This solicitation is for four construction projects at Tinian International Airport in the Commonwealth of Northern Mariana Islands. The projects include construction of a cargo pad and taxiway extension using Portland cement concrete, as well as NAVAIDS, utilities, and a cargo staging area. Additional projects are construction of a jet fuel system comprising harbor receipt and storage tanks, pipelines, and hydrant systems; repair and improvement of the haul route from the seaport to the airfield; and an option for construction of a maintenance support facility. The solicitation also includes three pre-priced planned modifications for munitions and explosives of concern and material potentially presenting an explosive hazard for some projects. The Department of the Navy Naval Facilities Engineering Command is the issuing agency.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5898351
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RFP N62742-22-R-1306
FY19 MCAF P-9030/PAF189030 APSI - CARGO PAD WITH TAXIWAY EXTENSION
FY19 MCAF P-9040/PAF189040 APSI - MAINTENANCE SUPPORT FACILITY
FY20 MCAF P-9010/PAF189010 APSI - FUEL TANKS WITH RECEIPT PIPELINE & HYDRANT SYSTEM
FY20 MCAF P-9021/PAF189021 APSI -AIRFIELD DEVELOPMENT PHASE 1 - ROADS
TINIAN INTERNATIONAL AIRPORT, TINIAN, CNMI
Continued on Page 2
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Apr-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6274222R1306
X 9B. DATED (SEE ITEM 11)
07-Dec-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Apr-2022
CODE
NAVFAC PACIFIC
CONSTRUCTION CONTRACTS BR (CODE ACQ33)
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6274222R1306
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
SECTION 00 01 15 LIST OF DRAWINGS
PARA 1.2 CONTRACT DRAWINGS
1.2.1 Part B List of Drawings
The following drawings are revised and accompany this Amendment:
NAVFAC
DWG NO.
DRAWING
SHEET NO.
CHANGE
NO.
TITLE
17230745 G-101 1 CONSTRUCTION PHASING NOTES
17230746 G-102 1 CONSTRUCTION PHASING – PHASE 1
17230747 G-103 1 CONSTRUCTION PHASING – PHASE 2 WORK AREA B
17230766 G-103A 1 CONSTRUCTION PHASING – PHASE 2 WORK AREA C
17230748 G-104 1 CONSTRUCTION PHASING – PHASE 3
17230749 G-105 1
CONSTRUCTION PHASING PLANS – RELOCATED
THRESHOLD – 1 OF 3
17230750 G-106 1
CONSTRUCTION PHASING PLANS – RELOCATED
THRESHOLD – 2 OF 3
17230751 G-107 1
CONSTRUCTION PHASING PLANS – RELOCATED
THRESHOLD – 3 OF 3
17230753 G-109 1 NEW RUNWAY PAVEMENT MARKING PLAN – 1 OF 3
17230754 G-110 1 NEW RUNWAY PAVEMENT MARKING PLAN – 2 OF 3
17230755 G-111 1 NEW RUNWAY PAVEMENT MARKING PLAN – 3 OF 3
17230767 G-112 1 TEMPORARY FENCE ON PAVEMENT DETAILS
17230768 G-113 1 TEMPORARY FENCE ON GRASS DETAILS
1.2.3 Part D List of Drawings
The following drawings are revised and accompany this Amendment:
NAVFAC
DWG NO.
DRAWING
SHEET NO.
CHANGE
NO.
TITLE
17256498 G-002 1 SHEET INDEX
17256503 G-103 1 CONSTRUCTION SAFETY PHASING PLAN (CSPP)
17267155 G-104 1 TEMPORARY FENCE ON PAVEMENT DETAILS
17267156 G-105 1
FOD SIGN & TEMPORARY FENCE ON GRASS
DETAILS
17256585 CS401 1 ENLARGED SITE PLAN – TRUCK FILLSTAND
17256620 SB103 1 FOUNDATION PLAN – GENERATOR BUILDING
PART A: GENERAL REQUIREMENTS
SPECIFICATION
SECTION
CHANGE
NO.
TITLE
01 35 13 1 SPECIAL PROJECT PROCEDURES
N6274222R1306
SECTION 01 35 13 SPECIAL PROJECT PROCEDURES
Delete the section in its entirety and replace it with the attached Section 01 35 13, Amendment 0006. The Federal Aviation Administration CSPP Conditional Approval Letter was added. The Construction Safety and Phasing Plan FY20 MCAF P-9010/PAF189010 APSI – Fuel Tanks with Receipt Piping & Hydrant System, dated September 10, 2021, and Construction Safety and Phasing Plan FY19 MCAF P-9030/PAF189030 APSI Cargo Pad with Taxiway Extension, dated September 10, 2021, were replaced with the Construction Safety and Phasing Plan FY19 MCAF P-9030/PAF189030 APSI Cargo Pad with Taxiway Extension, FY20 MCAF P-9010/PAF189010 APSI Fuel Tanks with Receipt Piping & Hydrant System, FY19 MCAF P-9040/PAF189040 APSI Maintenance Support Facility, dated 10 December 2021.
(End of Summary of Changes)
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
JNP KWA JNP
MARK PETERSEN, PM, PER
SAT-TO FORM DTD 01 OCT 2021
CN
KY
K. YOSHIMOTO
JC
G-101
C O
N S
TR
U
C
TI
O N
P H
A S
IN
G
N O
TE
S
17230745
PHASE III RESTRICTIONS (CONT):
3. WORK AREA D - THIS WORK AREA IS FOR CONSTRUCTION COMPLETION OF TAXIWAY
BRAVO AND MUST BE ACCOMPLISHED AFTER THE RUNWAY 26 THRESHOLD HAS BEEN
REPLACED IN ITS ORIGINAL LOCATION. THIS WORK REQUIRES UTILIZATION OF TAXIWAY
CLOSURE MARKERS AND LOW-PROFILE BARRICADES. THIS WORK REQUIRES AOA ACCESS,
ALL REQUIREMENTS FOR AOA ACCESS AND WORK APPLY.
4. TAXIWAY ALPHA WILL BE CLOSED EAST OF TAXIWAY DELTA TO RUNWAY 26.
5. CONTRACTOR IS REQUIRED TO ACCESS CONSTRUCTION SITE FROM BROADWAY AVENUE
DURING PHASE III CONSTRUCTION. THE CONTRACTOR MUST NOT CROSS THE
ACTIVE RUNWAY.
AREAS AND OPERATIONS AFFECTED BY CONSTRUCTION ACTIVITY
IDENTIFICATION OF EFFECTED AREAS:
1. PHASE I OCCURS NORTH OF RUNWAY 8-26 ROFA AS SHOWN ON THE CONSTRUCTION
PHASING - PHASE 1 DRAWING, G-102.
2. PHASE II OCCURS ACROSS RUNWAY 8-26 AND TIE INTO TAXIWAY A AS SHOWN
ON THE CONSTRUCTION PHASING - PHASE 2 DRAWING, G-103.
3. PHASE III OCCURS AT THE TAXIWAY B/TAXIWAY A JUNCTURE AS SHOWN ON THE
CONSTRUCTION PHASING - PHASE 3 DRAWING, G-104.
MITIGATION OF EFFECTS
1. PHASE I WORK AREA A IS OUTSIDE OF THE AOA. THERE ARE NO RESTRICTIONS FOR WORK
OUTSIDE OF AOA.
2. PHASE II REQUIRES AOA ACCESS, ALL REQUIREMENTS FOR AOA ACCESS AND
WORK APPLY. WORK WILL BE COMPLETED WITHIN THE RUNWAY 8-26 ROFA UNDER A
RELOCATED THRESHOLD SCENARIO.
3. PHASE III REQUIRES AOA ACCESS, ALL REQUIREMENTS FOR AOA ACCESS AND
WORK APPLY.
NAVIGATION AID (NAVAID) PROTECTION
1. NOT APPLICABLE.
CONTRACTOR ACCESS
ACCESS AND STAGING AREAS
1. CONTRACTOR ACCESS ROUTES ARE SHOWN ON SHEET G-100. CONTRACTOR
STAGING AREA SHOWN ON SHEETS G-102 THROUGH G-104 ON THE CONSTRUCTION
PHASING PLANS.
VEHICLE AND PEDESTRIAN OPERATIONS
1. CONTRACTOR PERSONNEL REQUIRING AOA ACCESS MUST COMPLY WITH THE
AIRPORT'S BADGING PROCEDURES.
2. INDIVIDUALS IDENTIFIED BY THE CONTRACTOR TO WORK WITHIN THE AOA MUST
UNDERGO TRAINING TO COMPLY WITH THE AIRPORT'S RULES FOR GROUND
VEHICLE OPERATIONS AND WILL BE RESPONSIBLE FOR MAINTAINING COMPLIANCE.
3. ENTRY GATES MUST BE LOCKED AT ALL TIMES. IN THE EVENT THAT THE GATES NEED
TO BE OPENED FOR AN EXTENDED PERIOD OF TIME, THE GATES MUST BE MANNED.
4. THE CONTRACTOR MUST PROVIDE AN ESCORT TRAINED BY THE AIRPORT FOR ALL
VEHICLES REQUIRING ACCESS TO THE AOA.
5. THE CONTRACTOR'S PERSONNEL AND EQUIPMENT MUST STAY WITHIN THE INDICATED
STAGING AREA, HAUL ROUTE(S), AND PHASE AS INDICATED FOR EACH PHASE.
