C 0200000 Management and Administration.docx

DOCX document 91 KB Posted

Attached to
HVAC MAINTENANCE SERVICES Federal contract opportunity
Solicitation number
N6945021Q0012
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document outlines requirements for a federal contract to provide heating, ventilation, and air conditioning (HVAC) maintenance services at a critical facility located at Naval Air Station Jacksonville in Florida. The contractor shall be responsible for performing maintenance, repairs, and alterations on HVAC systems, including boilers excluding those in the Central Utility Plant. The contractor must provide all labor, management, supervision, tools, materials, and equipment required to complete the HVAC services. The Naval Facilities Engineering Command is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to HVAC MAINTENANCE SERVICES, newest first.
File Type Posted
AMEND 02 Pre-Bid Inquiry Form.xls XLS spreadsheet
AMD 02 N6945021Q0012.pdf PDF
AMEND 02 J 1502000 Facility Investment.docx DOCX document
AMEND 02 Attachment J-0200000-06 CNRSEINST 41011.pdf PDF
AMD 01 N6945021Q0012.pdf PDF
AMEND J 1502000 Facility Investment.docx DOCX document
AMEND I Price Quote Spreadsheet.xlsx XLSX spreadsheet
AMEND C 1502000 Facility Investment.docx DOCX document
N69450Q210012_SiteVisitBrief.pdf PDF
Site Visit Log_FINAL.pdf PDF
J 0200000 Management and Administration.docx DOCX document
F 0200000 Management and Administration Deliveries or Performance.docx DOCX document
III Questions and Answers.docx DOCX document
F 1502000 Facility Investment Deliveries or Performance.docx DOCX document
C 0100000 General Information.docx DOCX document
I Price Quote Spreadsheet.xlsx XLSX spreadsheet
RFQ N6945021Q0012.pdf PDF
C 1502000 Facility Investment.docx DOCX document
II Pre-Bid Inquiry Form.xls XLS spreadsheet
J-1502000-03 Site Map NAS Jax.pdf PDF
J 1502000 Facility Investment.docx DOCX document
IV AMAG Request Form.xls XLS spreadsheet
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section C-020000 Management and Administration

