This federal solicitation requests proposals for four construction projects at Tinian International Airport in the Commonwealth of the Northern Mariana Islands. The solicitation seeks bids for the construction of a cargo pad with taxiway extension using Portland cement concrete, including utilities and support facilities. It also requests proposals for the construction of a jet fuel system with receipt pipeline, fuel storage tanks totaling 220,000 barrels, and hydrant delivery system. Additionally, the solicitation includes a project to repair and improve the haul route from the seaport to the airfield. An optional pre-priced line item is specified for a maintenance support facility. The solicitation requires compliance with seismic and force protection design standards. The Navy may exercise the option for the maintenance facility within 365 days of award. Three planned modifications related to munitions and explosives are also included. Proposals are due by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AT
T S
XETE FO
SA
TR
EYD.RICE
26 75 5
R
EG
IS
TE
RED ARCHITEC
T
P.O. Box 8900 Tamuning, Guam 96131
1 2 3 4 5
D
C
B
A
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK
AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO
ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.
IF SHEET IS LESS THAN 559 X 864
REDUCED PRINT. USE GRAPHIC SCALES
1 2 3 4 5
D
C
B
A
AAATTTTTTTAA XXXXXXEEEEEEETTTTTTTEEEEEE FFFFFFOOOOOOO
9-24-21
S
XETE FO
SA
TR
EYD.RICE
26 75 5
R
EG
IS
TE
RED ARCHITEC
T
1 2 3 4 5
D
C
B
A
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK
AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO
ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.
IF SHEET IS LESS THAN 559 X 864
REDUCED PRINT. USE GRAPHIC SCALES
1 2 3 4 5
D
C
B
A
AAAATTTTTTAA XXXXXXEEEEEEETTTTTTTEEEEEE FFFFFFOOOOOOO
NORTH
KHK SMC JDE
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
CN
KY
K. YOSHIMOTO
JC
SCALE
HAUL ROUTE AND LOCATIONA1 1:10000 G-010
H
AU
L R
O U
TE
A
N D
L O
C
AT
IO
N
HAUL ROUTE GENERAL NOTES
LEGEND
TWO-WAY PRIMARY HAUL ROUTE
POTENTIAL STAGING AREA
ALL DEMOLISHED MATERIAL, RUBBISH AND DEBRIS
GENERATED BY THIS PROJECT MUST BE HAULED TO
AN APPROVED LANDFILL.
PROJECT AREA
TWO-WAY HAUL ROUTE, PHASE III ONLY
A
9010 PROJECT LIMITS, NOT
AVAILABLE FOR STAGING
THE OFFLOADING AREA IS AVAILABLE FOR
OFFLOADING AND TEMPORARY STORAGE OF
MATERIALS. CONTRACTOR MUST COORDINATE USE
WITH TINIAN PORTS AUTHORITY PERSONNEL AND
CONTRACTING OFFICER TO SCHEDULE SHIPMENTS.
B
17230743
10 SEP 2021
EDUARDO M. SALANATIN
GU 1123 09/24/2021
X
N89°39'58"W155.923M
N
°2 0'
"E
9.
6M
N 10°55'23"W 170.657M
S79°24'52"W 1,074.858M
S10°32'55"E 167.978M
S79°27'05"W
160.979MS10°32'55"E
143.981M
N79°24'52"E 410.946M
S10°52'55"E 211.972M
S79°24'52"W 2,135.728M
N 10°32'55"W
350.937M
X
XXXXX
X X
S10° 37' 53"E 83.939M
S10° 37' 37"E 83.937M
NORTH
KHK SMC JDE
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
CN
KY
K. YOSHIMOTO
JC
EXISTING CONDITIONS
GENERAL NOTES
EXISTING CONDITIONS ARE FROM GIS DATA.A
LEGEND
LEASE BOUNDARY
SCALE
OVERALL EXISTING CONDITIONS PLANA1 1:4000
G-100
O
VE
R
AL
L
EX
IS
TI
N G
C O
N D
IT
IO
N S
PL
AN
17230744
09/24/2021
XAS REGISTERED ENGINEERING FIRM F-2966
09/24/2
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
JNP KWA JNP
CN
KY
K. YOSHIMOTO
JC
G-101
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G N
O
TE
S
17230745
PHASE III RESTRICTIONS (CONT):
5. CONTRACTOR IS REQUIRED TO ACCESS CONSTRUCTION SITE FROM BROADWAY AVE.
DURING PHASE III CONSTRUCTION. THE CONTRACTOR MUST NOT CROSS THE
ACTIVE RUNWAY.
AREAS AND OPERATIONS AFFECTED BY CONSTRUCTION ACTIVITY
IDENTIFICATION OF EFFECTED AREAS:
1. PHASE I OCCURS NORTH OF RUNWAY 8-26 AS SHOWN ON THE CONSTRUCTION
PHASING - PHASE 1 DRAWING, G-102.
2. PHASE II OCCURS ACROSS RUNWAY 8-26 AND TIE INTO TAXIWAY A AS SHOWN
ON THE CONSTRUCTION PHASING - PHASE 2 DRAWING, G-103.
3. PHASE III OCCURS AT THE TAXIWAY B/TAXIWAY A JUNCTURE AS SHOWN ON THE
CONSTRUCTION PHASING - PHASE 3 DRAWING, G-104.
MITIGATION OF EFFECTS
1. PHASE I WORK AREA A IS OUTSIDE OF THE AOA. PHASE I WORK AREA B REQUIRES
AOA ACCESS, ALL REQUIREMENTS FOR AOA ACCESS, AND WORK APPLY.
2. PHASE II REQUIRES AOA ACCESS, ALL REQUIREMENTS FOR AOA ACCESS AND
WORK APPLY.
3. PHASE III REQUIRES AOA ACCESS, ALL REQUIREMENTS FOR AOA ACCESS AND
WORK APPLY.
NAVIGATION AID (NAVAID) PROTECTION
1. NOT APPLICABLE.
CONTRACTOR ACCESS
ACCESS AND STAGING AREAS
1. CONTRACTOR ACCESS ROUTES ARE SHOWN ON SHEET G-100. CONTRACTOR
STAGING AREA SHOWN ON SHEETS G-102 THRU G-104 ON THE CONSTRUCTION
PHASING PLANS.
VEHICLE AND PEDESTRIAN OPERATIONS
1. CONTRACTOR PERSONNEL REQUIRING AOA ACCESS MUST COMPLY WITH THE
AIRPORT'S BADGING PROCEDURES.
2. INDIVIDUALS IDENTIFIED BY THE CONTRACTOR TO WORK WITHIN THE AOA MUST
UNDERGO TRAINING TO COMPLY WITH THE AIRPORT'S RULES FOR GROUND
VEHICLE OPERATIONS AND WILL BE RESPONSIBLE FOR MAINTAINING COMPLIANCE.
3. ENTRY GATES MUST BE LOCKED AT ALL TIMES. IN THE EVENT THAT THE GATES NEED
TO BE OPENED FOR AN EXTENDED PERIOD OF TIME, THE GATES MUST BE MANNED.
4. THE CONTRACTOR MUST PROVIDE AN ESCORT TRAINED BY THE AIRPORT FOR ALL
VEHICLES REQUIRING ACCESS TO THE AOA.
5. THE CONTRACTOR'S PERSONNEL AND EQUIPMENT MUST STAY WITHIN THE INDICATED
STAGING AREA, HAUL ROUTE(S), AND PHASE AS INDICATED FOR EACH PHASE.
6. THE CONTRACTOR MUST MAINTAIN CONTROL OF ALL PERSONNEL AND EQUIPMENT
TO PREVENT UNAUTHORIZED ENTRY OF PERSONS OR VEHICLES FROM ENTERING THE
AOA.
7. THE CONTRACTOR'S VEHICLES MUST BE MARKED AND LIGHTED IN ACCORDANCE WITH
FAA AC 150/5370-2 AND 150/5210-5 (LATEST EDITION) AT ALL TIMES WHILE ON THE
PROJECT SITE. THIS MUST INCLUDE A FLAG ON A STAFF ATTACHED TO THE VEHICLE
SO THAT THE FLAG WILL BE READILY VISIBLE. THE FLAG MUST BE AT LEAST A
(0.9 METER BY 0.9 METER) SQUARE HAVING A CHECKERED PATTERN OF
INTERNATIONAL ORANGE AND WHITE SQUARES AT LEAST 300MM ON EACH SIDE.
CONSTRUCTION VEHICLES MUST BE EQUIPPED WITH A YELLOW FLASHING LIGHT
MEETING THE REQUIREMENTS OF FAA AC 150/5210-5D DURING PERIODS OF LOW
VISIBILITY AS DETERMINED BY THE CONTRACTING OFFICER.
RADIO COMMUNICATIONS
1. WHEN WORKING WITHIN THE AOA, BADGED AND TRAINED INDIVIDUALS ARE
RESPONSIBLE FOR MONITORING THE AIRPORT'S COMMON TRAFFIC ADVISORY
FREQUENCY (CTAF) 123.6 MHZ. THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING
AN ADEQUATE NUMBER OF RADIOS FOR HIS PERSONNEL.
