Exhibits_1-16_FOMS_III_Cost.pdf

PDF 309 KB Posted

Attached to
Facilities Operations and Maintenance Services
Solicitation number
NNG16572637R-1
Issued by

About this file

Exhibits 1-16 (Please Note Exhibit 16 is marked Reserved)

View the file

Other files

File Type Posted
Signed_SSA_Letter.pdf PDF
Set_6_Questions_and_Answers_FOMS_III.pdf PDF
Set_5_Questions_and_Answers_FOMS_III.pdf PDF
Amendment_5_SF30.pdf PDF
Set_4_Questions_and_Answers_FOMS_III_(2).pdf PDF
Appendix_8_-_GOMAR_ACRONYM_LIST.pdf PDF
Revised_SECTION_K.pdf PDF
Appendix_8_-_All_Assets.pdf PDF
FOMS_III_SOW_rev_2-16-17.pdf PDF
SF30_Amendment_4.pdf PDF
Appendix_8_-_Asset_Condition_Code.pdf PDF
Exhibits_1-16_FOMS_III_Cost_Exhibits.pdf PDF
Appendix_8_-_Table_of_Contents.pdf PDF
Appendix_8_-_SHOP_(Craft)_Codes.pdf PDF
Appendix_8_-_Quantity_of_Assets_Incl_Plus_and_Minus.pdf PDF
Set_3_Questions_and_Answers_FOMS_III.pdf PDF
Amendment_3_SF30.pdf PDF
Amendment_2_NNG16572637R.pdf PDF
Set_2_Questions_and_Answers_for_NNG16572637R_FOMS_III.pdf PDF
SECTION_L_Amended.pdf PDF
SF30.pdf PDF
Questions_and_Answers.pdf PDF
SF33.pdf PDF
Enclosure_2_IT_Security_Management_Plan.pdf PDF
Attachment_Q_Painting_and_Caulking_Bid_Schedule_-_Clean.pdf PDF
Attachment_D_DD254_Cover_Page.pdf PDF
Appendix_9_-_FOMS_Specifications.pdf PDF
Attachment_H_IT_Security_Applicable_Documents_List.pdf PDF
Attachment_Q_Roofing_Bid_Schedule_-_Clean.pdf PDF
Appendix_5_-_Installation_Accountable_Government_Materials.pdf PDF
Attachment_N_Collective_Bargaining_Agreement.pdf PDF
Attachment_P_Wage_Determination.pdf PDF
Cover_Letter_FOMS_III_RFP.pdf PDF
Appendix_7_-_Chemical_Treatment.pdf PDF
Attachment_D_DD_254_Pg_3_Continuation.pdf PDF
Attachment_G_Quality_Control_Plan.pdf PDF
Attachment_O_Wage_Determination.pdf PDF
Attachment_B_IDIQ_Cost_and_Fixed_Price_Rate_Matrix--Hybrid_Core-IDIQ.pdf PDF
Attachment_C_Installation_Accountable_Govt_Prop.pdf PDF
Attachment_Q_Concrete_Paving_and_Traffic_Control_Bid_Schedule_-_Clean.pdf PDF
Appendix_8_-_Listing_of_Asset_Quantities_and_PM_Requirements.pdf PDF
Attachment_L_Safety_and_Health_Plan.pdf PDF
Enclosure_1_QASP_Cost-Type_Contract.pdf PDF
Appendix_6_-_Installation_Accountable_Government_Property.pdf PDF
Attachment_Q_Asbestos_bid_Schedule_-_Clean.pdf PDF
Appendix_1_-_Appendix_and_Attachment_List.pdf PDF
Enclosure_3_RTOs.pdf PDF
NNG16572637R_RFP.pdf PDF
Exhibit_18_Pricing_Charts_for_FFP_Task_Orders.pdf PDF
Attachment_K_Contract_Historical_Data.pdf PDF
Show 40 more

Latest 50 of 105 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP# NN16572637R

Proposing Entity:

EXHIBIT 1

PRIME OFFEROR

CORE REQUIREMENTS

SUMMARY OF ESTIMATED COST PLUS FIXED FEE

Base Period Option 1 Option 2 Option 3 Option 4 GRAND

Elements of Cost Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5 TOTAL

TOTAL PRIME PLUS SIGNIFICANT SUBCONTRACTOR

DIRECT LABOR HOURS

TOTAL ESTIMATED COST

MAXIMUM AVAILABLE FIXED FEE (Fixed Fee/Technical Performance Incentive Fee)

TOTAL COST PLUS FIXED FEE

This exhibit contains Source Selection Information. See FAR 3.104.

