. Paint

C3020 Floor Finish SF Epoxy

C3020 Wall Base Finish LF 4” Resilient Base

C3030 Ceiling Finish SF 24”X24” Suspended Acoustical Ceiling Tiles

C3030 Suspension Systems SF Suspended exposed grid compatible with ACT system

D3040 HVAC Provide ducted supply and return.

D502001 Branch Wiring A/R Branch Circuits & Outlets per ESR

D50202 Lighting Equipment A/R General Lighting: Provide in compliance with UFC 3-530-01.

Provide in compliance with ASHRAE 90.1 2010.

D503001 Telecommunications A/R compliance with Specification 27 10 00

D503002 Public Address System A/R

Part 3 - Page | 21

6 ENGINEERING SYSTEM REQUIREMENTS (ESR)

B10 Superstructure B20 Exterior Enclosure C10 Interior Construction C20 Stairs C30 Interior Finishes D20 Plumbing

D30 HVAC

D40 Fire Protection Systems D50 Electrical Power and Lighting E20 Furnishings G10 Site Preparation G20 Site Improvements G30 Site Civil/Mechanical Utilities G40 Site Electric Utilities

B10 SUPERSTRUCTURE

SYSTEM DESCRIPTION

Provide the building framing system in accordance with UFC 3-301-01, Structural Engineering subject to the following limitation:

Design the structural in accordance with the following loading criteria:

Occupancy Category or Use: Use Occupancy Category II.

Wind Exposure: Wind design shall be based on Exposure C

Anti-Terrorism Force Protection (ATFP): Building is within controlled perimeter.

B20 EXTERIOR ENCLOSURE

Building envelope: Includes repair of brick veneer, weep holes, back up wall reinforcement, internally installed brick anchors, flashing, insulation and vapor barrier. Refer to B2010 Exterior Walls.

SHPPO: Comply with Historical Preservation requirements for the Hadnot Point District.

Finishes: Comply with the Base Exterior Architecture Plan, BEAP

B2010 EXTERIOR WALLS

Provide written and graphic descriptions of exterior enclosure barrier materials and location within the wall as a part of the Contractor provided design analysis.

B201001 EXTERIOR CLOSURE

SEE Drawing A105 in Part 6 for SOW.

Provide contract drawings that indicate each exterior enclosure barrier location and the materials that make up the barriers. Detail the following barrier conditions;

1. Typical conditions at wall sections.

Part 3 - Page | 22

2. Barrier treatment at wall openings.

3. Intersections with other exterior enclosure assemblies and materials. Include intersections at roof and floors.

4. Intersections with counter flashing.

5. Inside and outside corners.

6. Preservation of air and water tightness at anchors for materials that cover the barrier.

Treatment to seal barrier penetrations such as conduits, pipes, electric boxes, and fixtures.

Indicate air barrier perimeter, if facility is segmented into areas that are not within the air barrier envelope.

Internal brick ties type and anchoring methods

B201005 EXTERIOR LOUVERS & SCREENS

Provide as specified in MCBCL Standard spec section 08 91 00 WALL LOUVERS in Part 5

B201006 HANDRAILS

All existing handrails and guardrails to remain must be finished to withstand extreme wear condition

All new handrails and guardrails must hot-deep galvanized steel and finished to withstand extreme wear condition

B201007 EXTERIOR FASCIA, SOFFIT, TRIM, CEILING AND MOLDING

All existing painted items must be painted to withstand extreme wear condition

All new items must be made of plastic wood like materials

B201009 EXTERIOR PAINTING AND COATING

Existing items: Prepare to receive new field applied exterior coatings for all items that are not prefinished

New items: Provide field applied exterior coatings when required to provide a color other than a standard prefinished color.

B201010 EXTERIOR SEALANTS

Provide exterior application of joint sealants to seal joints and prepare for finish material installation.

B201012 SCREEN WALL

Provide screen walls where required to screen mechanical units, and trash receptacles. Screen walls shall be compatible with the building architecture and shall be of masonry construction only, no chain link will be accepted. See Attachment N in Part 6 for section of wall.

B2020 EXTERIOR WINDOWS

Provide windows in each existing window condition. Exterior windows must be prefinished aluminum.

Part 3 - Page | 23

Windows must meet Antiterrorism requirements and or in secured rooms as indicated.

B202001 WINDOWS

Exterior windows must be prefinished aluminum, thermally-broken, and with specified glazing.

Windows and glazing must comply with UFC 04-010-01 DoD Antiterrorism Standards for Buildings and shall be designed to resist impact/breakage by hurricane windborne debris in accordance with the International Building Code, 2006 Edition.

B202002 STOREFRONTS

Exterior storefronts must be prefinished aluminum, thermally-broken, and with specific glazing.

Storefronts must comply must comply with UFC 04-010-01 DoD Antiterrorism Standards for Buildings.