WILDLIFE MANAGEMENT
1. CONTRACTOR MUST CAREFULLY CONTROL AND CONTINUOUSLY REMOVE TRASH,
WASTE, OR LOOSE MATERIALS THAT MAY ATTRACT WILDLIFE.
2. IF STOCKPILES OR STORED MATERIALS ARE FOUND TO BE A WILDLIFE ATTRACTANT,
THE CONTRACTOR MUST IMPLEMENT MITIGATION MEASURES AS DIRECTED BY THE
CONTRACTING OFFICER.
3. THE CONSTRUCTION SITE MUST BE GRADED TO MAINTAIN POSITIVE DRAINAGE
ALWAYS TO ELIMINATE AREAS OF STANDING WATER.
4. CONTRACTOR IS RESPONSIBLE FOR MOWING WITHIN THE PROJECT WORK LIMITS.
GRASS MUST NOT EXCEED 15cm IN HEIGHT.
5. CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING ALL FENCES AND GATES
INSTALLED AS PART OF THEIR CONTRACT, IN SUFFICIENTLY GOOD CONDITION TO
PREVENT PASSAGE OF WILDLIFE INTO THE AOA.
6. CONTRACTOR WILL MONITOR FOR ANY DISRUPTIONS OF EXISTING WILDLIFE HABITAT
THAT TAKES PLACE.
7. CONTRACTOR TO CONTINUOUSLY MONITOR THE AOA FENCE FOR POTENTIAL ENTRY
POINTS FOR WILDLIFE.
FOREIGN OBJECT DEBRIS (FOD) MANAGEMENT
1. THE PERIMETER OF THE CONSTRUCTION SITE AND ALL HAUL ROUTES MUST BE
CONTINUOUSLY MONITORED BY THE CONTRACTOR TO ENSURE THE TEMPORARY
BARRICADES ARE PER PLAN AND TO ENSURE NO FOD HAZARD IS PRESENT.
2. FOD SIGNS MUST BE INSTALLED AT CONSTRUCTION AIRFIELD POINTS OF ENTRY FOR
FOD CHECKS WHEN VEHICULAR TRAFFIC IS NEAR AND WILL BE ENTERING THE
AIRFIELD.
3. A FOD CHECK MUST BE PERFORMED ON ALL VEHICLES ENTERING ACTIVE
AIRFIELD PAVEMENTS. DRIVERS WILL BE RESPONSIBLE FOR A VISUAL INSPECTION
OF ALL TIRES AND FOR REMOVING MUD AND OTHER DEBRIS PRIOR TO PROCEEDING
ON ACTIVE PAVEMENT.
4. CONTRACTOR IS RESPONSIBLE FOR THE EFFORT AND COST OF IMMEDIATE
CLEANING OF PAVEMENT WHERE EQUIPMENT CROSSES ACTIVE PAVEMENTS.
THE CONTRACTOR MUST USE A POWER SWEEPER TO CONTINUOUSLY
MAINTAIN A FOD FREE ENVIRONMENT.
FOREIGN OBJECT DEBRIS (FOD) MANAGEMENT (CONT.)
5. WATER MUST BE USED AS A DUST CONTROL MEASURE AS NEEDED OR AS
DIRECTED BY THE CONTRACTING OFFICER. IF, IN THE OPINION OF THE
CONTRACTING OFFICER OR AIRPORT, DUST FROM CONSTRUCTION ACTIVITIES
CREATES A NUISANCE OR LIMITED VISIBILITY CONDITION FOR OPERATIONS,
CONSTRUCTION ACTIVITY WILL CEASE UNTIL THE DUST HAS BEEN MITIGATED
BY SPRINKLING ACTIVITIES TO THE SATISFACTION OF THE CONTRACTING
OFFICER OR AIRPORT. TIME LOST DUE TO WORK STOPPAGE FOR THIS
ACTIVITY WILL NOT CONSTITUTE AN EXTENSION OF CONTRACT TIME.
HAZMAT MANAGEMENT
1. THE CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER
MANAGEMENT PROCEDURES FOR FUEL DELIVERIES, EQUIPMENT FUELING,
AND SPILL RECOVERY PROCEDURES PRIOR TO WORK BEGINNING ON THE
PROJECT.
NOTIFICATION OF CONSTRUCTION ACTIVITIES
A LIST OF RESPONSIBLE REPRESENTATIVES/POINTS OF CONTACT:
TINIAN AIRPORT:
OPERATIONS: ANTONIO L BORJA 1(670) 433-9294
DISPATCH: AIRPORT ADVISORY STATION 1(670) 433-9295
CONTRACTOR:
PROJ. MANAGER: TBD PHONE NUMBER
PROJ. FOREMAN: TBD PHONE NUMBER
SAFETY OFFICER: TBD PHONE NUMBER
NOTICE TO AIRMEN (NOTAM):
PRIMARY: ANTONIO L BORJA 1(670) 433-9294
SECONDARY: NATASHA MORGAN 1(670) 433-9295
EMERGENCY NOTIFICATION PROCEDURES:
PRIMARY: ANTONIO L BORJA 1(670) 433-9294
SECONDARY: GERALD CRISOSTOMO 1(670) 433-9294
COORDINATION WITH ARFF PERSONNEL:
PRIMARY: ASST. CHIEF JOHN MITHNOY 1(670) 433-9303
SECONDARY: CAPTAIN JOHN BARCINAS 1(670) 433-9296
NOTIFICATION TO THE FAA:
PRIMARY: RONSON FOX (808) 312-6034
SECONDARY: WILLIAM BROWN (808) 312-6034
INSPECTION REQUIREMENTS
1. THE CONTRACTING OFFICER, TINIAN AIRPORT OPERATIONS AND
CONTRACTOR'S SAFETY OFFICER MUST CONDUCT DAILY INSPECTIONS OF
THE PROJECT SITE TO ENSURE ALL SAFETY REQUIREMENTS IN THE
CONTRACT DOCUMENTS ARE MET.
2. PROJECT AREAS TO BE RE-OPENED AFTER A CLOSURE MUST BE
INSPECTED AND APPROVED BY THE CONTRACTING OFFICER AND TINIAN
AIRPORT OPERATIONS PRIOR TO RE-OPENING.
3. A FINAL INSPECTION FOR EACH PHASE MUST INCLUDE THE CONTRACTING
OFFICER, TINIAN AIRPORT OPERATIONS AND CONTRACTOR'S SAFETY
OFFICER AND MUST BE SCHEDULED WITH 7 DAYS NOTICE.
4. CPA FLIGHT SERVICE MUST BE NOTIFIED AND ALLOWED TO PARTICIPATE IN
INSPECTION ACTIVITIES AS THEY DEEM APPROPRIATE.
5. ANY PART 139 DEFICIENCIES REQUIRE IMMEDIATE ATTENTION WHETHER
CAUSED BY NEGLIGENCE, OVERSIGHT, OR PROJECT SCOPE CHANGE.
UNDERGROUND UTILITIES
1. CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER, CPA FLIGHT
SERVICE AND TINIAN AIRPORT OPERATIONS, MEANS OF LOCATING AND
IDENTIFYING ALL UNDERGROUND UTILITIES IN THE PROJECT WORK AREAS
IF EXCAVATION IS NECESSARY.
2. CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER, CPA FLIGHT
SERVICE AND TIINIAN AIRPORT OPERATIONS, MEANS OF PROTECTING ALL
UNDERGROUND UTILITIES IN THE PROJECT WORK AREAS.
3. CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER, CPA FLIGHT
SERVICE AND TINIAN AIRPORT OPERATIONS, MEANS OF PROTECTING THE
FAA BACKUP EMERGENCY COMMUNICATION SYSTEM (BUEC) LOCATED
NEAR THE ARFF STATION. THE BUEC SYSTEM COMMUNICATES WITH SAIPAN
TOWER AND THE ELECTRONIC SIGNAL MUST BE PRESERVED.
4. CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER, CPA FLIGHT
SERVICE AND TINIAN AIRPORT OPERATIONS, MEANS OF REPORTING AND
REPAIRING ALL UNDERGROUND UTILITY DAMAGES IN PROJECT WORK AREAS.
5. CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER, CPA FLIGHT
SERVICE AND TINIAN AIRPORT OPERATIONS, UTILITY OWNER AND
EMERGENCY CONTACT INFORMATION PRIOR TO STARTING ANY EXCAVATION.
PENALTIES FOR VIOLATIONS
1. 1ST OFFENSE: WRITTEN WARNING OF VIOLATION.
2. 2ND OFFENSE: 30-DAY SUSPENSION OF MOVEMENT AREA PRIVILEGES.
3. 3RD OFFENSE: PERMANENT REVOCATION OF MOVEMENT AREA
PRIVILEGES.
SPECIAL CONDITIONS
1. LOW PROFILE BARRICADES DENOTE THE LIMITS OF CONSTRUCTION
AND PROVIDE A LEVEL OF SAFETY FOR PERSONNEL WITHIN THE
PROJECT WORK AREAS. PHASES 2 AND 3 WILL HAVE AIRCRAFT
TAXIING NEAR THE WORK AREA, CONTRACTOR TO ESTABLISH
STANDARD OPERATIONAL PROCEDURES (SOP) FOR PERSONNEL IN
THESE AREAS. THIS SOP MUST BE REVIEWED AND APPROVED BY
THE CONTRACTING OFFICER AND WILL BE REQUIRED TRAINING FOR
ALL INDIVIDUALS ACCESSING THESE AREAS.