0200000 – Management and Administration

Spec Item
Title
2
Management and Administration
2.1
Definitions and Acronyms
2.2
General Information
2.2.1
Government Regular Working Hours
2.2.1.1
Observed Federal Holidays
2.2.2
Wage Determinations
2.2.3
Requirements Hierarchy
2.3
General Administrative Requirements
2.3.1
Required Conferences and Meetings
2.3.2
Training for Maintenance and Operation of New and Replacement Systems and Equipment
2.3.3
Partnering
2.3.3.1
Informal Partnering
2.3.3.2
Contract Partnering Administration
2.3.3.3
Contract Partnering Session Attendees
2.3.4
Permits and Licenses
2.3.5
Insurance
2.3.5.1
Certificate of Insurance
2.3.5.2
Minimum Insurance Amounts
2.3.6
Protection of Government Property
2.3.7
Government Information Technology (IT) System
2.3.8
Directives, Instructions, and References
2.3.9
Invoicing Procedures
2.3.10
Forms
2.4
Government-Furnished Property, Materials and Services
2.4.1
Government-Furnished Facilities (GFF)
2.4.2
Government-Furnished Utilities
2.4.3
Government-Furnished Materials (GFM)
2.4.4
Government-Furnished Equipment (GFE)
2.4.5
Government-Furnished Services (GFS)
2.5
Contractor-Furnished Items
2.6
Management
2.6.1
Work Reception
2.6.2
Work Control
2.6.3
Work Schedule
2.6.4
Deliverables
2.6.5
Service Interruptions
2.6.6
NAVFAC Maximo
2.6.7
Quality Management System (QMS)
2.6.7.1
Quality Management (QM) Plan
2.6.7.2
Quality Inspection and Surveillance
2.6.7.3
Quality Inspection and Surveillance Report
2.6.8
Property Management Plan
2.6.9
System and Equipment Replacement
2.7
Personnel Requirements
2.7.1
Key Personnel
2.7.1.1
Project Manager (PM)
2.7.1.2
Quality Manager
2.7.1.3
Site Safety and Health Officer (SSHO)
2.7.1.4
Environmental/Energy Manager
2.7.2
Employee Requirements
2.7.2.1
Employee Certification and Training
2.7.2.2
Employee Appearance
2.7.2.3
Employee Conduct
2.7.2.4
Identification as Contractor Employee
2.7.2.5
Removal of Employees
2.7.2.6
Proof of Legal Residency
2.7.3
Service Contract Report
2.8
Security Requirements
2.8.1
Employee Listing
2.8.2
Vehicles
2.8.3
Passes and Badges
2.8.4
Access to Installation
2.8.4.1
DBIDS Program
2.8.4.2
DBIDS Credentials
2.8.5
Access to Buildings
2.8.6
Access Arrangements
2.8.6.1
Escort Arrangement for Secured Areas
2.8.7
Security Clearances
2.8.8
Access to Sensitive Unclassified Information
2.8.9
Access to Navy Marine Corps Intranet (NMCI)
2.8.10
Employee Status
2.8.11
Cameras & Recording Devices
2.9
Contractor Safety Program
2.9.1
Accident Prevention Plan (APP)
2.9.2
Activity Hazard Analysis (AHA)
2.9.3
Safety and Occupational Health (SOH) Risks and Compliance Plans
2.9.3.1
Alcohol and Drug Abuse Prevention Plan
2.9.3.2
Chemical Hazard Communication Program
2.9.3.3
Confined Space Program
2.9.3.4
Critical Lift Plan
2.9.3.5
Fall Prevention and Protection Plan
2.9.4
Crane Operations
2.9.4.1
Crane Inspections
2.9.4.2
Rigging Gear
2.9.4.3
Crane Operators
2.9.5
Accident and Damage Reporting
2.9.5.1
Accident Reporting and Notification Criteria
2.9.6
Fire Protection
2.9.7
Monthly On-Site Labor Report
2.9.8
OSHA Citations and Violations
2.9.9
Safety Inspections and Monitoring
2.9.10
Safety Certification
2.9.11
Safety Apparel on Jobsites
2.9.12
Emergency Medical Treatment
2.9.13
Excavations
2.10
Environmental Management and Sustainability
2.10.1
Energy Management Program
2.10.1.1
Water Conservation Plan
2.10.1.2
Energy Efficient Products
2.10.2
Environmental Protection
2.10.2.1
Sampling, Testing and Laboratory Services
2.10.2.2
ODS Requirements for Refrigerant Recycling
2.10.2.3
Solid Waste Management and Recycling
2.10.2.4
Regulated Waste Disposal
2.10.2.5
Universal Waste
2.10.2.6
Spill Prevention, Containment, and Clean-up
2.10.2.7
Hazardous Material Management
2.10.2.8
Protection of Endangered and Threatened Species (Flora and Fauna)
2.10.2.9
Noise Control
2.10.2.10
Salvage
2.10.2.11
Asbestos Containing Material (ACM)
2.10.2.12
Clean Air Act (CAA)
2.10.3
Sustainable Procurement and Practices
2.10.3.1
Environmentally Preferable Products
2.10.3.2
Use of Recovered Materials
2.10.3.3
Use of Biobased Products
2.11
Disaster Preparedness
2.12
Technical Library
2.13
Warranty Management
2.14
Recurring Work Procedures
2.14.1
Notification to the Government for Work Above the Recurring Work Limitations
2.15
Over and Above Work
2.15.1
Unit Priced Labor (UPL)Work
2.15.1.1
Over and Above Work Preparation of Proposals
2.15.1.1.1
Labor Requirements
2.15.1.1.2
Material and Equipment Requirements
2.16
Phase Out Plan

0200000 - Management and Administration

Spec Item
Title
Description
2
Management and Administration
None.
2.1
Definitions and Acronyms
Definitions and Acronyms are listed in J-0200000-01.
2.2
General Information
None.
2.2.1
Government Regular Working Hours
The Government's regular working hours are 0730-1600, five days per week, Monday through Friday, except observed Federal holidays. Work in certain areas may require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.
2.2.1.1
Observed Federal Holidays
The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
2.2.2
Wage Determinations
Placeholder for Collective Bargaining Agreements, Service Contract Labor Standards and Wage Rate Requirements wage determinations provided in J-0200000-02.
2.2.3
Requirements Hierarchy
Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.