6. THE CONTRACTOR MUST MAINTAIN CONTROL OF ALL PERSONNEL AND EQUIPMENT TO
PREVENT UNAUTHORIZED ENTRY OF PERSONS OR VEHICLES FROM ENTERING THE AOA.
7. THE CONTRACTOR'S VEHICLES MUST BE MARKED AND LIGHTED IN ACCORDANCE WITH
FAA AC 150/5370-2 (LATEST EDITION) AND 150/5210-5 (LATEST EDITION) AT ALL TIMES WHILE
ON THE PROJECT SITE. THIS MUST INCLUDE A FLAG ON A STAFF ATTACHED TO THE VEHICLE
SO THAT THE FLAG WILL BE READILY VISIBLE. THE FLAG MUST BE AT LEAST A (0.9 METER BY
0.9 METER) SQUARE HAVING A CHECKERED PATTERN OF INTERNATIONAL ORANGE AND
WHITE SQUARES AT LEAST 300MM ON EACH SIDE. CONSTRUCTION VEHICLES MUST BE
EQUIPPED WITH A YELLOW FLASHING LIGHT MEETING THE REQUIREMENTS OF FAA AC
150/5210-5 (LATEST EDITION) DURING PERIODS OF LOW VISIBILITY AS DETERMINED BY THE
CONTRACTING OFFICER.
RADIO COMMUNICATIONS
1. WHEN WORKING WITHIN THE AOA, BADGED AND TRAINED INDIVIDUALS ARE
RESPONSIBLE FOR MONITORING THE AIRPORT'S COMMON TRAFFIC ADVISORY
FREQUENCY (CTAF) 123.6 MHZ. THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING
AN ADEQUATE NUMBER OF RADIOS FOR HIS PERSONNEL.
WILDLIFE MANAGEMENT
1. CONTRACTOR MUST CAREFULLY CONTROL AND CONTINUOUSLY REMOVE TRASH,
WASTE, OR LOOSE MATERIALS THAT MAY ATTRACT WILDLIFE.
2. IF STOCKPILES OR STORED MATERIALS ARE FOUND TO BE A WILDLIFE ATTRACTANT, THE
CONTRACTOR MUST IMPLEMENT MITIGATION MEASURES AS DIRECTED BY THE
CONTRACTING OFFICER.
3. THE CONSTRUCTION SITE MUST BE GRADED TO MAINTAIN POSITIVE DRAINAGE
ALWAYS TO ELIMINATE AREAS OF STANDING WATER.
4. CONTRACTOR IS RESPONSIBLE FOR MOWING WITHIN THE PROJECT WORK LIMITS.
GRASS MUST NOT EXCEED 15cm IN HEIGHT.
5. CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING ALL FENCES AND GATES INSTALLED
AS PART OF THEIR CONTRACT, IN SUFFICIENTLY GOOD CONDITION TO PREVENT PASSAGE
OF WILDLIFE INTO THE AOA.
6. CONTRACTOR WILL MONITOR FOR ANY DISRUPTIONS OF EXISTING WILDLIFE HABITAT THAT
TAKES PLACE.
7. CONTRACTOR TO CONTINUOUSLY MONITOR THE AOA FENCE FOR POTENTIAL ENTRY POINTS
FOR WILDLIFE.
FOREIGN OBJECT DEBRIS (FOD) MANAGEMENT
1. THE PERIMETER OF THE CONSTRUCTION SITE AND ALL HAUL ROUTES MUST BE
CONTINUOUSLY MONITORED BY THE CONTRACTOR TO ENSURE THE TEMPORARY
BARRICADES ARE PER PLAN AND TO ENSURE NO FOD HAZARD IS PRESENT.
2. FOD SIGNS MUST BE INSTALLED AT CONSTRUCTION AIRFIELD POINTS OF ENTRY FOR FOD
CHECKS WHEN VEHICULAR TRAFFIC IS NEAR AND WILL BE ENTERING THE AIRFIELD.
3. A FOD CHECK MUST BE PERFORMED ON ALL VEHICLES ENTERING ACTIVE AIRFIELD
PAVEMENTS. DRIVERS WILL BE RESPONSIBLE FOR A VISUAL INSPECTION
OF ALL TIRES AND FOR REMOVING MUD AND OTHER DEBRIS PRIOR TO PROCEEDING ON
ACTIVE PAVEMENT.
FOREIGN OBJECT DEBRIS (FOD) MANAGEMENT (CONT.)
4. CONTRACTOR IS RESPONSIBLE FOR THE EFFORT AND COST OF IMMEDIATE
CLEANING OF PAVEMENT WHERE EQUIPMENT CROSSES ACTIVE PAVEMENTS.
THE CONTRACTOR MUST USE A POWER SWEEPER TO CONTINUOUSLY
MAINTAIN A FOD FREE ENVIRONMENT.
5. WATER MUST BE USED AS A DUST CONTROL MEASURE AS NEEDED OR AS
DIRECTED BY THE CONTRACTING OFFICER. IF, IN THE OPINION OF THE
CONTRACTING OFFICER OR AIRPORT, DUST FROM CONSTRUCTION ACTIVITIES
CREATES A NUISANCE OR LIMITED VISIBILITY CONDITION FOR OPERATIONS,
CONSTRUCTION ACTIVITY WILL CEASE UNTIL THE DUST HAS BEEN MITIGATED
BY SPRINKLING ACTIVITIES TO THE SATISFACTION OF THE CONTRACTING
OFFICER OR AIRPORT. TIME LOST DUE TO WORK STOPPAGE FOR THIS
ACTIVITY WILL NOT CONSTITUTE AN EXTENSION OF CONTRACT TIME.
HAZMAT MANAGEMENT
1. THE CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER
MANAGEMENT PROCEDURES FOR FUEL DELIVERIES, EQUIPMENT FUELING,
AND SPILL RECOVERY PROCEDURES PRIOR TO WORK BEGINNING ON THE
PROJECT.
NOTIFICATION OF CONSTRUCTION ACTIVITIES
A LIST OF RESPONSIBLE REPRESENTATIVES/POINTS OF CONTACT:
TINIAN AIRPORT:
OPERATIONS: ANTONIO L BORJA 1(670) 433-9294
DISPATCH: AIRPORT ADVISORY STATION 1(670) 433-9295
CONTRACTOR:
PROJ. MANAGER: TBD PHONE NUMBER
PROJ. FOREMAN: TBD PHONE NUMBER
SAFETY OFFICER: TBD PHONE NUMBER
NOTICE TO AIRMEN (NOTAM):
PRIMARY: ANTONIO L BORJA 1(670) 433-9294
SECONDARY: NATASHA MORGAN 1(670) 433-9295
EMERGENCY NOTIFICATION PROCEDURES:
PRIMARY: ANTONIO L BORJA 1(670) 433-9294
SECONDARY: GERALD CRISOSTOMO 1(670) 433-9294
COORDINATION WITH ARFF PERSONNEL:
PRIMARY: ASST. CHIEF JOHN MITHNOY 1(670) 433-9303
SECONDARY: CAPTAIN JOHN BARCINAS 1(670) 433-9296
NOTIFICATION TO THE FAA:
PRIMARY: RONSON FOX (808) 312-6032
SECONDARY: WILLIAM BROWN (808) 312-6034
INSPECTION REQUIREMENTS
1. THE CONTRACTING OFFICER, TINIAN AIRPORT OPERATIONS AND
CONTRACTOR'S SAFETY OFFICER MUST CONDUCT DAILY INSPECTIONS OF
THE PROJECT SITE TO ENSURE ALL SAFETY REQUIREMENTS IN THE
CONTRACT DOCUMENTS ARE MET.
2. PROJECT AREAS TO BE RE-OPENED AFTER A CLOSURE MUST BE
INSPECTED AND APPROVED BY THE CONTRACTING OFFICER AND TINIAN
AIRPORT OPERATIONS PRIOR TO RE-OPENING.
3. A FINAL INSPECTION FOR EACH PHASE MUST INCLUDE THE CONTRACTING
OFFICER, TINIAN AIRPORT OPERATIONS AND CONTRACTOR'S SAFETY
OFFICER AND MUST BE SCHEDULED WITH 7 DAYS NOTICE.
4. CPA FLIGHT SERVICE MUST BE NOTIFIED AND ALLOWED TO PARTICIPATE IN
INSPECTION ACTIVITIES AS THEY DEEM APPROPRIATE.
5. ANY PART 139 DEFICIENCIES REQUIRE IMMEDIATE ATTENTION WHETHER
CAUSED BY NEGLIGENCE, OVERSIGHT, OR PROJECT SCOPE CHANGE.
UNDERGROUND UTILITIES
1. CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER, CPA FLIGHT
SERVICE AND TINIAN AIRPORT OPERATIONS, MEANS OF LOCATING AND
IDENTIFYING ALL UNDERGROUND UTILITIES IN THE PROJECT WORK AREAS
IF EXCAVATION IS NECESSARY.
2. CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER, CPA FLIGHT
SERVICE AND TINIAN AIRPORT OPERATIONS, MEANS OF PROTECTING ALL
UNDERGROUND UTILITIES IN THE PROJECT WORK AREAS.
3. CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER, CPA FLIGHT
SERVICE AND TINIAN AIRPORT OPERATIONS, MEANS OF PROTECTING THE
FAA BACKUP EMERGENCY COMMUNICATION SYSTEM (BUEC) LOCATED
NEAR THE ARFF STATION. THE BUEC SYSTEM COMMUNICATES WITH SAIPAN
TOWER AND THE ELECTRONIC SIGNAL MUST BE PRESERVED.
4. CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER, CPA FLIGHT
SERVICE AND TINIAN AIRPORT OPERATIONS, MEANS OF REPORTING AND
REPAIRING ALL UNDERGROUND UTILITY DAMAGES IN PROJECT WORK AREAS.
5. CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER, CPA FLIGHT
SERVICE AND TINIAN AIRPORT OPERATIONS, UTILITY OWNER AND
EMERGENCY CONTACT INFORMATION PRIOR TO STARTING ANY EXCAVATION.
PENALTIES FOR VIOLATIONS
1. 1ST OFFENSE: WRITTEN WARNING OF VIOLATION.
2. 2ND OFFENSE: 30-DAY SUSPENSION OF MOVEMENT AREA PRIVILEGES.
3. 3RD OFFENSE: PERMANENT REVOCATION OF MOVEMENT AREA PRIVILEGES.
SPECIAL CONDITIONS
1. LOW PROFILE BARRICADES DENOTE THE LIMITS OF CONSTRUCTION WHEN
ADJACENT TO ACTIVE PAVEMENTS AND PROVIDE A LEVEL OF SAFETY FOR
PERSONNEL WITHIN THE PROJECT WORK AREAS. PHASES II AND III WILL
HAVE AIRCRAFT TAXIING NEAR THE WORK AREA, CONTRACTOR TO ESTABLISH
STANDARD OPERATIONAL PROCEDURES (SOP) FOR PERSONNEL IN THESE
AREAS. THIS SOP MUST BE REVIEWED AND APPROVED BY THE CONTRACTING
OFFICER AND WILL REQUIRE TRAINING FOR ALL INDIVIDUALS ACCESSING
THESE AREAS.
RUNWAY AND TAXIWAY VISUAL AIDS
1. FOR RUNWAY CLOSURES, RAISED LIGHTED RUNWAY CLOSURE
MARKERS MUST BE PLACED AT BOTH ENDS OF THE RUNWAY
DIRECTLY OVER THE RUNWAY DESIGNATION MARKINGS.
2. FOR TAXIWAY CLOSURES, LOW LEVEL BARRICADES MUST BE
PLACED FULLY ACROSS THE TAXIWAY PAVEMENT INCLUDING
SHOULDER PAVEMENT. BARRICADES MUST BE SECURED IN PLACE
TO PREVENT MOVEMENT BY HIGH WINDS OR PROP WASH.
MARKING AND SIGNS FOR ACCESS ROUTES
1. ACCESS ROUTES ARE LIMITED TO HAUL ROUTES DESIGNATED IN
THE PHASED AREAS OF CONSTRUCTION.
2. APPROPRIATE MARKING AND SIGNAGE WILL BE REVIEWED BY THE
AIRPORT PRIOR TO ANY WORK IN THE PHASED AREA.
3. APPROPRIATE LIGHTING WILL BE REQUIRED IF THE CONTRACTOR
INTENDS ON WORKING DURING NIGHTTIME HOURS.
HAZARD MARKING AND LIGHTING
1. DESCRIPTION - LIGHTED BARRICADES MUST BE UTILIZED TO
DENOTE HAZARDS, CLOSED AREAS, OPEN EXCAVATIONS, AND
DELINEATE WORK AREAS, RE: C1/G-108. RUNWAY CLOSURES MUST
UTILIZE RAISED RUNWAY LIGHTED CLOSURE MARKERS WHEN THE
RUNWAY IS CLOSED FOR CONSTRUCTION ACTIVITIES, RE: B3/G-108.
2. LOCATIONS - SEE CONSTRUCTION PHASING PLAN SHEETS G-102
THROUGH G-107.
3. MAINTENANCE - CONTRACTOR IS RESPONSIBLE FOR DAILY
INSPECTIONS AND MAINTENANCE OF ALL HAZARD MARKING AND
LIGHTING APPURTENANCES.
4. RESPONSIBLE INDIVIDUAL - THE CONTRACTOR'S SAFETY OFFICER
AS IDENTIFIED IN SECTION 8 MUST BE RESPONSIBLE FOR ALL
HAZARD MARKING AND LIGHTING.
WORK ZONE LIGHTING FOR NIGHTTIME CONSTRUCTION
1. IF THE CONTRACTOR ANTICIPATES WORKING DURING NIGHTTIME
HOURS, THE CONTRACTOR MUST PROVIDE TO THE CONTRACTING
OFFICER A LIGHTING PLAN 10 DAYS PRIOR TO COMMENCING WORK
AT NIGHT. LIGHTING MUST BE PLACED IN A MANNER TO NOT
CREATE A SAFETY HAZARD TO AIRCRAFT IN TAXI OR IN FLIGHT.
PROTECTION OF RUNWAY AND TAXIWAY SAFETY AREAS
1. RUNWAY SAFETY AREA (RSA) - NO CONSTRUCTION CAN OCCUR
WITHIN THE RUNWAY 8-26 RSA WHILE THE RUNWAY IS OPERATIONAL.
CONSTRUCTION FLAGS MAY BE PLACED AT 30-METER INTERVALS TO
VISUALLY SHOW THE RSA LIMITS. FOR PHASE II, THE RUNWAY 26 RSA
WILL BE MOVED DUE TO THE THRESHOLD RELOCATION, WHICH WILL
BE ACCOMPLISHED OVER A SINGLE 12-HOUR CLOSURE.
2. RUNWAY OBJECT FEE AREA (ROFA) - CONSTRUCTION MAY OCCUR
WITHIN THE RUNWAY 8-26 OFA WHILE THE RUNWAY IS OPERATIONAL.
CONSTRUCTION EQUIPMENT, HOWEVER, MUST BE REMOVED FROM
THE ROFA WHEN NOT IN USE AND MATERIAL MUST NOT BE
STOCKPILED IN THE ROFA. THIS PROJECT PLACES THE LIMIT OF
CONSTRUCTION AT THE ROFA BOUNDARY TO MITIGATE POTENTIAL
PENETRATIONS INTO THE RSA DURING CONSTRUCTION.
3. TAXIWAY SAFETY AREA (TSA) - CONSTRUCTION ACTIVITIES WITHIN
THE TSA MUST NOT OCCUR UNLESS THE TAXIWAY IS CLOSED TO
AIRCRAFT OPERATIONS.
4. TAXIWAY OBJECT FREE AREA (TOFA) - CONSTRUCTION ACTIVITIES
WITHIN THE TOFA MUST NOT OCCUR UNLESS THE TAXIWAY IS
CLOSED TO AIRCRAFT OPERATIONS.
5. OBSTACLE FREE ZONE (OFZ) - CONSTRUCTION PERSONNEL,
EQUIPMENT, AND MATERIAL MAY NOT PENETRATE THE OFZ WHILE
THE RUNWAY IS OPERATIONAL. BASED ON THE LOCATION OF THE
PROPOSED CONSTRUCTION ACTIVITIES IT IS NOT ANTICIPATED THAT
THE CONTRACTOR WILL PENETRATE THE OFZ.
6. RUNWAY APPROACH / DEPARTURE SURFACES - ALL CONSTRUCTION
PERSONNEL, EQUIPMENT, AND MATERIAL MUST REMAIN CLEAR OF
THE THRESHOLD SITING SURFACES. BASED ON THE LOCATION OF
THE PROPOSED CONSTRUCTION ACTIVITIES IT IS NOT ANTICIPATED
THAT THE CONTRACTOR WILL PENETRATE THE RUNWAY APPROACH /
DEPARTURE SURFACES.
OTHER LIMITATIONS ON CONSTRUCTION
1. THE CONTRACTOR MUST MAINTAIN THE AIRFIELD SECURITY 24
HOURS A DAY. THE NEW AIRFIELD PERIMETER FENCE MUST BE
INSTALLED AND APPROVED BEFORE THE TEMPORARY AOA FENCE IS
REMOVED. THE CONTRACTOR MUST PROVIDE SECURITY
GUARDS AT ANY GATES THAT THE CONTRACTOR UTILIZES FOR
ACCESS TO AN ACTIVE AOA. THE GATES MUST BE LOCKED WHEN
NOT MANNED.
2. THE CONTRACTOR MUST REFERENCE THE DRAFT CONSTRUCTION
SAFETY AND PHASING PLANS (CSPP) IN THE CONTRACT DOCUMENTS.
THE CONTRACTOR IS REQUIRED TO PREPARE AND SUBMIT A SAFETY
PLAN COMPLIANCE DOCUMENT (SPCD) THAT MEETS FAA ADVISORY
CIRCULAR 150-5370-2 REQUIREMENTS AND DETAILS HOW
CONTRACTOR WILL COMPLY WITH THE CSPP. THE CONTRACTOR IS
REQUIRED TO SUBMIT THE SPCD TO THE CONTRACTING OFFICER,
CPA FLIGHT SERVICE, AND AIRPORT OPERATIONS FOR APPROVAL
PRIOR TO THE START OF CONSTRUCTION ACTIVITIES. CONSTRUCTION
EQUIPMENT MUST BE SUBMITTED IN THE OBSTRUCTION
EVALUATION/AIRPORT AIRSPACE ANALYSIS BY CONTRACTOR.
