About this file

This notice provides questions and answers related to a solicitation for construction projects at Tinian International Airport in the Commonwealth of the Northern Mariana Islands. The solicitation seeks construction of a cargo pad and taxiway extension, a maintenance support facility, fuel tanks and a hydrant system, and repairs to the airport access road. It involves the Department of the Navy Naval Facilities Engineering Command Pacific and includes requirements for seismic and typhoon-resistant designs, as well as environmental, archaeological and explosive safety monitoring. The notice addresses questions on communication duct placement, fuel stand coordinates, and references revised drawings provided in Amendment 0006.

View the file

Other files

File Type Posted
22R1306-Note8.pdf PDF
N6274222R1306_AMD06.pdf PDF
22R1306-Note6.pdf PDF
N6274222R1306_AMD05.pdf PDF
22R1306-Note5.pdf PDF
22R1306-Note4.pdf PDF
N6274222R1306_AMD04.pdf PDF
22R1306-Note3.pdf PDF
N6274222R1306_AMD03_.pdf PDF
22R1306_Note2.pdf PDF
Virtual Site Visit Participants.pdf PDF
22R1306-Note1.pdf PDF
N6274222R1306_AMD0002_ALL.pdf PDF
N6274222R1306_Amd01.pdf PDF
P-9010 Fuel Tank_Hydr Sys Final_Drawings_3 of 4.pdf PDF
P-9030 Cargo Pad_Final_Drawings-updated-2 OF 3.pdf PDF
P-9010 Fuel Tank_Hydr Sys Final_Drawings_2 of 4.pdf PDF
P-9030 Cargo Pad_Final_Drawings-updated-1 OF 3.pdf PDF
P-9030 Cargo Pad_Final_Drawings-updated-3 OF 3.pdf PDF
PART A DIV01 Tinian Final Spec Book Vol 1F of 5.pdf PDF
PART C P-9040 Tinian Final Spec Book Vol 3 of 5.pdf PDF
PART A DIV01 Tinian Final Spec Book Vol 1B of 5.pdf PDF
PART D P-9010 Tinian Final Spec Book Vol 4 of 5.pdf PDF
PART A DIV01 Tinian Final Spec Book Vol 1A of 5.pdf PDF
PART A DIV01 Tinian Final Spec Book Vol 1D of 5.pdf PDF
P-9010 Fuel Tank_Hydr Sys Final_Drawings_1 of 4.pdf PDF
P-9021 Offsite Roadways Final_Drawings.pdf PDF
PART A DIV01 Tinian Final Spec Book Vol 1C of 5.pdf PDF
PART E P-9021R Tinian Final Spec Book Vol 5 of 5.pdf PDF
PART A DIV01 Tinian Final Spec Book Vol 1E of 5.pdf PDF
N6274222R1306_RFP.pdf PDF
P-9040 MX Support Facility Final_Drawings.pdf PDF
PART B P-9030 Tinian Final Spec Book Vol 2 of 5.pdf PDF
P-9010 Fuel Tank_Hydr Sys Final_Drawings_4 of 4.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC

258 MAKALAPA DR STE 100

PEARL HARBOR HI 96860-3134

Notice No. 7 5 April 2022

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-22-R-1306

FY19 MCAF P-9030/PAF189030 APSI - CARGO PAD WITH TAXIWAY EXTENSION

FY19 MCAF P-9040/PAF189040 APSI - MAINTENANCE SUPPORT FACILITY

FY20 MCAF P-9010/PAF189010 APSI - FUEL TANKS WITH RECEIPT PIPELINE &

HYDRANT SYSTEM

FY20 MCAF P-9021/PAF189021 APSI -AIRFIELD DEVELOPMENT PHASE 1 - ROADS

TINIAN INTERNATIONAL AIRPORT, TINIAN, CNMI

NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30. Please be advised that further questions asked 10 days before the closing may not be answered.

DEFERRED RESPONSES FROM NOTICE NO. 6

94. Communication Ductbank Under Existing Airport Access Road We respectfully ask to reconsider the answer to Q&A No. 85 in regards to boring under the Airport Access Road.

Would traditional ductbank excavation and placement be allowed if the Contractor would employ means and methods (i.e. steel plating, flagmen, traffic control measures, etc.) to ensure there is no disruption to the ingress and egress of the Airport?

This approach would provide the Government with an economic solution for this small scope of work. Please advise.

ANSWER: Please bid per RFP.

95. Ref. Drawing; P-9010: CG401, & Notice No. 5 Q&A No. 88 Future Truck Fill stand 1.

Please provide the coordinates for the Truck Fill stand which will allow us to locate/determine the appropriate surface reinstatement measures needed following construction of the canopy foundation.

Is it the intent of the designer to leave the footings buried without any indicators?

ANSWER: The center west foundation center point has been located on CS401. It has been coordinated with SB103. Please refer to the revised sheets included in Amendment 0006. The finish requirements for the fill stand are included within the civil documents.