2.3
General Administrative Requirements
N/A
2.3.1
Required Conferences and Meetings
The Contractor shall attend administrative and coordination meetings. The Contractor shall provide sign-in sheets and prepare minutes of all meetings and submit per Section F for review and comments. Comments received within two working days shall be incorporated into the minutes and a copy of the final revision shall be submitted per Section F for concurrence. Historically, there have been approximately 2 meetings per Month.
2.3.2
Training for Maintenance and Operation of New and Replacement Systems and Equipment
When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.
2.3.3
Partnering
To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.

Partnering should accomplish three goals:

- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.

- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.

- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership. Required Conferences and meetings listed in J-0200000-03.

2.3.3.1
Informal Partnering
The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.

The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.

The Partners will determine the frequency of the follow-on sessions.

2.3.3.2
Contract Partnering Administration
Upon award, the ACO will contact the Contractor, supported command(s), Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process. Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.

The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.

2.3.3.3
Contract Partnering Session Attendees

The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.

President/Vice President

* Project Manager

* Quality Manager Site Safety and Health Officer

2.3.4
Permits and Licenses
The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F.
2.3.5
Insurance
The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-5, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.
2.3.5.1
Certificate of Insurance
The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.
2.3.5.2
Minimum Insurance Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

Ensure insurance amounts are current.

Comprehensive General Liability: $500,000 per occurrence

Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage

Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes

Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers.

2.3.6
Protection of Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.
2.3.7
Government Information Technology (IT) System
N/A
2.3.8
Directives, Instructions, and References
Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-04. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract and those superseding these directives, instructions and references.
2.3.9
Invoicing Procedures
Refer to DFARS Clauses 252.232-7003 titled “Electronic Submission of Payment Request” and 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013).
2.3.10
Forms
Special forms referenced in this Annex are included among the Forms in J-0200000-05.
2.4
Government-Furnished Property, Materials and Services
N/A
2.4.1
Government-Furnished Facilities (GFF)
300SF of tech space located in Building 512 mechanical room.
2.4.2
Government-Furnished Utilities
N/A
2.4.3
Government-Furnished Materials (GFM)
N/A
2.4.4
Government-Furnished Equipment (GFE)
N/A
2.4.5
Government-Furnished Services (GFS)
N/A
2.5
Contractor-Furnished Items
Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.
2.6
Management
The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.
2.6.1
Work Reception
The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and work orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.
2.6.2
Work Control
The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO or COR. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.
2.6.3
Work Schedule
The Contractor's work shall not interfere with normal Government business. In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.
•The date and time work was coordinated
•The name and phone number of the Government person with whom

the work was coordinated

2.6.4
Deliverables
Records and reports are specified in Sections C, F, J, and within the Directives, Instructions, and References. The Contractor shall submit accurate and complete documents within the specified timeframes. The Contractor shall revise/modify records and reports, as directed by the KO, at no additional cost to the Government.

Except where otherwise specified, all deliverables shall be submitted electronically in a Microsoft Office Version 2010 compatible format. Deliverables shall be unprotected and capable of being sorted by CLIN, work order number, asset number, section, annex/sub-annex, spec item and/or clause. All formulas shall be traceable.

Government acceptance of deliverables shall not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.

The Contractor shall provide status of deliverables per Section F.

2.6.5
Service Interruptions
If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO and COR, affected tenants, and customers in accordance with local procedures. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO and COR, affected tenants and customers as soon as practicable.
2.6.6
NAVFAC MAXIMO
N/A
2.6.7
Quality Management System (QMS)
The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:

· Accurate documentation of work processes, procedures, and output measures.

· A systematic procedure for assessing compliance with performance objectives and standards.

· Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.

· Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.

2.6.7.1
Quality Management (QM) Plan
The Contractor shall develop and submit a QM Plan per Section F. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.