3. NO STOCKPILES OF MATERIAL ARE PERMITTED WITHIN RUNWAY OR
TAXIWAY SAFETY AREAS OR OBJECT FREE AREAS. STOCKPILE
HEIGHTS OUTSIDE OF ROFA MUST BE COORDINATED WITH
CONTRACTING OFFICER AND MUST IN NO CASE PENETRATE AIRPORT
IMAGINARY SURFACES AS DEFINED BY FAA PART 77.
4. ONLY ONE RELOCATED THRESHOLD IS PERMITTED AT ANY GIVEN
TIME ON RUNWAY 08-26.
COORDINATION
PROGRESS MEETINGS
1. THE CONTRACTOR IS REQUIRED TO HOLD WEEKLY MEETINGS THROUGHOUT
DURATION OF THE PROJECT. OPERATIONAL SAFETY MUST BE A STANDING
AGENDA ITEM FOR DISCUSSION DURING THE PROGRESS MEETINGS. ATTENDEES
MUST INCLUDE CONTRACTOR, CONTRACTING OFFICER, CPA REPRESENTATIVE,
AND OTHER AGENCIES AS NEEDED (BECQ, CUC, DPW, FIRE DEPARTMENT).
SCOPE OR SCHEDULE CHANGES
1. CHANGES IN SCOPE OR DURATION AT ANY POINT OF THE PROJECT MAY REQUIRE
REVISIONS TO THE CSPP AND REVIEW AND APPROVAL BY CPA (AIRPORT) AND
FAA ADO HNL.
FAA ATO COORDINATION
1. ISSUE APPROPRIATE NOTAMS FOR PAVEMENT CLOSURES AND RUNWAY LENGTH
CHANGES DESCRIBED IN PHASING.
PHASING - PHASE I WORK
PHASE I CONSISTS OF APPROXIMATELY (NOT FOR BIDDING PURPOSES):
1. DEMOLISH 96,617 SQUARE METERS OF EXISTING PAVEMENT.
2. CONSTRUCT 13,812 SQUARE METERS OF TEMPORARY GRAVEL ACCESS ROAD.
3. CONSTRUCT 15,883 SQUARE METERS OF CARGO PAD PAVEMENT.
4. CONSTRUCT 27,785 SQUARE METERS OF TAXIWAY B AND F PAVEMENT, INCLUDING
LIGHTS, SIGNS AND PAVEMENT MARKINGS, THIS PORTION WILL BE NORTH OF THE
RUNWAY 8-26 OFA.
5. CONSTRUCT THE FIRE WATER PUMP HOUSE AND ASSOCIATED STORAGE TANKS.
6. CONSTRUCT 12,670 SQUARE METERS OF PERMANENT PAVED ROAD.
7. CONSTRUCT 1,636 LINEAR METERS OF NEW AOA FENCE.
8. CONSTRUCT BIO SECURITY CONTAINMENT FACILITY.
9. CONSTRUCT FUEL STORAGE FACILITIES AT THE AIRPORT AND THE HARBOR
INCLUDING FUEL STORAGE TANKS, FILLING STATIONS BUILDINGS INCLUDING A
FUEL PUMP AND CONTROLS BUILDING AND BIO SECURITY CONTAINMENT FACILITY.
10. CONSTRUCT MAINTENANCE SUPPORT FACILITY.
PHASE I RESTRICTIONS:
1. PHASE I WILL BE COMPLETED OVER AN APPROXIMATE TWO AND A HALF-YEAR
PERIOD.
2. WORK AREA A - THIS AREA IS FOR ALL WORK NORTH (OUTSIDE) OF THE
TEMPORARY AOA FENCE INSTALLED IN ASSOCIATION WITH PREVIOUS SEPARATE
PROJECT. THERE ARE NO RESTRICTIONS FOR WORK OUTSIDE OF AOA.
PHASE II WORK
PHASE II CONSISTS OF APPROXIMATELY (NOT FOR BIDDING PURPOSES):
1. RELOCATE RUNWAY 26 THRESHOLD APPROXIMATELY 1,016 METERS WEST.
RUNWAY EDGE LIGHT LENS COLOR ADJUSTMENT, REMOVE 9,606 SQUARE METERS
OF RUNWAY MARKINGS, ADD 3,467 SQUARE METERS OF TEMPORARY RUNWAY
MARKINGS, COVER THE RUNWAY DISTANCE REMAINING SIGNAGE AND THE
RELOCATE THE THRESHOLD/RUNWAY END LIGHTS AND DEACTIVATE THE RUNWAY
26 PRECISION APPROACH PATH INDICATOR (PAPI) AND RUNWAY END IDENTIFIER
LIGHTS (REILS).
2. DEMOLISH 6,825 SQUARE METERS OF EXISTING RUNWAY 26 ASPHALT SHOULDER
PAVEMENT.
3. CONSTRUCT 11,038 SQUARE METERS OF TAXIWAY B PAVEMENT, INCLUDING LIGHTS,
SIGNS, AND PAVEMENT MARKINGS.
4. REMOVE RUNWAY 26 THRESHOLD RELOCATION AND RETURN EDGE LIGHT LENSES
TO FULL-LENGTH CONFIGURATION, RESTORE RUNWAY 26 PAPI AND REIL TO
OPERATION; UNCOVER THE RUNWAY DISTANCE REMAINING SIGNS; REMOVE 4,665
SQUARE METERS OF MARKINGS AND INSTALL 8,134 SQUARE METERS OF
PERMANENT MARKINGS TO THE FULL- LENGTH CONFIGURATION AS INDICATED IN
THE PLANS.
5. RE-OPEN RUNWAY AT FULL LENGTH.
PHASE II RESTRICTIONS:
1. PHASE II MUST BE COORDINATED TO REDUCE THE AMOUNT OF TIME RUNWAY 8-26
OPERATES WITH A RELOCATED THRESHOLD. IT IS ANTICIPATED THAT
CONSTRUCTION WITHIN THE ROFA MAY BE ACCOMPLISHED IN LESS THAN 200
CALENDAR DAYS. THE CONTRACTOR MUST COORDINATE WITH THE CONTRACTING
OFFICER TO MINIMIZE AND ESTABLISH A TIMEFRAME FOR WORK UNDER A
RELOCATED THRESHOLD SCENARIO.
2. PHASE II MAY BE CONSTRUCTED CONCURRENTLY WITH PHASE I, HOWEVER THE
TOTAL DURATION FOR PHASE II MUST BE MINIMIZED.
3. WORK AREA B - THIS WORK AREA IS FOR THE CONSTRUCTION OF TAXIWAY B AND
MUST BE ACCOMPLISHED WHILE THE THRESHOLD IS RELOCATED (SEE WORK AREA
C). THIS WORK REQUIRES THE UTILIZATION OF TAXIWAY CLOSURE MARKERS AND
LOW-PROFILE BARRICADES TO ISOLATE THE WORK AREA. THIS WORK REQUIRES
AOA ACCESS, ALL REQUIREMENTS FOR AOA ACCESS AND WORK APPLY.
4. WORK AREA C - THIS AREA IS FOR THE RELOCATION OF THE RUNWAY 26
THRESHOLD. THIS WORK REQUIRES AOA ACCESS, ALL REQUIREMENTS FOR AOA
ACCESS AND WORK APPLY. THIS WORK REQUIRES THE RUNWAY TO BE CLOSED.
ALL WORK REQUIRING A RUNWAY CLOSURE MUST BE ACCOMPLISHED WITHIN A
SINGLE12-HOUR RUNWAY CLOSURE FOR RELOCATING THE THRESHOLD AND
ANOTHER 12-HOUR RUNWAY CLOSURE FOR RESTORING THE RUNWAY TO FULL
LENGTH. RAISED LIGHTED RUNWAY CLOSURE MARKERS MUST BE UTILIZED
DURING THE RUNWAY CLOSURES.
PHASE III WORK
PHASE III CONSISTS OF APPROXIMATELY (NOT FOR BIDDING PURPOSES):
1. DEMOLISH 1,054 SQUARE METERS OF EXISTING RUNWAY 26 ASPHALT SHOULDER
PAVEMENT.
2. CONSTRUCTION OF THE TAXIWAY BRAVO WEST FILLET LEAD-IN, 192 SQUARE
METERS OF PAVEMENT, INCLUDING LIGHTS, SIGNS, AND PAVEMENT MARKINGS.
THIS WORK REQUIRES AOA ACCESS, ALL REQUIREMENTS FOR AOA ACCESS AND
WORK APPLY.
PHASE III RESTRICTIONS:
1. WORK ON PHASE III MAY NOT BEGIN UNTIL PHASE II WORK HAS BEEN COMPLETED.
2. IT IS ANTICIPATED THAT CONSTRUCTION OF PHASE III WORK MAY BE
ACCOMPLISHED IN LESS THAN 60 CALENDAR DAYS.
01 APRIL 2022
R
AM
EN
D
M
EN
T
Evan Mizuno
01 APR 2022
NORTH
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
MARK PETERSEN, PM, PER
SAT-TO FORM DTD 01 OCT 2021
CN
KY
K. YOSHIMOTO
JC
SCALE
CONSTRUCTION PHASING - PHASE 1A1 1:4000
WORK AREA 'A'
STAGING AREA
LEGEND
X
EXISTING AOA FENCE
PERMANENT AOA FENCE, RE: CS506 AND CS507
X
KEYNOTES
G-102
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G
PH
AS
E
TWO-WAY PRIMARY HAUL ROUTE,
PHASE I AND PHASE II
17230746
JNP KWA JNP
006 F.O.D. SIGN, RE: B1/G-108.
008 EXISTING APRON
009 TEMPORARY MANUAL LOCK (WITH CHAIN AND PADLOCK)
AOA GATE.