RUNWAY AND TAXIWAY VISUAL AIDS
1. FOR RUNWAY CLOSURES, RAISED LIGHTED RUNWAY CLOSURE
MARKERS MUST BE PLACED AT BOTH ENDS OF THE RUNWAY
DIRECTLY OVER THE RUNWAY DESIGNATION MARKINGS.
2. FOR TAXIWAY CLOSURES, LOW LEVEL BARRICADES MUST BE
PLACED FULLY ACROSS THE TAXIWAY PAVEMENT INCLUDING
SHOULDER PAVEMENT. BARRICADES MUST BE SECURED IN PLACE
TO PREVENT MOVEMENT BY HIGH WINDS OR PROP WASH.
MARKING AND SIGNS FOR ACCESS ROUTES
1. ACCESS ROUTES ARE LIMITED TO HAUL ROUTES DESIGNATED IN
THE PHASED AREAS OF CONSTRUCTION.
2. APPROPRIATE MARKING AND SIGNAGE WILL BE REVIEWED BY THE
AIRPORT PRIOR TO ANY WORK IN THE PHASED AREA.
3. APPROPRIATE LIGHTING WILL BE REQUIRED IF THE CONTRACTOR
INTENDS ON WORKING DURING NIGHTTIME HOURS.
HAZARD MARKING AND LIGHTING
1. DESCRIPTION - LIGHTED BARRICADES MUST BE UTILIZED TO
DENOTE HAZARDS, CLOSED AREAS, OPEN EXCAVATIONS, AND
DELINEATE WORK AREAS, RE: C1/G-108. RUNWAY CLOSURES MUST
UTILIZE RAISED RUNWAY LIGHTED CLOSURE MARKERS WHEN THE
RUNWAY IS CLOSED FOR CONSTRUCTION ACTIVITIES, RE: B3/G-108.
2. LOCATIONS - SEE CONSTRUCTION PHASING PLAN SHEETS G-102
THROUGH G-107.
3. MAINTENANCE - CONTRACTOR IS RESPONSIBLE FOR DAILY
INSPECTIONS AND MAINTENANCE OF ALL HAZARD MARKING AND
LIGHTING APPURTENANCES.
4. RESPONSIBLE INDIVIDUAL - THE CONTRACTOR'S SAFETY OFFICER
AS IDENTIFIED IN SECTION 8 MUST BE RESPONSIBLE FOR ALL
HAZARD MARKING AND LIGHTING.
WORK ZONE LIGHTING FOR NIGHTTIME CONSTRUCTION
1. IF THE CONTRACTOR ANTICIPATES WORKING DURING NIGHTTIME
HOURS, THE CONTRACTOR MUST PROVIDE TO THE CONTRACTING
OFFICER A LIGHTING PLAN 10 DAYS PRIOR TO COMMENCING WORK
AT NIGHT. LIGHTING MUST BE PLACED IN A MANNER TO NOT
CREATE A SAFETY HAZARD TO AIRCRAFT IN TAXI OR IN FLIGHT.
PROTECTION OF RUNWAY AND TAXIWAY SAFETY AREAS
1. RUNWAY SAFETY AREA (RSA) - NO CONSTRUCTION CAN OCCUR
WITHIN THE RUNWAY 8-26 RSA WHILE THE RUNWAY IS OPERATIONAL.
WORK WITHIN THE RSA MAY OCCUR BETWEEN MIDNIGHT AND 6 AM
WITH AN AOA ESCORT.
CONSTRUCTION FLAGS MAY BE PLACED AT 30-METER INTERVALS TO
VISUALLY SHOW THE RSA LIMITS. FOR PHASE II, THE RUNWAY 26
RSA WILL BE MOVED DUE TO THE THRESHOLD RELOCATION, WHICH
WILL BE ACCOMPLISHED OVER A SINGLE 12-HOUR CLOSURE.
2. RUNWAY OBJECT FEE AREA (ROFA) - CONSTRUCTION MAY OCCUR
WITHIN THE RUNWAY 8-26 OFA WHILE THE RUNWAY IS OPERATIONAL.
CONSTRUCTION EQUIPMENT, HOWEVER, MUST BE REMOVED FROM
THE ROFA WHEN NOT IN USE AND MATERIAL MUST NOT BE
STOCKPILED IN THE ROFA. THIS PROJECT PLACES THE LIMIT OF
CONSTRUCTION AT THR ROFA BOUNDARY TO MITIGATE POTENTIAL
PENETRATIONS INTO THE RSA DURING CONSTRUCTION.
3. TAXIWAY SAFETY AREA (TSA) - CONSTRUCTION ACTIVITIES WITHIN
THE TSA MUST NOT OCCUR UNLESS THE TAXIWAY IS CLOSED TO
AIRCRAFT OPERATIONS.
4. TAXIWAY OBJECT FREE AREA (TOFA) - CONSTRUCTION ACTIVITIES
WITHIN THE TOFA MUST NOT OCCUR UNLESS THE TAXIWAY IS
CLOSED TO AIRCRAFT OPERATIONS.
5. OBSTACLE FREE ZONE (OFZ) - CONSTRUCTION PERSONNEL,
EQUIPMENT, AND MATERIAL MAY NOT PENETRATE THE OFZ WHILE
THE RUNWAY IS OPERATIONAL.
6. RUNWAY APPROACH / DEPARTURE SURFACES - ALL CONSTRUCTION
PERSONNEL, EQUIPMENT, AND MATERIAL MUST REMAIN CLEAR OF
THE THRESHOLD SITING SURFACES.
7. THE CONTRACTOR MUST MAINTAIN THE AIRFIELD SECURITY. NEW
AIRFIELD PERIMETER FENCE MUST BE INSTALLED BEFORE EXISTING
AIRFIELD FENCING IS REMOVED. SECURITY GUARDS MUST BE
PROVIDED AT ANY CONTRACTOR INSTALLED GATES. GATES MUST BE
LOCKED WHEN NOT MANNED.
OTHER LIMITATIONS ON CONSTRUCTION
1. THE CONTRACTOR MUST MAINTAIN THE AIRFIELD SECURITY 24
HOURS A DAY. THE NEW AIRFIELD PERIMETER FENCE MUST BE
INSTALLED AND APPROVED BY CPA BEFORE THE EXISTING AIRFIELD
FENCE IS REMOVED. THE CONTRACTOR MUST PROVIDE SECURITY
GUARDS AT ANY GATES THAT THE CONTRACTOR INSTALLS. THE
GATES MUST BE LOCKED WHEN NOT MANNED.
2. THE CONTRACTOR MUST REFERENCE THE DRAFT CONSTRUCTION
SAFETY AND PHASING PLANS (CSPP) IN THE CONTRACT DOCUMENTS.
THE CONTRACTOR IS REQUIRED TO PREPARE AND SUBMIT A SAFETY
PLAN COMPLIANCE DOCUMENT (SPCD) THAT MEETS FAA ADVISORY
CIRCULAR 150-5370-2 REQUIREMENTS AND DETAILS HOW
CONTRACTOR WILL COMPLY WITH THE CSPP. THE CONTRACTOR IS
REQUIRED TO SUBMIT THE SPCD TO THE CONTRACTING OFFICER,
CPA FLIGHT SERVICE, AND AIRPORT OPERATIONS FOR APPROVAL
PRIOR TO THE START OF CONSTRUCTION ACTIVITIES.
3. NO STOCKPILES OF MATERIAL ARE PERMITTED WITHIN RUNWAY OR
TAXIWAY SAFETY AREAS OR OBJECT FREE AREAS. STOCKPILE
HEIGHTS OUTSIDE OF ROFA MUST BE COORDINATED WITH
CONTRACTING OFFICER AND MUST IN NO CASE PENETRATE AIRPORT
IMAGINARY SURFACES AS DEFINED BY FAA PART 77.
4. ONLY ONE RELOCATED THRESHOLD IS PERMITTED AT ANY GIVEN TIME
ON RUNWAY 08-26.
COORDINATION
PROGRESS MEETINGS
1. THE CONTRACTOR IS REQUIRED TO HOLD WEEKLY MEETINGS THROUGHOUT
DURATION OF THE PROJECT. OPERATIONAL SAFETY MUST BE A STANDING AGENDA
ITEM FOR DISCUSSION DURING THE PROGRESS MEETINGS. ATTENDEES MUST
INCLUDE CONTRACTOR, CONTRACTING OFFICER, CPA REPRESENTATIVE, AND OTHER
AGENCIES AS NEEDED (BECQ, CUC, DPW, FIRE DEPARTMENT).
SCOPE OR SCHEDULE CHANGES
1. CHANGES IN SCOPE OR DURATION AT ANY POINT OF THE PROJECT MAY REQUIRE
REVISIONS TO THE CSPP AND REVIEW AND APPROVAL BY CPA (AIRPORT) AND
FAA ADO HNL.