The Contractor’s QM Plan shall include, at a minimum, the following:

· Policy and objectives of Quality Management System (QMS)

· Quality organization

· List of personnel

· Responsibilities & lines of authority

· Training and qualifications

· Approach to assuring quality of services provided and conformance with performance objectives and standards

· Methods and procedures for effective planning, operation and control of processes and performance of work

· Procedures for inspection and surveillance of services

· Scheduling and performance of inspection and surveillance

· Measurement, data collection and analysis

· Corrective action, preventive action, and continuous improvement

· Oversight of subcontracted work

· Documentation and records management

· Communication with government (customers)

2.6.7.2
Quality Inspection and Surveillance
The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.212-4, CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be submitted to the KO after termination of the contract per Section F.
2.6.7.3
Quality Inspection and Surveillance Report
The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.
2.6.8
Property Management Plan
N/A
2.6.9
System and Equipment Replacement
The Contractor shall maintain the integrity and performance of existing energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work. Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced. Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment.
2.7
Personnel Requirements
The Contractor shall comply with the personnel requirements stated below.
2.7.1
Key Personnel
The Contractor shall submit a List of Key Personnel and Qualifications per Section F. The Contractor shall provide any additional information requested by the KO necessary to certify their qualifications.

The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality Manager, SSHO, and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.

2.7.1.1
Project Manager (PM)
The Contractor shall provide a PM and designated alternate, as applicable, who has the have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be on-site with in 4 hours during the Government's regular working hours.

The PM shall have at least one year of experience in managing a workforce providing services on contracts of similar size, scope and complexity.

2.7.1.2
Quality Manager
The Quality Manager shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality Manager under this contract:

The Quality Manager shall have at least three years of experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity. The Quality Manager may be the same person as the SSHO.

2.7.1.3
Site Safety and Health Officer (SSHO)
The SSHO must meet the requirements of EM 385-1-1 Section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project. The SSHO or an equally-qualified Designated Representative/alternate shall be on-site when work is being performed to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs.

A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for acceptance in consultation with the Safety Office.

SSHO may be the same person as the Project Manager and/or Quality Manager.

2.7.1.4
Environmental/ Energy Manager
N/A
2.7.2
Employee Requirements
The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety, environmental, and energy requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures.
2.7.2.1
Employee Certification and Training
The Contractor shall maintain personnel certification, training, and licensing records for employee requirements specified herein and within all technical annexes/sub-annexes. Certification, training, and licensing records shall be kept current and on file for the duration of the contract including all option periods. Records shall be made available for Government review within 2 days of request.
2.7.2.2
Employee Appearance
The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.
2.7.2.3
Employee Conduct
Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.
2.7.2.4
Identification as Contractor Employee
Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. All Contractor employees shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.
2.7.2.5
Removal of Employees
The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security.
2.7.2.6
Proof of Legal Residency
No employee or representative of the Contractor will be admitted to the site of work unless satisfactory Proof of Legal Residency is submitted per Section F.
2.7.3
Service Contract Report
Not Applicable.
2.8
Security Requirements
The Contractor shall comply with all Federal, state, and local security statutes, regulations, and requirements. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. The Contractor shall ensure that all security/entrance clearances are obtained.
2.8.1
Employee Listing
The Contractor shall maintain a current Employee List and submit per Section F. The list shall include employee’s name, supervisor, company, and level of security clearance.
2.8.2
Vehicles
The company name shall be displayed on each of the Contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid state license plate that complies with State Vehicle Code. Vehicles shall meet all other requirement of the State Vehicle Code, such as safety standards, and shall carry proof of insurance and state registration, if applicable.
2.8.3
Passes and Badges
All Contractor employees shall obtain the required employee and vehicle passes. The Contractor employees must be able to obtain Common Access Cards (CAC) in accordance with security requirements. Each employee shall wear the Government issued badge over the front of the outer clothing. When an employee leaves the Contractor's service, the employee's Passes and Badges shall be returned within 10 calendar days.
2.8.4
Access to Installation
All Contractor personnel shall obtain access to the installation through enrollment and registration into the Defense Biometric Identification System (DBIDS).

The Contractor shall provide the KO with the name of their designated Service Contractor Administrator (SCA) for enrollment in DBIDS. Once enrolled, the Contractor must provide the DBIDS Registrar with an approved employee list and then direct their employees to register into DBIDS.

2.8.4.1
DBIDS Program
DBIDS is an enterprise identity management and perimeter installation access control solution in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to three years, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. There are no fees associated with obtaining a DBIDS credential.

The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

2.8.4.2
DBIDS Credentials
Contractor employees shall furnish a completed copy of the SECNAV 5512/1 form to obtain the required background check and visit the local Navy Installation Visitor Control Center to obtain a DBIDS credential once approved. The SECNAV 5512/1 form and additional information about DBIDS can be found at: https://www.cnic.navy.mil/om/dbids.html.