AM
EN
D M
EN
T
001 CONTRACTOR STAGING AREA.
002 FIRE WATER PUMP HOUSE AND ASSOCIATED
STORAGE TANKS, SEE SHEET CS102.
003 BIO SECURITY CONTAINMENT FACILITY, SEE SHEET
CS103.
010 TEMPORARY AOA FENCE, RE: G-112
011 TEMPORARY MANUAL LOCK (WITH CHAIN AND PADLOCK)
AOA SWING GATE, RE: G-112
012 TEMPORARY AOA FENCE ON PAVEMENT, RE: G-111
X X X TEMPORARY AOA FENCE, SEE SHEETS
G-112 AND G-113
X X X
09/24/2021
THE SEAL ABOVE SEALS
DRAWING CHANGES IN
AMENDMENT 0006.
01 APRIL 2022
R
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
MARK PETERSEN, PM, PER
SAT-TO FORM DTD 01 OCT 2021
CN
KY
K. YOSHIMOTO
JC
SCALE
CONSTRUCTION PHASING - PHASE 2 WORK AREA BA1 1:4000
G-103
STAGING AREA
LEGEND
EXISTING AOA FENCE
PERMANENT AOA FENCE, SEE SHEETS
CS506 AND CS507
WORK AREA 'B'
KEYNOTES
X
LOW PROFILE BARRICADE, RE: DETAIL C1/G-108
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G
PH
AS
E
W O
R K
AR
EA
B
X
001 CONTRACTOR STAGING AREA.
002 FIRE WATER PUMP HOUSE AND ASSOCIATED
STORAGE TANKS, SEE SHEET CS102.
003 BIO SECURITY CONTAINMENT FACILITY, SEE SHEET
CS103.
005 LIGHTED "X" CLOSURE MARKER, ONLY TO BE USED
DURING THRESHOLD RELOCATIONS WHEN THE
RUNWAY IS CLOSED IN ITS ENTIRETY, RE: B3/G-108. TO
BE PLACED OVER RUNWAY IDENTIFIER NUMBERS.
TWO-WAY PRIMARY HAUL ROUTE,
PHASE I AND PHASE II
17230747
JNP KWA JNP
006 F.O.D. SIGN, RE: B1/G-108.
007 RELOCATED THRESHOLD, RE: A3/G-108.
004 TAXIWAY CLOSURE MARKER, RE: B4/G-108
TAXIWAY CLOSURE MARKER, RE: DETAIL B4/G-108
008 EXISTING APRON
LIGHTED "X" CLOSURE MARKER
AM
EN
D M
EN
T
XX
X
009 TEMPORARY MANUAL LOCK (WITH CHAIN AND PADLOCK)
AOA GATE.
010 TEMPORARY AOA FENCE, RE: G-112
011 TEMPORARY MANUAL LOCK (WITH CHAIN AND PADLOCK)
AOA SWING GATE, RE: G-112
012 TEMPORARY AOA FENCE ON PAVEMENT, RE: G-111
X X X TEMPORARY AOA FENCE, SEE SHEETS
G-112 AND G-113
X X X
09/24/2021
THE SEAL ABOVE SEALS
DRAWING CHANGES IN
AMENDMENT 0006.
01 APRIL 2022
R
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
JNP KWA JNP
MARK PETERSEN, PM, PER
SAT-TO FORM DTD 01 OCT 2021
CN
KY
K. YOSHIMOTO
JC
SCALE
CONSTRUCTION PHASING - PHASE 2 WORK AREA CA1 1:4000
G-103A
STAGING AREA
LEGEND
WORK AREA 'C'
KEYNOTES
X
LOW PROFILE BARRICADE, RE: DETAIL C1/G-108
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G
PH
AS
E
W O
R K
AR
EA
C
001 CONTRACTOR STAGING AREA.
002 FIRE WATER PUMP HOUSE AND ASSOCIATED
STORAGE TANKS, SEE SHEET CS102.
003 BIO SECURITY CONTAINMENT FACILITY, SEE SHEET
CS103.
005 LIGHTED "X" CLOSURE MARKER, ONLY TO BE USED
DURING THRESHOLD RELOCATIONS WHEN THE
RUNWAY IS CLOSED IN ITS ENTIRETY, RE: B3/G-108. TO
BE PLACED OVER RUNWAY IDENTIFIER NUMBERS.
TWO-WAY PRIMARY HAUL ROUTE,
PHASE I AND PHASE II
JNP KWA JNP
006 F.O.D. SIGN, RE: B1/G-108.
007 RELOCATED THRESHOLD, RE: A3/G-108.
004 TAXIWAY CLOSURE MARKER, RE: B4/G-108
TAXIWAY CLOSURE MARKER, RE: DETAIL B4/G-108
LIGHTED "X" CLOSURE MARKER
AM
EN
D M
EN
T
008 EXISTING APRON
009 TEMPORARY MANUAL LOCK (WITH CHAIN AND PADLOCK)
AOA GATE.
010 TEMPORARY AOA FENCE, RE: G-112
011 TEMPORARY MANUAL LOCK (WITH CHAIN AND PADLOCK)
AOA SWING GATE, RE: G-112
012 TEMPORARY AOA FENCE ON PAVEMENT, RE: G-111
EXISTING AOA FENCEX
X PERMANENT AOA FENCE, SEE SHEETS
CS506 AND CS507
X X X TEMPORARY AOA FENCE, SEE SHEETS
G-112 AND G-113
X X X
X
X 09/24/2021
THE SEAL ABOVE SEALS
DRAWING CHANGES IN
AMENDMENT 0006.
01 APRIL 2022
R
17230766
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
MARK PETERSEN, PM, PER
SAT-TO FORM DTD 01 OCT 2021
CN
KY
K. YOSHIMOTO
JC
SCALE
CONSTRUCTION PHASING - PHASE 3A1 1:4000
G-104
LEGEND
KEYNOTES
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G
PH
AS
E
001 CONTRACTOR STAGING AREA
002 FIRE WATER PUMP HOUSE AND ASSOCIATED
STORAGE TANKS, SEE SHEET CS102
003 BIO SECURITY CONTAINMENT FACILITY, SEE SHEET
CS103
17230748
JNP KWA JNP
006 F.O.D. SIGN, RE: B1/G-108.
004 TAXIWAY CLOSURE MARKER, RE: B4/G-108
WORK AREA 'D'
EXISTING AOA FENCEX
LOW PROFILE BARRICADE, RE: DETAIL C1/G-108
X
TWO-WAY PRIMARY HAUL ROUTE,
PHASE I AND PHASE II
TAXIWAY CLOSURE MARKER, RE: DETAIL B4/G-108
PERMANENT AOA FENCE, SEE SHEETS
CS506 AND CS507
AM
EN
D M
EN
T
008 EXISTING APRON
009 TEMPORARY MANUAL LOCK (WITH CHAIN AND PADLOCK)
AOA GATE.
010 TEMPORARY AOA FENCE, RE: G-112
011 TEMPORARY MANUAL LOCK (WITH CHAIN AND PADLOCK)
AOA SWING GATE, RE: G-112
012 TEMPORARY AOA FENCE ON PAVEMENT, RE: G-111
X X X TEMPORARY AOA FENCE, SEE SHEETS
G-112 AND G-113
X X X
09/24/2021
THE SEAL ABOVE SEALS
DRAWING CHANGES IN
AMENDMENT 0006.
01 APRIL 2022
R
KHK SMC JDE
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
MARK PETERSEN, PM, PER
SAT-TO FORM DTD 01 OCT 2021
CN
KY
K. YOSHIMOTO
JC
SCALE
CONSTRUCTION PHASING PLANS - RELOCATED THRESHOLD - 1 OF 3A1 1:2000
G-105
LEGEND
A MARKING REMOVAL MUST BE ACCOMPLISHED BY
PHYSICAL REMOVAL. PAINTING OVER MARKINGS TO
OBSCURE THEM IS NOT PERMITTED.
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G P
LA
N
S
- R
EL
O
C
AT
ED
T
H R
ES
H
O
LD
O F
B FOR PAVEMENT MARKING DETAILS, SEE SHEET G-108.
CONSTRUCTION PHASING PLAN
GENERAL NOTES
C ALL PAVEMENT MARKINGS EXCEPT RUNWAY SHOULDER
MARKING TO BE OUTLINED WITH 0.15M BLACK OUTLINE.
D ALL WHITE PAVEMENT MARKINGS TO BE
RETROREFLECTIVE.
17230749
E ALL PERMANENT AND TEMPORARY MARKING
REMOVAL MUST BE ACCOMPLISHED ACCORDING
TO FAA AC 150/5340-1M FIGURE 1-1 THROUGH 1-5.
