Attachment_Q_Asbestos_bid_Schedule_-_Clean.pdf

PDF 174 KB Posted

Attached to
Facilities Operations and Maintenance Services Federal contract opportunity
Solicitation number
NNG16572637R-1
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

Attachment Q Asbestos Bid Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Facilities Operations and Maintenance Services, newest first.
File Type Posted
Signed_SSA_Letter.pdf PDF
Amendment_5_SF30.pdf PDF
Revised_SECTION_K.pdf PDF
Appendix_8_-_Asset_Condition_Code.pdf PDF
Appendix_8_-_All_Assets.pdf PDF
Exhibits_1-16_FOMS_III_Cost_Exhibits.pdf PDF
Appendix_8_-_Table_of_Contents.pdf PDF
Appendix_8_-_GOMAR_ACRONYM_LIST.pdf PDF
Amendment_2_NNG16572637R.pdf PDF
Set_2_Questions_and_Answers_for_NNG16572637R_FOMS_III.pdf PDF
SF30.pdf PDF
Attachment_P_Wage_Determination.pdf PDF
Attachment_N_Collective_Bargaining_Agreement.pdf PDF
Attachment_Q_Concrete_Paving_and_Traffic_Control_Bid_Schedule_-_Clean.pdf PDF
Enclosure_1_QASP_Cost-Type_Contract.pdf PDF
Appendix_6_-_Installation_Accountable_Government_Property.pdf PDF
Attachment_K_Contract_Historical_Data.pdf PDF
SF33.pdf PDF
Attachment_Q_Roofing_Bid_Schedule_-_Clean.pdf PDF
Attachment_C_Installation_Accountable_Govt_Prop.pdf PDF
Attachment_B_IDIQ_Cost_and_Fixed_Price_Rate_Matrix--Hybrid_Core-IDIQ.pdf PDF
Appendix_8_-_Listing_of_Asset_Quantities_and_PM_Requirements.pdf PDF
Enclosure_3_RTOs.pdf PDF
Appendix_1_-_Appendix_and_Attachment_List.pdf PDF
Exhibit_18_Pricing_Charts_for_FFP_Task_Orders.pdf PDF
Attachment_M_FINANCIAL_REPORTING_533_Attach_Core_and_IDIQ.pdf PDF
Appendix_9_-_FOMS_Specifications.pdf PDF
Enclosure_2_IT_Security_Management_Plan.pdf PDF
Attachment_D_DD254_Cover_Page.pdf PDF
Attachment_Q_Painting_and_Caulking_Bid_Schedule_-_Clean.pdf PDF
FOMS_III_Site_Visit_Attendees.pdf PDF
Appendix_4_-_Installation_Provided_Government_Facilities_Summary.pdf PDF
Appendix_2_-_Acronyms.pdf PDF
Appendix_9_-_FOMS_Specifications.pdf PDF
Enclosure_2_IT_Security_Management_Plan.pdf PDF
Attachment_L_Safety_and_Health_Plan.pdf PDF
Attachment_F_-_FOMS_III_Tech_Performance_Incentive_Fee_Plan.pdf PDF
Attachment_Q_Concrete_Paving_and_Traffic_Control_Bid_Schedule.pdf PDF
Attachment_F_TPIF.pdf PDF
NNG16572637R_FOMS_III_DRFP.pdf PDF
Exhibits_1-16_FOMS_III_Cost.pdf PDF
Attachment_M_FINANCIAL_REPORTING_533.pdf PDF
Attachment_Q_Asbestos_Bid_Schedule.pdf PDF
Attachment_G_Quality_Control_Plan.pdf PDF
Attachment_B_IDIQ_Cost_and_Fixed_Price_Rate_Matrix.pdf PDF
FOMS_III_DRFP_Cover_Letter_and_Reg._Form.pdf PDF
SF33.pdf PDF
Attachment_Q_Painting_and_Caulking_Bid_Schedule.pdf PDF
Attachment_D_DD254.pdf PDF
Amendment_5_SF30.pdf PDF
Show all 50

Facilities Operations and Maintenance Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOMS III

Asbestos Abatement Bid Schedule

(inclusive of all cost including fee)

Attachment Q

Units Unit Price Unit Price Unit Price Unit Price Unit Price

Contract

Year 1

Contract

Year 2

Contract

Year 3

Contract

Year 4

Contract

Year 5

PREPARATION

1 Furnish all labor and materials to fabricate and install a THREE-STAGE decontamination facility in accordance with federal requirements.

