This notice provides questions and answers related to a solicitation for construction projects at Tinian International Airport in the Commonwealth of the Northern Mariana Islands. The solicitation seeks a contractor to perform the following work: construct a cargo pad and taxiway extension, build a maintenance support facility, install a jet fuel system including receipt, storage and delivery infrastructure, and repair the haul route from the seaport to the airfield. The fuel system will include one 100,000 barrel and two 60,000 barrel aboveground storage tanks, pipelines, pumping stations and truck fill stands. The maintenance support facility must withstand winds of 190 miles per hour. The period of performance is not specified. Three pre-priced modifications are included for munitions and explosives of concern/material potentially presenting an explosive hazard work related to projects P-9030, P-9010 and P-9021 if needed. The solicitation number is N6274222R1306 and is issued by the Department of the Navy Naval Facilities Engineering Command Pacific.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
Notice No. 5 28 March 2022
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-22-R-1306
FY19 MCAF P-9030/PAF189030 APSI - CARGO PAD WITH TAXIWAY EXTENSION
FY19 MCAF P-9040/PAF189040 APSI - MAINTENANCE SUPPORT FACILITY
FY20 MCAF P-9010/PAF189010 APSI - FUEL TANKS WITH RECEIPT PIPELINE &
HYDRANT SYSTEM
FY20 MCAF P-9021/PAF189021 APSI -AIRFIELD DEVELOPMENT PHASE 1 - ROADS
TINIAN INTERNATIONAL AIRPORT, TINIAN, CNMI
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30. Please be advised that further questions asked 10 days before the closing may not be answered.
REVISED ANSWER FROM NOTICE NO. 3
58. P-9030 – Drawing CG102 P-9040 – Drawing CG101 9040 Existing Grade Topography It appears the P-9040 drawing CG102 existing grade contours do not match the P-9030 drawing CG101 Existing Grade or Finish Grade contour lines. Please advise.
ORIGINAL ANSWER: The grading plan for P-9030 depicts the existing condition for the P- 9040 project.
REVISED ANSWER: All of the finish grades for P-9010, P9030, and P-9040 depict the finish grades for the project site.
REVISED ANSWER FROM NOTICE NO. 4
69. For Project P-9010, can the contractor assume that all time delay relays and control relays shown in Control Circuit Schematic drawings EI651-EI652 for Pump Control are to be located inside SPCP and HPCP and not in the Motor Control Center?
ORIGINAL ANSWER: The intent is for them to be in the Motor Control Center. The specification will be revised in a future amendment.
REVISED ANSWER: The control relays and time delay relays shown on EI651 and EI652 are to be mounted in the Motor Control Center. The flow switches, temperature switches and local
RFP N62742-22-R-1306
Notice No. 5 control stations will be in the field. Section 26 20 11 will be updated in a future amendment to include the specifications for the MCC accessories and control devices.
RESPONSES DEFERRED FROM NOTICE NO. 2
20. Note 1 accompanying the price proposal Schedule SF1442 MEC/MPPEH Bases of Pricing
COMMENT:
Note 1 states that the Base Item CLIN 0001 thru CLIN 0003 and Option Item CLIN 0004 shall be based upon Low & High Likelihood areas of encountering MEC/MPPEH as designated in Figure 3.1 of the Tinian ESS Annex A-01 which accompanied the solicitation. Aside from the low likelihood areas designated for P-9030 APSI Cargo Pad with Taxiway Extension and P-9040 Maintenance Support Facility the remaining P-9010 and P-9021 area are not a feature of Figure
3.1 of the Tinian ESS Annex A-01.
QUESTIONS:
1. Please denote whether the areas associated with P-9010 and P-9021 fall within a Low & High Likelihood areas of encountering MEC/MPPEH.
2. In the event that Figure 3.1 of the Tinian ESS Annex A-01 were to indicate that P-9010, P- 9021, P-9030 & P-9040 or part thereof overlaid a high probability area would the cost associated with full MEC/MPPEH compliance be measured under CLIN’s 0005, 0006 and 0007 or the Base & Option Items.
3. Are CLIN’s 0005, 0006 and 0007 reserved only for MEC/MPPEH encounters in areas previously denoted as unlikely?
ANSWER:
Q1: Refer to the Tinian Annex A-109, which is included in the Amendment 0004 Section 01 57 19.03, for the Low & High Likelihood areas of encountering MEC/MPPEH associated with the P-9010 and P-9021 Offsite Roadways projects.
Q2: The Base Items Q3: Yes, it is for areas previously identified as Low Likelihood
RESPONSES DEFERRED FROM NOTICE NO. 3
84. P-9030 Dwgs. E-505, E-506, E-601 and Spec. section 33 71 01 45 ft. Overhead Power Pole Foundation P-9030 Spec section 33 71 01 para. 3.1.1 states “Concrete poles shall be embedded in accordance with the detail provided in the drawings.” Details on drawings E-505 and E-506 do not show a concrete foundation for the Overhead Power Poles. Please provide foundation detail for Overhead Power Poles.
