This notice provides answers to questions from offerors on Solicitation Number N6274222R1306. The solicitation seeks design-build construction services for four projects at Tinian International Airport in the Commonwealth of the Northern Mariana Islands. The projects include construction of a cargo pad with taxiway extension, maintenance support facility, fuel tanks with receipt pipeline and hydrant system, and airfield development for roads. The notice clarifies specifications, defers some answers, and indicates that further questions within 10 days of closing may not be answered. It also notes three pre-priced planned modifications for munitions and explosives of concern/material potentially presenting an explosive hazard remediation for three of the projects. The Department of the Navy, Naval Facilities Engineering Command Pacific is listed as the issuing agency.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
Notice No. 6 29 March 2022
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-22-R-1306
FY19 MCAF P-9030/PAF189030 APSI - CARGO PAD WITH TAXIWAY EXTENSION
FY19 MCAF P-9040/PAF189040 APSI - MAINTENANCE SUPPORT FACILITY
FY20 MCAF P-9010/PAF189010 APSI - FUEL TANKS WITH RECEIPT PIPELINE &
HYDRANT SYSTEM
FY20 MCAF P-9021/PAF189021 APSI -AIRFIELD DEVELOPMENT PHASE 1 - ROADS
TINIAN INTERNATIONAL AIRPORT, TINIAN, CNMI
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30. Please be advised that further questions asked 10 days before the closing may not be answered.
REVISED RESPONSE FROM NOTICE 5
69. For Project P-9010, can the contractor assume that all time delay relays and control relays shown in Control Circuit Schematic drawings EI651-EI652 for Pump Control are to be located inside SPCP and HPCP and not in the Motor Control Center?
ORIGINAL ANSWER: The intent is for them to be in the Motor Control Center. The specification will be revised in a future amendment.
REVISED ANSWER: The control relays and time delay relays shown on EI651 and EI652 are to be mounted in the Motor Control Center. The flow switches, temperature switches and local control stations will be in the field. Section 26 20 11 will be updated in a future amendment to include the specifications for the MCC accessories and control devices.
2ND REVISED ANSWER: The control relays and time delay relays shown on EI651 and EI652 are to be mounted in the Motor Control Center. The flow switches, temperature switches and local control stations will be in the field. Section 26 20 00 will be updated in a future amendment to include the specifications for the MCC accessories and control devices.
RESPONSES DEFERRED FROM NOTICE NO. 5
92. Spec Section 32 12 13 para. 2.1.1 and 2.2.1 All Projects - Bituminous Prime & Tack Coat The RFP spec section calls for the use of SS-1h emulsified asphalt primer. Previous projects over the past 30 years on Guam (for all federal agencies) have allowed the substitution of CSS- 1h in lieu of SS-1h. Also, CSS-1h is available from regional suppliers.
RFP N62742-22-R-1306
Notice No. 6
Please confirm that CSS-1h may be used on this project.
ANSWER: Bid project as specified.
93. Spec Section 32 12 16 para. 2.3 All Projects - Asphalt Cement Binder The RFP spec section calls for performance grade 70-22 asphalt cement binder. Previous projects over the past 15 years on Guam (for all federal agencies) have allowed the substitution of AR-8000 grade binder in lieu of grade 70-22.
Please confirm that AR-8000 grade binder may be used on this project.
ANSWER: Bid project as specified.
NOTICE NO. 6
94. Communication Ductbank Under Existing Airport Access Road We respectfully ask to reconsider the answer to Q&A No. 85 in regards to boring under the Airport Access Road.
Would traditional ductbank excavation and placement be allowed if the Contractor would employ means and methods (i.e. steel plating, flagmen, traffic control measures, etc.) to ensure there is no disruption to the ingress and egress of the Airport?
This approach would provide the Government with an economic solution for this small scope of work. Please advise.
ANSWER: Response is deferred.
95. Ref. Drawing; P-9010: CG401, & Notice No. 5 Q&A No. 88 Future Truck Fill stand 1.
Please provide the coordinates for the Truck Fill stand which will allow us to locate/determine the appropriate surface reinstatement measures needed following construction of the canopy foundation.
Is it the intent of the designer to leave the footings buried without any indicators?
ANSWER: Response is deferred.