AMEND I Price Quote Spreadsheet.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- HVAC MAINTENANCE SERVICES Federal contract opportunity
- Solicitation number
- N6945021Q0012
About this file
This document contains a price quote spreadsheet and description of work for an HVAC maintenance services contract opportunity with the Department of the Navy Naval Facilities Engineering Command. The contractor shall provide labor, management, tools, material and equipment to perform HVAC maintenance, repairs and alterations for critical facilities at Naval Air Station Jacksonville, Florida, including boilers but excluding central utility plant boilers. The price quote spreadsheet includes multiple contract line item numbers for recurring HVAC maintenance over five option years, with pricing to be reduced by half for the final option year exercised under FAR 52.217-8. One non-recurring repair item is identified for variable frequency drive replacement for Building 515 HVAC equipment.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN
| Annex/Spec Item | Description | Labor Category | Direct Labor Hours | Direct FTEs | Direct Labor Cost | Direct Material/Equipment Cost | Overhead | G&A | Profit | Total Price |
| 1502000 | HVAC Maintenance Services | |||||||||
| 3.0 | Building 512 Technician | |||||||||
| 3.3.1 | Integrated Maintenance Program | |||||||||
| 3.3.2 | Boiler Systems | |||||||||
| 3.3.2.1 | Boiler Systems Maintenance | |||||||||
| 3.3.3.1 | HVAC Refrigeration Systems Maintenance | |||||||||
| 3.3.3.2 | HVAC Water Testing and Treatment Services | |||||||||
| 3.3.3.3 | Condenser Tube Inspection | |||||||||
| 3.4 | Inspection, Testing and Certification Program | |||||||||
| 3.4.1 | Boilers | |||||||||
| CLIN 0001 TOTAL |
Contractor shall perform HVAC services over and above work requirements under this CLIN, in accordance with DFARS 252.217-7028 and Section C 0200000 Spec Item 2.14.1 and 2.15.1. Contractor shall not invoice for over and above work or non-recurring requirements under this CLIN until occurance of over and above work is approved by KO and inspected by COR. The same labor categories and labor rates proposed for CLIN 0001 shall be used for over and above work. Material and Equipment MUST BE NEGOTIATED BY KO.
| CLIN 1001 | ||||||||||
| Annex/Spec Item | Description | Labor Category | Direct Labor Hours | Direct FTEs | Direct Labor Cost | Direct Material/Equipment Cost | Overhead | G&A | Profit | Total Price |
| 1502000 | HVAC Maintenance Services | |||||||||
| 3.0 | Building 512 Technician | |||||||||
| 3.3.1 | Integrated Maintenance Program | |||||||||
| 3.3.2 | Boiler Systems | |||||||||
| 3.3.2.1 | Boiler Systems Maintenance | |||||||||
| 3.3.3.1 | HVAC Refrigeration Systems Maintenance | |||||||||
| 3.3.3.2 | HVAC Water Testing and Treatment Services | |||||||||
| 3.3.3.3 | Condenser Tube Inspection | |||||||||
| 3.4 | Inspection, Testing and Certification Program | |||||||||
| 3.4.1 | Boilers | |||||||||
| CLIN 1001 TOTAL |
| Contractor shall perform HVAC services over and above work requirements under this CLIN, in accordance with DFARS 252.217-7028 and Section C 0200000 Spec Item 2.14.1 and 2.15.1. Contractor shall not invoice for over and above work or non-recurring requirements under this CLIN until occurance of over and above work is approved by KO and inspected by COR. The same labor categories and labor rates proposed for CLIN 1001 shall be used for over and above work. Material and Equipment MUST BE NEGOTIATED BY KO. | ||||||||||
| CLIN 2001 | ||||||||||
| Annex/Spec Item | Description | Labor Category | Direct Labor Hours | Direct FTEs | Direct Labor Cost | Direct Material/Equipment Cost | Overhead | G&A | Profit | Total Price |
| 1502000 | HVAC Maintenance Services | |||||||||
| 3.0 | Building 512 Technician | |||||||||
| 3.3.1 | Integrated Maintenance Program | |||||||||