The Contractor may initiate the adjudication process when a background screen failure results in disqualification from participation in DBIDS and the Contractor employees do not agree with the reason for disqualification. The Contractor may also apply for a waiver when a background screening failure results in disqualification from participation in DBIDS. The Commanding Officer will be the final waiver determination authority.

The Contractor shall immediately collect employee DBIDS credentials and notify the KO in writing:

(1) That an employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) That there is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the installation or anyone therein.

2.8.5
Access to Buildings
The Contractor shall monitor and control access into restricted areas under their responsibility, allowing only those individuals who have been properly cleared into restricted areas or other controlled access areas. The Contractor shall comply with security requirements, plus those imposed by the installation Commander at all times. Personnel with access to special areas will have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas will wear special badges authorizing access for those areas. Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties. The Contractor shall secure all buildings and facilities entered during non-duty hours and will secure all building and facilities under the Contractor’s cognizance at the end of each work day or shift period.
2.8.6
Access Arrangements
The Contractor shall make all arrangements through the appropriate office necessary to obtain access to buildings, facilities and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority. The Government may issue keys to the Contractor. The Contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from its action or inaction.
2.8.6.1
Escort Arrangement for Secured Areas
The Contractor shall make arrangements for Government escort into secured areas requiring escort. The KO will provide information on applicable buildings, spaces and the appropriate point of contact.

The Contractor may experience delays while waiting for escorts. The Government estimates the wait period can be up to 15 minutes. The Contractor shall notify the Government Performance Assessment Representative (PAR) and appropriate point of contract if an escort is not available after 15 minutes and access to accomplish the work is denied. Unscheduled requirements, e.g., trouble calls, may require a longer wait for an escort.

2.8.7
Security Clearances
The Contractor shall obtain all required corporate and personnel Security Clearances prior to commencement of work. The Contractor shall ensure that a list of all personnel with Security Clearances is maintained current, including clearances that are pending.
2.8.8
Access to Sensitive Unclassified Information
The Contractor personnel whose work involves access to sensitive unclassified information shall undergo a National Agency Check with Law and Credit (NACLC) Tier 3 Investigation to verify their trustworthiness. If the Contractor personnel currently have a favorably adjudicated NACLC the Contractor shall notify the Government Command Security Manager who will validate this in the Joint Personnel Adjudication System (JPAS).

The Contractor shall request from the Government for access to the E-QIP Direct program for the Contractor employees to complete the SF-86 form on line for an NACLC. The Security Manager will determine suitability. Upon a favorable NACLC, the Contractor personnel shall provide the completed Personnel Security Investigation (PSI) to the Security Manager along with the original signed release statements, applicant fingerprint card (FD87), and an OF-306 Declaration for Federal Employment. The Contractor shall be responsible for providing the fingerprint card.

The request shall be renewed annually or for the duration of the contract if less than one year.

2.8.9
Access to Navy Marine Corps Intranet (NMCI)
N/A
2.8.10
Employee Status
The Contractor shall notify the KO of any changes to any employee’s status to include, but not limited to, termination, convictions/arrests, adverse actions taken on the job for any reason or any other documented misbehavior that may affect, or have the potential to affect, security standing in terms of access to federal facilities or IT systems.
2.8.11
Cameras and Recording Devices
The introduction or use onboard NAS Jacksonville of cameras, tape recorders, wire recorders or any other type recording device is prohibited except:

a. For official use as may be authorized by a station Department Head or resident activity Commanding Officer/Officer-in-Charge or Public Affairs Staff.

b. In private quarters, Bachelor Officer Quarters or Bachelor Enlisted Quarters.

c. For recreational use in designated recreational areas.

2.9
Contractor Safety Program
The Contractor shall develop and implement a Safety Program detailing how the Contractor plans, staffs, performs, and controls all safety practices while delivering best value services to the Government without any accidents or mishaps. The Contractor’s safety program shall comply with all safety standards identified in the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, UFC 3-560-01 Operation and Maintenance Electrical Safety, and Public Law 91-596, Occupational Safety and Health Act.

Any reference to “USACE" facilities, property, or equipment specified in EM 385-1-1 should be interpreted as Government facilities, property, and equipment.