EXHIBIT 1A

PRIME OFFEROR

SUMMARY OF ESTIMATED COST PLUS FIXED FEE

REPRESENTATIVE TASK ORDER NUMBER

TOTAL PRIME PLUS SIGNIFICANT SUBCONTRACTOR DIRECT

LABOR HOURS

ESTIMATED COST FIXED FEE

TOTAL ESTIMATED COST

PLUS FIXED FEE

TOTAL

REPRESENTATIVE TASK ORDER 1

EXHIBIT 2

PRIME OFFEROR

CORE REQUIREMENTS

ELEMENTS OF COST BY WORK BREAKDOWN STRUCTURE (WBS)

WBS Level _____

Base Period Option 1 Option 2 Option 3 Option 4 GRAND

Elements of Cost Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5 TOTAL

Onsite Direct Labor (DL) Hours:

Total Prime Onsite Direct Labor Hours (Derived from Exhibit 2A )

Significant Subcontractor Onsite DL Hours*: (Derived from Exhibit 2B)

(List total hours separately by company)

Subtotal Significant Subcontractors Onsite Direct Labor Hours

TOTAL PRIME AND SIGNIFICANT SUBCONTRACTORS ONSITE DIRECT

LABOR HOURS

TOTAL PRIME ONSITE DIRECT LABOR COSTS (Derived from Exhibit 2A )

ONSITE OVERHEAD COSTS

Other Direct Costs (ODCs):

Significant Subcontracts (list separately by company)**

Other Subcontracts

Material $876,400 $902,692 $929,773 $957,666 $986,396 $4,652,927

Uniforms $48,900 $50,367 $51,878 $53,434 $55,037 $259,616

Chemical Water Treatment $420,875 $433,502 $446,507 $459,902 $473,699 $2,234,485

Fuel Oil Cleaning $16,406 $16,898 $17,405 $17,927 $18,465 $87,101

Fencing Repairs $21,886 $22,542 $23,218 $23,915 $24,632 $116,193

Travel

Miscellaneous $733,751 $755,763 $778,436 $801,789 $825,843 $3,895,582

Other (Specify)

TOTAL ODCs

SUBTOTAL COSTS

G&A COSTS

TOTAL ESTIMATED COST

TOTAL FIXED FEE PERCENTAGE

MAXIMUM AVAILABLE FIXED FEE AMOUNT (Fixed Fee/TPI Fee)

TOTAL COST PLUS FIXED FEE

*Significant Subcontractor (20% of proposed Core estimated value (Base and all Option Periods)) - Insert Direct Labor Hours Only

**List each significant subcontractor separately by company - Insert Total Costs and Fees/Profits

Offerors may adjust elements of cost to be consistent with your current accounting system.

Miscellaneous ODC’s are defined as facility repairs, replacements and maintenance, crane maintenance, kitchen exhaust cleaning, technical equipment maintenance and plant materials.

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 2A

CORE REQUIREMENTS

DIRECT LABOR HOURS, DIRECT LABOR RATES AND DIRECT LABOR COSTS DETAIL

Contract Year _____ and WBS Level _____

Elements of Cost Labor Type

(E or NE)

Contract

Year 1

Contract

Year 2

Contract

Year 3

Contract

Year 4

Contract

Year 5

TOTAL

ONSITE DIRECT LABOR (DL) HOURS:

(List by Individual DL Category)

TOTAL ONSITE DIRECT LABOR HOURS

ONSITE DIRECT LABOR HOURLY RATES:

(List by Individual DL Category)

ONSITE DIRECT LABOR COSTS:

