Attachment Q Asbestos Bid Schedule
View the file
Other files for this federal contract opportunity
Show all 50
Facilities Operations and Maintenance Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOMS III
Asbestos Abatement Bid Schedule
(inclusive of all cost including fee)
Attachment Q
Units Unit Price Unit Price Unit Price Unit Price Unit Price
Contract
Year 1
Contract
Year 2
Contract
Year 3
Contract
Year 4
Contract
Year 5
PREPARATION
1 Furnish all labor and materials to fabricate and install a THREE-STAGE decontamination facility in accordance with federal requirements.
EA
2 Furnish all labor and materials to fabricate and install a TWO-STAGE (no shower) decontamination facility in accordance with current federal requirements.
EA
3 Furnish all labor and materials to construct a temporary partition. The partition must be at least seven feet in height and constructed of plywood, sheetrock or similar material. This line item includes dismantling of the partition at the completion of all work.
sf
4 Install 6-mil thick polyethylene sheeting for use in constructing containment, covering items, as a drop cloth, etc. This line item includes encapsulation, dismantling and disposal.
sf
5 REMOVE asbestos-contaminated debris from floor. Includes HEPA vacuum and wet wipe.
sf
6 REMOVE asbestos-containing or asbestos-contaminated suspended acoustical lay-in ceiling tile, including suspension system and accessories.
6a Height up to 12’ sf
6b Height above 12’ sf
7 REMOVE asbestos-containing materials from planar surfaces (ceiling and walls) down to bare substrate.
sf
8 REMOVE layer of VAT Friable ACM floor tiles.
8a Up to 1000 SF sf
8b over 1000 SF sf
9 REMOVE layer of VAT Non Friable ACM floor tiles.
9a Up to 1000 SF sf
9b over 1000 SF sf
10 REMOVE layer of VAT Non Friable ACM floor tiles, with carpet tiles attached.
sf
Item Description
(inclusive of all cost including fee)
Attachment Q
11 Remove asbestos-containing mastic from floor, wall or ceiling
11a Up to 1000 SF sf
11b Over 1000 SF sf
12 Cut access holes in ACMs walls or ceilings to include gaining access to ACMs sf
13 REMOVE existing wood or metal stud drywall partitions where the partition abuts asbestos-containing material. This includes the removal of doors, door frames, electrical outlets, clocks, and switches, and all wiring back to the next junction box or outlet box. Return all doors, frames and hardware to the government.
sf
14 REMOVE horizontal or vertical pipe enclosure covers to gain access to asbestos-containing pipe insulation material. These covers are typically single sheeted, three-sided sheet metal, and are screwed together.
sf
15 ENCAPSULATE ACM on ductwork, including all hangers or other type of fasteners. Encapsulation is to be accomplished via an airless sprayer and an
EPA-approved lockdown encapsulant. Diameters listed below include insulation.
sf
16 REMOVE ACM from ductwork, fan enclosures, or similar equipment. sf
17 ENCAPSULATE asbestos-containing material on piping. Encapsulation is to be accomplished using lagging material and EPA-approved bridging mastic.
17a Less than 2 inch lf
17b 2 inch - 6 inches lf
17c 7 inch to 12 inches lf
17d 14 inch to 20 inches lf
18 REMOVE and DISPOSE of Asbestos Insulation from Piping and Hangers.
18a Less than 2 inch lf
18b 2 inch - 6 inches lf
18c 7 inch - 12 inches lf
18d 14 inch to 20 inches lf
19 REMOVE asbestos-containing materials from tanks, boilers, breaching, heat exchangers and related equipment. Encapsulate utilizing bridging encapsulant or lagging.
sf
20 Remove ACM from pipe or valves using GLOVEBAGS EA
(inclusive of all cost including fee)
Attachment Q
21 APPLY wet-wrap, material to exposed asbestos edges, whole edges or damaged asbestos-containing materials.
sf
22 DECONTAMINATE horizontal and vertical surfaces by HEPA-vacuuming, wet-wiping and encapsulating surface with an EPA approved lock-down encapsulant and an airless sprayer. This line item is intended for surfaces within full containments where there are not substantial visible quantities of debris on the surfaces.
22a Surfaces up to 10 feet in height sf
22b Surfaces greater than 10 feet. in height sf
23 Provide an industrial hygienist to conduct asbestos abatement oversight and air monitoring services to conform to all applicable OSHA and EPA regulations and to sign asbestos oversight and air monertering reports.
hr
24 Conduct on-site asbestos air sample analysis in accordance with NIOSH
Method 7400 Phase Contrast Microscopy.
EA