FAA ATO COORDINATION
1. ISSUE APPROPRIATE NOTAMS FOR PAVEMENT CLOSURES AND RUNWAY LENGTH
CHANGES DESCRIBED INCLUDED IN SECTION 2 PHASING.
PHASING - PHASE I WORK
PHASE I CONSISTS OF APPROXIMATELY: (NOT FOR BIDDING PURPOSES)
1. DEMOLISH 96,617 SQ METERS OF EXISTING PAVEMENT.
2. CONSTRUCT 13,812 SQUARE METERS OF TEMPORARY GRAVEL ACCESS ROAD.
3. CONSTRUCT 15,883 SQUARE METERS OF CARGO PAD PAVEMENT.
4. CONSTRUCT 27,785 SQUARE METERS OF TAXIWAY B AND F PAVEMENT, THIS
PORTION WILL BE NORTH OF THE RUNWAY 8-26 OFA.
5. CONSTRUCT THE FIRE WATER PUMP HOUSE AND ASSOCIATED STORAGE TANKS.
6. CONSTRUCT 12,670 SQUARE METERS OF PERMANENT PAVED ROAD.
7. CONSTRUCT 1,636 LINEAR METERS OF NEW AOA FENCE.
8. CONSTRUCT BIO SECURITY CONTAINMENT FACILITY.
PHASE I RESTRICTIONS:
1. PHASE I WILL BE COMPLETED OVER A TWO AND A HALF-YEAR PERIOD.
2. WORK AREA A - THIS AREA IS FOR ALL WORK NORTH OF THE EXISTING AOA FENCE.
THERE ARE NO RESTRICTIONS FOR WORK OUTSIDE OF AOA.
3. WORK AREA B - THIS AREA IS FOR ALL WORK SOUTH OF THE EXISTING AOA FENCE
AND REQUIRES AOA ACCESS, ALL REQUIREMENTS FOR AOA ACCESS AND WORK
MUST APPLY. CONTRACTOR TO INSTALL PERMANENT AOA FENCE AND PASS
INSPECTION PRIOR TO REMOVAL OF EXISTING AOA FENCE.
PHASE II WORK
PHASE II CONSISTS OF APPROXIMATELY: (NOT FOR BIDDING PURPOSES)
1. RELOCATE RUNWAY 26 THRESHOLD APPROXIMATELY 1,016 METERS WEST. RUNWAY
EDGE LIGHT LENS COLOR ADJUSTMENT, REMOVE 9,606 SQ METERS OF RUNWAY
MARKINGS, ADD 3,467 SQ METERS OF TEMPORARY RUNWAY MARKINGS, COVER
THE RUNWAY DISTANCE REMAINING SIGNAGE AND THE RELOCATE THE
THRESHOLD/RUNWAY END LIGHTS AND DEACTIVATE THE RUNWAY 26 PRECISION
APPROACH PATH INDICATOR (PAPI) AND RUNWAY END IDENTIFIER LIGHTS (REILS).
2. DEMOLISH 6,825 SQ METERS OF EXISTING RUNWAY 26 ASPHALT SHOULDER PAVEMENT.
3. CONSTRUCT 11,038 SQUARE METERS OF TAXIWAY B PAVEMENT, INCLUDING LIGHTS,
SIGNS, AND PAVEMENT MARKINGS.
4. REMOVE RUNWAY 26 THRESHOLD RELOCATION AND RETURN EDGE LIGHT LENSES
TO FULL-LENGTH CONFIGURATION, RESTORE RUNWAY 26 PAPI AND REIL TO
OPERATION; UNCOVER THE RUNWAY DISTANCE REMAINING SIGNS; REMOVE 4,665 SQ
METERS OF TEMPORARY MARKINGS AND INSTALL 8,134 SQ METERS OF PERMANENT
MARKINGS TO THE FULL- LENGTH CONFIGURATION AS INDICATED IN THE PLANS.
5. RE-OPEN RUNWAY AT FULL LENGTH.
PHASE II RESTRICTIONS:
1. PHASE II MUST BE COORDINATED TO REDUCE THE AMOUNT OF TIME RUNWAY 8-26
OPERATES WITH A RELOCATED THRESHOLD. IT IS ANTICIPATED THAT CONSTRUCTION
WITHIN THE ROFA MAY BE ACCOMPLISHED IN LESS THAN 200 CALENDAR DAYS. THE
CONTRACTOR MUST COORDINATE WITH THE CONTRACTING OFFICER TO MINIMIZE AND
ESTABLISH A TIMEFRAME FOR WORK UNDER A RELOCATED THRESHOLD SCENARIO.
2. PHASE II MAY BE CONDUCTED CONCURRENTLY WITH PHASE I, HOWEVER THE
TOTAL DURATION FOR PHASE II MUST BE MINIMIZED.
3. WORK AREA C - THIS AREA IS FOR THE RELOCATION OF THE RUNWAY 26 THRESHOLD.
THIS WORK REQUIRES AOA ACCESS, ALL REQUIREMENTS FOR AOA ACCESS AND WORK
APPLY. THIS WORK REQUIRES THE RUNWAY TO BE CLOSED. ALL WORK REQUIRING A
RUNWAY CLOSURE MUST BE ACCOMPLISHED WITHIN A SINGLE12-HOUR RUNWAY
CLOSURE FOR RELOCATING THE THRESHOLD AND ANOTHER 12-HOUR RUNWAY
CLOSURE FOR RESTORING THE RUNWAY TO FULL LENGTH. RAISED LIGHTED RUNWAY
CLOSURE MARKERS MUST BE UTILIZED DURING THE RUNWAY CLOSURES.
4. WORK AREA D - THIS WORK AREA IS FOR THE CONSTRUCTION OF TAXIWAY B AND
MUST BE ACCOMPLISHED WHILE THE RUNWAY 26 THRESHOLD IS RELOCATED.
PHASE III WORK
PHASE III CONSISTS OF APPROXIMATELY: (NOT FOR BIDDING PURPOSES)
1. DEMOLISH 1,054 SQ METERS OF EXISTING RUNWAY 26 ASPHALT SHOULDER PAVEMENT.
2. CONSTRUCTION OF THE TAXIWAY BRAVO WEST FILLET LEAD-IN, 192 SQUARE METERS
OF PAVEMENT, INCLUDING LIGHTS, SIGNS, AND PAVEMENT MARKINGS. THIS WORK
REQUIRES AOA ACCESS, ALL REQUIREMENTS FOR AOA ACCESS AND WORK APPLY.
PHASE III RESTRICTIONS:
1. WORK ON PHASE III MAY NOT BEGIN UNTIL PHASE II WORK HAS BEEN COMPLETED.
2. IT IS ANTICIPATED THAT CONSTRUCTION OF PHASE III WORK MAY BE ACCOMPLISHED IN
LESS THAN 60 CALENDAR DAYS.
3. WORK AREA E - THIS WORK AREA IS FOR CONSTRUCTION COMPLETION OF TAXIWAY
BRAVO. THIS WORK REQUIRES THE INSTALLATION OF LOW-PROFILE BARRICADES. THIS
WORK REQUIRES AOA ACCESS, ALL REQUIREMENTS FOR AOA
ACCESS AND WORK APPLY.
4. TAXIWAY ALPHA WILL BE CLOSED WEST OF TAXIWAY BRAVO, TO RUNWAY 8.
09/24/2021
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
CN
KY
K. YOSHIMOTO
JC
SCALE
CONSTRUCTION PHASING - PHASE 1A1 1:4000
WORK AREA 'A'
WORK AREA 'B'
LEGEND
X
EXISTING AOA FENCE
AOA FENCE, SEE SHEET CS506
X
CONTRACTOR STAGING AREA.
KEYNOTES
G-102
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G
PH
AS
E
002 FIRE WATER PUMP HOUSE AND ASSOCIATED
STORAGE TANKS, SEE SHEET CS102.
003 BIO SECURITY CONTAINMENT FACILITY, SEE SHEET
CS103.
TWO-WAY PRIMARY HAUL ROUTE,
PHASE I AND PHASE II
17230746
006 F.O.D. SIGN, RE: B1/G-108.
DES DRW CHKJNP KWA JNP
09/24/2021
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
CN
KY
K. YOSHIMOTO
JC
SCALE
CONSTRUCTION PHASING - PHASE 2A1 1:4000
G-103
WORK AREA 'D'
LEGEND
EXISTING AOA FENCE
AOA FENCE, SEE SHEET CS506
WORK AREA 'C'
KEYNOTES
X
LOW PROFILE BARRICADE, RE: DETAIL C1/G-108
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G
PH
AS
E
X
001 CONTRACTOR STAGING AREA.
002 FIRE WATER PUMP HOUSE AND ASSOCIATED
STORAGE TANKS, SEE SHEET CS102.
003 BIO SECURITY CONTAINMENT FACILITY, SEE SHEET
CS103.
005 LIGHTED "X" CLOSURE MARKER, ONLY TO BE USED
DURING THRESHOLD RELOCATIONS WHEN THE
RUNWAY IS CLOSED IN ITS ENTIRETY, RE: B3/G-108.