(List by Individual DL Category)

TOTAL ONSITE DIRECT LABOR COSTS

EXHIBIT 2B

SIGNIFICANT SUBCONTRACTOR

CORE REQUIREMENTS

ELEMENTS OF COST BY WORK BREAKDOWN STRUCTURE (WBS)

WBS Level _____

Base Period Option 1 Option 2 Option 3 Option 4 GRAND

Elements of Cost Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5 TOTAL

TOTAL ONSITE DIRECT LABOR HOURS

TOTAL ONSITE DIRECT LABOR COSTS

ONSITE OVERHEAD COSTS

Other Direct Costs (ODCs):

Other Subcontracts

Material

Travel

Other (Specify)

TOTAL ODCs

SUBTOTAL COST

G&A COSTS

TOTAL ESTIMATED COST

[Sub Specify Type - FEE or PROFIT] PERCENTAGE

[Sub Specify Type - FEE or PROFIT] AMOUNT

TOTAL COST PLUS [Sub Specify Type - FEE or PROFIT]

Offerors may adjust elements of cost to be consistent with your current accounting system.

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 3

SUMMARY OF INDIRECT RATES

Fringe Benefit G&A Expense Other (Identify)**

Rate Overhead Rate Rate Rate

Contract Year 1 - Base Period

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 1 Composite

Contract Year 2 - Option 1

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 2 Composite

Contract Year 3 - Option 2

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 3 Composite

Contract Year 4 - Option 3

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 4 Composite

Contract Year 5 - Option 4

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 5 Composite

BASE OF APPLICATION - INDIRECT RATE APPLIED

AGAINST (Specific Base)***

*Explain Basis of Allocation of Contractor FY Rates to Obtain Contract Year Composite Rates

**If Multiple "Other" Indirect Rates - Add additional columns and specify each individually

***Explanation of Base of Application

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 4

SUMMARY OF RECURRING OTHER DIRECT COSTS (ODCs) / COST ESTIMATING RELATIONSHIPS (CERs)

Specify ODC** Specify ODC** Specify ODC** Specify ODC** Percentage/Rate/Amount*** Percentage/Rate/Amount*** Percentage/Rate/Amount*** Percentage/Rate/Amount***

Contract Year 1 - Base Period

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 1 Composite

Contract Year 2 - Option 1

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 2 Composite

Contract Year 3 - Option 2

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 3 Composite

Contract Year 4 - Option 3

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 4 Composite

Contract Year 5 - Option 4

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 5 Composite

BASE OF APPLICATION - INDIRECT RATE APPLIED

AGAINST (Specific Base)****

*Explain Basis of Allocation of Contractor FY Rates to Obtain Contract Year Composite Rates

**Type/Name of Recurring ODCs or CERs (i.e. Computer Usage, Program Management, Administrative Support, Depreciation, etc.)

***Specify ODC as either a Percentage (%), Rate, and/or Dollar amount ($)

****Explanation of Base of Application

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 5A

OVERHEAD EXPENSE POOL (Composition of Burden Pool)

Overhead or Service Center Pool = _______________

(Specify Type of Overhead Burden, e.g. Labor, Onsite, Engineering, Procurement, Service Center(s), etc. - See Section L - Cost Volume Instructions)

OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.

Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor

Cost Elements within Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year the Overhead Burden Pool Prior Yr 3** Prior Yr 2** Prior Yr 1** _________ _________ _________ _________ _________

Total Overhead Pool Expenses

Base of Distribution (identify) Dollars:

Existing Base

Forecasted Base*

Contractor FY Rate (%)

Conversion of Contractor FY Overhead Rate to Contract Year (CY) Rate CY 1 CY 2 CY 3 CY 4 CY 5

Proposed Overhead Bid Rate by CY

If more than one Overhead Pool is proposed, submit a separate Exhibit for each Pool.

*Provide details of the forecasted base.

**If 8(a) Unpopulated Joint Venture (JV), provide actual expenses for both entities that comprise the JV.

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 5B

GENERAL AND ADMINISTRATIVE (G&A) EXPENSE POOL (Composition of Burden Pool)

OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.

Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor

Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year

Prior Yr 3** Prior Yr 2** Prior Yr 1** _________ _________ _________ _________ _________

Labor:

Labor Related Cost:

B&P

IR&D

Corporate Allocations:

Other (Specify):

Total G&A Pool Expenses

Base of Distribution (identify) Dollars:

Existing Base

Forecasted Base*

Contractor FY Rate (%)

Conversion of Contractor FY G&A Rate to Contract Year (CY) Rate CY 1 CY 2 CY 3 CY 4 CY 5

Proposed G&A Bid Rate by CY

If more than one G&A Pool is proposed, submit a separate Exhibit for each Pool.

*Provide details of the forecasted base.

**If 8(a) Unpopulated Joint Venture (JV), provide actual expenses for both entities that comprise the JV.

Cost Elements Within the G&A Expense Pool

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 6

CORE REQUIREMENTS

OTHER SUBCONTRACTS

CONTRACT

YEAR

WBS(s) SUBCONTRACTOR DESCRIPTION OF EFFORT

TYPE OF

CONTRACT

PRIME

PROPOSED

SUB HOURS

PRIME

PROPOSED

SUB PRICE

TOTAL

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 9

CORE REQUIREMENTS

OTHER DIRECT COSTS

WBS DESCRIPTION CONTRACT YEAR 1 CONTRACT YEAR 2 CONTRACT YEAR 3 CONTRACT YEAR 4 CONTRACT YEAR 5 5 YEAR TOTAL

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 10

PHASE-IN PLAN PRICE

Proposed

Costs

DIRECT LABOR HOURS (Derived from Exhibit 10A )

DIRECT LABOR COST (Derived from Exhibit 10A )

OVERHEAD

OTHER DIRECT COSTS:

Relocation

Training

Subcontracts

Travel

Other (detail)

TOTAL ODCS

SUBTOTAL COSTS

G&A

TOTAL COSTS

PROFIT

TOTAL FIRM FIXED PRICE

Elements of Cost

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 10A

DIRECT LABOR PHASE-IN COSTS

Contract Direct Labor Categories Hours Proposed Rates Proposed Costs

TOTAL PHASE-IN DIRECT LABOR

COSTS

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 11

CORE REQUIREMENTS

SOURCE OF PERSONNEL CHART

(FIRST CONTRACT YEAR ONLY)

Total Number of Staff Labor Category/Position Title

Labor

Category

Code*

Personnel Available

Within Company

Personnel to be

Obtained from

Incumbent

Outside Hired Staff

TOTAL

*Code each Labor Cateogry: S=SALARIED; H=HOURLY; U=UNION; E=EXEMPT; NE=NON-EXEMPT DOL/WD DETERMINATION;

I=INCUMBENT; SU=SUBCONTRACTOR

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 12

PRODUCTIVE WORK YEAR CALCULATION

Base Period Option 1 Option 2 Option 3 Option 4

CY 1 CY 2 CY 3 CY 4 CY 5

Total Possible Hours in Year

Less:

Vacation in Hours

Holidays in Hours

Sick Leave in Hours

Miscellaneous in Hours

(specifically identify)

This exhibit contains Source Selection Information. See FAR 3.104.

PRODUCTIVE WORK YEAR in Hours

(Hours Actually Worked)

[ ] Prime Offeror OR [ ] Significant Subcontractor OR [ ] Non-Significant Subcontractor

EXHIBIT 13A

FRINGE BENEFITS (FB)

(Total Compensation Plan)

Exempt Employees

Company Or Division Name:

Employer Location(s):

Effective:

Insurance Plans

Health

Life

Dental

Disability

Other (List)

Sick Leave

Employee Savings

Severance Pay

Vacation

Holidays

Other (List)

Total Cost of FB

This exhibit contains Source Selection Information. See FAR 3.104.

NOTE: This is a SAMPLE format only and reflects examples of fringe benefit items your company package may include. All costs should be shown in cents-per-hour (9 Holidays = $.185). It is recognized that such costs will be averages for the different employee categories involved (EXEMPT, UNION, etc.). Each benefit item should be briefly highlighted. EXAMPLE: Vacation – “2 weeks after one year, 3 after seven years, and 4 after fifteen years.” Only company costs should be shown, if a specific benefit item is contributory by the employee, explain separately.

