This document is an amendment to a federal solicitation for Vault Septic Pumping Service Blanket Purchase Agreements (BPAs) in the McKenzie River Ranger District. The purpose of the amendment is to conduct the 2024 annual review of the previously established BPAs and to reopen the solicitation to allow new companies to submit quotes.

The amendment provides a detailed list of 24 sites within the McKenzie River Ranger District that require vault septic pumping services, including the number of vaults/toilets, approximate vault size, estimated annual frequency, and distance from Eugene, Oregon. The period of performance is May 1, 2024 to April 30, 2025. The solicitation number is 1240BD22Q0028_1, and it is issued by the USDA Forest Service. Interested contractors must submit their offers by acknowledging receipt of this amendment prior to the specified date and time.

View the file

Other files

File Type Posted
Umatilla NF Heppner RD.pdf PDF
Olympic National Forest.pdf PDF
Skykomish Ranger District.pdf PDF
Olympic National Forest.pdf PDF
1125110-MBS_SNOQUALMIE SCHEDULE OF ITEMS 1240BD22Q0028_1.pdf PDF
HOOD RIVER AND BARLOW RANGER DISTRICT SCHEDULE OF ITEMS 1240BD22Q0028_1.pdf PDF
Okanogan Wenatchee NF ENTIAT.pdf PDF
Okanogan Wenatchee RIVER RD.pdf PDF
Okanogan Wenatchee CLE ELUM RD.pdf PDF
15-5545 clallam.pdf PDF
Sweet Home Ranger District Linn County.pdf PDF
SiuslawNF Schedule of Items.pdf PDF
Snoqualmie Ranger District SR_410.pdf PDF
Bend Fort Rock Ranger District.pdf PDF
15-5583 hood river.pdf PDF
Olympic National Forest.pdf PDF
Diamond Lake Ranger District.pdf PDF
Okanogan Wenatchee NF ENTIAT.pdf PDF
WillametteNF Schedule of Items.pdf PDF
Skykomish Ranger District.pdf PDF
15-5575 lincoln.pdf PDF
Snoqualmie Ranger District I_90 Corridor.pdf PDF
North Umpqua Ranger District.pdf PDF
Okanogan Wenatchee RIVER RD.pdf PDF
Middle Fork Ranger District.pdf PDF
Columbia River Gorge National Scenic Area or sites.pdf PDF
1240BD22Q0028_1 Vault Septic Pumping Service solicitation.pdf PDF
Cottage Grove Ranger District.pdf PDF
Detroit Ranger District.pdf PDF
Okanogan Wenatchee NF NACHES.pdf PDF
Okanogan Wenatchee NF METHOW VALLEY.pdf PDF
15-5551 grays harbor.pdf PDF
UmpquaNF Schedule of Items.pdf PDF
15-5563 clackamas.pdf PDF
MtBaker SnoqualmieNF Schedule of Items.pdf PDF
15-5579 coos douglas.pdf PDF
15-5565 deschutes.pdf PDF
15-5569 lane.pdf PDF
Columbia River Gorge National Scenic Area washington sites.pdf PDF
Hebo Ranger District.pdf PDF
15-5587 linn.pdf PDF
DeschutesNF.pdf PDF
15-5535 king.pdf PDF
Tiller Ranger District.pdf PDF
15-5577 clatsop.pdf PDF
Okanogan Wenatchee Chelan RD.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x) x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

40BD

USDA-FS, CSA NORTHWEST 2

1220 SW 3RD AVE, STE 310

PORTLAND OR 97204-2829

04/01/2024

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION

NO.1240BD22Q0028_1

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION

NO. P0001

5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/06/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

ARLENE K STEFFEY

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this modification is to:

- Conduct the 2024 annual review of previously established Blanket Purchase Agreements for Region 6 Vault Pumping Services, see updated Schedule of Items and wage determination.

Period of Performance: 05/01/2024 to 04/30/2025 https://sam.gov/opp/3b0de8408c204dc894d648fd7a4d6c13/view;

-and, to reopen the solicitation allowing new companies to submit quotes.