EA

2 Furnish all labor and materials to fabricate and install a TWO-STAGE (no shower) decontamination facility in accordance with current federal requirements.

EA

3 Furnish all labor and materials to construct a temporary partition. The partition must be at least seven feet in height and constructed of plywood, sheetrock or similar material. This line item includes dismantling of the partition at the completion of all work.

sf

4 Install 6-mil thick polyethylene sheeting for use in constructing containment, covering items, as a drop cloth, etc. This line item includes encapsulation, dismantling and disposal.

sf

5 REMOVE asbestos-contaminated debris from floor. Includes HEPA vacuum and wet wipe.

sf

6 REMOVE asbestos-containing or asbestos-contaminated suspended acoustical lay-in ceiling tile, including suspension system and accessories.

6a Height up to 12’ sf

6b Height above 12’ sf

7 REMOVE asbestos-containing materials from planar surfaces (ceiling and walls) down to bare substrate.

sf

8 REMOVE layer of VAT Friable ACM floor tiles.

8a Up to 1000 SF sf

8b over 1000 SF sf

9 REMOVE layer of VAT Non Friable ACM floor tiles.

9a Up to 1000 SF sf

9b over 1000 SF sf

10 REMOVE layer of VAT Non Friable ACM floor tiles, with carpet tiles attached.

sf

Item Description

(inclusive of all cost including fee)

Attachment Q

11 Remove asbestos-containing mastic from floor, wall or ceiling

11a Up to 1000 SF sf

11b Over 1000 SF sf

12 Cut access holes in ACMs walls or ceilings to include gaining access to ACMs sf

13 REMOVE existing wood or metal stud drywall partitions where the partition abuts asbestos-containing material. This includes the removal of doors, door frames, electrical outlets, clocks, and switches, and all wiring back to the next junction box or outlet box. Return all doors, frames and hardware to the government.

sf

14 REMOVE horizontal or vertical pipe enclosure covers to gain access to asbestos-containing pipe insulation material. These covers are typically single sheeted, three-sided sheet metal, and are screwed together.

sf

15 ENCAPSULATE ACM on ductwork, including all hangers or other type of fasteners. Encapsulation is to be accomplished via an airless sprayer and an

EPA-approved lockdown encapsulant. Diameters listed below include insulation.

sf

16 REMOVE ACM from ductwork, fan enclosures, or similar equipment. sf

17 ENCAPSULATE asbestos-containing material on piping. Encapsulation is to be accomplished using lagging material and EPA-approved bridging mastic.

17a Less than 2 inch lf

17b 2 inch - 6 inches lf

17c 7 inch to 12 inches lf

17d 14 inch to 20 inches lf

18 REMOVE and DISPOSE of Asbestos Insulation from Piping and Hangers.

18a Less than 2 inch lf

18b 2 inch - 6 inches lf

18c 7 inch - 12 inches lf

18d 14 inch to 20 inches lf

19 REMOVE asbestos-containing materials from tanks, boilers, breaching, heat exchangers and related equipment. Encapsulate utilizing bridging encapsulant or lagging.

sf

20 Remove ACM from pipe or valves using GLOVEBAGS EA

(inclusive of all cost including fee)

Attachment Q

21 APPLY wet-wrap, material to exposed asbestos edges, whole edges or damaged asbestos-containing materials.

sf

22 DECONTAMINATE horizontal and vertical surfaces by HEPA-vacuuming, wet-wiping and encapsulating surface with an EPA approved lock-down encapsulant and an airless sprayer. This line item is intended for surfaces within full containments where there are not substantial visible quantities of debris on the surfaces.

22a Surfaces up to 10 feet in height sf

22b Surfaces greater than 10 feet. in height sf

23 Provide an industrial hygienist to conduct asbestos abatement oversight and air monitoring services to conform to all applicable OSHA and EPA regulations and to sign asbestos oversight and air monertering reports.

hr

24 Conduct on-site asbestos air sample analysis in accordance with NIOSH

Method 7400 Phase Contrast Microscopy.

EA