RemarksBenefit Item

Percentage AND Cost Per Hour of

Employee Contribution

Percentage AND Cost Per Hour of

Company Contribution Total Cost of FB per Hour

[ ] Prime Offeror OR [ ] Significant Subcontractor OR [ ] Non-Significant Subcontractor

EXHIBIT 13B

FRINGE BENEFITS (FB)

(Total Compensation Plan)

Non-Exempt Employees

Company Or Division Name:

Employer Location(s):

Effective:

Insurance Plans

Health

Life

Dental

Disability

Other (List)

Sick Leave

Employee Savings

Severance Pay

Vacation

Holidays

Other (List)

Total Cost of FB

This exhibit contains Source Selection Information. See FAR 3.104.

NOTE: This is a SAMPLE format only and reflects examples of fringe benefit items your company package may include. All costs should be shown in cents-per-hour (9 Holidays = $.185). It is recognized that such costs will be averages for the different employee categories involved (EXEMPT, UNION, etc.). Each benefit item should be briefly highlighted. EXAMPLE: Vacation – “2 weeks after one year, 3 after seven years, and 4 after fifteen years.” Only company costs should be shown, if a specific benefit item is contributory by the employee, explain separately.

Total Cost of FB per Hour RemarksBenefit Item

Percentage AND Cost Per Hour of

Employee Contribution

Percentage AND Cost Per Hour of

Company Contribution

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 14A

Cognizant Defense Contract Audit Agency (DCAA) Office Information

DCAA Online Info http://www.dcaa.mil

Company Name: DCAA FAO:

POC: POC:

Phone Number: Phone Number:

FAX Number: FAX Number:

E-Mail Address: E-Mail Address:

Street: Street:

P.O.Box: P.O.Box:

City: City:

State: State:

Zip Code: Zip Code:

Note: The submitting entity audit point of contact (POC) and address provided above must be at a location where auditable records supporting the proposed amounts physically reside.

This exhibit contains Source Selection Information. See FAR 3.104.

DCAA Field Audit Office (FAO):Submitting Entity:

http://www.dcaa.mil/

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 14B

Cognizant Defense Contract Management Agency (DCMA) Office Information

DCMA Online Info http://www.dcma.mil

Company Name: DCMA Office

POC: POC:

Phone Number: Phone Number:

FAX Number: FAX Number:

E-Mail Address: E-Mail Address:

Street: Street:

P.O.Box: P.O.Box:

City: City:

State: State:

Zip Code: Zip Code:

Disclosures: Date Status

Contractor Estimating System Review (CESR)

Contractor Purchasing System Review (CPSR)

Contractor Billing System Review

Contractor Accounting System Review

Contractor Disclosure Statement Accuracy

Contractor Executive Compensation Review

Contractor Property Management System

Forward Pricing Rate Agreements

Earned Value Management System (EVMS)

Level of CAS applicability

Determination of Cost Accounting Standards (CAS) applicability

Note: The submitting entity audit point of contact (POC) and address provided above must be at a location where auditable records supporting the proposed amounts physically reside.

This exhibit contains Source Selection Information. See FAR 3.104.

Audit Report #

Submitting Entity: DCMA Cognizant Office:

http://www.dcma.mil/

Elements of Cost Month*** Month Month Month Month Month Month Month Month Month Month Month TOTAL

Onsite Direct Labor (DL) Hours:

Total Prime Onsite Direct Labor Hours (Derived from

Exhibit 15A )

Significant Subcontractor Onsite DL Hours*:

(List total hours separately by company)

Subtotal Significant Subcontractors Onsite Direct Labor Hours

TOTAL PRIME AND SIGNIFICANT SUBCONTRACTORS

DIRECT LABOR HOURS

TOTAL PRIME ONSITE DIRECT LABOR COSTS (Derived from Exhibit 15A )