EXISTING AOA FENCE
PERMANENT AOA FENCE, SEE SHEET
CS506 AND CS507
X
X
REMOVED EDGE LIGHT FIXTURES
TEMPORARY RUNWAY THRESHOLD EDGE LIGHT
RE: A1/G-107
EXISTING TAXIWAY EDGE LIGHTS
EXISTING RUNWAY DISTANCE SIGNAGE,
RE: A1/G-107
EXISTING THRESHOLD/RUNWAY END
LIGHTS
MARKING REMOVAL SYMBOL, RE: B4/G-107
EXISTING RUNWAY THRESHOLD EDGE LIGHT
AM
EN
D M
EN
T
X X X TEMPORARY AOA FENCE, SEE SHEETS
G-112 AND G-113
X X X
09/24/2021
THE SEAL ABOVE SEALS
DRAWING CHANGES IN
AMENDMENT 0006.
01 APRIL 2022
AR
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
MARK PETERSEN, PM, PER
SAT-TO FORM DTD 01 OCT 2021
CN
KY
K. YOSHIMOTO
JC
SCALE
CONSTRUCTION PHASING PLANS - RELOCATED THRESHOLD - 2 OF 3A1 1:2000
G-106
LEGEND
A
CONSTRUCTION PHASING PLAN
GENERAL NOTES
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G P
LA
N
S
- R
EL
O
C
AT
ED
T
H R
ES
H
O
LD
O F
MARKING REMOVAL MUST BE ACCOMPLISHED BY
PHYSICAL REMOVAL. PAINTING OVER MARKINGS TO
OBSCURE THEM IS NOT PERMITTED.
B FOR PAVEMENT MARKING DETAILS, SEE SHEET G-108.
C ALL PAVEMENT MARKINGS EXCEPT RUNWAY SHOULDER
MARKING TO BE OUTLINED WITH 0.15M BLACK OUTLINE.
D ALL WHITE PAVEMENT MARKINGS TO BE
RETROREFLECTIVE.
17230750
E ALL PERMANENT AND TEMPORARY MARKING
REMOVAL MUST BE ACCOMPLISHED ACCORDING
TO FAA AC 150/5340-1M FIGURE 1-1 THRU 1-5.
EXISTING AOA FENCE
PERMANENT AOA FENCE, SEE SHEETS
CS506 AND CS507
X
X
X X X TEMPORARY AOA FENCE, SEE SHEETS
G-112 AND G-113
REMOVED EDGE LIGHT FIXTURES
TEMPORARY RUNWAY THRESHOLD EDGE LIGHT
RE: A1/G-107
EXISTING TAXIWAY EDGE LIGHTS
RELOCATED RUNWAY END LIGHTS
EXISTING RUNWAY DISTANCE SIGNAGE,
RE: A1/G-107
EXISTING THRESHOLD/RUNWAY END
LIGHTS
MARKING REMOVAL SYMBOL, RE: B4/G-107
X X X
X
X
09/24/2021
THE SEAL ABOVE SEALS
DRAWING CHANGES IN
AMENDMENT 0006.
01 APRIL 2022
AR
AM
EN
D
M
EN
T
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
MARK PETERSEN, PM, PER
SAT-TO FORM DTD 01 OCT 2021
CN
KY
K. YOSHIMOTO
JC
SCALE
CONSTRUCTION PHASING PLANS - RELOCATED THRESHOLD - 3 OF 3A1 1:2000
G-107
LEGEND
EXISTING AOA FENCE
PERMANENT AOA FENCE, SEE SHEET
CS506 AND CS507
A
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G P
LA
N
S
- R
EL
O
C
AT
ED
T
H R
ES
H
O
LD
O F
MARKING REMOVAL MUST BE ACCOMPLISHED BY
PHYSICAL REMOVAL. PAINTING OVER MARKINGS TO
OBSCURE THEM IS NOT PERMITTED.
B FOR PAVEMENT MARKING DETAILS, SEE SHEET G-108.
CONSTRUCTION PHASING PLAN
GENERAL NOTES
17230751
X
X
C ALL PERMANENT AND TEMPORARY MARKING
REMOVAL MUST BE ACCOMPLISHED ACCORDING
TO FAA AC 150/5340-1M FIGURE 1-1 THRU 1-5.
REMOVED EDGE LIGHT FIXTURES
TEMPORARY RUNWAY THRESHOLD EDGE LIGHT
RE: A1/G-107
EXISTING TAXIWAY EDGE LIGHTS
RELOCATED RUNWAY END LIGHTS
EXISTING RUNWAY DISTANCE SIGNAGE,
RE: A1/G-107
EXISTING THRESHOLD/RUNWAY END
LIGHTS
MARKING REMOVAL SYMBOL, RE: B4/G-107
AM
EN
D M
EN
T
X X X TEMPORARY AOA FENCE, SEE SHEETS
G-112 AND G-113
X X X
09/24/2021
THE SEAL ABOVE SEALS
DRAWING CHANGES IN
AMENDMENT 0006.
01 APRIL 2022
AR
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
MARK PETERSEN, PM, PER
SAT-TO FORM DTD 01 OCT 2021
CN
KY
K. YOSHIMOTO
JC
SCALE
NEW RUNWAY PAVEMENT MARKING PLAN - 1 OF 3A1 1:2000
G-109
LEGEND
EXISTING AOA FENCEX
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
N
EW
R U
N W
AY
P
AV
EM
EN
T
M
AR
KI
N
G P
LA
N
O F
CONSTRUCTION PHASING PLAN
GENERAL NOTES
A FOR PAVEMENT MARKING DETAILS, SEE SHEET G-108.
B ALL PAVEMENT MARKINGS EXCEPT RUNWAY SHOULDER
MARKING TO BE OUTLINED WITH 0.15M BLACK OUTLINE.
C ALL WHITE PAVEMENT MARKINGS TO BE RETROREFLECTIVE.
17230753
X PERMANENT AOA FENCE,
SEE SHEETS CS506 AND CS507
AM
EN
D M
EN
T
X X X TEMPORARY AOA FENCE, SEE SHEETS
G-112 AND G-113
X X X
09/24/2021
THE SEAL ABOVE SEALS
DRAWING CHANGES IN
AMENDMENT 0006.
01 APRIL 2022
R
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
MARK PETERSEN, PM, PER
SAT-TO FORM DTD 01 OCT 2021
CN
KY
K. YOSHIMOTO
JC
SCALE
NEW RUNWAY PAVEMENT MARKING PLAN - 2 OF 3A1 1:2000
G-110
LEGEND
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
N
EW
R U
N W
AY
P
AV
EM
EN
T
M
AR
KI
N
G P
LA
N
O F
CONSTRUCTION PHASING PLAN
GENERAL NOTES
A FOR PAVEMENT MARKING DETAILS, SEE SHEET G-108.
B ALL PAVEMENT MARKINGS EXCEPT RUNWAY SHOULDER
MARKING TO BE OUTLINED WITH 0.15M BLACK OUTLINE.
C ALL WHITE PAVEMENT MARKINGS TO BE RETROREFLECTIVE.
17230754
AM
EN
D M
EN
T
EXISTING AOA FENCEX
X PERMANENT AOA FENCE,
SEE SHEETS CS506 AND CS507
X X X TEMPORARY AOA FENCE, SEE SHEETS
G-112 AND G-113
X X X
09/24/2021
THE SEAL ABOVE SEALS
DRAWING CHANGES IN
AMENDMENT 0006.
01 APRIL 2022
R
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
JNP KWA JNP
MARK PETERSEN, PM, PER
SAT-TO FORM DTD 01 OCT 2021
CN
KY
K. YOSHIMOTO
JC
SCALE
NEW RUNWAY PAVEMENT MARKING PLAN - 3 OF 3A1 1:2000
G-111
LEGEND
CONSTRUCTION PHASING PLAN
GENERAL NOTES
SCALE
NEW RUNWAY DESIGNATOR MARKING DETAILA3 NTS
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
N
EW
R U
N W
AY
P
AV
EM
EN
T
M
AR
KI
N
G P
LA
N
O F
A FOR PAVEMENT MARKING DETAILS, SEE SHEET G-108.
B ALL PAVEMENT MARKINGS EXCEPT RUNWAY SHOULDER
MARKING TO BE OUTLINED WITH 0.15M BLACK OUTLINE.
C ALL WHITE PAVEMENT MARKINGS TO BE RETROREFLECTIVE.
17230755
EXISTING AOA FENCEX
X PERMANENT AOA FENCE,
SEE SHEETS CS506 AND CS507
AM
EN
D M
EN
T
X X X TEMPORARY AOA FENCE, SEE SHEETS
G-112 AND G-113
X X X
09/24/2021
THE SEAL ABOVE SEALS
DRAWING CHANGES IN
AMENDMENT 0006.
01 APRIL 2022
R
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
MARK PETERSEN, PM, PER
SAT-TO FORM DTD 01 OCT 2021
CN
KY
K. YOSHIMOTO
JC
G-112
TE
M
PO
R
AR
Y
FE
N
C E
O N
P
AV
EM
EN
T D
ET
AI
LS
JNP KWA JNP
AM
EN
D M
EN
T
NOTE:
UNLESS OTHERWISE STATED, ALL
DIMENSIONS ARE IN MILLIMETERS.
SCALE
SECURITY FENCE DETAILSA1 N.T.S.
