This solicitation is for four construction projects at Tinian International Airport in the Commonwealth of Northern Mariana Islands. The projects include construction of a cargo pad and taxiway extension, fuel tanks with a receipt pipeline and hydrant system, airfield development of roads, and an optional maintenance support facility. The Department of the Navy Naval Facilities Engineering Command issued the solicitation with a response date of 365 calendar days after contract award. Three pre-priced planned modifications are included for munitions and explosives of concern and material potentially presenting an explosive hazard for some of the projects. The cargo pad, fuel tanks, and roads must meet seismic zone 3 and typhoon wind resistance design standards. The maintenance facility option can be exercised within a year of award.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AT
T S
XETE FO
SA
TR
EYD.RICE
2 6 75 5
R
EG
IS
TE
RED ARCHITEC
T
400 US ROUTE 1
NORTH SUITE B
FALMOUTH, MAINE 04105
TEL. (207) 869-8006
FAX (207) 869-8015
2525 GAMBELL STREET
SUITE 200
ANCHORAGE, AK 99503
TEL. (907) 563-3835
FAX (907) 563-3817
ATTTTTTTTTTTTTTTTTTTTTTTTTTTTTA XXXXXXXXXXXXXXXXXXXXXXXEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEETTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
9-24-21
S
XETE FO
SA
TR
EYD.RICE
2 6 75 5
R
EG
IS
TE
RED ARCHITEC
T
ATTTTTTTTTTTTTTTTTTTTTTTTTTTTTA XXXXXXXXXXXXXXXXXXXXXXXEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEETTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
S
XETE FO
SA
TR
EYD.RICE
2 6 75 5
R
EG
IS
TE
RED ARCHITEC
T
ATTTTA XXXXXEEEEEETTTTTTEEEEEE FFFFFFOOOOOO
09/24/2021
1.
1.
2.
1.
S
XETE FO
SA
TR
EYD.RICE
2 6 75 5
R
EG
IS
TE
RED ARCHITEC
T
ATTTTTTTTTTTTTTTTTTTTTTTTTTTTTA XXXXXXXXXXXXXXXXXXXXXXXEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEETTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
S
XETE FO
SA
TR
EYD.RICE
2 6 75 5
R
EG
IS
TE
RED ARCHITEC
T
ATTTTTTTTTTTTTTTTTTTTTTTTTTTTTA XXXXXXXXXXXXXXXXXXXXXXXEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEETTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
24 SEP 2021
24 SEP 2021
S
XETE FO
SA
TR
EYD.RICE
2 6 75 5
R
EG
IS
TE
RED ARCHITEC
T
AATTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTAA XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEETTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
S
XETE FO
SA
TR
EYD.RICE
2 6 75 5
R
EG
IS
TE
RED ARCHITEC
T
ATTTTTTTTTTTTTTTTTTTTTTTTA XXXXXXXXXXXXXXXXXXXXXXXEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEETTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
S
XETE FO
SA
TR
EYD.RICE
2 6 75 5
R
EG
IS
TE
RED ARCHITEC
T
ATTTTTTTTTTTTTTTTTA XXXXXXXXXXXXXXXXEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEETTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
| GENERAL |
| G-001 - COVER SHEET |
| G-002 - SHEET INDEX |
| G-003 - SHEET INDEX |
| G-100 - HAUL ROUTE AND LOCATION PLAN |
| G-101 - OVERALL SITE PLAN - ALL PHASES |
| G-102 - CONSTRUCTION SAFETY PHASING PLAN (CSPP) NOTES |
| G-103 - CONSTRUCTION SAFETY PHASING PLAN (CSPP) |
| GI002 - GENERAL NOTES, SYMBOLS AND ABBREVIATIONS |
| GI003 - ABBREVIATIONS CONTINUED |
| GI010- -CODE SUMMARY/LIFE SAFETY PLAN -HYDRANT SYSTEM FUEL PUMP HOUSE |
| GI011- -CODE SUMMARY/LIFE SAFETY PLAN -GENERATOR BUILDING |
| GI012- -CODE SUMMARY/LIFE SAFETY PLAN -SEAPORT FUEL PUMP HOUSE |
| GI015 - HAZARDOUS AREA PLANS |
| GI016 - HAZARDOUS AREA PLANS |
| GI020- -AIR BARRIER PLAN AND SECTION - HYDRANT SYSTEM FUEL PUMP HOUSE |
| GI021- -AIR BARRIER PLAN AND SECTION -GENERATOR BUILDING |
| GI022- -AIR BARRIER PLAN AND SECTION -SEAPORT FUEL PUMP HOUSE |
| GI100 - CODE COMPLIANCE - AREAS 1, 2, 3, & 4 |
| GI101 - CODE COMPLIANCE - AREA 5 |
| GC100 - EROSION CONTROL DETAILS |
| GC101 - EROSION CONTROL PLAN |
| GC102 - EROSION CONTROL PLAN |
| GC500 - EROSION CONTROL DETAILS |
| GC501 - EROSION CONTROL DETAILS |
| SURVEY |
| V-100 - OVERALL TOPOGRAPHIC SURVEY |
| V-101 - TOPOGRAPHIC SURVEY - AREA 1 |
| V-102 - TOPOGRAPHIC SURVEY - AREA 2 |
| V-103 - TOPOGRAPHIC SURVEY - AREA 3 |
| V-104 - TOPOGRAPHIC SURVEY - AREA 4 |
| V-105 - TOPOGRAPHIC SURVEY - AREAS 5 & 6 |
| V-106 - TOPOGRAPHIC SURVEY - AREAS 7 & 8 |
| V-107 - TOPOGRAPHIC SURVEY - AREA 9 |
| V-108 - TOPOGRAPHIC SURVEY - AREA 10 |
| V-109 - TOPOGRAPHIC SURVEY SEAPORT - AREA 5 |
| GEOTECH |
| B-100 - BORING LOCATIONS |
| B-101 - BORING LOCATIONS |
| B-102 - BORING LOCATIONS |
| B-103 - BORING LOGS |
| B-104 - BORING LOGS |
| B-105 - BORING LOGS |
| B-106 - BORING LOGS |
| B-107 - BORING LOGS |
| B-108 - BORING LOGS |
| B-109 - BORING LOGS |
| B-110 - BORING LOGS |
| B-111 - BORING LOGS |
| B-112 - BORING LOGS |
| B-113 - BORING LOGS |
| B-114 - BORING LOGS |
| Text4: 08 OCT 2021 | |
| 2021-10-08T15:22:29-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:22:52-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:22:54-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:22:56-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:22:57-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:22:59-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:01-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:02-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:04-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:06-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:08-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:10-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:12-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:14-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:16-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:17-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:19-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:21-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:23-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:25-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:26-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:28-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:30-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:32-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:34-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:36-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:37-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:39-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:41-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:43-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:45-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:47-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:49-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:51-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:53-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:55-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:56-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:23:58-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:24:00-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:24:02-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:24:04-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:24:06-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:24:08-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:24:10-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:24:12-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:24:15-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:24:16-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:24:18-1000 | |
| Evan Mizuno | |
| I authorize this document. |
| 2021-10-08T15:24:20-1000 | |
| Evan Mizuno | |
| I authorize this document. |
File details come from the government source that posted it. Updated .