Attachment_Q_Roofing_Bid_Schedule_-_Clean.pdf

PDF 98 KB Posted

Attached to
Facilities Operations and Maintenance Services Federal contract opportunity
Solicitation number
NNG16572637R-1
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

Attachment Q Roofing Bid Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Facilities Operations and Maintenance Services, newest first.
File Type Posted
Set_5_Questions_and_Answers_FOMS_III.pdf PDF
Set_4_Questions_and_Answers_FOMS_III_(2).pdf PDF
FOMS_III_SOW_rev_2-16-17.pdf PDF
SF30_Amendment_4.pdf PDF
Revised_SECTION_K.pdf PDF
Appendix_8_-_Asset_Condition_Code.pdf PDF
Set_3_Questions_and_Answers_FOMS_III.pdf PDF
Amendment_2_NNG16572637R.pdf PDF
SF30.pdf PDF
Appendix_5_-_Installation_Accountable_Government_Materials.pdf PDF
Cover_Letter_FOMS_III_RFP.pdf PDF
Appendix_7_-_Chemical_Treatment.pdf PDF
Attachment_D_DD_254_Pg_3_Continuation.pdf PDF
Attachment_G_Quality_Control_Plan.pdf PDF
Attachment_O_Wage_Determination.pdf PDF
Attachment_L_Safety_and_Health_Plan.pdf PDF
NNG16572637R_RFP.pdf PDF
Attachment_E_PIV.pdf PDF
Attachment_I_IT_Security_Management_Plan.pdf PDF
Appendix_2_-_Acronyms.pdf PDF
Attachment_P_Wage_Determination.pdf PDF
Attachment_N_Collective_Bargaining_Agreement.pdf PDF
Attachment_Q_Concrete_Paving_and_Traffic_Control_Bid_Schedule_-_Clean.pdf PDF
Enclosure_1_QASP_Cost-Type_Contract.pdf PDF
Appendix_6_-_Installation_Accountable_Government_Property.pdf PDF
Attachment_Q_Asbestos_bid_Schedule_-_Clean.pdf PDF
Attachment_K_Contract_Historical_Data.pdf PDF
SF33.pdf PDF
FOMS_III_Site_Visit_Attendees.pdf PDF
Appendix_7_-_Chemical_Treatment.pdf PDF
Appendix_8_-_Listing_of_Asset_Quantities_and_PM_Requirements.pdf PDF
Appendix_1_-_Appendix_and_Attachment_List.pdf PDF
Appendix_4_-_Installation_Provided_Government_Facilities_Summary.pdf PDF
Attachment_E_PIV.pdf PDF
Attachment_D_DD254_Form.pdf PDF
Enclosure_3_RTOs.pdf PDF
Exhibit_18_Pricing_Charts.pdf PDF
Attachment_Q_Roofing_Bid_Schedule.pdf PDF
Attachment_C_Installation_Accountable_Government_Property.pdf PDF
Attachment_P_Wage_Determination.pdf PDF
Enclosure_2_IT_Security_Management_Plan.pdf PDF
Attachment_L_Safety_and_Health_Plan.pdf PDF
Attachment_F_-_FOMS_III_Tech_Performance_Incentive_Fee_Plan.pdf PDF
Attachment_Q_Concrete_Paving_and_Traffic_Control_Bid_Schedule.pdf PDF
Attachment_F_TPIF.pdf PDF
NNG16572637R_FOMS_III_DRFP.pdf PDF
Exhibits_1-16_FOMS_III_Cost.pdf PDF
Attachment_M_FINANCIAL_REPORTING_533.pdf PDF
Attachment_J_OCI_Avoidance.pdf PDF
Amendment_5_SF30.pdf PDF
Show all 50

Facilities Operations and Maintenance Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOMS III

Roofing Bid Schedule

(inclusive of all cost including fee)

Attachment Q

Description Unit Price Unit Price Unit Price Unit Price Unit Price

Unit Contract

Year 1

Contract

Year 2

Contract

Year 3

Contract

Year 4

Contract

Year 5

1 Sheet metal work, aluminum, other than gutters and downspouts. SF

2 Sheet metal work, aluminum gutters, including accessories. SF

3 Sheet metal work, aluminum downspouts, including accessories. SF

4 5-inch OG aluminum gutters. LF

5 3-inch X 4-inch rectangular aluminum downspout. LF

Gutter hanger or bracket, downspout strap, end cap or slip joint connector.

EA

7 Elbow (any size) or miter or drop outlet section in gutter. EA

Membrane base flashing consisting of modified bitumen membrane SF

Tear off and remove existing asphalt shingle roofing system.

Remaining surface cleaned and prepared for reroofing.

SQ

Apply prime coating, asphaltic emulsion topping, and EPA

Energy Star certified aluminum reflective coating over asphaltic built-up roofs or modified bitumen roof membranes.

SQ

Apply primer and base coats and EPA Energy Star certified acrylic or equal Elastomeric top coating over asphaltic built-up, modified bitumen, or CSPE roof membranes. Includes any necessary roof preparation and cleaning.

SQ

Add modified SBS mineral surface inorganic cap sheet fully adhered with torch welding over built-up roof membrane.

Includes any necessary roof preparation and cleaning.

SQ

13 Perform infrared inspection of roof. SQ

Provide and install walking pads on Built-Up or Modified

Bituminous roofs

SF

Furnish and install asphalt shingle roofing system on bare roof deck with roof slopes between 4:12 and 8:12. Shingle exposure per manufacturer's instructions and single ply of No. 15 felt.

(Add CLIN 002-66 for tearoff)

SQ

Furnish and install single ply reinforced modified bitumen

Membrane roofing system over concrete deck. (R30 Insulation)

SQ

Furnish and install single ply reinforced modified bitumen

Membrane roofing system over steel deck. (R30 Insulation)

SQ

Heat apply 18-inch wide (minimum) strip of single ply modified bitumen membrane over split, tear, or break in existing mod bit single ply membrane or built up roof membrane. Includes preparation of existing surface and finishing new surface to match existing roof field. Includes tear-off and disposal of affected existing roofing.

SF

Replace localized deteriorated or damaged single ply modified

Bitumen membrane or BUR membrane with new mod bit heat applied Membrane and mod bit base flashing as needed. Includes preparation of existing surface and finishing new surface to match existing roof field. Includes tear-off and disposal of affected existing roofing.

SF

File details come from the government source that posted it. Updated .