Okanogan Wenatchee NF ENTIAT.pdf
PDF 405 KB Posted
- Attached to
- VAULT SEPTIC PUMPING SERVICE BPA ANNUAL RENEWAL
- Solicitation number
- 1240BD22Q0028_1
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a contract amendment for the annual renewal of previously established Blanket Purchase Agreements (BPAs) for vault septic pumping services in the Okanogan-Wenatchee National Forest, Region 6. The purpose of the amendment is to conduct the 2024 annual review of the existing BPAs and to reopen the solicitation to allow new companies to submit quotes.
The amendment provides a detailed Schedule of Items and Pricing for 14 different sites across the Entiat Ranger District, including the quantity and size of single and double vault toilets, the estimated frequency of service per year, and the distance from the Entiat area. The period of performance is from 5/1/2024 to 4/30/2025. The solicitation number is 1240BD22Q0028_1 and it is being administered by the USDA Forest Service.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x) x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40BD
USDA-FS, CSA NORTHWEST 2
1220 SW 3RD AVE, STE 310
PORTLAND OR 97204-2829
04/01/2024
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION
NO.1240BD22Q0028_1
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION
NO. P0001
5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/06/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
ARLENE K STEFFEY
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to:
- Conduct the 2024 annual review of previously established Blanket Purchase Agreements for Region 6 Vault Pumping Services, see updated Schedule of Items and wage determination.
Period of Performance: 05/01/2024 to 04/30/2025 https://sam.gov/opp/3b0de8408c204dc894d648fd7a4d6c13/view;
- and, to reopen the solicitation allowing new companies to submit quotes.
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
X FAR 13.303-6(b), Agreement C.3.1(a) X 1 kennethmiller Highlight kennethmiller Highlight kennethmiller Highlight kennethmiller Highlight
PUMPING SERVICES FOR VAULT TOILETS, PIT TOILETS AND SEPTIC SYSTEMS
OKANOGAN - WENATCHEE NATIONAL FOREST
Schedule of Items/Price Schedule
ENTIAT RANGER DISTRICT
2108 Entiat Way P.O. Box 476 Entiat, WA 98822
(509) 784-4700 (Voice/TTY)
Line Item Description/ Location Special Notes Qty of Tanks at Site Single Double Approx Vault Size Estimated Frequency Per Year
Miles from Entiat
Price per trip 5/1/2024 thru 4/30/2025
ENRD-1 Cottonwood Campground
Last 4.5 miles on two-lane, gravel. Entiat River Rd
Single = 750 GA 4 0 Single = 750 GA 0.5 37
ENRD-2 Cottonwood Guard Station Last 4.5 miles on two-lane, gravel. Entiat River Rd
Single = 500 GA 1 0 Single = 500 GA 0.5 37
ENRD-3 Entiat River Trailhead
Last 5 miles on two-lane, gravel. Entiat River Rd
Single = 750 GA 1 0 Single = 750 GA 1 38
ENRD-4 Fox Creek Campground Paved access entire way, on Entiat River Rd Single = 500 GA 2 0 Single = 500 GA 1 26
ENRD-5 French Corral
Last 11 miles on two-lane, gravel. Entiat River Rd to Mad River Rd to 5800 Rd
GA 1 0 Single = 750 GA 1 25
ENRD-6 Lake Creek Campground Paved access entire way, Single = 750 GA 2 0 Single = 750 GA 1 27
ENRD-7 Lake Creek Trailhead Paved access entire way, Single = 750 GA 1 0 Single = 750 GA 0.5 27
ENRD-8 North Fork Group Site
Paved access 90 percent of the way.
Entiat River Rd
GA 1 0 Single = 750 GA 1 32
ENRD-9 North Fork Trailhead
Last 4.5 miles on one-and-a-half-lane, dirt. 5100 Rd to 5606 Rd
Single = 750 GA 1 0 Single = 750 GA 1 36
ENRD-10 Pine Flats Campground
Paved access 90 percent of the way. Entiat River Rd to Mad River Rd
Single = 750 GA 2 0 Single = 750 GA 1 16
ENRD-11 Silver Falls Campground Paved access entire way, Single = 750 GA, Double = 1500 GA 5 1 Single = 750 GA, Double
= 1500 GA
1 30
ENRD-12 Silver Falls Day Use Paved access entire way, Single = 750 GA 1 0 Single = 750 GA 2 30
Line Item Description/ Location Special Notes Qty of Tanks at Site Single Double Approx Vault Size Estimated Frequency Per Year
Miles from Entiat
Price per trip 5/1/2024 thru 4/30/2025
ENRD-13
Silver Falls Guard Station Paved access entire way, on Entiat River Rd Single = 500 GA 1 0 Single = 500 GA 0.5 30
ENRD-14
Three Creek Group Site Last 3 miles on two-lane, gravel. Entiat River Rd Single = 750 GA 1 0 Single = 750 GA 1 35
| Contractor Information: |
| Text2: |
| Text3: |
File details come from the government source that posted it. Updated .