ANSWER: Specification Section 33 71 01 para 3.1.1 will be amended in a future amendment to read “Concrete poles must be embedded in accordance with the attachment at the end of this specification section based on local utility company standards.”
85. P-9030 Dwg. ES136 and detail C4/E-502 Communication Ductbank Under Existing Airport Access Road P-9030 drawing ES136 instructs to bore approximately 60 LF under the Airport Access Road to ensure no roadway outage. We ask that typical trench and ductbank section be allowed at this location, due to the minimal time to complete the ductbank improvement (1 day) and the high costs to mobilize boring equipment and operator to Tinian for the small quantity. Please advise if traditional ductbank construction may be utilized.
ANSWER: This road is the primary access road to the Tinian International Airport. Bid per RFP.
86. P-9010 - CS and CF site plans, detail C1/CS506 and spec section 05 50 13 P-9010 Bollard DiameterThe various Civil Site plans and bollard detail calls for 4-inch diameter bollard, whereas the specs call for 6-inch diameter.
Please advise which to follow.
ANSWER: Specification section 05 50 13 is revised to include all P-9010 bollards. Refer to detail A3/A-541 for bollards adjacent to buildings or within buildings. Refer to detail C1/CS506 for all other bollards shown on the CS and CF drawings. See future amendment for updates to UFGS Section 05 50 13.
87. P-9040 – dwgs. CU101 and CU500 and spec section 05 50 13 P-9040 Bollard Detail Are bollards required at the fire hydrants on P-9040? If so, please provide detail for bollards on P-9040 and confirm diameter, as the spec section calls for 6” diameter.
ANSWER: Two bollards at each hydrant have been added. In a future amendment drawings CU100 and CS501 will provide the locations and the detail.
88. Ref. Drawing; P-9010 : SB103 Future Truck Fill Stand Please confirm if the future truck fill stand is part of the scope of work for P-9010 and provide location in the site plan.
ANSWER: Project P-9010 does have a Truck Fill Stand, but not a canopy. The canopy was removed but the canopy foundation remained for a future canopy.
89. Ref. Drawing; P-9010 : SP108 Cross-Over Valve Pit: Aluminum Grating/ Galvanized H- Beam Ledger angles and grating are aluminum; H-beam is galvanized wide flange. There may be a potential oxidation issue between the aluminum grating and galvanized beam. Please confirm whether to proceed as it is.
ANSWER: Aluminum and galvanized steel are close on the galvanic series. There is minimal potential unless immersed in seawater. The aluminum angles at the inside perimeter of the pits are secured to the concrete with stainless steel anchor bolts. Isolate the anchors from the angles with nylon isolation sleeves on the bolts. Refer to SP108 in a future amendment.
90. Construction Waste Disposal Please advise if non-hazardous construction waste may be disposed of at the Tinian Landfill.
ANSWER: Contractor to coordinate with CNMI Department of Public Works (DPW) and Bureau of Environmental Coastal Quality (BECQ) for permit requirements, not limited to Specification Section 01 57 19, Paragraph 3.7.
91. Ref. Drawing; P-9010: SP002, & Notice No. 2 Response on Question No. 30 P-9010:
Epoxy Coated Rebar The response to Notice No. 2 Question No. 30 has confirmed the epoxy coated rebar requirements for P-9010 but reference drawing: SP002 has indicated NO epoxy coated rebar for Storage Tanks. Please clarify.
ANSWER: Since the concrete cut-and-cover tanks will be protected by a waterproofing membrane surrounded by protection board, uncoated reinforcing steel to ASTM A615 will be utilized. All other structures within P-9010 will be constructed with epoxy coated reinforcing steel conforming to ASTM A934.
NOTICE NO. 5
92. Spec Section 32 12 13 para. 2.1.1 and 2.2.1 All Projects - Bituminous Prime & Tack Coat The RFP spec section calls for the use of SS-1h emulsified asphalt primer. Previous projects over the past 30 years on Guam (for all federal agencies) have allowed the substitution of CSS- 1h in lieu of SS-1h. Also, CSS-1h is available from regional suppliers.
Please confirm that CSS-1h may be used on this project.
ANSWER: Response is deferred.
93. Spec Section 32 12 16 para. 2.3 All Projects - Asphalt Cement Binder The RFP spec section calls for performance grade 70-22 asphalt cement binder. Previous projects over the past 15 years on Guam (for all federal agencies) have allowed the substitution of AR-8000 grade binder in lieu of grade 70-22.
Please confirm that AR-8000 grade binder may be used on this project.
ANSWER: Response is deferred.