| 3.3.2 | Boiler Systems | |||||||||
| 3.3.2.1 | Boiler Systems Maintenance | |||||||||
| 3.3.3.1 | HVAC Refrigeration Systems Maintenance | |||||||||
| 3.3.3.2 | HVAC Water Testing and Treatment Services | |||||||||
| 3.3.3.3 | Condenser Tube Inspection | |||||||||
| 3.4 | Inspection, Testing and Certification Program | |||||||||
| 3.4.1 | Boilers | |||||||||
| CLIN 2001 TOTAL |
| Contractor shall perform HVAC services over and above work requirements under this CLIN, in accordance with DFARS 252.217-7028 and Section C 0200000 Spec Item 2.14.1 and 2.15.1. Contractor shall not invoice for over and above work or non-recurring requirements under this CLIN until occurance of over and above work is approved by KO and inspected by COR. The same labor categories and labor rates proposed for CLIN 2001 shall be used for over and above work. Material and Equipment MUST BE NEGOTIATED BY KO. | ||||||||||
| CLIN 3001 | ||||||||||
| Annex/Spec Item | Description | Labor Category | Direct Labor Hours | Direct FTEs | Direct Labor Cost | Direct Material/Equipment Cost | Overhead | G&A | Profit | Total Price |
| 1502000 | HVAC Maintenance Services | |||||||||
| 3.0 | Building 512 Technician | |||||||||
| 3.3.1 | Integrated Maintenance Program | |||||||||
| 3.3.2 | Boiler Systems | |||||||||
| 3.3.2.1 | Boiler Systems Maintenance | |||||||||
| 3.3.3.1 | HVAC Refrigeration Systems Maintenance | |||||||||
| 3.3.3.2 | HVAC Water Testing and Treatment Services | |||||||||
| 3.3.3.3 | Condenser Tube Inspection | |||||||||
| 3.4 | Inspection, Testing and Certification Program | |||||||||
| 3.4.1 | Boilers | |||||||||
| CLIN 3001 TOTAL |
| Contractor shall perform HVAC services over and above work requirements under this CLIN, in accordance with DFARS 252.217-7028 and Section C 0200000 Spec Item 2.14.1 and 2.15.1. Contractor shall not invoice for over and above work or non-recurring requirements under this CLIN until occurance of over and above work is approved by KO and inspected by COR. The same labor categories and labor rates proposed for CLIN 3001 shall be used for over and above work. Material and Equipment MUST BE NEGOTIATED BY KO. | ||||||||||
| CLIN 4001 | ||||||||||
| Annex/Spec Item | Description | Labor Category | Direct Labor Hours | Direct FTEs | Direct Labor Cost | Direct Material/Equipment Cost | Overhead | G&A | Profit | Total Price |
| 1502000 | HVAC Maintenance Services | |||||||||
| 3.0 | Building 512 Technician | |||||||||
| 3.3.1 | Integrated Maintenance Program | |||||||||
| 3.3.2 | Boiler Systems | |||||||||
| 3.3.2.1 | Boiler Systems Maintenance | |||||||||
| 3.3.3.1 | HVAC Refrigeration Systems Maintenance | |||||||||
| 3.3.3.2 | HVAC Water Testing and Treatment Services | |||||||||
| 3.3.3.3 | Condenser Tube Inspection | |||||||||
| 3.4 | Inspection, Testing and Certification Program | |||||||||
| 3.4.1 | Boilers | |||||||||
| CLIN 4001 TOTAL |
| Contractor shall perform HVAC services over and above work requirements under this CLIN, in accordance with DFARS 252.217-7028 and Section C 0200000 Spec Item 2.14.1 and 2.15.1. Contractor shall not invoice for over and above work or non-recurring requirements under this CLIN until occurance of over and above work is approved by KO and inspected by COR. The same labor categories and labor rates proposed for CLIN 4001 shall be used for over and above work. Material and Equipment MUST BE NEGOTIATED BY KO. | ||||||||||
| CLIN 5001 | ||||||||||
| Annex/Spec Item | Description | Labor Category | Direct Labor Hours | Direct FTEs | Direct Labor Cost | Direct Material/Equipment Cost | Overhead | G&A | Profit | Total Price |
| 1502000 | HVAC Maintenance Services | |||||||||
| 3.0 | Building 512 Technician | |||||||||
| 3.3.1 | Integrated Maintenance Program | |||||||||
| 3.3.2 | Boiler Systems | |||||||||
| 3.3.2.1 | Boiler Systems Maintenance | |||||||||
