This notice provides questions and answers related to a solicitation for construction projects at Tinian International Airport in the Commonwealth of the Northern Mariana Islands. The solicitation seeks construction of a cargo pad and taxiway extension, a maintenance support facility, fuel tanks and a hydrant system, and repairs to the airport access road. It involves the Department of the Navy Naval Facilities Engineering Command Pacific and includes requirements for seismic and typhoon-resistant designs, as well as environmental, archaeological and explosive safety monitoring. The notice addresses questions on communication duct placement, fuel stand coordinates, and references revised drawings provided in Amendment 0006.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
Notice No. 7 5 April 2022
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-22-R-1306
FY19 MCAF P-9030/PAF189030 APSI - CARGO PAD WITH TAXIWAY EXTENSION
FY19 MCAF P-9040/PAF189040 APSI - MAINTENANCE SUPPORT FACILITY
FY20 MCAF P-9010/PAF189010 APSI - FUEL TANKS WITH RECEIPT PIPELINE &
HYDRANT SYSTEM
FY20 MCAF P-9021/PAF189021 APSI -AIRFIELD DEVELOPMENT PHASE 1 - ROADS
TINIAN INTERNATIONAL AIRPORT, TINIAN, CNMI
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30. Please be advised that further questions asked 10 days before the closing may not be answered.
DEFERRED RESPONSES FROM NOTICE NO. 6
94. Communication Ductbank Under Existing Airport Access Road We respectfully ask to reconsider the answer to Q&A No. 85 in regards to boring under the Airport Access Road.
Would traditional ductbank excavation and placement be allowed if the Contractor would employ means and methods (i.e. steel plating, flagmen, traffic control measures, etc.) to ensure there is no disruption to the ingress and egress of the Airport?
This approach would provide the Government with an economic solution for this small scope of work. Please advise.
ANSWER: Please bid per RFP.
95. Ref. Drawing; P-9010: CG401, & Notice No. 5 Q&A No. 88 Future Truck Fill stand 1.
Please provide the coordinates for the Truck Fill stand which will allow us to locate/determine the appropriate surface reinstatement measures needed following construction of the canopy foundation.
Is it the intent of the designer to leave the footings buried without any indicators?
ANSWER: The center west foundation center point has been located on CS401. It has been coordinated with SB103. Please refer to the revised sheets included in Amendment 0006. The finish requirements for the fill stand are included within the civil documents.