TWO-WAY PRIMARY HAUL ROUTE,
PHASE I AND PHASE II
17230747
006 F.O.D. SIGN, RE: B1/G-108.
007 RELOCATED THRESHOLD, RE: A3/G-108.
004 TAXIWAY CLOSURE MARKER, RE: B4/G-108
TAXIWAY CLOSURE MARKER, RE: DETAIL B4/G-108
DES DRW CHKJNP KWA JNP
09/24/2021
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
CN
KY
K. YOSHIMOTO
JC
SCALE
CONSTRUCTION PHASING - PHASE 3A1 1:4000
G-104
LEGEND
KEYNOTES
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G
PH
AS
E
001 CONTRACTOR STAGING AREA
002 FIRE WATER PUMP HOUSE AND ASSOCIATED
STORAGE TANKS, SEE SHEET CS102
003 BIO SECURITY CONTAINMENT FACILITY, SEE SHEET
CS103
005 LIGHTED "X" CLOSURE MARKER, ONLY TO BE USED
DURING THRESHOLD RELOCATIONS WHEN THE
RUNWAY IS CLOSED IN ITS ENTIRETY, RE: B3/G-108.
17230748
JNP KWA JNP
006 F.O.D. SIGN, RE: B1/G-108.
004 TAXIWAY CLOSURE MARKER, RE: B4/G-108
WORK AREA 'D'
EXISTING AOA FENCE
AOA FENCE, SEE SHEET CS506
WORK AREA 'C'
X
LOW PROFILE BARRICADE, RE: DETAIL C1/G-108
X
TWO-WAY PRIMARY HAUL ROUTE,
PHASE I AND PHASE II
TAXIWAY CLOSURE MARKER, RE: DETAIL B4/G-108
09/24/2021
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
CN
KY
K. YOSHIMOTO
JC
SCALE
CONSTRUCTION PHASING PLANS - RELOCATED THRESHOLD - 1 OF 3A1 1:2000
G-105
LEGEND
EXISTING AOA FENCE
A MARKING REMOVAL MUST BE ACCOMPLISHED BY
PHYSICAL REMOVAL. PAINTING OVER MARKINGS TO
OBSCURE THEM IS NOT PERMITTED.
X
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G P
LA
N
S
- R
EL
O
C
AT
ED
T
H R
ES
H
O
LD
O F
B FOR PAVEMENT MARKING DETAILS, SEE SHEET G-108.
CONSTRUCTION PHASING PLAN
GENERAL NOTES
C ALL PAVEMENT MARKINGS EXCEPT RUNWAY SHOULDER
MARKING TO BE OUTLINED WITH 0.15M BLACK OUTLINE.
D ALL WHITE PAVEMENT MARKINGS TO BE
RETROREFLECTIVE.
17230749
E ALL PERMANENT AND TEMPORARY MARKING
REMOVAL MUST BE ACCOMPLISHED ACCORDING
TO FAA AC 150/5340-1M FIGURE 1-1 THRU 1-5.
09/24/2021
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
CN
KY
K. YOSHIMOTO
JC
SCALE
CONSTRUCTION PHASING PLANS - RELOCATED THRESHOLD - 2 OF 3A1 1:2000
G-106
LEGEND
EXISTING AOA FENCE
AOA FENCE, SEE SHEET CS506
A
CONSTRUCTION PHASING PLAN
GENERAL NOTES
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G P
LA
N
S
- R
EL
O
C
AT
ED
T
H R
ES
H
O
LD
O F
MARKING REMOVAL MUST BE ACCOMPLISHED BY
PHYSICAL REMOVAL. PAINTING OVER MARKINGS TO
OBSCURE THEM IS NOT PERMITTED.
X
X
B FOR PAVEMENT MARKING DETAILS, SEE SHEET G-108.
C ALL PAVEMENT MARKINGS EXCEPT RUNWAY SHOULDER
MARKING TO BE OUTLINED WITH 0.15M BLACK OUTLINE.
D ALL WHITE PAVEMENT MARKINGS TO BE
RETROREFLECTIVE.
17230750
E ALL PERMANENT AND TEMPORARY MARKING
REMOVAL MUST BE ACCOMPLISHED ACCORDING
TO FAA AC 150/5340-1M FIGURE 1-1 THRU 1-5.
09/24/2021
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
CN
KY
K. YOSHIMOTO
JC
SCALE
CONSTRUCTION PHASING PLANS - RELOCATED THRESHOLD - 3 OF 3A1 1:2000
G-107
LEGEND
EXISTING AOA FENCE
AOA FENCE, SEE SHEET CS506
A
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G P
LA
N
S
- R
EL
O
C
AT
ED
T
H R
ES
H
O
LD
O F
MARKING REMOVAL MUST BE ACCOMPLISHED BY
PHYSICAL REMOVAL. PAINTING OVER MARKINGS TO
OBSCURE THEM IS NOT PERMITTED.
B FOR PAVEMENT MARKING DETAILS, SEE SHEET G-108.
CONSTRUCTION PHASING PLAN
GENERAL NOTES
17230751
X
X
C ALL PERMANENT AND TEMPORARY MARKING
REMOVAL MUST BE ACCOMPLISHED ACCORDING
TO FAA AC 150/5340-1M FIGURE 1-1 THRU 1-5.
09/24/2021
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
CN
KY
K. YOSHIMOTO
JC
G-108
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G P
LA
N
D
ET
AI
LS
17230752
SCALE
TAXIWAY CLOSURE MARKER DETAILB4 N.T.S.
SCALE
AIRFIELD SIGN COVER DETAILA4 N.T.S.
SIZES VARY BY LOCATION
COVER PANELS OR SIGNS AS CALLED OUT
ON SHEETS G-104 TO G-106 WITH TARP OR
SIMILAR SO THAT SIGN IS OBSCURED.
SECURE COVER AGAINST WIND AND JET
BLAST (TYP).
EXISTING SIGN
GRADE
TAXIWAY CLOSURE MARKER NOTES:
1. YELLOW MATERIAL THAT MEETS THE REQUIREMENTS
OF AC 150/5370-2G.
2. MATERIAL MUST BE SECURED AGAINST JET BLASTS AS
APPROVED BY THE AIRPORT AND ENGINEER.
3. IF FABRIC IS USED, FABRIC MUST BE SCREWED TO THE
PAVEMENT. AT THE COMPLETION OF THE PHASE, THE
SCREW HOLES MUST BE FILLED.
4. TAXIWAY CLOSURE MARKERS MUST BE PROVIDED BY
THE CONTRACTOR.
9.1 M (T
AXIW
AY)
1.5M (TAXIWAY)3.8M (TAXIWAY)
SCALE
TEMPORARY RUNWAY THRESHOLD LIGHT MOUNTING DETAILA1 N.T.S.
TOP VIEW
RELOCATED RUNWAY
THRESHOLD LIGHT, BASE
PLATE AND TRANSFORMER
(8 EACH). LOCATE
ISOLATION TRANSFORMER
BELOW FIXTURE IN A
CORROSION RESISTANT
JUNCTION BOX.
ANCHOR BOARDS TO
FULL STRENGTH
PAVEMENT (TYP)
9.5mm X 50.8mm LAG SCREW
WITH WASHER (4 EACH)
4m m
ELEVATION VIEW
SHOULDER
RUNWAY
(T
YP
30M(TYP)
1.
5M
0.9M WIDE YELLOW
STRIPE (TYP)
SCALE
RUNWAY SHOULDER MARKINGC4 N.T.S.
RUNWAY THRESHOLD BEGINS
AT OUT BOARD EDGE OF
THRESHOLD BAR
PAVEMENT EDGE
15M
RUNWAY GEOMETRIC
CENTERLINE
1M
1.5M
30M
1.5M
6M
NOTES:
1. CHEVRONS ARE YELLOW, REFLECTIVE AND AT AN ANGLE
OF 45° TO THE RUNWAY CENTERLINE.
2. APPLY BLACK, 0.15 METER WIDE OUTLINE TO CHEVRONS.
SCALE
TEMPORARY CHEVRON DETAILA3 N.T.S.
3M WIDE WHITE
THRESHOLD BAR MARKING
STANDARD RUNWAY MARKINGS,
RE: G-108, G-109, G-110
0.15M0.9M0.15M
RUNWAY
PAVEMENT
ASPHALT
SHOULDER
SCALE
RUNWAY EDGE MARKINGD3 N.T.S.
0.15M BLACK STRIPE
NON-REFLECTIVE
0.9M WHITE STRIPE
REFLECTIVE
0.15M BLACK STRIPE
NON-REFLECTIVE
0.
M 0.
M
0.
9M
36M 24M 36M
0.15M BLACK STRIPE
NON-REFLECTIVE
(TYP)
RUNWAY CENTERLINE
MARKING, WHITE,
REFLECTIVE,
0.9M WIDE (TYP)
SCALE
RUNWAY CENTERLINE MARKINGD4 N.T.S.
RUNWAY THRESHOLD BEGINS
AT OUT BOARD EDGE OF
THRESHOLD BAR
PAVEMENT EDGE
RUNWAY GEOMETRIC
CENTERLINE
1M
1.5M
15M
1.5M
6M
NOTES:
1. CHEVRONS ARE YELLOW, REFLECTIVE AND AT AN ANGLE
OF 45° TO THE RUNWAY CENTERLINE.