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

X FAR 13.303-6(b), Agreement C.3.1(a) X 1 kennethmiller Highlight kennethmiller Highlight kennethmiller Highlight kennethmiller Highlight

McKenzie River Ranger District – Lane County 57600 McKenzie Hwy McKenzie Bridge, OR 97413 541-822-3381

Line Item

Description of Site -

MCKENZIE RIVER

Ranger District

Special Notes

# of Vaults/ Toilets

Approx Vault Size Estimated Annual Frequency

Miles from *

Bid (per trip)

5/1/2024- 4/30/2025

MRRD-

Paradise Day Use Area -

MP54 HWY 126 2

Single restroom/dbl vault/750GA each vault/1500GA total capacity for facility miles from

Eugene

_____ per trip

MRRD-

Trail Bridge Campground MP12 HWY 126 (Turn left if traveling east at sign, cross bridge, turn left, go past EWEB power station, Campground on left)

Closed until

2 single vault restrooms/500GA each vault/1000GA total capacity for facility

Every other year for both miles from

Eugene

_____ per trip

MRRD-

Smith Boat Launch MP12 HWY 126 (Turn left if traveling east at sign, cross bridge, turn left, go past EWEB power station, go past Trail Bridge Campground, continue 2 miles to Smith Boat Launch at Reservoir Dam)

2 single vault restrooms/750GA each vault/1500GA total capacity for facility miles from

Eugene

_____ per trip

Line Item

Description of Site -

MCKENZIE RIVER

Ranger District

Special Notes

# of Vaults/ Toilets

Approx Vault Size Estimated Annual Frequency

Miles from *

Bid (per trip)

5/1/2024- 4/30/2025

MRRD-

Carmen Reservoir Day Use Area MP6 HWY

Single vault restroom/750GA total capacity for facility miles from

Eugene

_____ per trip

MRRD-

Fish Lake Day Use Area

MP1 HWY 126 2

Single restroom/dbl vault/750GA each vault/1500GA total capacity for facility miles from

Eugene

_____ per trip

MRRD-

Fish Lake Guard Station

MP1 HWY 126 1

Single restroom/single vault/750GA total capacity for facility

Every other year miles from

Eugene

_____ per trip

MRRD-

Lost Lake Campground

MP73 HWY 126/20

May not be included starting

3 Single Vaults

3 single restrooms/750GA Each vault/2250 total capacity for facility miles from

Eugene

_____ per trip

MRRD-

Santiam Snow Park

MP80 HWY 126/20 2

Single restroom/dbl vault/750GA each vault/1500GA total capacity for facility miles from

Description of Site -

MCKENZIE RIVER

Ranger District

Special Notes

# of Vaults/ Toilets

Approx Vault Size Estimated Annual Frequency

Miles from *

Bid (per trip)

5/1/2024- 4/30/2025

MRRD-

Ray Benson Snow Park

MP80 HWY 126/20 4

2 Double vault Restrooms/750GA each vault/1500GA each restroom/ 3000GA total capacity for facility

2 for CXT near snow shelter Every other year for the

ROMTEC

miles from

Eugene

_____ per trip

MRRD-

Santiam OHV Staging Area MP80 HWY 126/20

1 Single Vault

Single restroom/single vault/750GA total capacity miles from

Eugene

_____ per trip

MRRD-

Proxy Falls Trailhead MP 64 HWY 242 (Past Ray Benson Snow park on FSRD 2690 approximately 2 miles)

Single restroom/dbl vault/750GA each vault/1500GA total capacity for facility miles from

Eugene

_____ per trip

MRRD-

Alder Springs Campground/Linton Lake Trailhead MP 66

HWY 242

Single restroom/single vault/750GA total facility capacity miles from

Eugene

_____ per trip

MRRD-

Obsidian Trailhead MP

71 HWY 242 2

2 single vault restrooms/75GA each vault/1500GA total facility capacity

1 for hiker parking area Every third year for horse riding parking area miles from

