SF30_-_Amendment_4_-_Signed.pdf

PDF 314 KB Posted

Attached to
Research, Engineering, Mission Integration Services (REMIS) Federal contract opportunity
Solicitation number
NNJ17584385R
Issued by
National Aeronautics and Space Administration Johnson Space Center

About this file

SF30 - Amendment 4

View the file

Other files for this federal contract opportunity

Other files attached to Research, Engineering, Mission Integration Services (REMIS), newest first.
File Type Posted
Section_L_Rev._E.docx DOCX document
SF30_-_Amendment_6_-_Signed.pdf PDF
SF30_-_Amendment_5_-_Signed.pdf PDF
Section_L_Attachment_L-2F_Rev._A.docx DOCX document
Q54_and_higher_Final.docx DOCX document
Section_L_Rev._C.docx DOCX document
REMIS_CPFF_(IDIQ).xlsx XLSX spreadsheet
Section_L_Rev._B.docx DOCX document
Section_L_Attachment_L-2C_Rev._A.docx DOCX document
Amendment_1_-_REMIS.pdf PDF
Section_L_Rev._A.docx DOCX document
Section_L_Attachment_L-2A__Rev._A.docx DOCX document
Section_L_Attachment_L-2G_Rev._A.docx DOCX document
Section_L_Attachment_L-2D_Rev._A.docx DOCX document
Section_I_.docx DOCX document
Section_L_Attachment_L-2C_.docx DOCX document
Section_J_Attachment_J-6.pdf PDF
Section_L_Attachment_L-2G.docx DOCX document
Section_H_.docx DOCX document
Section_L_Attachment_L-2A_.docx DOCX document
Section_L_.docx DOCX document
Section_E.docx DOCX document
Section_J_Attachment_J-12.pdf PDF
Section_J_Attachment_J-10.pdf PDF
Section_C.docx DOCX document
Section_J_Attachment_J-9.pdf PDF
Section_K.doc DOC document
Section_J_Attachment_J-8.pdf PDF
Section_J_Attachment_J-7.pdf PDF
Questions_and_Answers_for_DRFP_Final.pdf PDF
REMIS_Pre-proposal_Conference_Registration_sign-in_sheet.pdf PDF
Section_L_Rev_2.pdf PDF
Section_J_Attachment_J-1_R1.pdf PDF
Section_M_R.1.pdf PDF
Section_L_R.1_.pdf PDF
Section_M.pdf PDF
Section_L_Attachment_2E.pdf PDF
Section_D.pdf PDF
Section_J_Attachment_J-12.pdf PDF
Section_L_Attachment_2F.pdf PDF
Section_L_Attachment_2G.pdf PDF
Section_L_.pdf PDF
Section_J_Attachment_J-10.pdf PDF
Section_L_Attachment_3_FFP_IDIQ_.xlsx XLSX spreadsheet
Table_of_Contents.pdf PDF
Section_L_Attachment_3_Cover_Page.pdf PDF
Section_L_Attachment_3_CPFF_(IDIQ).xlsx XLSX spreadsheet
SF33.pdf PDF
Section_J_Attachment_J-8.pdf PDF
Section_K.pdf PDF
Show all 50

Research, Engineering, Mission Integration Services (REMIS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x) x 10A. MODIFICATION OF CONTRACT/ORDER NO.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

See Schedule

JSC

Houston TX 77058-3696 2101 NASA Parkway Attn: BG/ Samuel McIlvoy NASA/Johnson Space Center

4200584385000004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Net Increase:

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

D. OTHER (Specify type of modification and authority) x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment to Request for Proposal (RFP) NNJ17584385R is to 1) Provide Answers to RFP Questions 55-84 from the Final RFP. This is the final set of Questions and Answers that will be provided; 2) Update the following sections of the Final RFP- Section B, and Section L Attachment L-2F. These documents have been uploaded showing Track Changes;

3) Add Attachment L-9 Pre-award Survey of Prospective Contractor Accounting System Checklist. This Attachment had not yet been uploaded to the website.

Please see attached page for additional details on the document updates in #2 above.

15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Adrian D. Clayton

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

10/17/2016

10/17/2016 xx

09/08/2016

NNJ17584385R

smcilvoy Rectangle smcilvoy Typewritten Text x

NNJ17584385R - Research, Engineering, Mission and Integration Services

Section B

• Clause B.A.4 Contract Value is revised to show the total value as $TBD.

Section L Attachment L-2C

• Section 2.0 Requirements is revised to clarify the quantity and part numbers for the Hose Assembly, CWC-I Offload.

SF30 - Amendment 4
SF30

Amendment 4

2016-10-17T15:16:46-0500
ADRIAN CLAYTON

File details come from the government source that posted it. Updated .