2.9.1
Accident Prevention Plan (APP)
The Contractor shall develop and implement a site Accident Prevention Plan (APP). The APP shall be prepared by the Contractor’s SSHO and shall be followed by all Contractor employees, subcontractors, and vendors at each service site.

The APP shall follow the format and include all elements addressed in Appendix A of EM 385-1-1. The APP shall incorporate Activity Hazard Analyses (AHAs) and compliance plans addressing all applicable Safety and Occupational Health (SOH) risks that are relevant to the site specific hazards and controls for each activity and type of work that may be encountered in the performance of this contract.

2.9.2
Activity Hazard Analysis (AHA)
The Government reserves the right to require the Contractor to perform over and above work that is within the general scope of the contract. The Contractor shall prepare Activity Hazard Analyses (AHAs) for all applicable common recurring work activities performed under this contract. AHAs for recurring work shall be submitted with the APP and shall be updated as work activities or conditions change and additional AHAs prepared as new work activities are required. AHAs for non-recurring, one-time (e.g., Over and Above Work requirements) work occurrences shall be submitted at least two working days prior to start of work. Specifically: For contract modifications to recurring work requirements where changes are germane to the original contract, the Contractor shall revise applicable AHAs within 15 calendar days after modification is signed.

· For contracts with Over and Above Work, the Contractor shall submit an AHA on Over and Above Work requirements, with the associated proposal, whenever the service environment or required task is different from the recurring work services.

The Contractor shall follow the Risk Management Process for the development of Activity Hazard Analysis (AHA) in accordance with paragraph 01.A.14 and Appendix A of EM 385-1-1. A formatted outline of an AHA is provided in Figure 1-2 of EM 385-1-1.

During performance of services, the SSHO shall periodically review the AHA at each service site and for each sub-annex to assess the effectiveness of the Contractor’s overall APP. If changes to the AHAs are required, such changes shall be submitted to the KO for review and acceptance.

2.9.3
Safety and Occupational Health (SOH) Risks and Compliance Plans
Based on a risk assessment of recurring and Over and Above Work requirements and on mandatory OSHA compliance programs, the Contractor shall develop, provide and implement all applicable compliance plans, as necessary for the situation or types of work to be performed under this contract. Compliance plans, programs, and procedures along with their respective references are detailed in Appendix A, paragraph 3.i of EM 385-1-1.

These plans shall be submitted with the APP and shall be updated as situations change. Additional compliance plans, programs, and procedures shall be developed as applicable when new types of work are required under this contract.

2.9.3.1
Alcohol and Drug Abuse Prevention Plan
The Contractor shall develop an alcohol and drug abuse prevention plan to explain how it will satisfy the drug-free work force requirement to include elements addressed in paragraph 01.C.02 of EM 385-1-1.
2.9.3.2
Chemical Hazard Communication Program
The Contractor shall develop a project-specific chemical hazard communication program to include elements addressed in paragraph 06.B.01 of EM 385-1-1and applicable OSHA requirements in 29 Code of Federal Regulations (CFR) 1910.120 and 29 CFR 1926.59.
2.9.3.3
Confined Space Program
The Contractor shall develop an activity/site-specific confined space program to include elements addressed in paragraph 34.A of EM 385-1-1 and comply with relevant requirements in 29 CFR 1910, 29 CFR 1915, and 29 CFR 1926, OSHA Directive CPL 2.100 and any other Federal, state and local regulatory standards.
2.9.3.4
Critical Lift Plan
The Contractor shall develop a critical lift plan to explain how it will conduct lifts for any of the following conditions:

1) Lifts over 75 percent of the capacity of the crane or hoist (or lifts over 50 percent of the capacity of a barge mounted mobile crane's hoists) at any radius of lift;

2) Lifts involving more than one crane, hoist, or LHE

3) Lifts of personnel;

4) Lifts involving non-routine rigging or operation, sensitive equipment, or unusual safety risks

5) Lifts involving hazardous materials (e.g., explosives, highly volatile substances);

6) Lifts where the center of gravity could change;

7) Lifts without the use of outriggers using rubber tire load charts;

8) Lifts using more than one hoist on the same crane, hoist, or LHE;

9) Lifts involving Multiple Lift Rigging (MLR) Assemblies or other non-routine or technically difficult rigging arrangements;

10) Lifts involving submerged loads. Exception: lifts that were engineered to travel in guided slots throughout the lift and have fixed rigging and/or lifting beams, i.e., intake gates, tailgates/logs);

11) Lifts out of the operator’s view. (Exception: if hand signals used by a signal person in view of the operator or radio communications are available and in use, load does not exceed two tons AND is determined a routine lift by the lift super.)

