Okanogan Wenatchee NF ENTIAT.pdf
PDF 460 KB Posted
- Attached to
- VAULT SEPTIC PUMPING SERVICE BPA ANNUAL RENEWAL
- Solicitation number
- 1240BD22Q0028_1
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a contract amendment (SF-30) for a federal solicitation for Vault Septic Pumping Services on the Okanogan-Wenatchee National Forest. The purpose of this amendment is to: 1) Conduct the 2024 annual review of previously established Blanket Purchase Agreements for Region 6 Vault Pumping Services, with an updated Schedule of Items and wage determination. The period of performance is 05/01/2024 to 04/30/2025. 2) Reopen the solicitation to allow new companies to submit quotes.
The amendment provides details on the 12 separate vault toilet, pit toilet, and septic system locations, including the number of vaults, approximate vault sizes, estimated service frequency per year, and distance from the Entiat Ranger District office. Contractors are required to provide pricing per trip for each location. The solicitation number is 1240BD22Q0028_1 and the agency is the USDA Forest Service.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x) x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40BD
USDA-FS, CSA NORTHWEST 2
1220 SW 3RD AVE, STE 310
PORTLAND OR 97204-2829
04/01/2024
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION
NO.1240BD22Q0028_1
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION
NO. P0001
5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/06/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
ARLENE K STEFFEY
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to:
- Conduct the 2024 annual review of previously established Blanket Purchase Agreements for Region 6 Vault Pumping Services, see updated Schedule of Items and wage determination.
Period of Performance: 05/01/2024 to 04/30/2025 https://sam.gov/opp/3b0de8408c204dc894d648fd7a4d6c13/view;
-and, to reopen the solicitation allowing new companies to submit quotes.
-and to reopen the solicitation allowing new companies to submit quotes.
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
X FAR 13.303-6(b), Agreement C.3.1(a) X 1 kennethmiller Highlight kennethmiller Highlight kennethmiller Highlight kennethmiller Highlight
PUMPING SERVICES FOR VAULT TOILETS, PIT TOILETS AND SEPTIC SYSTEMS
OKANOGAN - WENATCHEE NATIONAL FOREST
Schedule of Items/Price Schedule
ENTIAT RANGER DISTRICT
2108 Entiat Way P.O. Box 476 Entiat, WA 98822
(509) 784-4700 (Voice/TTY)
Line Item Description/ Location Special Notes Number of Vaults Approx Vault Size Estimated Frequency
Per Year Miles from Entiat Price per trip
5/1/2024 thru 4/30/2025
ERD-1
Pine Flats Campground paved access 90 percent of the way.
1 Single Vault, 1 double
Vault
1 single restrooms/750GA vault/ 1 double/ 1500 GA vault/2250 total capacity for facility each once
ERD-2
Fox Creek Campground paved access entire way, on Entiat River Rd
2 Single Vaults
2 single vault restrooms/500GA each vault/1000GA total capacity for facility
ERD-3
Lake Creek Campground
2 Single Vaults
2 single vault restrooms/750GA each vault/1500GA total capacity for facility
ERD-4
Silver Falls Day Use
1 Single vault restroom/750GA total capacity for facility
ERD-5
Silver Falls Campground
7 Single Vaults
Single restroom/dbl vault/750GA each vault/5250GA total capacity for
Half (3.5) every year
ERD-6
North Fork Group Site paved access 90 percent of the way, Entiat River Rd
Single restroom/single vault/750GA total capacity for
Every other year
ERD-7
Three Creek Group Site Starting 2023; not yet in place
ERD-8
Cottonwood Campground
Last 4.5 miles on two lane, gravel, 4 Single Vaults
Single restroom/dbl vault/750GA each vault/3000GA total capacity for
Half (2) every year
ERD-9
Entiat River Trailhead
Last 5 miles on two lane gravel, Entiat
ERD-10
North Fork Trailhead lane and a half, dirt, 5100 then 5606 Rd
ERD-11
Silver Falls Guard Station two lane, gravel, vault/500GA total capacity for every other year
ERD-12
Lake Creek Trailhead
Every other year
| Contractor Information: |
| Text2: |
| Text3: |
File details come from the government source that posted it. Updated .