2. APPLY BLACK, 0.15 METER WIDE OUTLINE TO CHEVRONS.
SCALE
RUNWAY BLAST PAD CHEVRON DETAILB2 N.T.S.
3M WIDE WHITE
THRESHOLD BAR MARKING
STANDARD RUNWAY
MARKINGS, RE: G-108,
G-109, G-110
RELOCATED RUNWAY THRESHOLD
LIGHT, BASE PLATE AND
TRANSFORMER (8 EACH). LOCATE
ISOLATION TRANSFORMER BELOW
FIXTURE IN A CORROSION
RESISTANT JUNCTION BOX.
50.8mm X 101.6mm X 610mm
4.4 M
RUNWAY CLOSURE MARKER NOTES:
1. CONTRACTOR MUST PLACE LIGHTED "X" AT EACH END OF CLOSED
RUNWAY 8 - 26, IN ACCORDANCE WITH THE PHASING PLANS. LIGHTED
"X" MUST BE PLACED ON TOP OF THE PAINTED NUMBER DESIGNATOR
FOR EACH RUNWAY END, UNLESS OTHERWISE SHOWN.
CONTRACTOR MUST ALSO TEMPORARY DISCONNECT POWER OF
RUNWAY LIGHTS AT VAULT TO PREVENT THE POSSIBILITY OF THEM
TURNING ON AND CREATING A POTENTIAL RUNWAY INCURSION.
FOLLOW APPLICABLE "LOCKOUT" - "TAG-OUT" PROCEDURES.
2. THE CONTRACTOR MUST MAINTAIN THE LIGHTED X'S UNTIL
COMPLETION OF THE RUNWAY CLOSURE AND REMOVE AT END OF
CLOSURE WHEN DIRECTED BY THE CONTRACTING OFFICER.
3. LIGHTED X'S MUST BE LIT 24/7.
4. CLOSURE MUST MEET THE FOLLOWING FAA STANDARDS:
- FAA ADVISORY CIRCULAR AC 150/3545-55, 'SPECIFICATION FOR
L-893, LIGHTED VISUAL AID TO INDICATE TEMPORARY RUNWAY
CLOSURE'
- FAA ADVISORY CIRCULAR AC 150/5345-53, 'AIRPORT LIGHTING
EQUIPMENT CERTIFICATION PROGRAM'
- FAA ENGINEERING BRIEF 67, 'LIGHT SOURCES OTHER THAN
INCANDESCENT AND XENON FOR AIRPORT AND OBSTRUCTION
LIGHTING FIXTURES'
5 BULBS ON EACH ARM
WITH 1 SHARED BULB IN
THE MIDDLE (TYP)
C OF RUNWAYL
SCALE
LIGHTED "X" CLOSURE MARKERB3 N.T.S.
SCALE
LOW PROFILE BARRICADE DETAILC1 N.T.S.
LIGHTS ON BARRICADES MUST BE SPACED NO
GREATER THAN 3M APART
MAX
HEIGHT
457mm
LOW PROFILE BARRICADE NOTES:
1. BARRICADES MAY NOT EXCEED 457MM IN HEIGHT (EXCLUSIVE OF SUPPLEMENTARY LIGHTS) AND SHOULD BE SPACED TO PREVENT BREACH, BUT IN NO CASE GREATER THAN 15.2M APART. THEY MUST BE OF LOW MASS;
EASILY COLLAPSIBLE UPON CONTACT WITH AN AIRCRAFT; AND WEIGHTED OR STURDILY ATTACHED TO THE
SURFACE TO PREVENT DISPLACEMENT FROM JET BLAST OR OTHER WIND DISTURBANCE.
2. BARRICADE STRIPING MUST BE ORANGE AND WHITE CONFORMING TO FAA AC 15/5370-2 OPERATIONAL
SAFETY ON AIRPORTS DURING CONSTRUCTION.
3. THE REQUIRED LIGHTS MUST BE RED AND FLASHING. INTENSITIES AND LUMINANCE MUST BE AT LEAST FIVE CANDELAS EFFECTIVE INTENSITY AND FLASH AT A RATE OF FROM 55 TO 160 FLASHES PER MINUTE.
4. LIGHTS MUST BE OPERATED BETWEEN SUNSET AND SUNRISE AND DURING PERIODS OF LOW VISIBILITY
WHENEVER THE AIRPORT IS OPEN FOR OPERATIONS.
SIZE AND COLOR OF STRIPES (SEE BARRICADE NOTES)
FOD CHECK POINT!
ALL VEHICLES / EQUIPMENT
OPERATORS MUST PERFORM
FOD CHECK BEFORE ENTERING
AIRCRAFT MOVEMENT AREA
HT = 100,
COLOR = RED
HT = 75,
COLOR = RED
25 WIDE RED
STRIP SPACED 25
NOTES:
1. SIGN LETTERING MUST BE UPPER CASE AND RED IN COLOR.
2. SIGN BACKGROUND MUST BE WHITE.
3. PAINT BACK OF SIGN WHITE.
4. TEXT MUST BE CENTERED IN SIGN, EVENLY SPACED.
5. THE SIGN MUST BE PLACED 1 - 3 METERS FROM THE EDGE OF
THE HAUL ROUTE SURFACE AND JUST PRIOR TO GATED
ENTRANCE TO THE AIRFIELD SO THAT THE SIGN CAN BE EASILY
VISUALIZED FROM THE DRIVER'S SEAT.
6. FOD SIGNS MUST BE PLACED AT ALL CONTRACTOR AIRFIELD
ACCESS LOCATIONS.
SCALE
FOD SIGN DETAILB1 N.T.S.
16MM DIA x127MM
LONG BOLT
50MM SQUARE
GALVANIZED STEEL
TUBING WITH 7
16 HOLES
SPACED AT 25MM
O.C.C
990 57MM GALVANIZED
STEEL SQUARE
TUBING WITH 7/16
HOLES SPACED AT
25MM O.C.305
SLOPE TO DRAIN
8MM DIA. MACHINE
BOLTS BOTH WAYS
09/24/2021
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
CN
KY
K. YOSHIMOTO
JC
SCALE
NEW RUNWAY PAVEMENT MARKING PLAN - 1 OF 3A1 1:2000
G-109
LEGEND
EXISTING AOA FENCEX
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
N
EW
R U
N W
AY
P
AV
EM
EN
T
M
AR
KI
N
G P
LA
N
O F
CONSTRUCTION PHASING PLAN
GENERAL NOTES
A FOR PAVEMENT MARKING DETAILS, SEE SHEET G-108.
B ALL PAVEMENT MARKINGS EXCEPT RUNWAY SHOULDER
MARKING TO BE OUTLINED WITH 0.15M BLACK OUTLINE.
C ALL WHITE PAVEMENT MARKINGS TO BE RETROREFLECTIVE.
17230753
09/24/2021
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
CN
KY
K. YOSHIMOTO
JC
SCALE
NEW RUNWAY PAVEMENT MARKING PLAN - 2 OF 3A1 1:2000
G-110
LEGEND
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
N
EW
R U
N W
AY
P
AV
EM
EN
T
M
AR
KI
N
G P
LA
N
O F
X
EXISTING AOA FENCEX
AOA FENCE,
SEE SHEETS CS506 AND CS507
CONSTRUCTION PHASING PLAN
GENERAL NOTES
A FOR PAVEMENT MARKING DETAILS, SEE SHEET G-108.
B ALL PAVEMENT MARKINGS EXCEPT RUNWAY SHOULDER
MARKING TO BE OUTLINED WITH 0.15M BLACK OUTLINE.
C ALL WHITE PAVEMENT MARKINGS TO BE RETROREFLECTIVE.
17230754
09/24/2021
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
JNP KWA JNP
CN
KY
K. YOSHIMOTO
JC
SCALE
NEW RUNWAY PAVEMENT MARKING PLAN - 3 OF 3A1 1:2000
G-111
LEGEND
CONSTRUCTION PHASING PLAN
GENERAL NOTES
SCALE
NEW RUNWAY DESIGNATOR MARKING DETAILA3 NTS
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
N
EW
R U
N W
AY
P
AV
EM
EN
T
M
AR
KI
N
G P
LA
N
O F
X
EXISTING AOA FENCEX
AOA FENCE,
SEE SHEETS CS506 AND CS507
A FOR PAVEMENT MARKING DETAILS, SEE SHEET G-108.
B ALL PAVEMENT MARKINGS EXCEPT RUNWAY SHOULDER
MARKING TO BE OUTLINED WITH 0.15M BLACK OUTLINE.
C ALL WHITE PAVEMENT MARKINGS TO BE RETROREFLECTIVE.
17230755
09/24/2021
SCALE: 1:100
0 2000 4000
AT
T S
XETE FO
SA
TR
EYD.RICE
26 75 5
R
EG
IS
TE
RED ARCHITEC
T
1 2 3 4 5
D
C
B
A
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK
AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO
ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.