Description of Site -

MCKENZIE RIVER

Ranger District

Special Notes

# of Vaults/ Toilets

Approx Vault Size Estimated Annual Frequency

Miles from *

Bid (per trip)

5/1/2024- 4/30/2025

MRRD-

Scott Lake Campground MP 71 HWY 242 (Turn west onto FSRD 260, 2 miles to Campground)

3 single restrooms/750GA Each vault/2250 total capacity for facility miles from

Eugene

_____ per trip

MRRD-

Dee Wright Observatory

MP 77 HWY 242 2

Single restroom/dbl vault/750GA each vault/1500GA total capacity for facility miles from

Eugene

_____ per trip

MRRD-

Echo Boat Launch Turn onto Forest Road 19 at MP 46 on HWY 126, Take RT at first intersection, drive to top of Cougar Dam and turn left (drive across dam), turn right on FSRD 1993, 2 miles to facility.

Single restroom/dbl vault/750GA each vault/1500GA total capacity for facility

Once every other year miles from

Eugene

_____ per trip

MRRD-

East Fork Trailhead Turn onto Forest Road 19 at MP 46 on HWY 126, Take RT at first intersection, drive to top of Cougar Dam and turn left (drive across dam), turn right on FSRD 1993, 2 miles to facility.

Single restroom/single vault/500GA total capacity for facility

Once every other year miles from

Description of Site -

MCKENZIE RIVER

Ranger District

Special Notes

# of Vaults/ Toilets

Approx Vault Size Estimated Annual Frequency

Miles from *

Bid (per trip)

5/1/2024- 4/30/2025

MRRD-

French Pete Trailhead Turn onto Forest Road 19 at MP 46 on HWY 126, Take RT at first intersection. MP 47 on

FSRD19.

Single restroom/single vault/500GA total capacity for facility

Once every 3 years miles from

Eugene

_____ per trip

MRRD-

Roaring River Campground MP 37

FSRD 19

Single restroom/dbl vault/750GA each vault/1500GA total capacity for facility miles from

Eugene

_____ per trip

MRRD-

Box Canyon Horse Campground MP 32

FSRD 19

2 Single restrooms/single vaults/500GA each/1000GA total capacity for facility

Once every 3 years miles from

Eugene

_____ per trip

MRRD-

Box Canyon Guard Station MP 32 FSRD 19 1

1 Single restroom/single vault/500GA total capacity for facility

Once every 3 years miles from

Description of Site -

MCKENZIE RIVER

Ranger District

Special Notes

# of Vaults/ Toilets

Approx Vault Size Estimated Annual Frequency

Miles from *

Bid (per trip)

5/1/2024- 4/30/2025

MRRD-

Indian Ridge Lookout Turn onto Forest Road 19 at MP 46 on HWY 126, Take RT at first intersection. Continue up FSRD 19 to junction with FSRD 1980. Turn onto FSRD1980. Drive to junction with FSRD

247. Turn onto FSRD 247 and drive to Lookout at top of ridge.

FSRD 1980 and 247 are unpaved, long, winding and narrow. Total drive time from Eugene one way is approximately 2 hours.

Single restroom/Single vault/750GA total capacity

Once every 3 years miles from

Eugene

_____ per trip

MRRD-

Horse Creek Group Campground Turn onto FSRD 2638 just after bridge that crosses McKenzie River at the community of McKenzie Bridge. Drive 3 miles on FSRD 2638. Facility is on left just past junction with FSRD 2639 (King Road).

2 Single restrooms/single vaults/750GA each/1500GA total capacity for facility miles from

Description of Site -

MCKENZIE RIVER

Ranger District

Special Notes

# of Vaults/ Toilets

Approx Vault Size Estimated Annual Frequency

Miles from *

Bid (per trip)

5/1/2024- 4/30/2025

MRRD-

Blue Pool/Tamolitch Falls Trailhead Off of Hwy 126

2 Single restrooms/single vaults/750GA each/1500GA total capacity for facility

2/3/2022 miles from

Contractor Information:
Text2:
Text3:

File details come from the government source that posted it. Updated .