The critical lift plan shall include elements addressed in paragraph 16.H of EM 385-1-1, paragraph 1.7.2 of NAVFAC P-307, and comply with requirements in ASME B30.22, ASME B30.3; ASME B30.5, and ASME B30.8.

The Contractor shall complete and maintain a copy of the Crane Operating Checklist For Critical Lifts for each lift.

2.9.3.5
Fall Prevention and Protection Plan
The Contractor shall develop a site specific fall prevention and protection plan to protect and prevent its service workers from falling from heights of 1.8m (6 feet) or more. This plan shall include elements addressed in paragraph 21.D of EM 385-1-1 and ANSI A10.32, ANSI Z359.1, and ANSI/ASSE A10.34. The fall prevention and protection plan shall include a Rescue and Evacuation Plan in accordance with EM 385-1-1, Section 21.N. A competent person for fall protection shall prepare and sign the plan.
2.9.4
Crane Operations
All operations of Cranes, Multi-Purpose Machines and Material Handling Equipment shall comply with EM 385-1-1, NAVFAC P-307, 29 CFR Part 1910, and 29 CFR Part 1926.

The Contractor shall comply with paragraph 1.7.2 of NAVFAC P-307 and notify the Contracting Officer at least 24 hours prior to bringing any crane (including delivery vehicles with crane boom attachments), multi-purpose machines, material handling equipment, or construction equipment that may be used in a crane-like application to lift suspended loads on board a Navy Installation. Written documentation of the last weight test of the crane and all related weight handling equipment (e.g. attachments, rigging gear, etc.) shall be maintained on site.

A joint verification with the Government representative must be performed to ensure that a legible and indelible completed copy of Appendix P, Figure P-1 of NAVFAC P-307 is maintained on the crane, multi-purpose machine, and material handling equipment or construction equipment used in a crane-like application to lift suspended loads. The following certification and testing documentation shall be on site prior to entry and use on any Navy Installation:

1) Crane, multi-purpose machine, material handling equipment or construction equipment used in a crane-like application to lift suspended load certification

2) Load testing

3) Yearly, monthly and daily inspection logs

4) Rope/sling certifications

5) Operator certifications/designations

6) Designation of person performing log inspections

7) Cranes that are permanently located on a Navy Installation shall have a quarterly joint verification.

2.9.4.1
Crane Inspections

The Contractor shall ensure all inspections are performed in accordance with EM 385-1-1, NAVFAC P-307, 29 CFR Part 1910, and 29 CFR Part 1926 (daily, monthly, quarterly, yearly), and retain the current documentation of inspections. Documents shall be kept on site.

Daily pre-use inspections and testing shall be performed on all load hoisting and lowering mechanisms, boom hoisting and lowering mechanisms, swinging mechanisms, travel mechanisms (if to be used that day), and safety devices. Cranes that have to be re-rated shall be in accordance with SAE Recommended Practices, Crane Load Stability Test Code J765 and documentation maintained on site. The Contractor shall have an operational anti-two block device or a two-block damage prevention feature for all points of two blocking and a boom hoist disconnect, shutoff, or hydraulic relief to automatically stop the boom hoist when the boom reaches a predetermined high angle.

2.9.4.2
Rigging Gear
The Contractor shall ensure rigging gear and below the hook lifting devices and personnel comply with the following requirements:

1) Personnel performing rigging shall have an understanding of all signs, notices, and operating instructions, and be familiar with the applicable hand signals prescribed by the ASME B30 standard for the type of crane in use.

2) Personnel performing rigging shall be familiar with the rigging requirements in EM 385-1-1, NAVFAC P-307, 29 CFR Part 1910, and 29 CFR Part 1926.

3) The Contractor shall inspect rigging gear in accordance with EM 385-1-1, NAVFAC P-307, 29 CFR Part 1910, and 29 CFR Part 1926 and paragraph 1.7.2 of NAVFAC P-307. Certification records shall be made available for review upon request.