IF SHEET IS LESS THAN 559 X 864
REDUCED PRINT. USE GRAPHIC SCALES
1 2 3 4 5
D
C
B
A
ATTTTTTAA XXXXXXEEEEEEETTTTTTEEEEE FFFFFFOOOOOO
S
XETE FO
SA
TR
EYD.RICE
26 75 5
R
EG
IS
TE
RED ARCHITEC
T
1 2 3 4 5
D
C
B
A
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK
AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO
ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.
IF SHEET IS LESS THAN 559 X 864
REDUCED PRINT. USE GRAPHIC SCALES
1 2 3 4 5
D
C
B
A
AAAATTTTAA
T
XXXXXEEEEEEETTTTE FFFFFFOOOOOO
A
NER
ER
IG
ST E R
EN
I
C
TEA
OF
ST
OF RILA
N
AI
G
SEFORP
ED
OIS N LA E
DA
VIS
J. NGUYEN
F IRE PROTECT
ION
FP 2079
1 2 3 4 5
D
C
B
A
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK
AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO
ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.
IF SHEET IS LESS THAN 559 X 864
REDUCED PRINT. USE GRAPHIC SCALES
1 2 3 4 5
D
C
B
NER
ER
IG
ST E R
EN
I
C
TEA
OF
ST
OF RILA
N
AI
G
SEFORP
ED
OIS N LA E
DA
VIS
J. NGUYEN
F IRE PROTECT
ION
FP 2079
SCALE: 1:50
0 500 1000 2000
1 2 3 4 5
D
C
B
A
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK
AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO
ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.
IF SHEET IS LESS THAN 559 X 864
REDUCED PRINT. USE GRAPHIC SCALES
1 2 3 4 5
D
C
B
S
XETE FO
SA
TR
EYD.RICE
26 75 5
R
EG
IS
TE
RED ARCHITEC
T
1 2 3 4 5
D
C
B
A
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK
AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO
ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.
IF SHEET IS LESS THAN 559 X 864
REDUCED PRINT. USE GRAPHIC SCALES
1 2 3 4 5
D
C
B
A
AAAAATTTTTTTTTTTTTTTTTTTTTTTTTTTTAA XXXXXXXXXXXXXXXXXXXXXXXXEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEETTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTE FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
CODE COMPLIANCE PLAN GENERAL
NOTES
A REFER TO ARCHITECTURE PLANS FOR BUILDING
DIMENSIONS.
B SINCE THE OCCUPANCY OF THE FIRE PUMP BUILDING
IS LESS THAN 11 PEOPLE, THERE ARE NO ATFP
STANDOFF REQUIREMENTS.
DIMENSIONS ARE TO EDGE OF PAVEMENT UNLESS
OTHERWISE NOTED.
FIRE LANE
RAW WATER LINE
FDC
FIRE HYDRANT
FIRE ROOM
FIRE PUMP HOUSE, RE: AE101202
C
DOMESTIC WATER LINEPW
RW
KEYNOTES
LEGEND
THE FIRE WATER STORAGE TANK IS DIRECT FED FROM
WELL. THE PUMPING RATE FOR THE WELL IS 473 LPM
WHICH WILL FILL THE TANK IN 48 HOURS.
D
REFER TO SHEET F-111 FOR FIRE WATER AND
STORAGE TANK INFORMATION.
E
GI101
NORTH
KHK SMC JDE
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
CN
KY
K. YOSHIMOTO
JC
JDS BAB WAC
C O
D E
C O
M
PL
IA
N
C E
PL
AN
SCALE
CODE COMPLIANCE PLANA1
1:400
JDS
17230761
NOTE:
UNLESS OTHERWISE STATED, ALL CIVIL PLAN
SHEETS DIMENSIONS ARE IN METERS.
BAB WAC
GC100
EROSION CONTROL PLAN GENERAL
NOTES
A ALL ELEVATIONS ARE IN METERS.
B CONTOUR INTERVAL IS 1 M.
C REFER TO SHEETS GC500 AND GC501 FOR EROSION
CONTROL DETAILS.
D ALL CATCH BASINS MUST HAVE INLET PROTECTION
DURING CONSTRUCTION ACTIVITIES.
SF SILT FENCE, RE: A1/GC500
CONTRACTOR STAGING AREA
LIMITS OF CONSTRUCTION
AREA INLET PROTECTION,
RE: A4/GC500
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
MAJOR CONTOUR
MINOR CONTOUR
STORM DRAIN
AREA INLET PROTECTION, RE: A4/GC500
SILT FENCE, RE: A1/GC500
SD
CONTRACTOR STAGING AREA (8740 SM)104
KEYNOTES
LEGEND
E INSTALL EROSION CONTROL MEASURES AS INDICATED
ON THE PLANS AND AS FIELD CONDITIONS WARRANT
PRIOR TO COMMENCING ANY CONSTRUCTION
ACTIVITIES. REPAIRS OR MODIFICATIONS TO THE
MEASURES SHOULD BE MADE IF CONTROL MEASURES
PROVE INEFFECTIVE OR IF ADDITIONAL CONTROL
MEASURES ARE NECESSARY.
ROCK CHECK DAM, RE: A1/GC501106
SUGGESTED LOCATION FOR SEDIMENT BASIN. IF
SELECTED AS A MEANS TO REMOVE SEDIMENT, BASIN
MUST BE SIZED USING 38 MM RAINFALL DEPTH OVER THE
AREA IT INTENDS TO TREAT. REFER TO A4/GC501 FOR
ADDITIONAL GENERAL NOTES.
F SEED ALL DISTURBED AREAS PER SPECIFICATION 32 92 19
LEASE BOUNDARY
G REFER TO SHEETS CG100 - CG125 FOR GRADING PLANS.
BATCH PLANT108
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T G
C
ER
O
SI
O
N C
O N
TR
O
L
PL
AN
17230762
NOTE:
UNLESS OTHERWISE STATED, ALL CIVIL PLAN
SHEETS DIMENSIONS ARE IN METERS.
SCALE
EROSION CONTROL PLANA1 1:2000
NORTH
KHK SMC JDE
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
CN
KY
K. YOSHIMOTO
JC
10 SEP 2021
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
CN
KY
K. YOSHIMOTO
JC
SCALE
EROSION CONTROL PLANA1 1:2000 GC101
A ALL ELEVATIONS ARE IN METERS.
B CONTOUR INTERVAL IS 0.25m.
C REFER TO SHEETS GC500 - GC501 FOR EROSION
CONTROL DETAILS.
D ALL CATCH BASINS MUST HAVE INLET PROTECTION
DURING CONSTRUCTION ACTIVITIES.
STONE CONSTRUCTION ENTRANCE,
RE: C1/GC500
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
MAJOR CONTOUR
MINOR CONTOUR
SILT FENCE, RE: A1/GC500102
STABILIZED CONSTRUCTION ENTRANCE,
RE: C1/GC500
SF SILT FENCE, RE: A1/GC500
KEYNOTES
LEGEND
EROSION CONTROL PLAN GENERAL
NOTES
E SEED ALL DISTURBED AREAS PER SPECIFICATION 32 92 19
F REFER TO SHEETS CG100 - CG125 FOR GRADING PLANS.
CONTRACTOR STAGING AREA (8740 SM)104
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T G
C
ER
O
SI
O
N C
O N
TR
O
L
PL
AN
17230763
NOTE:
UNLESS OTHERWISE STATED, ALL CIVIL PLAN
SHEETS DIMENSIONS ARE IN METERS.
10 SEP 2021
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
CN
KY
K. YOSHIMOTO
JC
GC500
NOTE:
UNLESS OTHERWISE STATED, ALL
DIMENSIONS ARE IN MILLIMETERS.
21M (MIN)
M
(M
IN
(M
IN
NTS
SECTION A-A
NTS
PLAN
CRUSHED AGGREGATE
(STONE SIZE RC-40)
GEOTEXTILE
SCALE
STABLIZED CONSTRUCTION ENTRANCEC1 N.T.S.
SCALE
AREA INLET PROTECTIONA4 N.T.S.
SCALE
TRENCH DRAIN PROTECTIONC4 N.T.S.
(M
IN
100mm
1.8M
1. SET POSTS AND EXCAVATE A 0.1M X 0.1M
TRENCH UPSLOPE ALONG THE LINE OF POSTS.
2. STAPLE WIRE FENCING TO THE POSTS.
3. ATTACH THE FILTER BARRIER FABRIC TO THE
WIRE FENCE AND EXTEND IT INTO THE TRENCH.
4. BACKFILL AND COMPACT THE EXCAVATED SOIL.
5. EXTENSION OF FABRIC AND WIRE INTO THE TRENCH.
12-1/2 GAUGE (MIN)
WIRE
GROUND LINE
NOTES:
1. SILT FENCE MAY BE INSTALLED USING EITHER TRENCH OR SOIL SLICING CONSTRUCTION
METHOD.
2. WHEN ASSEMBLING SILT FENCE ON-SITE, COMPACT THE BACKFILL SOIL IMMEDIATELY NEXT
TO THE SILT FENCE GEOTEXTILE. COMPACT THE UPSTREAM SIDE FIRST, AND THEN THE
DOWNSTREAM SIDE. WHEN INSTALLING PRE-ASSEMBLED SILT FENCE, CARE MUST BE TAKEN
TO SUFFICIENTLY COMPACT SOIL ADJACENT TO THE INSTALLED GEOTEXTILE AND POSTS.