ONSITE OVERHEAD COSTS

Other Direct Costs (ODCs):

Significant Subcontracts (list separately by company)**

Other Subcontracts

Material

Travel

Other (Specify)

TOTAL ODCs

SUBTOTAL COSTS

G&A COSTS

TOTAL ESTIMATED COST

FIXED FEE PERCENTAGE

FIXED FEE AMOUNT

TOTAL COST PLUS FIXED FEE

*Significant Subcontractor - Insert Direct Labor Hours Only

**List each significant subcontractor separately by company - Insert Total Cost and Fees

***Adjust the number of month columns to match RTO period of performance

Offerors may adjust elements of cost to be consistent with your current accounting system.

This exhibit contains Source Selection Information. See FAR 3.104.

EXHIBIT 15

PRIME OFFEROR

REPRESENTATIVE TASK ORDER (RTO) ELEMENTS OF COST SUMMARY

RTO No. _____, CY ______, WBS Level _____

Elements of Cost Labor Type

(E or NE) Month* Month Month Month Month Month Month Month Month Month Month Month TOTAL

ONSITE DIRECT LABOR (DL) HOURS:

(List by Individual DL Category)

TOTAL ONSITE DIRECT LABOR HOURS

ONSITE DIRECT LABOR HOURLY RATES:**

(List by Individual DL Category)

ONSITE DIRECT LABOR COSTS:

(List by Individual DL Category)

TOTAL ONSITE DIRECT LABOR COSTS

*Adjust the number of month columns to match RTO period of performance

**Rates must match the DL Hourly Rates included in the Contract Attachment entitled, "IDIQ Direct Labor Rates, Indirect Rates, and Fee Matrices."

This exhibit contains Source Selection Information. See FAR 3.104.

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 15A

DIRECT LABOR HOURS, DIRECT LABOR RATES AND DIRECT LABOR COSTS DETAIL

RTO No. _____, CY _____, and WBS Level _____

Elements of Cost Month* Month Month Month Month Month Month Month Month Month Month Month TOTAL

TOTAL ONSITE DIRECT LABOR HOURS (Derived from

Exhibit 15A )

TOTAL ONSITE DIRECT LABOR COSTS (Derived from

Exhibit 15A )

ONSITE OVERHEAD COSTS

Other Direct Costs (ODCs):

Other Subcontracts

Material

Travel

Other (Specify)

TOTAL ODCs

SUBTOTAL COSTS

G&A COSTS

TOTAL ESTIMATED COST

[Sub Specify Type - FEE or PROFIT] PERCENTAGE

[Sub Specify Type - FEE or PROFIT] AMOUNT

TOTAL COST PLUS [Sub Specify Type - FEE or PROFIT]

*Adjust the number of month columns to match RTO period of performance

Offerors may adjust elements of cost to be consistent with your current accounting system.

This exhibit contains Source Selection Information. See FAR 3.104.

EXHIBIT 15B

SIGNIFICANT SUBCONTRACTOR

REPRESENTATIVE TASK ORDER (RTO) SUMMARY

RTO No. _____, CY _____, and WBS Level _____

RTO NO. WBS(s) SUBCONTRACTOR DESCRIPTION OF EFFORT

TYPE OF

CONTRACT

PRIME

PROPOSED

SUB HOURS

PRIME

PROPOSED

SUB PRICE

TOTAL

This exhibit contains Source Selection Information. See FAR 3.104.

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 15C

OTHER SUBCONTRACTS

CY WBS NOMENCLATURE PART NUMBER

QUANTITY

REQUIRED

UNIT PRICE TOTAL PRICE

TOTAL

This exhibit contains Source Selection Information. See FAR 3.104.

RFP# NN16572637R

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 15D

MATERIAL BY RTO

RTO No. ____

CY WBS DESCRIPTION

QUANTITY

REQUIRED

UNIT PRICE TOTAL PRICE

TOTAL

This exhibit contains Source Selection Information. See FAR 3.104.

RFP# NN16572637R

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 15F

OTHER DIRECT COSTS (ODC) BY RTO

RTO No. _____

File details come from the government source that posted it. Updated .