2.6 Ø (D12), BARBED
WIRE, 2 STRAND
DIAGONAL BRACE
48.6 Ø x2.3
GAUGE NO. 9
Ø4 CHAIN-LINK STEEL
50x50 DIAMOND MESH FABRIC
(HEAVILY ZINC COATED)
2000 2000
200 200
2.0 Ø (D14) BIND
WIRE (WIND TWICE)
LINE POST
60.5 Ø x3.8t
TOP RAIL
42.7 Ø x 3.5t
BOTTOM RAIL
42.7 Ø x 3.5t
4.0 Ø COILED SPRING
REINFORCED WIRE (TYP)
CLAMP
9 Ø, STRETCHER BAR
HOOK BOLT AND NUT
"U" BOLT AND NUT
GROUND CLAMP
LINE POST
60.5 Ø x 2.3
76.3 Ø x 2.8t
60.5 Ø x 2.3t
34.0 Ø x 2.3t
18 36 42 36 18
Ø 28
BOLTSLEEVE
JOINT
90 (105)
M8
M8
130 (145)
40 60
30°
CORNER POST, END POST
76.3 Ø x 2.8
30°
6.5
6.5
6.5
M8
30°
Ø60.5x2.3 (Ø76.3x2.8)
Ø34.0x2.3
M8
STEEL WIRE Ø5
Ø60.5X2.3 (Ø76.3X2.8)
HOOK BOLT
M8X90 (M8X105)
BAND WIRE Ø34.0X2.3
200200
HOOK BOLT
M8X90
M8
20 30 20
20 50 40 15
Ø
.7
2.
Ø42.7x2.3
Ø12
FB-38x3
Ø13
Ø76.3x2.8
Ø34.0x2.3
Ø9
HOOK BOLT
M8x105
MOUNTING FIXTURE
M10x30
ADJUSTABLE METAL FITTING
M8X65
Ø48.6X2.3
M8X65MOUNTING FIXTURE
Ø34.0X2.3
Ø60.5X2.3
JERSEY TYPE BARRIER
OR EQUIVALENT.
JERSEY TYPE BARRIER
OR EQUIVALENT.
JERSEY TYPE BARRIER
OR EQUIVALENT.
01 APRIL 2022
R
015.1 17230767
C
C S507
1 2 3 4 5
D
C
B
A
1 2 3 4 5
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
AS SHOWN
1581694
FIRE PROTECTION
TEXAS REGISTERED ENGINEERING FIRM F-2966
JACOBS GOVERNMENT SERVICES COMPANY
777 MAIN STREET
FORT WORTH, TEXAS 76102
A/E INFO
D
C
B
A
A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274218F0340
JEG NO. WFXO6305
DRAWFORM REVISION: 30 APR 2015
DATE
MARK PETERSEN, PM, PER
SAT-TO FORM DTD 01 OCT 2021
CN
KY
K. YOSHIMOTO
JC
G-113
TE
M
PO
R
AR
Y
FE
N
C E
O N
G R
AS
S
D
ET
AI
LS
JNP KWA JNP
AM
EN
D M
EN
T
NOTE:
UNLESS OTHERWISE STATED, ALL
DIMENSIONS ARE IN MILLIMETERS.
406 X
406 (MIN)
12 GA. GALV. STEEL
WIRE TIES AT 406 O.C.
3 STRANDS OF BARBED WIRE (TYP)
6 X19 STRETCHER BAR WITH
STRETCHER BAR BAND AT
305 O.C. MAX.
102 O.D. PIPE
50 MESH, 9 GAGE CHAIN
LINE FABRIC
FINISH PAVEMENT
610 X 610 (MIN)
2 86
M
AX
C
LE
AR
DROP ROD
FOUNDATION,
RE: B4/CS508
DROP ROD
ASSEMBLY,
RE: B3/CS508
GATE FRAME
LATCH ASSEMBLY,
RE: D5/CS508
CONCRETE FOOTING
NEAT EXCAVATION FROM
152 BELOW TOP OF FTG.
GATE GROUNDING
10 Ø GALV. TENSION ROD
WITH TURNBUCKLE
3000 LEAF
48 O.D. PIPE GATE FRAME AND BRACE
3 STRANDS #12 1/2 GAUGE
FACTORY ALUMINUM
COATED WIRE WITH #12
GATE 4 POINT BARBS AND
ALUMINUM COATED FINISH
(TYP) LINE POST CAP
WITH EYE TOP RAIL END
#9 GAGE GALV. IRON WIRE TIE
50 MESH GALV. STEEL CHAIN
LINK FABRIC WIRE TACK WELD
TOP RAIL AND POSTS AT
610mm INTERVALS
CROWN TOP OF FITTING
FENCE GROUNDING (TYP)
60 O.D. PIPE
BRACING 40 O.D.
PIPE
73 O.D. PIPE
BOTTOM RAIL
WITH TIE WIRES
(610 O.C. (MAX)
CONC. FOOTING
10 Ø GALV. TENSION
ROD WITH TURN BUCKLE
NEAT EXCAVATION
FROM 152 BELOW
TOP OF FOOTING
3000 MAX. 3000 MAX.
(M
IN
254 DIA.
(MIN)
(M
IN
)15
LINE POST
LINE POST
CORNER POST
NOTES:
1. WHEN NOTED WITHOUT BARBS INSTALL WITH POST CAPS
INSTEAD OF THE BARBS AND EXTENSION ARMS.
50 MAX CLEAR
M
AX
C
LE
AR
X X X X X
XXXXX
X X X X X X X
XX
X X
X X X X X X X
XXXXXXX
X X X X X X X X X X X X
XXXXX
X X X X X
TRUSS ROD (TYP)
BRACE RAIL (TYP)
BOTTOM TENSION WIRE
OR RAIL AS SPECIFIED
TOP TENSION WIRE OR
RAIL AS SPECIFIED
3 STRANDS OF
BARBED WIREGATE
OPENING
LATCH
HINGE
GATE
POST
HINGE
3 STRANDS OF
BARBED WIRE
FE
N
C E
FA
BR
IC
SCALE
2.13M HIGH PERIMETER CHAIN LINK FENCEC1 N.T.S.
SCALE
PEDESTRIAN GATEA3 N.T.S.SCALE
MANUAL DOUBLE LEAF SWING GATEA1 N.T.S.
DROP ROD
GATE FRAMEGATE FRAME
SCALE
LATCH ASSEMBLYD5 N.T.S.
SCALE
DROP ROD ASSEMBLYB3 N.T.S. SCALE
DROP ROD FOUNDATION DETAILB4 N.T.S.
PLAN VIEW
ELEVATION VIEW
PLAN
GATE FRAME
LATCH ASSEMBLY
DROP ROD
DOUBLE SWING GATE
25 ID STEEL PIPE
152 X 152 P.C. CONCRETE
SAND / GRAVEL
NOTES:
1. LINE POSTS, RAILS AND BRACES MUST CONFORM TO ASTM F1043 OR ASTM
F1083 GROUP 1A, (SCHEDULE 40) HIGH STRENGTH GRADE, 50 KSI YIELD
STRENGTH, EXTERNAL AND INTERNAL COATING CONFORMING TO TYPE A
ZINC FINISH
2. FABRIC MUST BE 50 MESH, 9 GAUGE ALUMINUM-COATED STEEL WIRE
CONFORMING TO ASTM A491.
3. PROVIDE LINE POSTS SPACED EQUIDISTANTLY APART, NOT EXCEEDING
3000mm ON CENTER. PROVIDE GATE POSTS SPACED AS NECESSARY FOR
SIZE OF GATE OPENINGS. DO NOT EXCEED 152M ON STRAIGHT RUNS
BETWEEN BRACED POSTS. PROVIDE CORNER OR PULL POSTS, WITH
BRACING IN BOTH DIRECTION, FOR CHANGES IN DIRECTION OF 15
DEGREES OR MORE, OR FOR THE ABRUPT CHANGES IN GRADE. SUBMIT
DRAWINGS SHOWING LOCATION OF GATE, CORNER, END, AND PULL POSTS.
4. TOP AND BOTTOM HEM OF CHAIN LINK WIRE FABRIC MUST BE TWISTED
MINIMUM 2 (TWO) TIMES AS SHOWN ON THE DRAWING.
5. TOP AND BOTTOM HEM OF CHAIN LINK WIRE FABRIC MUST BE BOUND TO
TOP AND BOTTOM RAILS WITH 2.0 Ø (D14) WIRE AT 200mm INTERVALS.
6. TOP AND BOTTOM HEM OF CHAIN LINK WIRE FABRIC MUST BE EXTENDED
OVER TOP RAIL AND TO GROUND LINE.
NOTE:
GATE MAY BE PLACED ON JERSEY TYPE BARRIERS OR OTHER
APPROVED STRUCTURES WHEN CROSSING PAVEMENT.
NOTE:
GATE MAY BE PLACED ON JERSEY TYPE BARRIERS OR OTHER
APPROVED STRUCTURES WHEN CROSSING PAVEMENT.
6 x 19 STRETCHER BAR WITH STRETCHER
BAR BAND @ 305 O.C. (MAX)
TOP OF TENSION WIRE WITH TIE
WIRES (TYP) 305 O.C. (MAX)
POST CAP WITH EXTENSION ARM FOR BARBED WIRE
01 APRIL 2022
R
015.2 17230768
C
B
A
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK
AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO
ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.