THE SOIL ADJACENT TO THE BURIED SILT FENCE GEOTEXTILE MUST BE COMPACTED TO
ACHIEVE NO LESS THAN 50% OF ITS ORIGINAL IN-SITU DENSITY.
FLOW
SECTION A
SECTION B
STAPLE
SPACING
150 (MAX)
SECTION A
SECTION B
STAPLE
POSTSSTAPLE
SCALE
SILT FENCEA1 N.T.S.
SCALE
SILT FENCE SPLICE/TERMINATIONA3 N.T.S.
STEEL OR WOOD
POST-IMBED 0.9M
MESH SPACING
150mm (MAX)
FILTER BARRIER
FABRIC
ER
O
SI
O
N C
O N
TR
O
L D
ET
AI
LS
17230764
C1-A
GC500
C4-A
GC500
A4-B
GC500
A4-A
GC500
10 SEP 2021
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
CN
KY
K. YOSHIMOTO
JC
GC501
SCALE
ROCK CHECK DAMA1 N.T.S.
D
IR
EC
TI
O N
4.5 x DRAINAGE AREA (HA)
LENGTH (M) =
M
IN
1 1
460 (MIN)
150 (MIN)
25 (MIN)
O F
FL
O
W
TO
P
W
ID
TH
M
IN
CUTAWAY TO SHOW
GEOTEXTILE COVERED
FILTER STONE CORE
EARTH EMBANKMENT
FILTER STONE
EMBANKMENT
GEOTEXTILE COVERED
FILTER STONE CORE
GEOTEXTILE COVERED
FILTER STONE CORE
TYPE A DRY RIPRAP
EXISTING GROUND
ER
O
SI
O
N C
O N
TR
O
L D
ET
AI
LS
17230765
NOTE:
UNLESS OTHERWISE STATED, ALL
DIMENSIONS ARE IN MILLIMETERS.
CONTOUR INTERVAL IS 0.25 m.
REFER TO SHEET GC500 FOR EROSION CONTROL
DETAILS.
ALL CATCH BASINS MUST HAVE INLET PROTECTION
DURING CONSTRUCTION ACTIVITIES.
INSTALL EROSION CONTROL MEASURES AS INDICATED
ON THE PLANS AND AS FIELD CONDITIONS WARRANT
PRIOR TO COMMENCING ANY CONSTRUCTION
ACTIVITIES. REPAIRS OR MODIFICATIONS TO THE
MEASURES SHOULD BE MADE IF CONTROL MEASURES
PROVE INEFFECTIVE OR IF ADDITIONAL CONTROL
MEASURES ARE NECESSARY.
MINIMIZE UNNECESSARY CLEARING AND GRADING
FROM ALL CONSTRUCTION SITES. CLEARING AND
GRADING MUST ONLY BE PERFORMED WITHIN AREAS
NEEDED TO BUILD THE PROJECT, INCLUDING
STRUCTURES, UTILITIES, ROADS, RECREATIONAL
AMENITIES, POST-CONSTRUCTION STORM WATER
MANAGEMENT FACILITIES, AND RELATED
INFRASTRUCTURE. CLEARING SHOULD ONLY BE
SCHEDULED DURING THE DRY SEASON IF POSSIBLE.
MASS CLEARING DURING THE WET SEASON SHOULD
BE AVOIDED.
A
B
C
D
E
WHENEVER PRACTICABLE AND FEASIBLE,
CONSTRUCTION MUST BE PHASED TO LIMIT
DISTURBANCE TO ONLY ONE AREA OF ACTIVE
CONSTRUCTION AT A TIME. FUTURE PHASES MUST
NOT BE DISTURBED UNTIL CONSTRUCTION OF PRIOR
PHASES IS COMPLETE AND THE LAND AREA IS
STABILIZED.
MINIMIZE UNNECESSARY CLEARING AND GRADING
FROM ALL CONSTRUCTION SITES. CLEARING AND
GRADING MUST ONLY BE PERFORMED WITHIN AREAS
NEEDED TO BUILD THE PROJECT, INCLUDING
STRUCTURES, UTILITIES, ROADS, RECREATIONAL
AMENITIES, POST-CONSTRUCTION STORM WATER
MANAGEMENT FACILITIES, AND RELATED
INFRASTRUCTURE. CLEARING SHOULD ONLY BE
SCHEDULED DURING THE DRY SEASON IF POSSIBLE.
MASS CLEARING DURING THE WET SEASON SHOULD
BE AVOIDED.
WHENEVER PRACTICABLE AND FEASIBLE,
CONSTRUCTION MUST BE PHASED TO LIMIT
DISTURBANCE TO ONLY ONE AREA OF ACTIVE
CONSTRUCTION AT A TIME. FUTURE PHASES MUST
NOT BE DISTURBED UNTIL CONSTRUCTION OF PRIOR
PHASES IS COMPLETE AND THE LAND AREA IS
STABILIZED.
F
G
H
DISTURBED AREAS MUST BE STABILIZED AS SOON AS
FEASIBLY POSSIBLE AFTER CONSTRUCTION IS
COMPLETED WITHIN A DESIGNATED CONSTRUCTION
AREA, AND IN NO CASE LONGER THAN 14 DAYS AFTER
COMPLETION OF ACTIVE CONSTRUCTION.
PERIMETER SEDIMENT CONTROLS MUST BE APPLIED
TO RETAIN OR FILTER CONCENTRATED RUNOFF FROM
DISTURBED AREAS TO TRAP OR RETAIN SEDIMENT
BEFORE IT LEAVES A CONSTRUCTION SITE. UPLAND
RUNOFF SHOULD BE DIVERTED AROUND
EXCAVATIONS WHERE POSSIBLE.
SEDIMENT TRAPPING AND SETTLING DEVICES MUST
BE EMPLOYED TO TRAP AND/OR RETAIN SUSPENDED
SEDIMENTS AND ALLOW TIME FOR THEM TO SETTLE
OUT IN CASES WHERE PERIMETER SEDIMENT
CONTROLS (E.G., SILT FENCE) ARE DEEMED TO BE
INEFFECTIVE IN TRAPPING SUSPENDED SEDIMENTS
ON-SITE.
ALL CONSTRUCTION SITE MANAGERS (OR
SUPERINTENDENTS) MUST PROVIDE DOCUMENTATION
THAT THEY HAVE RECEIVED ADEQUATE TRAINING IN
THE APPLICATION AND MAINTENANCE OF EROSION
AND SEDIMENT CONTROL PRACTICES.
I
J
K
L
ALL CONSTRUCTION SITE MANAGERS MUST
PARTICIPATE IN A PRE-CONSTRUCTION MEETING WITH
APPLICABLE AUTHORITY TO REVIEW THE PROVISIONS
OF THE EROSION AND SEDIMENT CONTROL PLAN AND
MAKE ANY FIELD ADJUSTMENT NECESSARY TO
IMPLEMENT THE INTENT OF THE PLAN TO MINIMIZE
EROSION AND MAXIMIZE SEDIMENT RETENTION
ON-SITE THROUGHOUT THE CONSTRUCTION
PROCESS.
CONSTRUCTION SHOULD BE SCHEDULED TO MINIMIZE
SOIL EXPOSURE IN THE RAINY SEASON (JULY 1ST -
NOV. 30TH) AND DURING PERIODS OF CORAL
SPAWNING.
EROSION AND SEDIMENT CONTROL PRACTICES MUST
BE AGGRESIVELY MAINTAINED THROUGHOUT ALL
PHASES OF CONSTRUCTION. ALL EROSION AND
SEDIMENT CONTROL PLANS MUST HAVE AN
ENFORCEABLE OPERATION AND MAINTENANCE
AGREEMENT TO ENSURE THAT PRACTICES ARE
MAINTAINED DURING THE CONSTRUCTION PROCESS.
M
N
O
SCALE
EROSION CONTROL GENERAL NOTESA4 N.T.S.
10 SEP 2021
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
CN
KY
K. YOSHIMOTO
JC
SCALE
OVERALL TOPOGRAPHIC SURVEYB1 1:4000
V-100
TOPOGRAPHIC SURVEY GENERAL
NOTES
BENCHMARKS
CONTROL POINT CP-9022NL N 1,659,187.9847
E 351,510.7382
EL. 76.876
CONTROL POINT CP-9016PKNL N 1,659,233.3922
E 351,762.1268
EL. 77.397
CONTROL POINT CP-9018NAIL N 1,659,280.5912
E 352,002.4838
EL. 77.674
LEGEND
LEASE BOUNDARY
ET TINI 1 N 1,655,557.2821
E 350,949.2057
EL. 1.287
TIDE STATION 1770000
TIDE STATION LOCATION TINIAN HARBOR,
TINIAN
PID AA4407
VM NONE
BENCH MARK TIDAL 1
HT ABOVE LMSL (METERS) 2.361
TIDAL EPOCH DATA
COORDINATES ARE BASED ON THE MARIANA ISLANDS
DISTRICT COORDINATE SYSTEM OF 1966.
This is the start of the file's text. The full file is on GovTribe.