2.9.4.3
Crane Operators
Crane operators shall meet the personnel qualifications requirements in paragraph 16.B of EM 385-1-1 and paragraph 1.7.2 of NAVFAC P-307. For mobile cranes with Original Equipment Manufacturer (OEM) rated capacitates of 2,000 pounds or greater, designate crane operators as qualified by a source that qualifies crane operators (i.e., union, a government agency, or an organization that tests and qualifies crane operators).
2.9.5
Accident and Damage Reporting
The Contractor shall notify the Contracting Officer as soon as practical, but no more than four hours after any accident meeting the definition of Recordable Injuries or Illnesses or High Visibility Accidents, property damage equal to or greater than $2,000, or any Weight Handling Equipment (WHE) accident. Notification shall also be provided for any mishap occurring in any of the following high hazard areas: electrical (to include Arc Flash, electrical shock, etc.); uncontrolled release of hazardous energy (includes electrical and non-electrical); weight or load handling equipment (LHE) or rigging; fall-from-height (any level other than same surface); and underwater diving. These mishaps shall be investigated in depth to identify all causes and to recommend hazard control measures.

Within notification include Contractor name; contract title; type of contract; name of activity, installation or location where accident occurred; date and time of accident; names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of accident (to include type of equipment used, PPE used, etc.). Preserve the conditions and evidence on the accident site until the Government investigation team arrives on-site and Government investigation is conducted.

The Contractor shall conduct an accident investigation for recordable injuries and illnesses, for accidents requiring Medical Treatment, property damage accidents resulting in at least $20,000 in damages, and near misses as defined in EM 385-1-1, to establish the root cause(s) of the accident. The Contractor shall complete the applicable NAVFAC Contractor Incident Reporting System (CIRS), and electronically submit via the NAVFAC Enterprise Safety Applications Management System (ESAMS) per Section F.

For any weight handling equipment accident (including rigging gear accidents) the Contractor shall conduct an accident investigation to establish the root cause(s) of the accident and comply with additional requirements and procedures for accidents in accordance with NAVFAC P-307, Section 12. The Contractor shall submit a WHE Accident Report (Crane and Rigging Gear) per Section F. No crane operations are allowed to proceed until cause is determined and corrective actions have been implemented to the satisfaction of the Contracting Officer.

For a near miss, the Contractor shall complete the applicable documentation in NAVFAC Contractor Incident Reporting System (CIRS), and electronically submit via the NAVFAC Enterprise Safety Applications Management System (ESAMS) per Section F.

For a near miss involving crane or rigging operations, the Contractor shall report verbally to the Contracting Officer as soon as management becomes aware but not later than 4 hours of such event and comply with additional requirements and procedures for near-misses in accordance with NAVFAC P-307, Section 12. A near miss occurs when an accident was avoided by mere chance or when intervention prevented an ongoing sequence of events that would have resulted in an accident (e.g. unplanned encroachment, improper crane set-up, improperly rigged load, etc.). The Contractor shall submit a Crane and Rigging Gear Near Miss Report per Section F.

2.9.5.1
Accident Reporting and Notification Criteria
The following criteria and definitions apply to the accident reporting requirements specified above:

Recordable Injuries or Illnesses. Any work-related injury or illness that results in:

1) Death, regardless of the time between the injury and death, or the length of the illness;

2) Days away from work (any time lost after day of injury/illness onset);

3) Restricted work;

4) Transfer to another job;

5) Medical treatment beyond first aid;

6) Loss of consciousness; or

7) A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (6) above.

High Visibility Accident. Any mishap which may generate publicity or high visibility.

Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even through provided by a physician or registered personnel.

WHE Accident. A WHE accident occurs when any one or more of the eight elements in the operating envelope fails to perform correctly during operation, including operation during maintenance or testing resulting in personnel injury or death; material or equipment damage; dropped load; derailment; two-blocking; overload; or collision, including unplanned contact between the load, crane, or other objects. A dropped load, derailment, two-blocking, overload and collision are considered accidents even though no material damage or injury occurs. A component failure (e.g., motor burnout, gear tooth failure, bearing failure) is not considered an accident solely due to material or equipment damage unless the component failure results in damage to other components (e.g., dropped boom, dropped load, roll over, etc.)

2.9.6
Fire Protection

This is the start of the file's text. The full file is on GovTribe.