B202004 EXTERIOR GLAZING

Provide glazing with a color matching existing adjacent buildings refer to BEAP.

Provide insulating glass units type glazing.

Provide as indicated in other documents: clear glass, or heat absorbing glass, or wireglass, or insulating glass units, or laminated glass, or tempered glass, or spandrel glass, type glazing.

B2030 EXTERIOR DOORS

Provide solid door assemblies other than at the main entrance. Exterior doors and frames shall be non-corroding hot-deep galvanized steel. Provide doors meeting thermal performance required by RFP Part 4.

Provide Extra Heavy Duty Doors -– American National Standards Institute/Steel Door Institute (ANSI/SDI) A250.8, Level 4, physical performance Level A, Model 2 (Seamless).

Door hardware finish shall be stainless steel.

Provide door glazing that matches the window glazing.

Must comply with UFC 04-010-01 DoD Antiterrorism Standards for Buildings.

B203001 SOLID DOORS

Provide solid steel door assemblies other than at main storefront/curtainwall entrances including painted, prefinished, galvanized, heavy-duty, non-corroding, insulated doors with frames and hardware.

Provide louvers and accessories and wall opening elements such as lintels sills and flashings.

B203002 GLAZED DOORS

Glazed Doors - Provide Exterior Glazed Doors and Entrances System. Including factory-finish painted steel framed door assemblies with insulated, glazing, frames, and hardware compatible with other buildings on the base and wall opening elements such as lintels, sills, through-wall flashings, and joint sealers.

B203008 EXTERIOR DOOR HARDWARE

Provide the services of a certified door hardware consultant to prepare the door hardware schedule.

Part 3 - Page | 24

Provide hardware keying compatible with the existing base-wide keying system. Provide replacement interchangeable cores compatible with the Best Lock system.

Provide the services of a certified door hardware consultant to prepare the door hardware schedule.

Provide door hardware finish of chrome-plated brass or bronze, stainless steel, brass or bronze.

C10 INTERIOR CONSTRUCTION

Interior construction includes interior partitions, interior doors, and fittings.

Provide durable construction appropriate for the building function. Acoustic properties of materials, as well as durability, must be considered during material selection.

GENERAL SYSTEM REQUIREMENTS

Areas of the Project subject to abuse require that "impact resistant" systems be provided. See "Room Requirements" for specific requirements on "Partitions", "Interior Doors", and "Fittings".

C1010 PARTITIONS

All interior partitions must be constructed of metal studs with gypsum board on each side

C101001 FIXED PARTITIONS

Provide fixed interior partitions that extend from finish floor to underside of structure above. Sound-rated partition assemblies shall have a minimum Sound Transmission Coefficient (STC) of 42 in accordance with ASTM E 90 or ASTM E 413 for frequency data.

For rated partitions provide UL Design Assemblies and firestoping.

C101003 RETRACTABLE PARTITIONS

Provide retractable partitions to include operable panel partitions and/or accordion folding partitions as indicated in other documents. Sound-rated partition assemblies must have a minimum Sound Transmission Coefficient (STC) of 42 in accordance with ASTM E 90 or ASTM E 413 for frequency data. Coordinate finishes with Section C30 Interior Finishes.

C101004 INTERIOR GUARDRAILS AND SCREENS

Provide balustrades where required by code.

C101005 INTERIOR WINDOWS

Provide interior windows of hollow metal, fixed or operable. Provide each window as a complete factory-assembled unit with glass factory or field installed.

Fire rated windows must meet UL Classification for the rating specified.

C101006 GLAZED STOREFRONTS

Provide glazed storefront system.

Part 3 - Page | 25

C101007 INTERIOR GLAZING

Interior glazing shall be clear glass tempered glass.

C1020 INTERIOR DOORS

C102001 STANDARD INTERIOR DOORS

Refer to Part 3 Section 5.0, Room Requirements for door requirements for individual rooms. Where rooms with different door requirements are connected by a door, provide a door type that meets the security and durability as well as finish requirements of both spaces.

All interior doors must be flush stile.

All interior doors must be wood, except where hollow metal doors are required to meet fire rating or at Mechanical Rooms. All interior door frames must be hollow metal.

Flush wood doors must be WDMA I.S.1A-04, custom grade, extra heavy duty. Flush wood doors must be WDMA I.S.-97 SCLC-5 5-ply structural composite lumber core.

Doors must have Factory Finish of AWI Quality Standards Section 1500, specification for Conversion varnish alkyd urea or catalyzed polyurethane.

Provide STC sound rated door assemblies that matches or exceeds the STC for the doors leading into room(s) listed in Part 3, Chapter 5 Room Requirements.

Provide doors leading into classified/secured/vaults areas to comply with Marine Corps Order MCO 5530.14A.