IF SHEET IS LESS THAN 559 X 864
REDUCED PRINT. USE GRAPHIC SCALES
1 2 3 4 5
D
C
B
A
01 APRIL 2022
SCALE
CONSTRUCTION SAFETY PHASING PLAN (CSPP)A1 1:1000
G-103
C O
N
ST
R U
C
TI
O N
S
AF
ET
Y
PH
AS
IN
G
P
LA
N (C
SP
P)
1 2 3 4 5
D
C
B
A
1 2 3 4 5
TI
N
IA
N
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T (T
IQ
TI
N
IA
N
, C N
M I
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AS SHOWN
1620531
N
AV
FA
C
P
AC
IF
IC
TEXAS REGISTERED ENGINEERING FIRM F-2966
D
C
B
A/E Contract No. N62742-17-D-0003
DRAWFORM REVISION: 30 APR 2015
A/E Task Order No. N6274219F0304
JEG NO. WFXO6309
FY
M C
AF
P
-9
/ P
AF
A
PS
I F U
EL
T
AN
KS
W
IT
H R
EC
EI
PT
P
IP
EL
IN
E
H
YD
R
AN
T
SY
ST
EM
NORTH
KEY PLANKEY PLANNOTE:
UNLESS OTHERWISE STATED, ALL CIVIL AND
ELECTRICAL PLAN SHEETS DIMENSIONS ARE
IN METERS.
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
DATE
MARK PETERSEN, PM, PER
SAT-TO FORM DTD 01 OCT 2021
M
AK
AL
AP
A, H
AW
AI
I
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
FIRE PROTECTION
CN
KY
K. YOSHIMOTO
JC
N
AV
FA
C
P
AC
IF
IC
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
FI
N
AL
R
E- D
ES
IG
N S
U
BM
IT
TA
L
A
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
KEYNOTES
WORK AREA 'A'
X
EXISTING AOA FENCE
AOA FENCE
X
LEGEND
TWO-WAY PRIMARY HAUL ROUTE
17256503
STAGING AREA
X X TEMPORARY AOA FENCE
A
AM
EN
D M
EN
T
004 F.O.D. SIGN, RE: C3/G-105.
006 TEMPORARY MANUAL LOCK (WITH CHAIN AND PADLOCK)
AOA SWING GATE, RE: G-104.
001 CONTRACTOR STAGING AREA.
002 PIPELINE SECURITY GATE.
003 SOIL STOCKPILE AREA.
005 TEMPORARY AOA FENCE, RE: G-105.
007 TEMPORARY AOA FENCE ON PAVEMENT, RE: B1/G-104.
09/24/2021
THE SEAL ABOVE SEALS
DRAWING CHANGES IN
AMENDMENT 0006.
01 APRIL 2022
G-104
TE
M
PO
R
AT
Y
FE
N
C E
O N
P
AV
EM
EN
T D
ET
AI
LS
1 2 3 4 5
D
C
B
A
1 2 3 4 5
TI
N
IA
N
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T (T
IQ
TI
N
IA
N
, C N
M I
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AS SHOWN
1620531
N
AV
FA
C
P
AC
IF
IC
TEXAS REGISTERED ENGINEERING FIRM F-2966
D
C
B
A/E Contract No. N62742-17-D-0003
DRAWFORM REVISION: 30 APR 2015
A/E Task Order No. N6274219F0304
JEG NO. WFXO6309
FY
M C
AF
P
-9
/ P
AF
A
PS
I F U
EL
T
AN
KS
W
IT
H R
EC
EI
PT
P
IP
EL
IN
E
H
YD
R
AN
T
SY
ST
EM
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
DATE
MARK PETERSEN, PM, PER
SAT-TO FORM DTD 01 OCT 2021
M
AK
AL
AP
A, H
AW
AI
I
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
FIRE PROTECTION
CN
KY
K. YOSHIMOTO
JC
N
AV
FA
C
P
AC
IF
IC
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
FI
N
AL
R
E- D
ES
IG
N S
U
BM
IT
TA
L
A
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
AM
EN
D M
EN
T
NOTE:
UNLESS OTHERWISE STATED, ALL
DIMENSIONS ARE IN MILLIMETERS.
SCALE
SECURITY FENCE DETAILSA1 N.T.S.
2.6 Ø (D12), BARBED
WIRE, 2 STRAND
DIAGONAL BRACE
48.6 Ø x2.3
GAUGE NO. 9
Ø4 CHAIN-LINK STEEL
50x50 DIAMOND MESH FABRIC
(HEAVILY ZINC COATED)
2000 2000
200 200
2.0 Ø (D14) BIND
WIRE (WIND TWICE)
LINE POST
60.5 Ø x3.8t
TOP RAIL
42.7 Ø x 3.5t
BOTTOM RAIL
42.7 Ø x 3.5t
4.0 Ø COILED SPRING
REINFORCED WIRE (TYP)
CLAMP
9 Ø, STRETCHER BAR
HOOK BOLT AND NUT
"U" BOLT AND NUT
GROUND CLAMP
LINE POST
60.5 Ø x 2.3
76.3 Ø x 2.8t
60.5 Ø x 2.3t
34.0 Ø x 2.3t
18 36 42 36 18
Ø 28
BOLTSLEEVE
JOINT
90 (105)
M8
M8
130 (145)
40 60
30°
CORNER POST, END POST
76.3 Ø x 2.8
30°
6.5
6.5
6.5
M8
30°
Ø60.5x2.3 (Ø76.3x2.8)
Ø34.0x2.3
M8
STEEL WIRE Ø5
Ø60.5X2.3 (Ø76.3X2.8)
HOOK BOLT
M8X90 (M8X105)
BAND WIRE Ø34.0X2.3
200200
HOOK BOLT
M8X90
M8
20 30 20
20 50 40 15
Ø
.7
2.
Ø42.7x2.3
Ø12
FB-38x3
Ø13
Ø76.3x2.8
Ø34.0x2.3
Ø9
HOOK BOLT
M8x105
MOUNTING FIXTURE
M10x30
ADJUSTABLE METAL FITTING
M8X65
Ø48.6X2.3
M8X65MOUNTING FIXTURE
Ø34.0X2.3
Ø60.5X2.3
JERSEY TYPE BARRIER
OR EQUIVALENT.
JERSEY TYPE BARRIER
OR EQUIVALENT.
JERSEY TYPE BARRIER
OR EQUIVALENT.
01 APRIL 2022
007.1 17267155
R
C
C S507
G-105
FO
D
S
IG
N
T
EM
PO
R
AR
Y
FE
N
C E
O N
G R
AS
S
D
ET
AI
LS
1 2 3 4 5
D
C
B
A
1 2 3 4 5
TI
N
IA
N
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T (T
IQ
TI
N
IA
N
, C N
M I
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AS SHOWN
1620531
N
AV
FA
C
P
AC
IF
IC
TEXAS REGISTERED ENGINEERING FIRM F-2966
D
C
B
A/E Contract No. N62742-17-D-0003
DRAWFORM REVISION: 30 APR 2015
A/E Task Order No. N6274219F0304
JEG NO. WFXO6309
FY
M C
AF
P
-9
/ P
AF
A
PS
I F U
EL
T
AN
KS
W
IT
H R
EC
EI
PT
P
IP
EL
IN
E
H
YD
R
AN
T
SY
ST
EM
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
DATE
MARK PETERSEN, PM, PER
SAT-TO FORM DTD 01 OCT 2021
M
AK
AL
AP
A, H
AW
AI
I
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
FIRE PROTECTION
CN
KY
K. YOSHIMOTO
JC
N
AV
FA
C
P
AC
IF
IC
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
FI
N
AL
R
E- D
ES
IG
N S
U
BM
IT
TA
L
A
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE
AM
EN
D M
EN
T
NOTE:
UNLESS OTHERWISE STATED, ALL
DIMENSIONS ARE IN MILLIMETERS.
406 X
406 (MIN)
12 GA. GALV. STEEL
WIRE TIES AT 406 O.C.
3 STRANDS OF BARBED WIRE (TYP)
6 X19 STRETCHER BAR WITH
STRETCHER BAR BAND AT
305 O.C. MAX.
102 O.D. PIPE
50 MESH, 9 GAGE CHAIN
LINE FABRIC
FINISH PAVEMENT
610 X 610 (MIN)
2 86
M
AX
C
LE
AR
DROP ROD
FOUNDATION,
RE: B4/CS508
DROP ROD
ASSEMBLY,
RE: B3/CS508
GATE FRAME
LATCH ASSEMBLY,
RE: D5/CS508
CONCRETE FOOTING
NEAT EXCAVATION FROM
152 BELOW TOP OF FTG.
GATE GROUNDING
10 Ø GALV. TENSION ROD
WITH TURNBUCKLE
3000 LEAF
48 O.D. PIPE GATE FRAME AND BRACE
3 STRANDS #12 1/2 GAUGE
FACTORY ALUMINUM
COATED WIRE WITH #12
GATE 4 POINT BARBS AND
ALUMINUM COATED FINISH
(TYP) LINE POST CAP
WITH EYE TOP RAIL END
#9 GAGE GALV. IRON WIRE TIE
50 MESH GALV. STEEL CHAIN
LINK FABRIC WIRE TACK WELD
TOP RAIL AND POSTS AT
610mm INTERVALS
CROWN TOP OF FITTING
FENCE GROUNDING (TYP)
60 O.D. PIPE
BRACING 40 O.D.
PIPE
73 O.D. PIPE
BOTTOM RAIL
WITH TIE WIRES
(610 O.C. (MAX)
CONC. FOOTING
10 Ø GALV. TENSION
ROD WITH TURN…