| 3.3.3.1 | HVAC Refrigeration Systems Maintenance | |||||||||
| 3.3.3.2 | HVAC Water Testing and Treatment Services | |||||||||
| 3.3.3.3 | Condenser Tube Inspection | |||||||||
| 3.4 | Inspection, Testing and Certification Program | |||||||||
| 3.4.1 | Boilers | |||||||||
| CLIN 5001 TOTAL |
| Contractor shall perform HVAC services over and above work requirements under this CLIN, in accordance with DFARS 252.217-7028 and Section C 0200000 Spec Item 2.14.1 and 2.15.1. Contractor shall not invoice for over and above work or non-recurring requirements under this CLIN until occurance of over and above work is approved by KO and inspected by COR. The same labor categories and labor rates proposed for CLIN 5001 shall be used for over and above work. Material and Equipment MUST BE NEGOTIATED BY KO. | ||||||||||
| CLIN 6001 | ||||||||||
| Annex/Spec Item | Description | Labor Category | Direct Labor Hours | Direct FTEs | Direct Labor Cost | Direct Material/Equipment Cost | Overhead | G&A | Profit | Total Price |
| 1502000 | HVAC Maintenance Services | |||||||||
| 3.0 | Building 512 Technician | |||||||||
| 3.3.1 | Integrated Maintenance Program | |||||||||
| 3.3.2 | Boiler Systems | |||||||||
| 3.3.2.1 | Boiler Systems Maintenance | |||||||||
| 3.3.3.1 | HVAC Refrigeration Systems Maintenance | |||||||||
| 3.3.3.2 | HVAC Water Testing and Treatment Services | |||||||||
| 3.3.3.3 | Condenser Tube Inspection | |||||||||
| 3.4 | Inspection, Testing and Certification Program | |||||||||
| 3.4.1 | Boilers | |||||||||
| CLIN 6001 TOTAL |
| Contractor shall perform HVAC services over and above work requirements under this CLIN, in accordance with DFARS 252.217-7028 and Section C 0200000 Spec Item 2.14.1 and 2.15.1. Contractor shall not invoice for over and above work or non-recurring requirements under this CLIN until occurance of over and above work is approved by KO and inspected by COR. The same labor categories and labor rates proposed for CLIN 6001 shall be used for over and above work. Material and Equipment MUST BE NEGOTIATED BY KO. | ||||||||||
| CLIN 7001 (FAR 52.217-8) | ||||||||||
| Annex/Spec Item | Description | Labor Category | Direct Labor Hours | Direct FTEs | Direct Labor Cost | Direct Material/Equipment Cost | Overhead | G&A | Profit | Total Price |
| 1502000 | HVAC Maintenance Services | |||||||||
| 3.0 | Building 512 Technician | |||||||||
| 3.3.1 | Integrated Maintenance Program | |||||||||
| 3.3.2 | Boiler Systems | |||||||||
| 3.3.2.1 | Boiler Systems Maintenance | |||||||||
| 3.3.3.1 | HVAC Refrigeration Systems Maintenance | |||||||||
| 3.3.3.2 | HVAC Water Testing and Treatment Services | |||||||||
| 3.3.3.3 | Condenser Tube Inspection | |||||||||
| 3.4 | Inspection, Testing and Certification Program | |||||||||
| 3.4.1 | Boilers | |||||||||
| CLIN 7001 TOTAL | ||||||||||
| In accordance with FAR 52.212-2 the pricing used for the option under FAR 52.217-8 will be based on one-half of the previous option year’s pricing. |
Contractor shall perform HVAC services over and above work requirements under this CLIN, in accordance with DFARS 252.217-7028 and Section C 0200000 Spec Item 2.14.1 and 2.15.1. Contractor shall not invoice for over and above work or non-recurring requirements under this CLIN until occurance of over and above work is approved by KO and inspected by COR. The same labor categories and labor rates proposed for CLIN 7001 shall be used for over and above work. Material and Equipment MUST BE NEGOTIATED BY KO.
SUBTOTAL
BLDG 515
| Description of Repair Work: |
| Variable Frequency Drive Replacement |
| Background: Building 515 HVAC equipment was not maintained in the last 18 months. It has been discovered Building 515 equipment will need to have equipment repaired within the first 60 days of contract award. |
File details come from the government source that posted it. Updated .