Provide a factory tested, insulated, engineered, metal door assembly including door frame, hardware, and seals necessary to achieve the required rating. Install in accordance with manufacturer's instructions.

C102002 GLAZED INTERIOR DOORS

Provide vision glazing in doors where it is required by the “Room Requirements” portion of this RFP.

C102003 FIRE DOORS

Provide interior fire doors.

C102007 INTERIOR DOOR HARDWARE

Provide special door hardware, such as combination locks, CDX-10, etc. as indicated in Part 3, Chapter 5.0, Room Requirements.

Provide the services of a Certified Door Hardware Consultant to prepare the door hardware schedule.

Provide hardware keying, lock cores, compatible with the existing base-wide keying system, BEST.

Lock cores must be BEST A4 system with the 7-pin option.

Provide stainless steel door hardware finish.

C1030 SPECIALTIES

Part 3 - Page | 26

C103001 COMPARTMENTS, CUBICLES, & TOILET PARTITIONS

Provide solid toilet partitions in all toilet rooms with more than one water closet or urinal. Provide toilet accessories as indicated in Part 3, Chapter 5.0, Room Requirements portion of this RFP.

Toilet partitions and screens shall be high density polyethylene/solid plastic.

C103002 TOILET AND BATH ACCESSORIES

Provide stainless steel toilet and bath accessories.

C103003 MARKER BOARDS AND TACK BOARDS

C103004 IDENTIFYING DEVICES

Provide interior room identification signs on each entrance to each interior room. Provide signage to identify each space by room number and name. Signage for general office areas must have changeable room name sections to accommodate personnel and functional changes.

Incorporate all necessary interior signage as part of the architectural drawings. Interior signage is not collateral equipment. Interior signage must demonstrate complete coordination with the facility design, Structural Interior Design (SID) and FF&E submittals. Provide interior directional signage as required for facility wayfinding. Provide an identifying device at each interior door. Signs must meet Architectural Barriers Act (ABA) Standards requirements.

Refer to Unified Facilities (UFC) 3-120-01, Design: Sign Standards, for more information. Refer to Part 5 MCBCL Standard 10 14 00.20 Interior Signage and Part 6 Attachment A13, MCBCL SIGNS

STANDARDS - GRAPHICS.

C103005 LOCKERS

Provide vented metal construction lockers and enamel finish lockers with manufacturer standard metal base. Lockers must have sloped tops.

Lockers are funded as part of the construction contract.

C103006 SHELVING

Provide steel utility plastic laminate clad shelving. Built-in fixed shelving is funded as part of the construction contract.

Provide stainless steel utility shelving with broom and mop holders.

C103007 FIRE EXTINGUISHER CABINETS

Provide Fire Extinguishers conforming to NFPA 10. Provide quantity and placement in compliance with the applicable sections of NFPA 101. Provide multipurpose dry chemical type fire extinguishers compliant with UL 299. Submit Manufacturer's Data for each type of Fire Extinguisher required, detailing all related Cabinet, Wall Mounting and Accessories information, complete with Manufacturer's Warranty with Inspection Tag. Provide fire extinguisher cabinets. Cabinet must be semi-recessed in new construction and surface-mounted in new mechanical/electrical spaces and existing wall construction. Coordinate cabinets with interior finishes.

C103008 COUNTERS

Part 3 - Page | 27

Provide solid acrylic, or plastic laminate, or stainless steel counter tops and back splashes.

C103009 CABINETS

Provide cabinetry and millwork items with associated accessories and hardware. Cabinetry shall be AWI custom grade and have concealed hinges with adjustable standards for shelves. All exposed surfaces will be covered with high pressure plastic laminate clad. Provide plastic laminate covered tops and splashes. Pre-formed splashes are not acceptable.

C103012 FIRESTOPPING PENETRATIONS

Provide all penetrations through rated walls and floors with rated material for fire stopping penetrations.

Provide fire stopping materials, supplied from a single domestic manufacturer, consisting of commercially manufactured, asbestos-free, nontoxic, water-based, noncombustible products FM APP GUIDE approved, or UL listed, for use with applicable construction and penetrating items. Provide all sleeves, caulking, and flashing for fire stopping penetrations.

C103014 ENTRANCE FLOOR GRILLES AND MATS

Provide recessed floor mats at main building entrances. Provide recessed floor mats at other building entrances shown in plans.

Provide entrance mats with rubber, or vinyl, or recycled tire surface treads.

C103090 OTHER INTERIOR SPECIALTIES

Provide wall or ceiling mounted motorized projection screens in class rooms and computer labs.

In Classrooms, Computer labs and Conference rooms, provide fixed ceiling mount for computer projector. Coordinate location in the rooms at CDW.

C20 STAIRS

SYSTEM DESCRIPTION

Provide stairs, including stair construction and stair finishes as required by the building code to provide egress from the building from above or below grade level floors.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .